2025-0506 JV-COVA Replace Roof 1A_BID DWGS - REVISED.pdf
PDF 27 MB Posted
- Solicitation number
- 36C25026B0011
About this file
These are bid drawings for a roof replacement project at the Chalmers P. Wylie Veterans Outpatient Clinic (Columbus Veterans Medical Center) in Columbus, Ohio, project number 757-21-101. The project scope includes replacement and restoration of multiple roof sections on Building 1A, specifically roofs 1 (A-D), 3 (A & B), 5, 5A, 5B, 6, 7, 7A, 12, 13, 14 (A & B), and 17 (A & B), totaling approximately 120,051 square feet with 8,248 square feet designated as wet areas. The base bid requires replacement of damaged roof portions and restoration of all roofs in scope using single-ply membrane systems (PVC or TPO) over rigid insulation with an average R-value minimum of R-33 and tapered insulation to direct water to roof drains. Roofs 5, 5A, and 5B will be replaced with fluid-applied waterproofing and a paver roof system. A bid alternate allows for descoping roofs 6, 12, and 13, and substituting non-slip aggregate in pathways instead of raised grated walkway systems.
The drawings include comprehensive architectural, electrical, and technical details across multiple sheets covering enlarged roof plans by section, restoration and replacement details, penetration treatments, drainage systems, and lightning protection requirements. All existing rooftop equipment, drains, vents, anchor posts, and HVAC systems are to remain and be protected during construction. New fluid-applied rehabilitation systems will be applied over existing roofing. The contractor must comply with VA Directive 1013 requiring flu shot documentation for all workers, maintain accessible egress, properly firestop penetrations through fire-rated assemblies, use charcoal filtration on air intakes during work, and coordinate with a new lightning protection system per NFPA 780. The contractor is responsible for field verification of all quantities and existing conditions before bidding, with discrepancies to be reported to the Contracting Officer's Representative.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
THE CONTRACT DRAWINGS AND PROJECT MANUAL (INDICATED BY THE SAME PROJECT NUMBER)
ARE COMPLEMENTARY. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S
REPRESENTATIVE (C.O.R.) OF ANY DISCREPANCIES FOUND DURING BIDDING AND THROUGH
CONSTRUCTION.
DO NOT SCALE DRAWINGS; DIMENSIONS SHALL GOVERN WHERE DIMENSIONS EXIST.
VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND
CONSTRUCTION. IF PROVIDED, EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR
SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE CONTRACTING
OFFICER REPRESENTATIVE.
THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN
DURING DEMOLITION AND CONSTRUCTION.
CONTRACTORS WORKING AT VA FACILITIES ARE REQUIRED TO PROVIDE A DOCUMENT STATING
THAT ALL WORKERS, PRIME AND SUBS, HAVE HAD THE FLU SHOT FOR THE CURRENT YEAR OF
THE CONTRACT. THIS IS IN COMPLIANCE WITH VA DIRECTIVE 1013, PREVENTION AND CONTROL OF SEASONAL INFLUENZA WITH VACCINES. ACCORDINGLY, PROVIDE A CERTIFICATION THAT ALL
WORKERS ON THIS CONTRACT HAVE BEEN IMMUNIZED IN ACCORDANCE WITH THIS DIRECTIVE.
MAINTAIN ACCESSIBLE EGRESS FOR THE DURATION OF THE PROJECT. THE CONTRACTOR IS
RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF
WORK AND THE ROUTES MUST BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF
THE PROJECT.
PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED
AND FIRE SAFE’D TO ACHIEVE THE REQUIRED FIRE RATING BY THE END OF CONSTRUCTION
OPERATIONS FOR EACH DAY.
ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND FEDERAL
AUTHORITIES, RULES AND REGULATIONS.
THESE DOCUMENTS SHOW DESIGN INTENT WITH MINIMUM CONSTRUCTION REQUIREMENTS AND
MINIMUM QUALITY OF WORK EXPECTED. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS,
METHODS AND TECHNIQUES FOR CONSTRUCTION AND EXPECTED QUALITY.
ALL MATERIALS UTILIZED ON THIS PROJECT SHALL BE NEW UNLESS OTHERWISE NOTED TO BE
SALVAGED AND REFURBISHED. MATERIAL QUALITY SHALL MEET OR EXCEED APPLICABLE
INDUSTRY STANDARDS.
COORDINATE ALL WORK WITH ALL OTHER DISCIPLINES. EXACT SIZE AND LOCATION OF ROOF,
WALL, AND FLOOR OPENINGS SHALL BE VERIFIED WITH CORRESPONDING CONTRACTING TRADES
PRIOR TO CONSTRUCTION.
ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.
THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND
VARYING ALL REQUIRED ROUGH OPENINGS AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT
MANUFACTURER AND CONTRACTING OFFICER REPRESENTATIVE PRIOR TO CONSTRUCTION.
WHERE EXISTING SURFACES ARE TO BE RE-FINISHED WILL SERVE AS SUBSTRATE FOR THE
ATTACHMENT OF NEW CONSTRUCTION, PREPARE EXISTING SURFACES AS NECESSARY TO
RECEIVE THE NEW MATERIALS FOR A LEVEL AND SMOOTH FINISH.
FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES APPARATUSES IMPACTING NEW
CONSTRUCTION. DETERMINE EXACT SIZE AND LOCATION OF PENETRATION WITHIN NEW
CONSTRUCTION, TIGHTLY SEAL AND CAULK.
HOST ONLINE CONSTRUCTION ADMINISTRATION SOFTWARE FOR THE DURATION OF THE
PROJECT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No. EXP DATE:
12/31/2025
Au to de sk
D oc s:
//C ol um bu s
VA
R ep la ce
R oo f o n
Bl dg
A/
FF
E_
C ol um bu s
- R ep la ce R oo f_
B1 A_
AR
C
H (2
4)
.rv t
5/ 6/
:3
9:
P M
GI001
COVER SHEET
05/06/2025 PRQ JLF
REPLACE ROOF BUILDING 1A 757-21-101
COLUMBUS, OHIO
BID DOCUMENTS
1A
CHALMERS P. WYLIE
VETERANS
OUTPATIENT CLINIC Approved: Columbus VAMC
REPLACE ROOF BUILDING 1A
PROJECT NUMBER: 757-21-101
CHALMERS P. WYLIE VETERANS OUTPATEINT CLINIC
DEPARTMENT OF VETERANS AFFAIRS
420 N. JAMES RD.
COLUMBUS OHIO, 43219
CAMPUS LOCATION PROJECT LOCATIONLOCATION MAP VICINITY MAP
VA
GENERAL NOTES
NORTHNORTH
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
GI001 COVER SHEET
GI100 OVERALL ROOF PLAN & 3D ROOF VIEW
ARCHITECTURE
AE101 ENLARGED ROOF PLAN - ROOF 1A
AE102 ENLARGED ROOF PLAN - ROOF 1B
AE103 ENLARGED ROOF PLAN - ROOF 1C
AE104 ENLARGED ROOF PLAN - ROOF 1D
AE105 ENLARGED ROOF PLAN - ROOF 3A
AE106 ENLARGED ROOF PLAN - ROOF 3B
AE107 ENLARGED ROOF PLAN - ROOFS 5 & 7
AE108 ENLARGED ROOF PLAN - ROOF 17A
AE109 ENLARGED ROOF PLAN - ROOF 17B
AE110 ENLARGED ROOF PLAN - ROOF 14A
AE111 ENLARGED ROOF PLAN - ROOF 14B
AE141 ROOF RESTORATION DETAILS
AE142 ROOF REPLACEMENT AND RESTORATION DETAILS
AE143 ROOF 5s DETAILS - DEMOLITION AND NEW WORK
ELECTRICAL
E001 ELECTRICAL LEGEND ABBREVIATIONS AND GENERAL NOTES
E100 ELECTRICAL ROOF PLAN - OVERALL
ED101 ELECTRICAL ROOF PLAN EAST -DEMO
ED102 ELECTRICAL ROOF PLAN WEST -DEMO
EP101 ELECTRICAL ROOF PLAN EAST -NEW
EP102 ELECTRICAL ROOF PLAN WEST -NEW
VA CENTRAL OHIO HEALTH CARE SYSTEM
BASE BID:
- REPLACE ONLY DAMAGE PORTIONS OF ROOF IN KIND AND RESTORE ALL
ROOFS IN SCOPE. THE CURRENT ROOFS IN SCOPE TO REPLACE AND/OR RESTORE ARE ROOFS
1(A - D), 3(A & B), 6, 7(A), 12, 13, 14(A & B), AND 17 (A & B). ROOFS 5, 5A, AND 5B WILL BE REPLACED
WITH FLUID APPLIED WATERPROOFING AND PAVER ROOF SYSTEM.
BID ALTERNATE:
- DESCOPE ROOFS 6, 12, AND 13 FROM THE PROJECT.
- ADDING A NON-SLIP AGGREGATE TO PATHWAYS IN THE FLUID-APPLIED MEMBRANE INSTEAD OF
RAISED GRATED WALKWAY SYSTEM.
BID DOCUMENTS 05/06/2025
CT272.104
ROOF 7
ROOF 1C
ROOF 3A
ROOF 17A
ROOF 1D
ROOF 1A
ROOF 1B
ROOF 3B
ROOF 17B
R5
R5A
R5B
R13*
ROOF 12*
ROOF 14A
NOT IN SCOPE (NIS)
ROOF 7A
R O O F 6*
ROOF 14B
R2 (NIS)
R4 (NIS)
ROOF 8 (NIS)
ROOF 9 (NIS)
ROOF 11 (NIS)
ROOF 19 (NIS)
ROOF 20 (NIS)
NOTE:
* INDICATES BID ALTERNATE - REMOVE ROOFS FROM SCOPE OF PROJECT.
ROOF 18 (NIS)
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. PROVIDE TAPERED INSULATION TO
DIRECT WATER TO ROOF DRAINS. MATCH ELEVATION WHERE TYING INTO EXISTING
ALL EXISTING WALKWAY PADS SHALL BE REMOVED PRIOR TO REPLACEMENT/RESTORATION WORK. NEW WALKWAY LAYOUT IS SHOWN ON THE ROOF PLAN DRAWINGS AE101 THROUGH AE113. QUANTIFY TOTAL PRIOR TO BID.
REPLACE ALL PLASTIC OR BROKEN DRAIN BASKETS AND CLAMP RINGS ON EXISTING ROOF DRAINS. QUANTIFY TOTAL PRIOR TO
BID.
ELEVATION HEIGHT BASED ON GROUND FLOOR.
MATCH EXISTING ROOF SLOPE AT PARTIAL ROOF REPLACEMENT
MECHANICAL DUCTWORK AND PIPING ARE FOR REFERENCE ONLY. SIZING IS SCHEMATIC.
EXISTING ROOFING SYSTEM IS A SINGLE-PLY MEMBRANE OVER RIGID INSULATION UNLESS NOTED OTHERWISE. TPO ROOF SYSTEM EXISTON ROOF 14 (A AND B). ALL OTHER EXISTING ROOFS USE A PVC ROOF SYSTEM.
ALL CONDENSING UNITS AND EQUIPMENT ON ROOF SUPPORTS NOT FLASHED INTO THE EXISTING ROOF SHALL BE DISCONNECTED AND TEMPORARILY REMOVED AND STORED WHILE ROOFING IS COMPLETED UNDER THE UNITS. PROTECT EQUIPMENT DURING THIS PERIOD. REFRIGERANT SHALL BE CAPTURED AND UTILITIES SERVING THIS EQUIPMENT WILL ALL BE
DISCONNECTED AND TEMPORARILY CAPPED.
CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING.
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM.
SEE ELECTRICAL DRAWINGS FOR NEW LIGHTNING PROTECTION SYSTEM.
PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
G E N E R A L N O T E S
L E G E N D
RESTORATION SCOPE
REPLACEMENT AND RESTORATION SCOPE
NOT IN SCOPE
REPLACEMENT SCOPE
ROOF 7
ROOF 1A
ROOF 3A
ROOF 1C ROOF 1D
ROOF 3B
R1B
ROOF 17A
ROOF 17B
ROOF 17D
ROOF 17C
ROOF 2
NOT IN SCOPE (NIS)
ROOF 18
ROOF 12*
ROOF 4
R6* R7A
R5B R5A
ROOF 14
R8
R9 R11
R13*
ROOF AREA SCHEDULE
ROOF SECTION NO. TOTAL AREA (SQ. FT.) WET AREA (SQ. FT.)
5A 5B 7A
32, 346 14,015 1,800 6,960
16,126 42,110
4,493
1,217
2,458
3,297
TOTAL 120,051 8,248
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No. EXP DATE:
12/31/2025
Au to de sk
D oc s:
//C ol um bu s
VA
R ep la ce
R oo f o n
Bl dg
A/
FF
E_
C ol um bu s
- R ep la ce R oo f_
B1 A_
AR
C
H (2
4)
.rv t
5/ 6/
:3
9:
P M
GI100
OVERALL ROOF PLAN & 3D ROOF
VIEW
05/06/2025 PRQ JLF
REPLACE ROOF BUILDING 1A 757-21-101
COLUMBUS, OHIO
BID DOCUMENTS
1A
CHALMERS P. WYLIE
VETERANS
OUTPATIENT CLINIC Approved: Columbus VAMC
1/32" = 1'-0"
OVERALL ROOF PLAN
OVERALL ROOF 3D
NOTE: THE QUATITIES EXPRESSED IN THIS TABLE ARE APROXIMATE VALUES.
CONTRACTOR MUST FIELD VERIFY THE QUANTITIES FOR THE ROOFS IN SCOPE.
C.
D.
E.
F.
G.
H.
I.
J.
K.
MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. PROVIDE TAPERED INSULATION TO
DIRECT WATER TO ROOF DRAINS. MATCH ELEVATION WHERE TYING INTO EXISTING
ALL EXISTING WALKWAY PADS SHALL BE REMOVED PRIOR TO REPLACEMENT/RESTORATION WORK. NEW WALKWAY LAYOUT IS SHOWN ON THE ROOF PLAN DRAWINGS AE101 THROUGH AE113. QUANTIFY TOTAL PRIOR TO BID.
REPLACE ALL PLASTIC OR BROKEN DRAIN BASKETS AND CLAMP RINGS ON EXISTING ROOF DRAINS. QUANTIFY TOTAL PRIOR TO
BID.
ELEVATION HEIGHT BASED ON GROUND FLOOR.
MATCH EXISTING ROOF SLOPE AT PARTIAL ROOF REPLACEMENT
MECHANICAL DUCTWORK AND PIPING ARE FOR REFERENCE ONLY. SIZING IS SCHEMATIC.
EXISTING ROOFING SYSTEM IS A SINGLE-PLY MEMBRANE OVER RIGID INSULATION UNLESS NOTED OTHERWISE. TPO ROOF SYSTEM EXISTON ROOF 14 (A AND B). ALL OTHER EXISTING ROOFS USE A PVC ROOF SYSTEM.
ALL CONDENSING UNITS AND EQUIPMENT ON ROOF SUPPORTS NOT FLASHED INTO THE EXISTING ROOF SHALL BE DISCONNECTED AND TEMPORARILY REMOVED AND STORED WHILE ROOFING IS COMPLETED UNDER THE UNITS. PROTECT EQUIPMENT DURING THIS PERIOD. REFRIGERANT SHALL BE CAPTURED AND UTILITIES SERVING THIS EQUIPMENT WILL ALL BE
DISCONNECTED AND TEMPORARILY CAPPED.
CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING.
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM.
SEE ELECTRICAL DRAWINGS FOR NEW LIGHTNING PROTECTION SYSTEM.
PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
G E N E R A L N O T E SL E G E N D
RESTORATION SCOPE
CONSISTS OF APPLICATION OF A FLUID APPLIED REHABILITATION SYSTEM OVER EXISTING
ROOFING SYSTEM.
REPLACEMENT AND RESTORATION SCOPE
CONSISTS OF SELECTIVE REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND
INSTALLATION OF NEW ROOFING SYSTEM TO MATCH EXISTING AND APPLICATION OF A FLUID-
APPLIED REHABILITATION SYSTEM.
NOT IN SCOPE
REPLACEMENT SCOPE
CONSISTS OF REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION
OF MODIFIED BITUMEN ROOFING OVER RIGID INSULATION.
BIOHAZARDOUS EXHAUST AREA
ROOF ACCESS POINT
HIGH-POWERED RADIO FREQUENCY AREA
PIPE VENT
ELEC. GROUNDING TERMINAL
ANCHOR POST
BOOT FLASHING
ROOF-TOP LADDER
RAISED GRATING
WALKWAY SYSTEM
SLIP-RESISTANCE
AGGREGATE IN FLUID-
APPLIED MEMBRANE
FOR WALKING PATHS
EXISTING RUBBER
WALKING MAT
MATCHLINEMATCHLINE
M A
TC
H
LI
N E
M A
TC
H
LI
N E
AE
AE
AE
/1 AE104/1 AE103
/1 AE102
ROOF 1A
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
2.01
2.02
2.03
2.04
2.05
2.06
AE142
Sim
AE141
Sim
AE141
Sim
AE141
Sim
2.08
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
1A
17A
3A 3B
17B
1B
1C 1D
14B 14A
6 5
ROOF 1D
ROOF 1C
ROOF 1A
ROOF 1B
ROOF 3A
ROOF 3B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No. EXP DATE:
12/31/2025
Au to de sk
D oc s:
//C ol um bu s
VA
R ep la ce
R oo f o n
Bl dg
A/
FF
E_
C ol um bu s
- R ep la ce R oo f_
B1 A_
AR
C
H (2
4)
.rv t
5/ 6/
:3
7:
P M
AE101
ENLARGED ROOF PLAN - ROOF 1A
05/06/2025 PRQ JLF
REPLACE ROOF BUILDING 1A 757-21-101
COLUMBUS, OHIO
BID DOCUMENTS
1A
CHALMERS P. WYLIE
VETERANS
OUTPATIENT CLINIC Approved: Columbus VAMC
D R A W I N G N O T E S :
2.01 EXISTING ROOF DRAIN AND OVERFLOW DRAIN TO REMAIN. - TYPICAL
2.02 EXISTING PIPE VENT PENETRATION TO REMAIN. - TYPICAL
2.03 EXISTING LIGHTNING PROTECTION GROUNDING TERMINAL PENETRATION TO REMAIN. - TYPICAL
2.04 EXISTING ANCHOR POST PENETRATION TO REMAIN. - TYPICAL
2.05 EXISTING HVAC EQUIPMENT TO REMAIN. - TYPICAL
2.06 EXISTING RADIO FREQUENCY EQUIPMENT TO REMAIN. RELOCATE TO INSTALL FLUID-APPLIED MEMBRANE, RELOCATE
BACK TO ORIGINAL LOCATION. - TYPICAL
2.08 REMOVE EXISTING ROOF WALKWAY PADS. INSTALL NEW WALKWAY SYSTEM. DRAWINGS SHOW NEW LAYOUT- TYPICAL
1/8" = 1'-0"
ENLARGED ROOF PLAN - ROOF 1A
C.
D.
E.
F.
G.
H.
I.
J.
K.
MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. PROVIDE TAPERED INSULATION TO
DIRECT WATER TO ROOF DRAINS. MATCH ELEVATION WHERE TYING INTO EXISTING
ALL EXISTING WALKWAY PADS SHALL BE REMOVED PRIOR TO REPLACEMENT/RESTORATION WORK. NEW WALKWAY LAYOUT IS SHOWN ON THE ROOF PLAN DRAWINGS AE101 THROUGH AE113. QUANTIFY TOTAL PRIOR TO BID.
REPLACE ALL PLASTIC OR BROKEN DRAIN BASKETS AND CLAMP RINGS ON EXISTING ROOF DRAINS. QUANTIFY TOTAL PRIOR TO
BID.
ELEVATION HEIGHT BASED ON GROUND FLOOR.
MATCH EXISTING ROOF SLOPE AT PARTIAL ROOF REPLACEMENT
MECHANICAL DUCTWORK AND PIPING ARE FOR REFERENCE ONLY. SIZING IS SCHEMATIC.
EXISTING ROOFING SYSTEM IS A SINGLE-PLY MEMBRANE OVER RIGID INSULATION UNLESS NOTED OTHERWISE. TPO ROOF SYSTEM EXISTON ROOF 14 (A AND B). ALL OTHER EXISTING ROOFS USE A PVC ROOF SYSTEM.
ALL CONDENSING UNITS AND EQUIPMENT ON ROOF SUPPORTS NOT FLASHED INTO THE EXISTING ROOF SHALL BE DISCONNECTED AND TEMPORARILY REMOVED AND STORED WHILE ROOFING IS COMPLETED UNDER THE UNITS. PROTECT EQUIPMENT DURING THIS PERIOD. REFRIGERANT SHALL BE CAPTURED AND UTILITIES SERVING THIS EQUIPMENT WILL ALL BE
DISCONNECTED AND TEMPORARILY CAPPED.
CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING.
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM.
SEE ELECTRICAL DRAWINGS FOR NEW LIGHTNING PROTECTION SYSTEM.
PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
G E N E R A L N O T E SL E G E N D
RESTORATION SCOPE
CONSISTS OF APPLICATION OF A FLUID APPLIED REHABILITATION SYSTEM OVER EXISTING
ROOFING SYSTEM.
REPLACEMENT AND RESTORATION SCOPE
CONSISTS OF SELECTIVE REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND
INSTALLATION OF NEW ROOFING SYSTEM TO MATCH EXISTING AND APPLICATION OF A FLUID-
APPLIED REHABILITATION SYSTEM.
NOT IN SCOPE
REPLACEMENT SCOPE
CONSISTS OF REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION
OF MODIFIED BITUMEN ROOFING OVER RIGID INSULATION.
BIOHAZARDOUS EXHAUST AREA
ROOF ACCESS POINT
HIGH-POWERED RADIO FREQUENCY AREA
PIPE VENT
ELEC. GROUNDING TERMINAL
ANCHOR POST
BOOT FLASHING
ROOF-TOP LADDER
RAISED GRATING
WALKWAY SYSTEM
SLIP-RESISTANCE
AGGREGATE IN FLUID-
APPLIED MEMBRANE
FOR WALKING PATHS
EXISTING RUBBER
WALKING MAT
M A
TC
H
LI
N E
MATCHLINE
M A
TC
H
LI
N E
/1 AE104
AE
AE
AE
ROOF 1B
ROOF 2
ROOF 4
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
2.01
2.02
2.03
2.04
2.06
2.07
2.19
AE141
Sim
AE141
Sim
AE141
Sim
AE142
Sim
AE141
Sim
AE142
Sim 3
AE141
Sim
2.20
AE141
Sim 6
AE141
Sim
AE141
Sim
1A 3A 3B 1B
1C 1D
17A
17B
14B 14A
6 5
ROOF 1D
ROOF 17A
ROOF 1A
ROOF 1C
ROOF 7
ROOF 1B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No. EXP DATE:
12/31/2025
Au to de sk
D oc s:
//C ol um bu s
VA
R ep la ce
R oo f o n
Bl dg
A/
FF
E_
C ol um bu s
- R ep la ce R oo f_
B1 A_
AR
C
H (2
4)
.rv t
5/ 6/
:3
7:
P M
AE102
ENLARGED ROOF PLAN - ROOF 1B
05/06/2025 PRQ JLF
REPLACE ROOF BUILDING 1A 757-21-101
COLUMBUS, OHIO
BID DOCUMENTS
1A
CHALMERS P. WYLIE
VETERANS
OUTPATIENT CLINIC Approved: Columbus VAMC
D R A W I N G N O T E S :
2.01 EXISTING ROOF DRAIN AND OVERFLOW DRAIN TO REMAIN. - TYPICAL
2.02 EXISTING PIPE VENT PENETRATION TO REMAIN. - TYPICAL
2.03 EXISTING LIGHTNING PROTECTION GROUNDING TERMINAL PENETRATION TO REMAIN. - TYPICAL
2.04 EXISTING ANCHOR POST PENETRATION TO REMAIN. - TYPICAL
2.06 EXISTING RADIO FREQUENCY EQUIPMENT TO REMAIN. RELOCATE TO INSTALL FLUID-APPLIED MEMBRANE, RELOCATE
BACK TO ORIGINAL LOCATION. - TYPICAL
2.07 EXISTING ELECTRICAL CONDUIT PENETRATION TO REMAIN. - TYPICAL
2.19 EXISTING GUARDRAIL TO REMAIN. - TYPICAL
2.20 ATTACH LOOSE SECTION OF ROOF GUTTER TO WALL.
1/8" = 1'-0"
ENLARGED ROOF PLAN - ROOF 1B
C.
D.
E.
F.
G.
H.
I.
J.
K.
MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. PROVIDE TAPERED INSULATION TO
DIRECT WATER TO ROOF DRAINS. MATCH ELEVATION WHERE TYING INTO EXISTING
ALL EXISTING WALKWAY PADS SHALL BE REMOVED PRIOR TO REPLACEMENT/RESTORATION WORK. NEW WALKWAY LAYOUT IS SHOWN ON THE ROOF PLAN DRAWINGS AE101 THROUGH AE113. QUANTIFY TOTAL PRIOR TO BID.
REPLACE ALL PLASTIC OR BROKEN DRAIN BASKETS AND CLAMP RINGS ON EXISTING ROOF DRAINS. QUANTIFY TOTAL PRIOR TO
BID.
ELEVATION HEIGHT BASED ON GROUND FLOOR.
MATCH EXISTING ROOF SLOPE AT PARTIAL ROOF REPLACEMENT
MECHANICAL DUCTWORK AND PIPING ARE FOR REFERENCE ONLY. SIZING IS SCHEMATIC.
EXISTING ROOFING SYSTEM IS A SINGLE-PLY MEMBRANE OVER RIGID INSULATION UNLESS NOTED OTHERWISE. TPO ROOF SYSTEM EXISTON ROOF 14 (A AND B). ALL OTHER EXISTING ROOFS USE A PVC ROOF SYSTEM.
ALL CONDENSING UNITS AND EQUIPMENT ON ROOF SUPPORTS NOT FLASHED INTO THE EXISTING ROOF SHALL BE DISCONNECTED AND TEMPORARILY REMOVED AND STORED WHILE ROOFING IS COMPLETED UNDER THE UNITS. PROTECT EQUIPMENT DURING THIS PERIOD. REFRIGERANT SHALL BE CAPTURED AND UTILITIES SERVING THIS EQUIPMENT WILL ALL BE
DISCONNECTED AND TEMPORARILY CAPPED.
CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING.
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM.
SEE ELECTRICAL DRAWINGS FOR NEW LIGHTNING PROTECTION SYSTEM.
PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
G E N E R A L N O T E SL E G E N D
RESTORATION SCOPE
CONSISTS OF APPLICATION OF A FLUID APPLIED REHABILITATION SYSTEM OVER EXISTING
ROOFING SYSTEM.
REPLACEMENT AND RESTORATION SCOPE
CONSISTS OF SELECTIVE REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND
INSTALLATION OF NEW ROOFING SYSTEM TO MATCH EXISTING AND APPLICATION OF A FLUID-
APPLIED REHABILITATION SYSTEM.
NOT IN SCOPE
REPLACEMENT SCOPE
CONSISTS OF REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION
OF MODIFIED BITUMEN ROOFING OVER RIGID INSULATION.
BIOHAZARDOUS EXHAUST AREA
ROOF ACCESS POINT
HIGH-POWERED RADIO FREQUENCY AREA
PIPE VENT
ELEC. GROUNDING TERMINAL
ANCHOR POST
BOOT FLASHING
ROOF-TOP LADDER
RAISED GRATING
WALKWAY SYSTEM
SLIP-RESISTANCE
AGGREGATE IN FLUID-
APPLIED MEMBRANE
FOR WALKING PATHS
EXISTING RUBBER
WALKING MAT
MATCHLINEMATCHLINE
M A
TC
H
LI
N E
M A
TC
H
LI
N E
/1 AE104
AE
/1 AE102
AE
AE
/1 AE101
ROOF 1C
AE141
Sim
AE141
Sim
2.01 2.02
2.03
2.04
2.05
2.06
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
1A 3A 3B 1B
1C 1D
17A
17B
14B 14A
6 5
ROOF 7
ROOF 1C
ROOF 3A
ROOF 3B
ROOF 1D
ROOF 1B
ROOF 1A
ROOF 2
ROOF 6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No. EXP DATE:
12/31/2025
Au to de sk
D oc s:
//C ol um bu s
VA
R ep la ce
R oo f o n
Bl dg
A/
FF
E_
C ol um bu s
- R ep la ce R oo f_
B1 A_
AR
C
H (2
4)
.rv t
5/ 6/
:3
8:
P M
AE103
ENLARGED ROOF PLAN - ROOF 1C
05/06/2025 PRQ JLF
REPLACE ROOF BUILDING 1A 757-21-101
COLUMBUS, OHIO
BID DOCUMENTS
1A
CHALMERS P. WYLIE
VETERANS
OUTPATIENT CLINIC Approved: Columbus VAMC
D R A W I N G N O T E S :
2.01 EXISTING ROOF DRAIN AND OVERFLOW DRAIN TO REMAIN. - TYPICAL
2.02 EXISTING PIPE VENT PENETRATION TO REMAIN. - TYPICAL
2.03 EXISTING LIGHTNING PROTECTION GROUNDING TERMINAL PENETRATION TO REMAIN. - TYPICAL
2.04 EXISTING ANCHOR POST PENETRATION TO REMAIN. - TYPICAL
2.05 EXISTING HVAC EQUIPMENT TO REMAIN. - TYPICAL
2.06 EXISTING RADIO FREQUENCY EQUIPMENT TO REMAIN. RELOCATE TO INSTALL FLUID-APPLIED MEMBRANE, RELOCATE
BACK TO ORIGINAL LOCATION. - TYPICAL
1/8" = 1'-0"
ENLARGED ROOF PLAN - ROOF 1C
C.
D.
E.
F.
G.
H.
I.
J.
K.
MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. PROVIDE TAPERED INSULATION TO
DIRECT WATER TO ROOF DRAINS. MATCH ELEVATION WHERE TYING INTO EXISTING
ALL EXISTING WALKWAY PADS SHALL BE REMOVED PRIOR TO REPLACEMENT/RESTORATION WORK. NEW WALKWAY LAYOUT IS SHOWN ON THE ROOF PLAN DRAWINGS AE101 THROUGH AE113. QUANTIFY TOTAL PRIOR TO BID.
REPLACE ALL PLASTIC OR BROKEN DRAIN BASKETS AND CLAMP RINGS ON EXISTING ROOF DRAINS. QUANTIFY TOTAL PRIOR TO
BID.
ELEVATION HEIGHT BASED ON GROUND FLOOR.
MATCH EXISTING ROOF SLOPE AT PARTIAL ROOF REPLACEMENT
MECHANICAL DUCTWORK AND PIPING ARE FOR REFERENCE ONLY. SIZING IS SCHEMATIC.
EXISTING ROOFING SYSTEM IS A SINGLE-PLY MEMBRANE OVER RIGID INSULATION UNLESS NOTED OTHERWISE. TPO ROOF SYSTEM EXISTON ROOF 14 (A AND B). ALL OTHER EXISTING ROOFS USE A PVC ROOF SYSTEM.
ALL CONDENSING UNITS AND EQUIPMENT ON ROOF SUPPORTS NOT FLASHED INTO THE EXISTING ROOF SHALL BE DISCONNECTED AND TEMPORARILY REMOVED AND STORED WHILE ROOFING IS COMPLETED UNDER THE UNITS. PROTECT EQUIPMENT DURING THIS PERIOD. REFRIGERANT SHALL BE CAPTURED AND UTILITIES SERVING THIS EQUIPMENT WILL ALL BE
DISCONNECTED AND TEMPORARILY CAPPED.
CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING.
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM.
SEE ELECTRICAL DRAWINGS FOR NEW LIGHTNING PROTECTION SYSTEM.
PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
G E N E R A L N O T E SL E G E N D
RESTORATION SCOPE
CONSISTS OF APPLICATION OF A FLUID APPLIED REHABILITATION SYSTEM OVER EXISTING
ROOFING SYSTEM.
REPLACEMENT AND RESTORATION SCOPE
CONSISTS OF SELECTIVE REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND
INSTALLATION OF NEW ROOFING SYSTEM TO MATCH EXISTING AND APPLICATION OF A FLUID-
APPLIED REHABILITATION SYSTEM.
NOT IN SCOPE
REPLACEMENT SCOPE
CONSISTS OF REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION
OF MODIFIED BITUMEN ROOFING OVER RIGID INSULATION.
BIOHAZARDOUS EXHAUST AREA
ROOF ACCESS POINT
HIGH-POWERED RADIO FREQUENCY AREA
PIPE VENT
ELEC. GROUNDING TERMINAL
ANCHOR POST
BOOT FLASHING
ROOF-TOP LADDER
RAISED GRATING
WALKWAY SYSTEM
SLIP-RESISTANCE
AGGREGATE IN FLUID-
APPLIED MEMBRANE
FOR WALKING PATHS
EXISTING RUBBER
WALKING MAT
M A
TC
H
LI
N E
M A
TC
H
LI
N E
MATCHLINEMATCHLINE
AE
AE
/1 AE101 /1 AE102
/1 AE103
AE
ROOF 1D
AE141
Sim
AE141
Sim
AE141
Sim
2.01
2.02
2.03
2.04
2.06
2.07
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
1A 3A 3B 1B
1C 1D
17A
17B
14B 14A
6 5
ROOF 7
ROOF 1D
ROOF 1C
ROOF 1A ROOF 3A
ROOF 6
ROOF 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No. EXP DATE:
12/31/2025
Au to de sk
D oc s:
//C ol um bu s
VA
R ep la ce
R oo f o n
Bl dg
A/
FF
E_
C ol um bu s
- R ep la ce R oo f_
B1 A_
AR
C
H (2
4)
.rv t
5/ 6/
:3
8:
P M
AE104
ENLARGED ROOF PLAN - ROOF 1D
05/06/2025 PRQ JLF
REPLACE ROOF BUILDING 1A 757-21-101
COLUMBUS, OHIO
BID DOCUMENTS
1A
CHALMERS P. WYLIE
VETERANS
OUTPATIENT CLINIC Approved: Columbus VAMC
D R A W I N G N O T E S :
2.01 EXISTING ROOF DRAIN AND OVERFLOW DRAIN TO REMAIN. - TYPICAL
2.02 EXISTING PIPE VENT PENETRATION TO REMAIN. - TYPICAL
2.03 EXISTING LIGHTNING PROTECTION GROUNDING TERMINAL PENETRATION TO REMAIN. - TYPICAL
2.04 EXISTING ANCHOR POST PENETRATION TO REMAIN. - TYPICAL
2.06 EXISTING RADIO FREQUENCY EQUIPMENT TO REMAIN. RELOCATE TO INSTALL FLUID-APPLIED MEMBRANE, RELOCATE
BACK TO ORIGINAL LOCATION. - TYPICAL
2.07 EXISTING ELECTRICAL CONDUIT PENETRATION TO REMAIN. - TYPICAL
1/8" = 1'-0"
ENLARGED ROOF PLAN - ROOF 1D
UP
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. PROVIDE TAPERED INSULATION TO
DIRECT WATER TO ROOF DRAINS. MATCH ELEVATION WHERE TYING INTO EXISTING
ALL EXISTING WALKWAY PADS SHALL BE REMOVED PRIOR TO REPLACEMENT/RESTORATION WORK. NEW WALKWAY LAYOUT IS SHOWN ON THE ROOF PLAN DRAWINGS AE101 THROUGH AE113. QUANTIFY TOTAL PRIOR TO BID.
REPLACE ALL PLASTIC OR BROKEN DRAIN BASKETS AND CLAMP RINGS ON EXISTING ROOF DRAINS. QUANTIFY TOTAL PRIOR TO
BID.
ELEVATION HEIGHT BASED ON GROUND FLOOR.
MATCH EXISTING ROOF SLOPE AT PARTIAL ROOF REPLACEMENT
MECHANICAL DUCTWORK AND PIPING ARE FOR REFERENCE ONLY. SIZING IS SCHEMATIC.
EXISTING ROOFING SYSTEM IS A SINGLE-PLY MEMBRANE OVER RIGID INSULATION UNLESS NOTED OTHERWISE. TPO ROOF SYSTEM EXISTON ROOF 14 (A AND B). ALL OTHER EXISTING ROOFS USE A PVC ROOF SYSTEM.
ALL CONDENSING UNITS AND EQUIPMENT ON ROOF SUPPORTS NOT FLASHED INTO THE EXISTING ROOF SHALL BE DISCONNECTED AND TEMPORARILY REMOVED AND STORED WHILE ROOFING IS COMPLETED UNDER THE UNITS. PROTECT EQUIPMENT DURING THIS PERIOD. REFRIGERANT SHALL BE CAPTURED AND UTILITIES SERVING THIS EQUIPMENT WILL ALL BE
DISCONNECTED AND TEMPORARILY CAPPED.
CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING.
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM.
SEE ELECTRICAL DRAWINGS FOR NEW LIGHTNING PROTECTION SYSTEM.
PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
G E N E R A L N O T E SL E G E N D
RESTORATION SCOPE
CONSISTS OF APPLICATION OF A FLUID APPLIED REHABILITATION SYSTEM OVER EXISTING
ROOFING SYSTEM.
REPLACEMENT AND RESTORATION SCOPE
CONSISTS OF SELECTIVE REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND
INSTALLATION OF NEW ROOFING SYSTEM TO MATCH EXISTING AND APPLICATION OF A FLUID-
APPLIED REHABILITATION SYSTEM.
NOT IN SCOPE
REPLACEMENT SCOPE
CONSISTS OF REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION
OF MODIFIED BITUMEN ROOFING OVER RIGID INSULATION.
BIOHAZARDOUS EXHAUST AREA
ROOF ACCESS POINT
HIGH-POWERED RADIO FREQUENCY AREA
PIPE VENT
ELEC. GROUNDING TERMINAL
ANCHOR POST
BOOT FLASHING
ROOF-TOP LADDER
RAISED GRATING
WALKWAY SYSTEM
SLIP-RESISTANCE
AGGREGATE IN FLUID-
APPLIED MEMBRANE
FOR WALKING PATHS
EXISTING RUBBER
WALKING MAT
M A
TC
H
LI
N E
M A
TC
H
LI
N E
AE
AE
AHUAHUAHU
AHU
ROOF 3A
2.01
2.05
2.08
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
2.10
1A 3A 3B 1B
1C 1D
17A
17B
14B 14A
6 5
ROOF 1A
ROOF 1D
ROOF 1B
ROOF 17A
ROOF 3B
ROOF 3A
ROOF 2
ROOF 6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No. EXP DATE:
12/31/2025
Au to de sk
D oc s:
//C ol um bu s
VA
R ep la ce
R oo f o n
Bl dg
A/
FF
E_
C ol um bu s
- R ep la ce R oo f_
B1 A_
AR
C
H (2
4)
.rv t
5/ 6/
:3
8:
P M
AE105
ENLARGED ROOF PLAN - ROOF 3A
05/06/2025 PRQ JLF
REPLACE ROOF BUILDING 1A 757-21-101
COLUMBUS, OHIO
BID DOCUMENTS
1A
CHALMERS P. WYLIE
VETERANS
OUTPATIENT CLINIC Approved: Columbus VAMC
D R A W I N G N O T E S :
2.01 EXISTING ROOF DRAIN AND OVERFLOW DRAIN TO REMAIN. - TYPICAL
2.05 EXISTING HVAC EQUIPMENT TO REMAIN. - TYPICAL
2.08 REMOVE EXISTING ROOF WALKWAY PADS. INSTALL NEW WALKWAY SYSTEM. DRAWINGS SHOW NEW LAYOUT- TYPICAL
2.10 EXISTING AIR HANDLING UNIT TO REMAIN.
1/8" = 1'-0"
ENLARGED ROOF PLAN - ROOF 3A
UP
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. PROVIDE TAPERED INSULATION TO
DIRECT WATER TO ROOF DRAINS. MATCH ELEVATION WHERE TYING INTO EXISTING
ALL EXISTING WALKWAY PADS SHALL BE REMOVED PRIOR TO REPLACEMENT/RESTORATION WORK. NEW WALKWAY LAYOUT IS SHOWN ON THE ROOF PLAN DRAWINGS AE101 THROUGH AE113. QUANTIFY TOTAL PRIOR TO BID.
REPLACE ALL PLASTIC OR BROKEN DRAIN BASKETS AND CLAMP RINGS ON EXISTING ROOF DRAINS. QUANTIFY TOTAL PRIOR TO
BID.
ELEVATION HEIGHT BASED ON GROUND FLOOR.
MATCH EXISTING ROOF SLOPE AT PARTIAL ROOF REPLACEMENT
MECHANICAL DUCTWORK AND PIPING ARE FOR REFERENCE ONLY. SIZING IS SCHEMATIC.
EXISTING ROOFING SYSTEM IS A SINGLE-PLY MEMBRANE OVER RIGID INSULATION UNLESS NOTED OTHERWISE. TPO ROOF SYSTEM EXISTON ROOF 14 (A AND B). ALL OTHER EXISTING ROOFS USE A PVC ROOF SYSTEM.
ALL CONDENSING UNITS AND EQUIPMENT ON ROOF SUPPORTS NOT FLASHED INTO THE EXISTING ROOF SHALL BE DISCONNECTED AND TEMPORARILY REMOVED AND STORED WHILE ROOFING IS COMPLETED UNDER THE UNITS. PROTECT EQUIPMENT DURING THIS PERIOD. REFRIGERANT SHALL BE CAPTURED AND UTILITIES SERVING THIS EQUIPMENT WILL ALL BE
DISCONNECTED AND TEMPORARILY CAPPED.
CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING.
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM.
SEE ELECTRICAL DRAWINGS FOR NEW LIGHTNING PROTECTION SYSTEM.
PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
G E N E R A L N O T E SL E G E N D
RESTORATION SCOPE
CONSISTS OF APPLICATION OF A FLUID APPLIED REHABILITATION SYSTEM OVER EXISTING
ROOFING SYSTEM.
REPLACEMENT AND RESTORATION SCOPE
CONSISTS OF SELECTIVE REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND
INSTALLATION OF NEW ROOFING SYSTEM TO MATCH EXISTING AND APPLICATION OF A FLUID-
APPLIED REHABILITATION SYSTEM.
NOT IN SCOPE
REPLACEMENT SCOPE
CONSISTS OF REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION
OF MODIFIED BITUMEN ROOFING OVER RIGID INSULATION.
BIOHAZARDOUS EXHAUST AREA
ROOF ACCESS POINT
HIGH-POWERED RADIO FREQUENCY AREA
PIPE VENT
ELEC. GROUNDING TERMINAL
ANCHOR POST
BOOT FLASHING
ROOF-TOP LADDER
RAISED GRATING
WALKWAY SYSTEM
SLIP-RESISTANCE
AGGREGATE IN FLUID-
APPLIED MEMBRANE
FOR WALKING PATHS
EXISTING RUBBER
WALKING MAT
AE
M A
TC
H
LI
N E
M A
TC
H
LI
N E
AE
ROOF 3B
ROOF 2
ROOF 4
COOLING PLATFORM OVERHEAD
AHU
1,217 SQ. FT.
2.01
2.05
2.09
2.09
2.08
2.12
2.122.13
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
2.10
AE142
Sim
PLASTIC
STORAGE
SHED
AHU
PLASTIC
STORAGE
SHED
PLASTIC
STORAGE
SHED
AE141
Sim
AE141
Sim
AE142
Sim
AE142
Sim
AE142
Sim
2.59
2.59
1A 3A 3B 1B
1C 1D
17A
17B
14B 14A
6 5
ROOF 1D
ROOF 1B
ROOF 17A
ROOF 1A
ROOF 3B
ROOF 3A
ROOF 2
ROOF 6
R4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No. EXP DATE:
12/31/2025
Au to de sk
D oc s:
//C ol um bu s
VA
R ep la ce
R oo f o n
Bl dg
A/
FF
E_
C ol um bu s
- R ep la ce R oo f_
B1 A_
AR
C
H (2
4)
.rv t
5/ 6/
:3
8:
P M
AE106
ENLARGED ROOF PLAN - ROOF 3B
05/06/2025 PRQ JLF
REPLACE ROOF BUILDING 1A 757-21-101
COLUMBUS, OHIO
BID DOCUMENTS
1A
CHALMERS P. WYLIE
VETERANS
OUTPATIENT CLINIC Approved: Columbus VAMC
D R A W I N G N O T E S :
2.01 EXISTING ROOF DRAIN AND OVERFLOW DRAIN TO REMAIN. - TYPICAL
2.05 EXISTING HVAC EQUIPMENT TO REMAIN. - TYPICAL
2.08 REMOVE EXISTING ROOF WALKWAY PADS. INSTALL NEW WALKWAY SYSTEM. DRAWINGS SHOW NEW LAYOUT- TYPICAL
2.09 EXISTING TEMPORARY SHED TO REMAIN. TEMPORARY RELOCATION WILL BE REQUIRED DURING RESTORATION WORK.
2.10 EXISTING AIR HANDLING UNIT TO REMAIN.
2.12 REMOVE/RELOCATE CONDENSER DURING ROOF REPLACEMENT. INSPECT CURB(S) FOR ANY NOTICEABLE DAMAGE;
CONTACT VA AND A/E TO DISCUSS ANY ISSUES DISCOVERED. INSTALL EXISTING CONDENSER IN PREVIOUS LOCATION
AFTER ROOF REPLACEMENT.
2.13 UPON REMOVAL OF ROOFING SYSTEM, INSPECT CURB FOR ANY NOTICEABLE DAMAGE. - CONTACT VA AND A/E TO
DISCUSS ANY ISSUES DISCOVERED.
2.59 EXISTING LOOSE LAID RUBBER WALKING MATS. REMOVE AND STORE DURING REPLACEMENT/RESTORATION WORK.
INSTALL MATS FOR RESIN STORAGE SHEDS TO SIT ON. USE RUBBER WALKING MATS TO ALSO CREATE PATH FROM
GRATED WALKWAY SYSTEM TO THE RESIN STORAGE SHEDS. - TYPICAL
1/8" = 1'-0"
ENLARGED ROOF PLAN - ROOFS 2, 3B & 4
ROOF 7
ROOF 7A
ROOF 5A
ROOF 5
ROOF 5B
71 SQ. FT.
425 SQ. FT.
310 SQ. FT.
2,087 SQ. FT.
58 SQ. FT.
46 SQ. FT.
267 SQ. FT.
AHU
ROOF 6
2.14
2.14
2.14
2.14
2.14
2.01
2.02
2.04
2.10
2.05
2.07
2.05
2.12
AE142
Sim
AE142
Sim
AE142
Sim
AE141
Sim
AE142
Sim
AE141
Sim
AE141
Sim
AE142
Sim
AE141
Sim
AE141
Sim
AE142
Sim
AE142
Sim
AE142
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE142
Sim
AE142
Sim
STEP UP ≈ 8"
ST
EP
U P 8"
ST
EP
U P 8"
AE143
Sim
AE143
Sim
AE143
Sim
AE143
Sim
AE143
Sim
AE143
Sim
AE143
Sim
AE143
Sim
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. PROVIDE TAPERED INSULATION TO
DIRECT WATER TO ROOF DRAINS. MATCH ELEVATION WHERE TYING INTO EXISTING
ALL EXISTING WALKWAY PADS SHALL BE REMOVED PRIOR TO REPLACEMENT/RESTORATION WORK. NEW WALKWAY LAYOUT IS SHOWN ON THE ROOF PLAN DRAWINGS AE101 THROUGH AE113. QUANTIFY TOTAL PRIOR TO BID.
REPLACE ALL PLASTIC OR BROKEN DRAIN BASKETS AND CLAMP RINGS ON EXISTING ROOF DRAINS. QUANTIFY TOTAL PRIOR TO
BID.
ELEVATION HEIGHT BASED ON GROUND FLOOR.
MATCH EXISTING ROOF SLOPE AT PARTIAL ROOF REPLACEMENT
MECHANICAL DUCTWORK AND PIPING ARE FOR REFERENCE ONLY. SIZING IS SCHEMATIC.
EXISTING ROOFING SYSTEM IS A SINGLE-PLY MEMBRANE OVER RIGID INSULATION UNLESS NOTED OTHERWISE. TPO ROOF SYSTEM EXISTON ROOF 14 (A AND B). ALL OTHER EXISTING ROOFS USE A PVC ROOF SYSTEM.
ALL CONDENSING UNITS AND EQUIPMENT ON ROOF SUPPORTS NOT FLASHED INTO THE EXISTING ROOF SHALL BE DISCONNECTED AND TEMPORARILY REMOVED AND STORED WHILE ROOFING IS COMPLETED UNDER THE UNITS. PROTECT EQUIPMENT DURING THIS PERIOD. REFRIGERANT SHALL BE CAPTURED AND UTILITIES SERVING THIS EQUIPMENT WILL ALL BE
DISCONNECTED AND TEMPORARILY CAPPED.
CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING.
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM.
SEE ELECTRICAL DRAWINGS FOR NEW LIGHTNING PROTECTION SYSTEM.
PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
G E N E R A L N O T E SL E G E N D
RESTORATION SCOPE
CONSISTS OF APPLICATION OF A FLUID APPLIED REHABILITATION SYSTEM OVER EXISTING
ROOFING SYSTEM.
REPLACEMENT AND RESTORATION SCOPE
CONSISTS OF SELECTIVE REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND
INSTALLATION OF NEW ROOFING SYSTEM TO MATCH EXISTING AND APPLICATION OF A FLUID-
APPLIED REHABILITATION SYSTEM.
NOT IN SCOPE
REPLACEMENT SCOPE
CONSISTS OF REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION
OF MODIFIED BITUMEN ROOFING OVER RIGID INSULATION.
BIOHAZARDOUS EXHAUST AREA
ROOF ACCESS POINT
HIGH-POWERED RADIO FREQUENCY AREA
PIPE VENT
ELEC. GROUNDING TERMINAL
ANCHOR POST
BOOT FLASHING
ROOF-TOP LADDER
RAISED GRATING
WALKWAY SYSTEM
SLIP-RESISTANCE
AGGREGATE IN FLUID-
APPLIED MEMBRANE
FOR WALKING PATHS
EXISTING RUBBER
WALKING MAT
ROOF 7
ROOF 1D
ROOF 1B
ROOF 17A
ROOF 12
ROOF 6
ROOF 5B
ROOF 5A
ROOF 7A
1A 3A 3B 1B
1C 1D
17A
17B
14B 14A
6 5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No. EXP DATE:
12/31/2025
Au to de sk
D oc s:
//C ol um bu s
VA
R ep la ce
R oo f o n
Bl dg
A/
FF
E_
C ol um bu s
- R ep la ce R oo f_
B1 A_
AR
C
H (2
4)
.rv t
5/ 6/
:3
8:
P M
AE107
ENLARGED ROOF PLAN - ROOFS 5
& 7
05/06/2025 PRQ JLF
REPLACE ROOF BUILDING 1A 757-21-101
COLUMBUS, OHIO
BID DOCUMENTS
1A
CHALMERS P. WYLIE
VETERANS
OUTPATIENT CLINIC Approved: Columbus VAMC
1/8" = 1'-0"
ENLARGED ROOF PLAN - ROOFS 5, 7, 8, 9 &11
D R A W I N G N O T E S :
2.01 EXISTING ROOF DRAIN AND OVERFLOW DRAIN TO REMAIN. - TYPICAL
2.02 EXISTING PIPE VENT PENETRATION TO REMAIN. - TYPICAL
2.04 EXISTING ANCHOR POST PENETRATION TO REMAIN. - TYPICAL
2.05 EXISTING HVAC EQUIPMENT TO REMAIN. - TYPICAL
2.07 EXISTING ELECTRICAL CONDUIT PENETRATION TO REMAIN. - TYPICAL
2.10 EXISTING AIR HANDLING UNIT TO REMAIN.
2.12 REMOVE/RELOCATE CONDENSER DURING ROOF REPLACEMENT. INSPECT CURB(S) FOR ANY NOTICEABLE DAMAGE;
CONTACT VA AND A/E TO DISCUSS ANY ISSUES DISCOVERED. INSTALL EXISTING CONDENSER IN PREVIOUS LOCATION
AFTER ROOF REPLACEMENT.
2.14 INSPECT EXISTING ROOF DRAIN AND OVERFLOW DRAIN DURING ROOF REPLACEMENT - CONTACT VA AND A/E TO
DISCUSS ANY ISSUES DISCOVERED.
DE
SC
OP
IN
G
RO
OF
W
OR
K
IS
P
AR
T
OF
T
HE
B
ID
A
LT
ER
NA
TE
C.
D.
E.
F.
G.
H.
I.
J.
K.
MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. PROVIDE TAPERED INSULATION TO
DIRECT WATER TO ROOF DRAINS. MATCH ELEVATION WHERE TYING INTO EXISTING
ALL EXISTING WALKWAY PADS SHALL BE REMOVED PRIOR TO REPLACEMENT/RESTORATION WORK. NEW WALKWAY LAYOUT IS SHOWN ON THE ROOF PLAN DRAWINGS AE101 THROUGH AE113. QUANTIFY TOTAL PRIOR TO BID.
REPLACE ALL PLASTIC OR BROKEN DRAIN BASKETS AND CLAMP RINGS ON EXISTING ROOF DRAINS. QUANTIFY TOTAL PRIOR TO
BID.
ELEVATION HEIGHT BASED ON GROUND FLOOR.
MATCH EXISTING ROOF SLOPE AT PARTIAL ROOF REPLACEMENT
MECHANICAL DUCTWORK AND PIPING ARE FOR REFERENCE ONLY. SIZING IS SCHEMATIC.
EXISTING ROOFING SYSTEM IS A SINGLE-PLY MEMBRANE OVER RIGID INSULATION UNLESS NOTED OTHERWISE. TPO ROOF SYSTEM EXISTON ROOF 14 (A AND B). ALL OTHER EXISTING ROOFS USE A PVC ROOF SYSTEM.
ALL CONDENSING UNITS AND EQUIPMENT ON ROOF SUPPORTS NOT FLASHED INTO THE EXISTING ROOF SHALL BE DISCONNECTED AND TEMPORARILY REMOVED AND STORED WHILE ROOFING IS COMPLETED UNDER THE UNITS. PROTECT EQUIPMENT DURING THIS PERIOD. REFRIGERANT SHALL BE CAPTURED AND UTILITIES SERVING THIS EQUIPMENT WILL ALL BE
DISCONNECTED AND TEMPORARILY CAPPED.
CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING.
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM.
SEE ELECTRICAL DRAWINGS FOR NEW LIGHTNING PROTECTION SYSTEM.
PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
G E N E R A L N O T E SL E G E N D
RESTORATION SCOPE
CONSISTS OF APPLICATION OF A FLUID APPLIED REHABILITATION SYSTEM OVER EXISTING
ROOFING SYSTEM.
REPLACEMENT AND RESTORATION SCOPE
CONSISTS OF SELECTIVE REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND
INSTALLATION OF NEW ROOFING SYSTEM TO MATCH EXISTING AND APPLICATION OF A FLUID-
APPLIED REHABILITATION SYSTEM.
NOT IN SCOPE
REPLACEMENT SCOPE
CONSISTS OF REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION
OF MODIFIED BITUMEN ROOFING OVER RIGID INSULATION.
BIOHAZARDOUS EXHAUST AREA
ROOF ACCESS POINT
HIGH-POWERED RADIO FREQUENCY AREA
PIPE VENT
ELEC. GROUNDING TERMINAL
ANCHOR POST
BOOT FLASHING
ROOF-TOP LADDER
RAISED GRATING
WALKWAY SYSTEM
SLIP-RESISTANCE
AGGREGATE IN FLUID-
APPLIED MEMBRANE
FOR WALKING PATHS
EXISTING RUBBER
WALKING MAT
AE
M A
TC
H
LI
N E
M A
TC
H
LI
N E
AE
88 SQ. FT.
221 SQ. FT.
AHU
2.01
2.02
2.03
2.15
2.16
2.14
2.10
2.05
2.08
COOLING PLATFORM OVERHEAD
AHU
AHU
PLASTIC STORAGE SHED
AE143
Sim
AE142
Sim
AE141
Sim
ROOF 12
ROOF 13
ROOF 17A
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
2.59
1A 3A 3B 1B
1C 1D
17A
17B
14B 14A
6 5
ROOF 7
ROOF 5B
ROOF 17A
ROOF 17BROOF 12
ROOF 13
ROOF 6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No. EXP DATE:
12/31/2025
Au to de sk
D oc s:
//C ol um bu s
VA
R ep la ce
R oo f o n
Bl dg
A/
FF
E_
C ol um bu s
- R ep la ce R oo f_
B1 A_
AR
C
H (2
4)
.rv t
5/ 6/
:3
9:
P M
AE108
ENLARGED ROOF PLAN - ROOF
17A
05/06/2025 PRQ JLF
REPLACE ROOF BUILDING 1A 757-21-101
COLUMBUS, OHIO
BID DOCUMENTS
1A
CHALMERS P. WYLIE
VETERANS
OUTPATIENT CLINIC Approved: Columbus VAMC
D R A W I N G N O T E S :
2.01 EXISTING ROOF DRAIN AND OVERFLOW DRAIN TO REMAIN. - TYPICAL
2.02 EXISTING PIPE VENT PENETRATION TO REMAIN. - TYPICAL
2.03 EXISTING LIGHTNING PROTECTION GROUNDING TERMINAL PENETRATION TO REMAIN. - TYPICAL
2.05 EXISTING HVAC EQUIPMENT TO REMAIN. - TYPICAL
2.08 REMOVE EXISTING ROOF WALKWAY PADS. INSTALL NEW WALKWAY SYSTEM. DRAWINGS SHOW NEW LAYOUT- TYPICAL
2.10 EXISTING AIR HANDLING UNIT TO REMAIN.
2.14 INSPECT EXISTING ROOF DRAIN AND OVERFLOW DRAIN DURING ROOF REPLACEMENT - CONTACT VA AND A/E TO
DISCUSS ANY ISSUES DISCOVERED.
2.15 INSPECT EXISTING LIGHTNING PROTECTION GROUNDING TERMINAL DURING ROOF REPLACEMENT - CONTACT VA AND
A/E TO DISCUSS ANY ISSUES DISCOVERED.
2.16 INSPECT EXISTING ANCHOR POST DURING ROOF REPLACEMENT - CONTACT VA AND A/E TO DISCUSS ANY ISSUES
DISCOVERED.
2.59 EXISTING LOOSE LAID RUBBER WALKING MATS. REMOVE AND STORE DURING REPLACEMENT/RESTORATION WORK.
INSTALL MATS FOR RESIN STORAGE SHEDS TO SIT ON. USE RUBBER WALKING MATS TO ALSO CREATE PATH FROM
GRATED WALKWAY SYSTEM TO THE RESIN STORAGE SHEDS. - TYPICAL
1/8" = 1'-0"
ENLARGED ROOF PLAN - ROOF 17A
DE
SC
OP
IN
G
RO
OF
A
ND
W
OR
K
IS
P
AR
T
OF
T
HE
B
ID
A
LT
ER
NA
TE
C.
D.
E.
F.
G.
H.
I.
J.
K.
MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. PROVIDE TAPERED INSULATION TO
DIRECT WATER TO ROOF DRAINS. MATCH ELEVATION WHERE TYING INTO EXISTING
ALL EXISTING WALKWAY PADS SHALL BE REMOVED PRIOR TO REPLACEMENT/RESTORATION WORK. NEW WALKWAY LAYOUT IS SHOWN ON THE ROOF PLAN DRAWINGS AE101 THROUGH AE113. QUANTIFY TOTAL PRIOR TO BID.
REPLACE ALL PLASTIC OR BROKEN DRAIN BASKETS AND CLAMP RINGS ON EXISTING ROOF DRAINS. QUANTIFY TOTAL PRIOR TO
BID.
ELEVATION HEIGHT BASED ON GROUND FLOOR.
MATCH EXISTING ROOF SLOPE AT PARTIAL ROOF REPLACEMENT
MECHANICAL DUCTWORK AND PIPING ARE FOR REFERENCE ONLY. SIZING IS SCHEMATIC.
EXISTING ROOFING SYSTEM IS A SINGLE-PLY MEMBRANE OVER RIGID INSULATION UNLESS NOTED OTHERWISE. TPO ROOF SYSTEM EXISTON ROOF 14 (A AND B). ALL OTHER EXISTING ROOFS USE A PVC ROOF SYSTEM.
ALL CONDENSING UNITS AND EQUIPMENT ON ROOF SUPPORTS NOT FLASHED INTO THE EXISTING ROOF SHALL BE DISCONNECTED AND TEMPORARILY REMOVED AND STORED WHILE ROOFING IS COMPLETED UNDER THE UNITS. PROTECT EQUIPMENT DURING THIS PERIOD. REFRIGERANT SHALL BE CAPTURED AND UTILITIES SERVING THIS EQUIPMENT WILL ALL BE
DISCONNECTED AND TEMPORARILY CAPPED.
CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING.
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM.
SEE ELECTRICAL DRAWINGS FOR NEW LIGHTNING PROTECTION SYSTEM.
PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
G E N E R A L N O T E SL E G E N D
RESTORATION SCOPE
CONSISTS OF APPLICATION OF A FLUID APPLIED REHABILITATION SYSTEM OVER EXISTING
ROOFING SYSTEM.
REPLACEMENT AND RESTORATION SCOPE
CONSISTS OF SELECTIVE REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND
INSTALLATION OF NEW ROOFING SYSTEM TO MATCH EXISTING AND APPLICATION OF A FLUID-
APPLIED REHABILITATION SYSTEM.
NOT IN SCOPE
REPLACEMENT SCOPE
CONSISTS OF REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION
OF MODIFIED BITUMEN ROOFING OVER RIGID INSULATION.
BIOHAZARDOUS EXHAUST AREA
ROOF ACCESS POINT
HIGH-POWERED RADIO FREQUENCY AREA
PIPE VENT
ELEC. GROUNDING TERMINAL
ANCHOR POST
BOOT FLASHING
ROOF-TOP LADDER
RAISED GRATING
WALKWAY SYSTEM
SLIP-RESISTANCE
AGGREGATE IN FLUID-
APPLIED MEMBRANE
FOR WALKING PATHS
EXISTING RUBBER
WALKING MAT
AE
AE
M A
TC
H
LI
N E
M A
TC
H
LI
N E
ROOF 17B
302 SQ. FT.
773 SQ. FT.
1,180 SQ. FT. TOTAL
AHU
ROOF 18
2.01
2.05
2.17
2.10
2.18
2.03
2.02
2.04
2.14
2.14
AE141
Sim
AE141
Sim
AE142
Sim
AHU
AHU
AHU
AHU
AE142
Sim
AE141
Sim
AE142
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE142
Sim
AE141
Sim
AE142
Sim
AE141
Sim
2.59
1A 3A 3B 1B
1C 1D
17A
17B
14B 14A
6 5
ROOF 17A
ROOF 17B
ROOF 14A
ROOF 14B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No. EXP DATE:
12/31/2025
Au to de sk
D oc s:
//C ol um bu s
VA
R ep la ce
R oo f o n
Bl dg
A/
FF
E_
C ol um bu s
- R ep la ce R oo f_
B1 A_
AR
C
H (2
4)
.rv t
5/ 6/
:3
9:
P M
AE109
ENLARGED ROOF PLAN - ROOF
17B
05/06/2025 PRQ JLF
REPLACE ROOF BUILDING 1A 757-21-101
COLUMBUS, OHIO
BID DOCUMENTS
1A
CHALMERS P. WYLIE
VETERANS
OUTPATIENT CLINIC Approved: Columbus VAMC
D R A W I N G N O T E S :
2.01 EXISTING ROOF DRAIN AND OVERFLOW DRAIN TO REMAIN. - TYPICAL
2.02 EXISTING PIPE VENT PENETRATION TO REMAIN. - TYPICAL
2.03 EXISTING LIGHTNING PROTECTION GROUNDING TERMINAL PENETRATION TO REMAIN. - TYPICAL
2.04 EXISTING ANCHOR POST PENETRATION TO REMAIN. - TYPICAL
2.05 EXISTING HVAC EQUIPMENT TO REMAIN. - TYPICAL
2.10 EXISTING AIR HANDLING UNIT TO REMAIN.
2.14 INSPECT EXISTING ROOF DRAIN AND OVERFLOW DRAIN DURING ROOF REPLACEMENT - CONTACT VA AND A/E TO
DISCUSS ANY ISSUES DISCOVERED.
2.17 ROOF REPLACEMENT PORTION OF THESE AREAS WILL BE DONE AFTER NORMAL BUSINESS HOURS/WEEKENDS. STERILE
PROCESSING SERVICES IS DIRECTLY BELOW THE ROOF.
2.18 EXISTING CROSS-OVER STAIRS TO REMAIN. RELOCATE AS NEEDED TO PROVIDE RESTORATION MEMBRANE.
2.59 EXISTING LOOSE LAID RUBBER WALKING MATS. REMOVE AND STORE DURING REPLACEMENT/RESTORATION WORK.
INSTALL MATS FOR RESIN STORAGE SHEDS TO SIT ON. USE RUBBER WALKING MATS TO ALSO CREATE PATH FROM
GRATED WALKWAY SYSTEM TO THE RESIN STORAGE SHEDS. - TYPICAL
1/8" = 1'-0"
ENLARGED ROOF PLAN - ROOFS 17B & 18
C.
D.
E.
F.
G.
H.
I.
J.
K.
MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. PROVIDE TAPERED INSULATION TO
DIRECT WATER TO ROOF DRAINS. MATCH ELEVATION WHERE TYING INTO EXISTING
ALL EXISTING WALKWAY PADS SHALL BE REMOVED PRIOR TO REPLACEMENT/RESTORATION WORK. NEW WALKWAY LAYOUT IS SHOWN ON THE ROOF PLAN DRAWINGS AE101 THROUGH AE113. QUANTIFY TOTAL PRIOR TO BID.
REPLACE ALL PLASTIC OR BROKEN DRAIN BASKETS AND CLAMP RINGS ON EXISTING ROOF DRAINS. QUANTIFY TOTAL PRIOR TO
BID.
ELEVATION HEIGHT BASED ON GROUND FLOOR.
MATCH EXISTING ROOF SLOPE AT PARTIAL ROOF REPLACEMENT
MECHANICAL DUCTWORK AND PIPING ARE FOR REFERENCE ONLY. SIZING IS SCHEMATIC.
EXISTING ROOFING SYSTEM IS A SINGLE-PLY MEMBRANE OVER RIGID INSULATION UNLESS NOTED OTHERWISE. TPO ROOF SYSTEM EXISTON ROOF 14 (A AND B). ALL OTHER EXISTING ROOFS USE A PVC ROOF SYSTEM.
ALL CONDENSING UNITS AND EQUIPMENT ON ROOF SUPPORTS NOT FLASHED INTO THE EXISTING ROOF SHALL BE DISCONNECTED AND TEMPORARILY REMOVED AND STORED WHILE ROOFING IS COMPLETED UNDER THE UNITS. PROTECT EQUIPMENT DURING THIS PERIOD. REFRIGERANT SHALL BE CAPTURED AND UTILITIES SERVING THIS EQUIPMENT WILL ALL BE
DISCONNECTED AND TEMPORARILY CAPPED.
CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING.
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM.
SEE ELECTRICAL DRAWINGS FOR NEW LIGHTNING PROTECTION SYSTEM.
PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
G E N E R A L N O T E SL E G E N D
RESTORATION SCOPE
CONSISTS OF APPLICATION OF A FLUID APPLIED REHABILITATION SYSTEM OVER EXISTING
ROOFING SYSTEM.
REPLACEMENT AND RESTORATION SCOPE
CONSISTS OF SELECTIVE REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND
INSTALLATION OF NEW ROOFING SYSTEM TO MATCH EXISTING AND APPLICATION OF A FLUID-
APPLIED REHABILITATION SYSTEM.
NOT IN SCOPE
REPLACEMENT SCOPE
CONSISTS OF REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION
OF MODIFIED BITUMEN ROOFING OVER RIGID INSULATION.
BIOHAZARDOUS EXHAUST AREA
ROOF ACCESS POINT
HIGH-POWERED RADIO FREQUENCY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .