This is an architectural detail drawing for a roofing replacement project at the Chalmers P. Wylie Veterans Outpatient Clinic, Columbus VAMC, prepared by the U.S. Department of Veterans Affairs. The document, labeled VA Form 08-6231, was issued as bid documents on 05/06/2025 with Addendum #01 released on 04/27/2026, which clarified that the 3.5" polystyrene insulation shall be flat rather than tapered.

The project scope encompasses demolition and replacement of roofing systems on Roofs #5, #5A, and #5B. Work requirements include removal of lightweight concrete fill down to the structural slab, surface preparation, installation of a new waterproofing system to the structural concrete deck, placement of 3.5" extruded polystyrene insulation with staggered joints, addition of a drain board, installation of 2" hydraulically pressed concrete pavers, and adjustment of roof drains to accommodate the new system. Flashing work includes removal and replacement of counter flashing at wall and parapet locations, reglet flashing installation, threshold flashing with new screw fasteners and EPDM washers, and base roof membrane installation. The existing concrete roof deck, wall construction, metal panel walls, aluminum door frames, and doors are to remain in place. The specifications note that priming of the substrate may be required and contractors must follow all specifications and manufacturer's recommendations. The drawing includes six detail sections at 1½" = 1'-0" scale illustrating parapet wall counter flashing, wall flashing, threshold flashing, roof drain, roof step-up with pavers, and roof step-up without pavers, along with a base flashing detail for two-piece sheet-metal counterflashing.

View the file

Other files

File Type Posted
36C25026B0011 0005_1.docx DOCX document
36C25026B0011 0005.pdf PDF
36C25026B0011 0004.pdf PDF
36C25026B0011 0004_1.docx DOCX document
00.01_GI001 - COVER SHEET.pdf PDF
07.02_AE102 - ENLARGED ROOF PLAN - ROOF 1B.pdf PDF
07.12_AE110 - ENLARGED ROOF PLAN - ROOF 14A.pdf PDF
07.13_AE111 - ENLARGED ROOF PLAN - ROOF 14B.pdf PDF
07.04_AE104 - ENLARGED ROOF PLAN - ROOF 1D.pdf PDF
07.01_AE101 - ENLARGED ROOF PLAN - ROOF 1A.pdf PDF
07.08_AE108 - ENLARGED ROOF PLAN - ROOF 17A.pdf PDF
07.05_AE105 - ENLARGED ROOF PLAN - ROOF 3A.pdf PDF
00 01 15 - LIST OF DRAWING SHEETS.pdf PDF
07 01 50.19 - PREPARATION FOR RE-ROOFING and ROOFING REHABILITATION.pdf PDF
36C25026B0011 0003.pdf PDF
07 22 00 - ROOF AND DECK INSULATION.pdf PDF
07 60 00 - FLASHING AND SHEET METAL.pdf PDF
00.02_GI100 - OVERALL ROOF PLAN and 3D ROOF VIEW.pdf PDF
07.03_AE103 - ENLARGED ROOF PLAN - ROOF 1C.pdf PDF
07.07_AE107 - ENLARGED ROOF PLAN - ROOFS 5 and 7.pdf PDF
07.06_AE106 - ENLARGED ROOF PLAN - ROOF 3B.pdf PDF
07.09_AE109 - ENLARGED ROOF PLAN - ROOF 17B.pdf PDF
01 00 00 - GENERAL REQUIREMENTS.pdf PDF
2025-0506 JV-COVA Replace Roof 1A_BID DWGS - REVISED.pdf PDF
36C25026B0011 0002_1.docx DOCX document
36C25026B0011 0001_1.docx DOCX document
36C25026B0011 0001.pdf PDF
Attachment - 2025-0506 JV-COVA Replace Roof 1A_Bid Specs.pdf PDF
Attachment - Wage Determinations - Franklin County.pdf PDF
Attachment - 852.219-75 VA Notice of Limitations on Subcontracting.pdf PDF
36C25026B0011_2.docx DOCX document
Attachment - VA Columbus Engineering Map Parking Directions.pdf PDF
Attachment - 2025-0506 JV-COVA Replace Roof 1A_Bid Project Manual.pdf PDF
36C25026B0011 - Solicitation - Replace Roof Building 1A.pdf PDF
Attachment - 2025-0506 JV-COVA Replace Roof 1A_Bid Dwgs.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING CONCRETE ROOF

DECK TO REMAIN

REMOVE LIGHTWEIGHT

CONCRETE FILL DOWN TO

STRUCTURAL SLAB. PREPARE

SURFACE TO RECEIVE NEW

ROOF SYSTEM.

3.5" EXTRUDED POLYSTYRENE

INSULATION - STAGGER JOINTS

WHEN USING MULTIPLE LAYERS.

DRAIN BOARD.

2" HYDRAULICALLY PRESSED

CONCRETE PAVERS.

NEW WATERPROOFING SYSTEM

TO STRUCTURAL CONCRETE

DECK.

LOWER ROOF DRAIN TO

ACCOMODATE FOR NEW ROOF

SYSTEM.

EXISTING CONCRETE ROOF

DECK TO REMAIN

REMOVE LIGHTWEIGHT

CONCRETE FILL DOWN TO

STRUCTURAL SLAB. PREPARE

SURFACE TO RECEIVE NEW

ROOF SYSTEM.

3.5" EXTRUDED POLYSTYRENE

INSULATION - STAGGER JOINTS

WHEN USING MULTIPLE LAYERS.

DRAIN BOARD.

2" HYDRAULICALLY PRESSED

CONCRETE PAVERS.

NEW WATERPROOFING SYSTEM

TO STRUCTURAL CONCRETE

DECK.

EXISTING WALL CONSTRUCTION

TO REMAIN

REMOVE AND REPLACE

COUNTER FLASHING

NEW SCREW FASTENER WITH

EPDM WASHER

REMOVE FLASHING FOR NEW

ROOF AS REQUIRED FOR

DEMOLITION - REPLACE

FLASHING; MATCH EXISTING

COLOR OF FLASHING.

EXISTING CONCRETE ROOF

DECK TO REMAIN

REMOVE LIGHTWEIGHT

CONCRETE FILL DOWN TO

STRUCTURAL SLAB. PREPARE

SURFACE TO RECEIVE NEW

ROOF SYSTEM.

3.5" EXTRUDED POLYSTYRENE

INSULATION - STAGGER JOINTS

WHEN USING MULTIPLE LAYERS.

DRAIN BOARD.

2" HYDRAULICALLY PRESSED

CONCRETE PAVERS.

NEW WATERPROOFING SYSTEM

TO STRUCTURAL CONCRETE

DECK.

BASE ROOF MEMBRANE.

EXISTING WALL / PARAPET

CONSTRUCTION TO REMAIN

REMOVE AND REPLACE

COUNTER FLASHING

REGLET FLASHING.

EXISTING CONCRETE ROOF

DECK TO REMAIN

3.5" EXTRUDED POLYSTYRENE

INSULATION - STAGGER JOINTS

WHEN USING MULTIPLE LAYERS.

DRAIN BOARD.

2" HYDRAULICALLY PRESSED

CONCRETE PAVERS.

NEW WATERPROOFING SYSTEM

TO STRUCTURAL CONCRETE

DECK.

EXISTING METAL PANEL WALL

CONSTRUCTION TO REMAIN -

BEYOND.

THRESHOLD FLASHING

NEW SCREW FASTENER WITH

EPDM WASHER

REMOVE THRESHOLD PLATE

FOR NEW ROOF SYSTEM -

REINSTALL AFTER NEW ROOF

SYSTEM IS IN PLACE.

EXISTING CONCRETE ROOF

DECK TO REMAIN

EXISTING ALUMINUM DOOR

FRAME AND DOOR TO REMAIN.

COUNTER FLASHING

BASE ROOF MEMBRANE.

3.5" EXTRUDED POLYSTYRENE

INSULATION - STAGGER JOINTS

WHEN USING MULTIPLE LAYERS.

DRAIN BOARD.

2" HYDRAULICALLY PRESSED

CONCRETE PAVERS.

NEW WATERPROOFING SYSTEM

TO STRUCTURAL CONCRETE

DECK.

EXISTING WALL / PARAPET

CONSTRUCTION TO REMAIN

REMOVE COUNTER FLASHING

FOR NEW ROOF -

REUSE/REPLACE COUNTER

FLASHING; MATCH COLOR OF

EXISTING FLASHING.

REMOVE FLASHING FOR NEW

ROOF AS REQUIRED FOR

DEMOLITION - REPLACE

FLASHING; MATCH EXISTING

COLOR OF FLASHING.

EXISTING CONCRETE ROOF

DECK TO REMAIN

REMOVE LIGHTWEIGHT

CONCRETE FILL DOWN TO

STRUCTURAL SLAB. PREPARE

SURFACE TO RECEIVE NEW

ROOF SYSTEM.

REMOVE EXISTING PVC CAP

SHEET MEMBRANE.

REMOVE INTERMEDIATE PVC

ROOF MEMBRANE LAYER

REMOVE THE EXISTING LAYERS

OF POLYISOCYANURATE

INSULATION.

NOTES:

- PRIMING OF THE SUBSTRATE MAY BE REQUIRED. FOLLOW

SPECIFICATIONS AND MANUFACTURER'S

RECOMMENDATIONS.

EXISTING WALL

THROUGH WALL FLASHING

SHEET-METAL RECEIVER WITH

REMOVABLE COUNTERFLASHING

LIQUID APPLIED TOP COAT

LIQUID APPLIED REINFORCED BASE COAT

LIQUID APPLIED REINFORCED FLASHING

EXISTING STRUCTURAL CONCRETE TO REMAIN.

BASE ROOF MEMBRANE

EXISTING CONCRETE ROOF

DECK TO REMAIN

BASE ROOF MEMBRANE.

NEW WATERPROOFING SYSTEM

TO STRUCTURAL CONCRETE

DECK.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

A u to d e s k D o c s /C o lu m b u s V

A

R e p la c e R o o f o n B ld g

A /F

F E

C o lu m b u s

R e p la c e

R o o f_ B

A

A

R C

H rv t

/2

/2

:4

:0

P

M

AE143

ROOF 5, 5A & 5B DETAILS -

DEMOLITION AND NEW WORK

05/06/2025 PRQ JLF

REPLACE ROOF BUILDING 1A 757-21-101

COLUMBUS, OHIO

BID DOCUMENTS

1A

CHALMERS P. WYLIE

VETERANS

OUTPATIENT CLINIC

Approved: Columbus VAMC

1 1/2" = 1'-0"

ROOF DRAIN

ROOF #5, #5A, & #5B DETAILS - NEW ROOF SYSTEM

1 1/2" = 1'-0"

ROOF STEP UP WITH PAVERS

1 1/2" = 1'-0"

WALL FLASHING

1 1/2" = 1'-0"

PARAPET WALL COUNTER FLASHING

1 1/2" = 1'-0"

THRESHOLD FLASHING

ROOF #5s DETAILS - DEMOLISH EXISTING ROOF SYSTEM

3" = 1'-0"

EXISTING ROOF 5 - TYPICAL DEMOLITION

NTS

BASE FLASHING ROOF SYSTEM - AXXONOMETRIC DETAIL

BASE FLASHING WITH TWO-PIECE SHEET-METAL COUNTERFLASHING FULLY REINFORCED OVER CONCRETE

1 1/2" = 1'-0"

ROOF STEP UP WITHOUT PAVERS

BID DOCUMENTS 05/06/2025

1 ADDENDUM 01 04/27/2026

ADDENDUM #01 - REVISED DETAIL NOTES TO SHOW FLAT 3.5" POLYSTYRENE

INSULATION. GRAPHIC WITHIN DETAIL SHOWS TAPERED, BUT SHALL BE FLAT 3.5"

TO MATCH SPECIFICATIONS.

1 1