00.02_GI100 - OVERALL ROOF PLAN and 3D ROOF VIEW.pdf
PDF 1 MB Posted
- Solicitation number
- 36C25026B0011
About this file
This is an architectural drawing document for a roof replacement project at the Chalmers P. Wylie Veterans Outpatient Clinic, a U.S. Department of Veterans Affairs facility in Columbus, Ohio.
The drawing depicts the overall roof plan and three-dimensional view of Building 1A, with a scale of 1/32" = 1'-0". The project scope includes replacement of multiple roof sections identified as ROOF 1A, ROOF 1B, ROOF 1C, ROOF 1D, ROOF 3A, ROOF 3B, ROOF 7, ROOF 17A, ROOF 17B, R5, R5A, R5B, ROOF 12 (bid alternate), ROOF 14A, and ROOF 14B. Several roof sections are designated as "Not In Scope (NIS)," including ROOF 2, ROOF 4, ROOF 6, ROOF 8, ROOF 9, ROOF 11, ROOF 13 (bid alternate), ROOF 18, ROOF 19, and ROOF 20. The document includes a roof area schedule providing total area calculations for in-scope work, totaling 10,491 square feet with 5,300 square feet identified as additional scope. The bid documents were issued on 05/06/2025, with Addendum 01 dated 04/27/2026. The drawing is prepared by FFE and HEAVY as the Architect/Engineer of Record and is fully sprinklered. The document is classified as CI100 and designated for fully sprinklered facilities.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CT272.104
ROOF 7
ROOF 1C
ROOF 3A
ROOF 17A
ROOF 1D
ROOF 1A
ROOF 1B
ROOF 3B
ROOF 17B
R5
R5A
R5B
R13*
ROOF 12*
ROOF 14A
NOT IN SCOPE (NIS)
ROOF 7A
R O
O F
ROOF 14B
R2 (NIS)
R4 (NIS)
ROOF 8 (NIS)
ROOF 9 (NIS)
ROOF 11 (NIS)
ROOF 19 (NIS)
ROOF 20 (NIS)
NOTE:
* INDICATES BID ALTERNATE - REMOVE ROOFS FROM SCOPE OF PROJECT.
ROOF 18 (NIS)
A. MAINTAIN EXISTING R-VALUE AND INSULATION THICKNESS TO MATCH EXISTING IN ISOLATED REPLACEMENT AREAS AS IDENTIFIED ON DRAWINGS, UNLESS NOTED OTHERWISE. PROVIDE TAPERED INSULATION TO DIRECT WATER TO ROOF DRAINS.
MATCH ELEVATION WHERE TYING INTO EXISTING.
B. ALL EXISTING WALKWAY PADS SHALL BE REMOVED PRIOR TO REPLACEMENT/RESTORATION WORK. NEW WALKWAY LAYOUT IS SHOWN ON THE ROOF PLAN DRAWINGS AE101 THROUGH AE111. QUANTIFY TOTAL PRIOR TO BID.
C. REPLACE ALL MISSING, PLASTIC, OR BROKEN DRAIN BASKETS AND CLAMP RINGS ON EXISTING ROOF DRAINS. QUANTIFY TOTAL
PRIOR TO BID.
D. ELEVATION HEIGHT BASED ON GROUND FLOOR.
E. MATCH EXISTING ROOF SLOPE AT PARTIAL ROOF REPLACEMENT
F. MECHANICAL DUCTWORK AND PIPING ARE FOR REFERENCE ONLY. SIZING IS SCHEMATIC.
G. EXISTING ROOFING SYSTEM IS A SINGLE-PLY MEMBRANE OVER RIGID INSULATION UNLESS NOTED OTHERWISE. TPO ROOF SYSTEM EXTENSION ROOF 14 (A AND B). ALL OTHER EXISTING ROOFS USE A PVC ROOF SYSTEM.
H. ALL CONDENSING UNITS AND EQUIPMENT ON ROOF SUPPORTS NOT FLASHED INTO THE EXISTING ROOF SHALL BE DISCONNECTED AND TEMPORARILY REMOVED AND STORED WHILE ROOFING IS COMPLETED UNDER THE UNITS. PROTECT EQUIPMENT DURING THIS PERIOD. REFRIGERANT SHALL BE CAPTURED AND UTILITIES SERVING THIS EQUIPMENT WILL ALL BE
DISCONNECTED AND TEMPORARILY CAPPED.
I. CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING.
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM.
J. SEE ELECTRICAL DRAWINGS FOR NEW LIGHTNING PROTECTION SYSTEM.
K. PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
G E N E R A L N O T E S
L E G E N D
RESTORATION SCOPE
REPLACEMENT AND RESTORATION SCOPE
NOT IN SCOPE
REPLACEMENT SCOPE
ROOF 7
ROOF 1A
ROOF 3A
ROOF 1C
ROOF 1D
ROOF 3B
R1B
ROOF 17A
ROOF 17B
ROOF 17D
ROOF 17C
ROOF 2
NOT IN SCOPE (NIS)
ROOF 18
ROOF 12*
ROOF 4
R6* R7A
R5B
R5A
ROOF 14
R8
R9
R11
R13*
ROOF AREA SCHEDULE
ROOF SECTION NO. TOTAL AREA (SQ. FT.) WET AREA (SQ. FT.)
5A
5B
7A
32, 346
14,015
1,800
6,960
16,126
42,110
4,493
1,217
2,458
3,297
TOTAL 120,051 8,248
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
A u to d e s k D o c s /C o lu m b u s V
A
R e p la c e R o o f o n B ld g
A /F
F E
C o lu m b u s
R e p la c e
R o o f_ B
A
A
R C
H rv t
/2
/2
:4
:1
P
M
GI100
OVERALL ROOF PLAN & 3D ROOF
VIEW
05/06/2025 PRQ JLF
REPLACE ROOF BUILDING 1A 757-21-101
COLUMBUS, OHIO
BID DOCUMENTS
1A
CHALMERS P. WYLIE
VETERANS
OUTPATIENT CLINIC
Approved: Columbus VAMC
1/32" = 1'-0"
OVERALL ROOF PLAN
OVERALL ROOF 3D
NOTE: THE QUATITIES EXPRESSED IN THIS TABLE ARE APROXIMATE VALUES.
CONTRACTOR MUST FIELD VERIFY THE QUANTITIES FOR THE ROOFS IN SCOPE.
BID DOCUMENTS 05/06/2025
1 ADDENDUM 01 04/27/2026