07.01_AE101 - ENLARGED ROOF PLAN - ROOF 1A.pdf
PDF 1 MB Posted
- Solicitation number
- 36C25026B0011
About this file
This document is an architectural drawing for roof replacement work at the Chalmers P. Wylie Veterans Outpatient Clinic in Columbus, Ohio, a U.S. Department of Veterans Affairs facility. The drawing provides an enlarged roof plan for Building 1A (Roof 1A) and includes detailed specifications for selective removal and replacement of the existing roofing system.
The scope of work includes removing the existing roof system down to the structural deck and installing a new roofing system to match existing conditions, along with waterproofing and paver roof system application. The drawing identifies multiple roof sections (Roof 1A, 1C, 1D, 3A, 3B) and specifies numerous elements to remain in place during construction, including existing roof drains, overflow drains, pipe vent penetrations, lightning protection grounding terminals, anchor post penetrations, and HVAC equipment. Additional work includes relocating high-powered radio frequency equipment temporarily during construction and returning it to its original location, removal and replacement of existing roof walkway pads with new walkway systems, and restoration of fluid-applied rehabilitation systems in designated areas. The drawing was prepared by the design consultant FFE and HEAPY, stamped by the Architect/Engineer of Record, and issued as part of the bid documents dated May 6, 2025, with Addendum 01 issued on April 27, 2026.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. MAINTAIN EXISTING R-VALUE AND INSULATION THICKNESS TO MATCH EXISTING IN ISOLATED REPLACEMENT AREAS AS IDENTIFIED ON DRAWINGS, UNLESS NOTED OTHERWISE. PROVIDE TAPERED INSULATION TO DIRECT WATER TO ROOF DRAINS.
MATCH ELEVATION WHERE TYING INTO EXISTING.
B. ALL EXISTING WALKWAY PADS SHALL BE REMOVED PRIOR TO REPLACEMENT/RESTORATION WORK. NEW WALKWAY LAYOUT IS SHOWN ON THE ROOF PLAN DRAWINGS AE101 THROUGH AE111. QUANTIFY TOTAL PRIOR TO BID.
C. REPLACE ALL MISSING, PLASTIC, OR BROKEN DRAIN BASKETS AND CLAMP RINGS ON EXISTING ROOF DRAINS. QUANTIFY TOTAL
PRIOR TO BID.
D. ELEVATION HEIGHT BASED ON GROUND FLOOR.
E. MATCH EXISTING ROOF SLOPE AT PARTIAL ROOF REPLACEMENT
F. MECHANICAL DUCTWORK AND PIPING ARE FOR REFERENCE ONLY. SIZING IS SCHEMATIC.
G. EXISTING ROOFING SYSTEM IS A SINGLE-PLY MEMBRANE OVER RIGID INSULATION UNLESS NOTED OTHERWISE. TPO ROOF SYSTEM EXTENSION ROOF 14 (A AND B). ALL OTHER EXISTING ROOFS USE A PVC ROOF SYSTEM.
H. ALL CONDENSING UNITS AND EQUIPMENT ON ROOF SUPPORTS NOT FLASHED INTO THE EXISTING ROOF SHALL BE DISCONNECTED AND TEMPORARILY REMOVED AND STORED WHILE ROOFING IS COMPLETED UNDER THE UNITS. PROTECT EQUIPMENT DURING THIS PERIOD. REFRIGERANT SHALL BE CAPTURED AND UTILITIES SERVING THIS EQUIPMENT WILL ALL BE
DISCONNECTED AND TEMPORARILY CAPPED.
I. CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING.
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM.
J. SEE ELECTRICAL DRAWINGS FOR NEW LIGHTNING PROTECTION SYSTEM.
K. PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
G E N E R A L N O T E S
1L E G E N D
RESTORATION SCOPE
APPLICATION OF A FLUID APPLIED REHABILITATION SYSTEM OVER EXISTING ROOFING SYSTEM.
REPLACEMENT AND RESTORATION SCOPE
SELECTIVE REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION OF NEW ROOFING SYSTEM TO MATCH EXISTING AND APPLICATION OF A FLUID-APPLIED REHABILITATION
SYSTEM.
NOT IN SCOPE
REPLACEMENT SCOPE
REMOVE EXISTING ROOF SYSTEM DOWN TO THE STRUCTURAL DECK. INSTALL FLUID-APPLIED
WATERPROOFING AND PAVER ROOF SYSTEM
BIOHAZARDOUS EXHAUST AREA
ROOF ACCESS POINT
HIGH-POWERED RADIO FREQUENCY AREA
PIPE VENT
ELEC. GROUNDING TERMINAL
ANCHOR POST
BOOT FLASHING
ROOF-TOP LADDER
RAISED GRATING
WALKWAY SYSTEM
SLIP-RESISTANCE
AGGREGATE IN FLUID-
APPLIED MEMBRANE
FOR WALKING PATHS
EXISTING RUBBER
WALKING MAT
MATCHLINEMATCHLINE
M A
T C
H L
IN
E
M A
T C
H L
IN
E
A E
A E
A E
/1 AE104/1 AE103
/1 AE102
ROOF 1A
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
2.01
2.02
2.03
2.04
2.05
2.06
AE142
Sim
AE141
Sim
AE141
Sim
AE141
Sim
2.08
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
1A
17A
3A 3B
17B
1B
1C 1D
14B
14A
6 5
ROOF 1D
ROOF 1C
ROOF 1A
ROOF 1B
ROOF 3A
ROOF 3B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
A u to d e s k D o c s /C o lu m b u s V
A
R e p la c e R o o f o n B ld g
A /F
F E
C o lu m b u s
R e p la c e
R o o f_ B
A
A
R C
H rv t
/2
/2
:4
:2
P
M
AE101
ENLARGED ROOF PLAN - ROOF 1A
05/06/2025 PRQ JLF
REPLACE ROOF BUILDING 1A 757-21-101
COLUMBUS, OHIO
BID DOCUMENTS
1A
CHALMERS P. WYLIE
VETERANS
OUTPATIENT CLINIC
Approved: Columbus VAMC
D R A W I N G N O T E S :
2.01 EXISTING ROOF DRAIN AND OVERFLOW DRAIN TO REMAIN. - TYPICAL
2.02 EXISTING PIPE VENT PENETRATION TO REMAIN. - TYPICAL
2.03 EXISTING LIGHTNING PROTECTION GROUNDING TERMINAL PENETRATION TO REMAIN. - TYPICAL
2.04 EXISTING ANCHOR POST PENETRATION TO REMAIN. - TYPICAL
2.05 EXISTING HVAC EQUIPMENT TO REMAIN. - TYPICAL
2.06 EXISTING RADIO FREQUENCY EQUIPMENT TO REMAIN. RELOCATE TO INSTALL FLUID-APPLIED MEMBRANE, RELOCATE
BACK TO ORIGINAL LOCATION. - TYPICAL
2.08 REMOVE EXISTING ROOF WALKWAY PADS. INSTALL NEW WALKWAY SYSTEM. DRAWINGS SHOW NEW LAYOUT- TYPICAL
1/8" = 1'-0"
ENLARGED ROOF PLAN - ROOF 1A
BID DOCUMENTS 05/06/2025
1 ADDENDUM 01 04/27/2026
| Sheets |
| AE101 - ENLARGED ROOF PLAN - ROOF 1A |
File details come from the government source that posted it. Updated .