This is an architectural drawing for roof replacement work at the Chalmers P. Wylie Veterans Outpatient Clinic in Columbus, Ohio, issued by the U.S. Department of Veterans Affairs. The document is bid documentation dated 05/06/2025 with Addendum 01 dated 04/27/2026.

The scope encompasses selective roof replacement and restoration across three roof areas: Roof 17A (302 square feet), Roof 17B (773 square feet), and Roof 18 (1,180 square feet), totaling 2,255 square feet. Work involves removal of existing roofing systems down to the structural deck and installation of new waterproofing and paver roof systems to match existing conditions. The drawing identifies existing elements to remain in place, including roof drains, overflow drains, pipe vent penetrations, lightning protection grounding terminals, anchor post penetrations, HVAC equipment, air handling units, and cross-over stairs. Notes specify that existing loose-laid rubber walking mats are to be removed, stored, and reinstalled, with rubber walkway systems connecting to resin storage sheds. The work includes inspection of existing roof drains and overflow drains during roof removal, with discussion of any discovered issues. Roof replacement in certain areas will be sequenced after Biological Hazard Processing Services relocations occur. The document includes general notes, detailed drawing notes, an isometric view showing all affected roof areas, and enlarged roof plans with specific equipment locations and penetrations marked throughout.

View the file

Other files

File Type Posted
36C25026B0011 0005_1.docx DOCX document
36C25026B0011 0005.pdf PDF
36C25026B0011 0004.pdf PDF
36C25026B0011 0004_1.docx DOCX document
00.01_GI001 - COVER SHEET.pdf PDF
07.02_AE102 - ENLARGED ROOF PLAN - ROOF 1B.pdf PDF
07.12_AE110 - ENLARGED ROOF PLAN - ROOF 14A.pdf PDF
07.43_AE143 - ROOF 5, 5A and 5B DETAILS - DEMOLITION AND NEW WORK.pdf PDF
07.13_AE111 - ENLARGED ROOF PLAN - ROOF 14B.pdf PDF
07.04_AE104 - ENLARGED ROOF PLAN - ROOF 1D.pdf PDF
07.01_AE101 - ENLARGED ROOF PLAN - ROOF 1A.pdf PDF
07.08_AE108 - ENLARGED ROOF PLAN - ROOF 17A.pdf PDF
07.05_AE105 - ENLARGED ROOF PLAN - ROOF 3A.pdf PDF
00 01 15 - LIST OF DRAWING SHEETS.pdf PDF
07 01 50.19 - PREPARATION FOR RE-ROOFING and ROOFING REHABILITATION.pdf PDF
36C25026B0011 0003.pdf PDF
07 22 00 - ROOF AND DECK INSULATION.pdf PDF
07 60 00 - FLASHING AND SHEET METAL.pdf PDF
00.02_GI100 - OVERALL ROOF PLAN and 3D ROOF VIEW.pdf PDF
07.03_AE103 - ENLARGED ROOF PLAN - ROOF 1C.pdf PDF
07.07_AE107 - ENLARGED ROOF PLAN - ROOFS 5 and 7.pdf PDF
07.06_AE106 - ENLARGED ROOF PLAN - ROOF 3B.pdf PDF
01 00 00 - GENERAL REQUIREMENTS.pdf PDF
2025-0506 JV-COVA Replace Roof 1A_BID DWGS - REVISED.pdf PDF
36C25026B0011 0002_1.docx DOCX document
36C25026B0011 0001_1.docx DOCX document
36C25026B0011 0001.pdf PDF
Attachment - 2025-0506 JV-COVA Replace Roof 1A_Bid Specs.pdf PDF
Attachment - Wage Determinations - Franklin County.pdf PDF
Attachment - 852.219-75 VA Notice of Limitations on Subcontracting.pdf PDF
36C25026B0011_2.docx DOCX document
Attachment - VA Columbus Engineering Map Parking Directions.pdf PDF
Attachment - 2025-0506 JV-COVA Replace Roof 1A_Bid Project Manual.pdf PDF
36C25026B0011 - Solicitation - Replace Roof Building 1A.pdf PDF
Attachment - 2025-0506 JV-COVA Replace Roof 1A_Bid Dwgs.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A. MAINTAIN EXISTING R-VALUE AND INSULATION THICKNESS TO MATCH EXISTING IN ISOLATED REPLACEMENT AREAS AS IDENTIFIED ON DRAWINGS, UNLESS NOTED OTHERWISE. PROVIDE TAPERED INSULATION TO DIRECT WATER TO ROOF DRAINS.

MATCH ELEVATION WHERE TYING INTO EXISTING.

B. ALL EXISTING WALKWAY PADS SHALL BE REMOVED PRIOR TO REPLACEMENT/RESTORATION WORK. NEW WALKWAY LAYOUT IS SHOWN ON THE ROOF PLAN DRAWINGS AE101 THROUGH AE111. QUANTIFY TOTAL PRIOR TO BID.

C. REPLACE ALL MISSING, PLASTIC, OR BROKEN DRAIN BASKETS AND CLAMP RINGS ON EXISTING ROOF DRAINS. QUANTIFY TOTAL

PRIOR TO BID.

D. ELEVATION HEIGHT BASED ON GROUND FLOOR.

E. MATCH EXISTING ROOF SLOPE AT PARTIAL ROOF REPLACEMENT

F. MECHANICAL DUCTWORK AND PIPING ARE FOR REFERENCE ONLY. SIZING IS SCHEMATIC.

G. EXISTING ROOFING SYSTEM IS A SINGLE-PLY MEMBRANE OVER RIGID INSULATION UNLESS NOTED OTHERWISE. TPO ROOF SYSTEM EXTENSION ROOF 14 (A AND B). ALL OTHER EXISTING ROOFS USE A PVC ROOF SYSTEM.

H. ALL CONDENSING UNITS AND EQUIPMENT ON ROOF SUPPORTS NOT FLASHED INTO THE EXISTING ROOF SHALL BE DISCONNECTED AND TEMPORARILY REMOVED AND STORED WHILE ROOFING IS COMPLETED UNDER THE UNITS. PROTECT EQUIPMENT DURING THIS PERIOD. REFRIGERANT SHALL BE CAPTURED AND UTILITIES SERVING THIS EQUIPMENT WILL ALL BE

DISCONNECTED AND TEMPORARILY CAPPED.

I. CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING.

PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM.

J. SEE ELECTRICAL DRAWINGS FOR NEW LIGHTNING PROTECTION SYSTEM.

K. PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA

REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.

G E N E R A L N O T E S

L E G E N D

RESTORATION SCOPE

APPLICATION OF A FLUID APPLIED REHABILITATION SYSTEM OVER EXISTING ROOFING SYSTEM.

REPLACEMENT AND RESTORATION SCOPE

SELECTIVE REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION OF NEW ROOFING SYSTEM TO MATCH EXISTING AND APPLICATION OF A FLUID-APPLIED REHABILITATION

SYSTEM.

NOT IN SCOPE

REPLACEMENT SCOPE

REMOVE EXISTING ROOF SYSTEM DOWN TO THE STRUCTURAL DECK. INSTALL FLUID-APPLIED

WATERPROOFING AND PAVER ROOF SYSTEM

BIOHAZARDOUS EXHAUST AREA

ROOF ACCESS POINT

HIGH-POWERED RADIO FREQUENCY AREA

PIPE VENT

ELEC. GROUNDING TERMINAL

ANCHOR POST

BOOT FLASHING

ROOF-TOP LADDER

RAISED GRATING

WALKWAY SYSTEM

SLIP-RESISTANCE

AGGREGATE IN FLUID-

APPLIED MEMBRANE

FOR WALKING PATHS

EXISTING RUBBER

WALKING MAT

A E

A E

M A

T C

H L

IN

E

M A

T C

H L

IN

E

ROOF 17B

302 SQ. FT.

773 SQ. FT.

1,180 SQ. FT. TOTAL

AHU

ROOF 18

2.01

2.05

2.17

2.10

2.18

2.03

2.02

2.04

2.14

2.14

AE141

Sim

AE141

Sim

AE142

Sim

AHU

AHU

AHU

AHU

AE142

Sim

AE141

Sim

AE142

Sim

AE141

Sim

AE141

Sim

AE141

Sim

AE141

Sim

AE141

Sim

AE141

Sim

AE142

Sim

AE141

Sim

AE142

Sim

AE141

Sim

2.59

1A 3A 3B

1B

1C 1D

17A

17B

14B

14A

6 5

ROOF 17A

ROOF 17B

ROOF 14A

ROOF 14B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

A u to d e s k D o c s /C o lu m b u s V

A

R e p la c e R o o f o n B ld g

A /F

F E

C o lu m b u s

R e p la c e

R o o f_ B

A

A

R C

H rv t

/2

/2

:4

:3

P

M

AE109

ENLARGED ROOF PLAN - ROOF

17B

05/06/2025 PRQ JLF

REPLACE ROOF BUILDING 1A 757-21-101

COLUMBUS, OHIO

BID DOCUMENTS

1A

CHALMERS P. WYLIE

VETERANS

OUTPATIENT CLINIC

Approved: Columbus VAMC

D R A W I N G N O T E S :

2.01 EXISTING ROOF DRAIN AND OVERFLOW DRAIN TO REMAIN. - TYPICAL

2.02 EXISTING PIPE VENT PENETRATION TO REMAIN. - TYPICAL

2.03 EXISTING LIGHTNING PROTECTION GROUNDING TERMINAL PENETRATION TO REMAIN. - TYPICAL

2.04 EXISTING ANCHOR POST PENETRATION TO REMAIN. - TYPICAL

2.05 EXISTING HVAC EQUIPMENT TO REMAIN. - TYPICAL

2.10 EXISTING AIR HANDLING UNIT TO REMAIN.

2.14 INSPECT EXISTING ROOF DRAIN AND OVERFLOW DRAIN DURING ROOF REPLACEMENT - CONTACT VA AND A/E TO

DISCUSS ANY ISSUES DISCOVERED.

2.17 ROOF REPLACEMENT PORTION OF THESE AREAS WILL BE DONE AFTER NORMAL BUSINESS HOURS/WEEKENDS. STERILE

PROCESSING SERVICES IS DIRECTLY BELOW THE ROOF.

2.18 EXISTING CROSS-OVER STAIRS TO REMAIN. RELOCATE AS NEEDED TO PROVIDE RESTORATION MEMBRANE.

2.59 EXISTING LOOSE LAID RUBBER WALKING MATS. REMOVE AND STORE DURING REPLACEMENT/RESTORATION WORK.

INSTALL MATS FOR RESIN STORAGE SHEDS TO SIT ON. USE RUBBER WALKING MATS TO ALSO CREATE PATH FROM

GRATED WALKWAY SYSTEM TO THE RESIN STORAGE SHEDS. - TYPICAL

1/8" = 1'-0"

ENLARGED ROOF PLAN - ROOFS 17B & 18

BID DOCUMENTS 05/06/2025

1 ADDENDUM 01 04/27/2026

Sheets
AE109 - ENLARGED ROOF PLAN - ROOF 17B