07.06_AE106 - ENLARGED ROOF PLAN - ROOF 3B.pdf

PDF 2 MB Posted

Attached to
Y1QA--Replace Roof Building 1A 757-21-101 - VAACC COLUMBUS
Solicitation number
36C25026B0011
Issued by

About this file

This document is an architectural drawing set for a roof replacement project at the Chalmers P. Wylie Veterans Outpatient Clinic, a U.S. Department of Veterans Affairs facility located in Columbus, Ohio. The project involves replacing roofing systems on Building 1A, with bid documents dated May 6, 2025, and one addendum issued on April 27, 2026.

The scope of work encompasses removal of existing roof systems down to the structural deck and installation of new waterproofing and paver roof systems across multiple roof sections (Roofs 1A, 1D, 2, 3B, and 4), totaling approximately 1,217 square feet on the cooling platform. Work includes removal and relocation of existing HVAC equipment and condenser units, inspection of roof curbs upon removal, removal and storage of existing loose-laid rubber walking mats for reuse on resin storage sheds, installation of new walkway systems, and selective rehabilitation using fluid-applied coatings in designated restoration scopes. Key existing infrastructure to remain includes roof drains, overflow drains, air handling units, and temporary storage sheds. The project requires coordination with VA and the architect/engineer of record regarding any issues discovered during removal phases, with completion requirements for reinstallation of equipment after roof replacement completion.

View the file

Other files

File Type Posted
36C25026B0011 0005_1.docx DOCX document
36C25026B0011 0005.pdf PDF
36C25026B0011 0004.pdf PDF
36C25026B0011 0004_1.docx DOCX document
00.01_GI001 - COVER SHEET.pdf PDF
07.02_AE102 - ENLARGED ROOF PLAN - ROOF 1B.pdf PDF
07.12_AE110 - ENLARGED ROOF PLAN - ROOF 14A.pdf PDF
07.43_AE143 - ROOF 5, 5A and 5B DETAILS - DEMOLITION AND NEW WORK.pdf PDF
07.13_AE111 - ENLARGED ROOF PLAN - ROOF 14B.pdf PDF
07.04_AE104 - ENLARGED ROOF PLAN - ROOF 1D.pdf PDF
07.01_AE101 - ENLARGED ROOF PLAN - ROOF 1A.pdf PDF
07.08_AE108 - ENLARGED ROOF PLAN - ROOF 17A.pdf PDF
07.05_AE105 - ENLARGED ROOF PLAN - ROOF 3A.pdf PDF
00 01 15 - LIST OF DRAWING SHEETS.pdf PDF
07 01 50.19 - PREPARATION FOR RE-ROOFING and ROOFING REHABILITATION.pdf PDF
36C25026B0011 0003.pdf PDF
07 22 00 - ROOF AND DECK INSULATION.pdf PDF
07 60 00 - FLASHING AND SHEET METAL.pdf PDF
00.02_GI100 - OVERALL ROOF PLAN and 3D ROOF VIEW.pdf PDF
07.03_AE103 - ENLARGED ROOF PLAN - ROOF 1C.pdf PDF
07.07_AE107 - ENLARGED ROOF PLAN - ROOFS 5 and 7.pdf PDF
07.09_AE109 - ENLARGED ROOF PLAN - ROOF 17B.pdf PDF
01 00 00 - GENERAL REQUIREMENTS.pdf PDF
2025-0506 JV-COVA Replace Roof 1A_BID DWGS - REVISED.pdf PDF
36C25026B0011 0002_1.docx DOCX document
36C25026B0011 0001_1.docx DOCX document
36C25026B0011 0001.pdf PDF
Attachment - 2025-0506 JV-COVA Replace Roof 1A_Bid Specs.pdf PDF
Attachment - Wage Determinations - Franklin County.pdf PDF
Attachment - 852.219-75 VA Notice of Limitations on Subcontracting.pdf PDF
36C25026B0011_2.docx DOCX document
Attachment - VA Columbus Engineering Map Parking Directions.pdf PDF
Attachment - 2025-0506 JV-COVA Replace Roof 1A_Bid Project Manual.pdf PDF
36C25026B0011 - Solicitation - Replace Roof Building 1A.pdf PDF
Attachment - 2025-0506 JV-COVA Replace Roof 1A_Bid Dwgs.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

UP

A. MAINTAIN EXISTING R-VALUE AND INSULATION THICKNESS TO MATCH EXISTING IN ISOLATED REPLACEMENT AREAS AS IDENTIFIED ON DRAWINGS, UNLESS NOTED OTHERWISE. PROVIDE TAPERED INSULATION TO DIRECT WATER TO ROOF DRAINS.

MATCH ELEVATION WHERE TYING INTO EXISTING.

B. ALL EXISTING WALKWAY PADS SHALL BE REMOVED PRIOR TO REPLACEMENT/RESTORATION WORK. NEW WALKWAY LAYOUT IS SHOWN ON THE ROOF PLAN DRAWINGS AE101 THROUGH AE111. QUANTIFY TOTAL PRIOR TO BID.

C. REPLACE ALL MISSING, PLASTIC, OR BROKEN DRAIN BASKETS AND CLAMP RINGS ON EXISTING ROOF DRAINS. QUANTIFY TOTAL

PRIOR TO BID.

D. ELEVATION HEIGHT BASED ON GROUND FLOOR.

E. MATCH EXISTING ROOF SLOPE AT PARTIAL ROOF REPLACEMENT

F. MECHANICAL DUCTWORK AND PIPING ARE FOR REFERENCE ONLY. SIZING IS SCHEMATIC.

G. EXISTING ROOFING SYSTEM IS A SINGLE-PLY MEMBRANE OVER RIGID INSULATION UNLESS NOTED OTHERWISE. TPO ROOF SYSTEM EXTENSION ROOF 14 (A AND B). ALL OTHER EXISTING ROOFS USE A PVC ROOF SYSTEM.

H. ALL CONDENSING UNITS AND EQUIPMENT ON ROOF SUPPORTS NOT FLASHED INTO THE EXISTING ROOF SHALL BE DISCONNECTED AND TEMPORARILY REMOVED AND STORED WHILE ROOFING IS COMPLETED UNDER THE UNITS. PROTECT EQUIPMENT DURING THIS PERIOD. REFRIGERANT SHALL BE CAPTURED AND UTILITIES SERVING THIS EQUIPMENT WILL ALL BE

DISCONNECTED AND TEMPORARILY CAPPED.

I. CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING.

PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM.

J. SEE ELECTRICAL DRAWINGS FOR NEW LIGHTNING PROTECTION SYSTEM.

K. PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA

REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.

G E N E R A L N O T E S

L E G E N D

RESTORATION SCOPE

APPLICATION OF A FLUID APPLIED REHABILITATION SYSTEM OVER EXISTING ROOFING SYSTEM.

REPLACEMENT AND RESTORATION SCOPE

SELECTIVE REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION OF NEW ROOFING SYSTEM TO MATCH EXISTING AND APPLICATION OF A FLUID-APPLIED REHABILITATION

SYSTEM.

NOT IN SCOPE

REPLACEMENT SCOPE

REMOVE EXISTING ROOF SYSTEM DOWN TO THE STRUCTURAL DECK. INSTALL FLUID-APPLIED

WATERPROOFING AND PAVER ROOF SYSTEM

BIOHAZARDOUS EXHAUST AREA

ROOF ACCESS POINT

HIGH-POWERED RADIO FREQUENCY AREA

PIPE VENT

ELEC. GROUNDING TERMINAL

ANCHOR POST

BOOT FLASHING

ROOF-TOP LADDER

RAISED GRATING

WALKWAY SYSTEM

SLIP-RESISTANCE

AGGREGATE IN FLUID-

APPLIED MEMBRANE

FOR WALKING PATHS

EXISTING RUBBER

WALKING MAT

A E

M A

T C

H L

IN

E

M A

T C

H L

IN

E

A E

ROOF 3B

ROOF 2

ROOF 4

COOLING PLATFORM OVERHEAD

AHU

1,217 SQ. FT.

2.01

2.05

2.09

2.09

2.08

2.12

2.122.13

AE141

Sim

AE141

Sim

AE141

Sim

AE141

Sim

AE141

Sim

2.10

AE142

Sim

PLASTIC

STORAGE

SHED

AHU

PLASTIC

STORAGE

SHED

PLASTIC

STORAGE

SHED

AE141

Sim

AE141

Sim

AE142

Sim

AE142

Sim

AE142

Sim

2.59

2.59

1A 3A 3B

1B

1C 1D

17A

17B

14B

14A

6 5

ROOF 1D

ROOF 1B

ROOF 17A

ROOF 1A

ROOF 3B

ROOF 3A

ROOF 2

ROOF 6

R4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

A u to d e s k D o c s /C o lu m b u s V

A

R e p la c e R o o f o n B ld g

A /F

F E

C o lu m b u s

R e p la c e

R o o f_ B

A

A

R C

H rv t

/2

/2

:4

:0

P

M

AE106

ENLARGED ROOF PLAN - ROOF 3B

05/06/2025 PRQ JLF

REPLACE ROOF BUILDING 1A 757-21-101

COLUMBUS, OHIO

BID DOCUMENTS

1A

CHALMERS P. WYLIE

VETERANS

OUTPATIENT CLINIC

Approved: Columbus VAMC

D R A W I N G N O T E S :

2.01 EXISTING ROOF DRAIN AND OVERFLOW DRAIN TO REMAIN. - TYPICAL

2.05 EXISTING HVAC EQUIPMENT TO REMAIN. - TYPICAL

2.08 REMOVE EXISTING ROOF WALKWAY PADS. INSTALL NEW WALKWAY SYSTEM. DRAWINGS SHOW NEW LAYOUT- TYPICAL

2.09 EXISTING TEMPORARY SHED TO REMAIN. TEMPORARY RELOCATION WILL BE REQUIRED DURING RESTORATION WORK.

2.10 EXISTING AIR HANDLING UNIT TO REMAIN.

2.12 REMOVE/RELOCATE CONDENSER DURING ROOF REPLACEMENT. INSPECT CURB(S) FOR ANY NOTICEABLE DAMAGE;

CONTACT VA AND A/E TO DISCUSS ANY ISSUES DISCOVERED. INSTALL EXISTING CONDENSER IN PREVIOUS LOCATION

AFTER ROOF REPLACEMENT.

2.13 UPON REMOVAL OF ROOFING SYSTEM, INSPECT CURB FOR ANY NOTICEABLE DAMAGE. - CONTACT VA AND A/E TO

DISCUSS ANY ISSUES DISCOVERED.

2.59 EXISTING LOOSE LAID RUBBER WALKING MATS. REMOVE AND STORE DURING REPLACEMENT/RESTORATION WORK.

INSTALL MATS FOR RESIN STORAGE SHEDS TO SIT ON. USE RUBBER WALKING MATS TO ALSO CREATE PATH FROM

GRATED WALKWAY SYSTEM TO THE RESIN STORAGE SHEDS. - TYPICAL

1/8" = 1'-0"

ENLARGED ROOF PLAN - ROOFS 2, 3B & 4

BID DOCUMENTS 05/06/2025

1 ADDENDUM 01 04/27/2026

Sheets
AE106 - ENLARGED ROOF PLAN - ROOF 3B

File details come from the government source that posted it. Updated .