This is an architectural drawing set for a roof replacement project at the Chalmers P. Wylie Veterans Outpatient Clinic, a U.S. Department of Veterans Affairs facility in Columbus, Ohio. The project involves the replacement of roofing systems on Building 1A, with work spanning multiple roof sections (Roofs 5, 5A, 5B, 6, 7, 7A, and associated areas) totaling approximately 3,264 square feet across various roof sections. The scope includes selective removal of existing roofing systems down to the substrate, application of new roofing systems to match existing conditions, and installation of waterproofing and paver roof systems where applicable.
Key work elements include restoration and rehabilitation of fluid-applied systems, inspection and retention of existing roof drains, overflow drains, pipe vents, anchor post penetrations, HVAC equipment, electrical conduits, and air handling units. The contractor is required to remove and relocate the condenser during roof replacement, with reinstallation following project completion. A bid alternate option exists for descoping Roof 6 work. Drawing notes indicate that any issues discovered during drain inspection must be discussed with the VA and architect/engineer. The bid documents were issued on May 6, 2025, with Addendum 01 dated April 27, 2026. The project is prepared by FFE (consultant) and Heapy (architect/engineer of record).
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROOF 7
ROOF 7A
ROOF 5A
ROOF 5
ROOF 5B
71 SQ. FT.
425 SQ. FT.
310 SQ. FT.
2,087 SQ. FT.
58 SQ. FT.
46 SQ. FT.
267 SQ. FT.
AHU
ROOF 6
2.14
2.14
2.14
2.14
2.14
2.01
2.02
2.04
2.10
2.05
2.07
2.05
2.12
AE142
Sim
AE142
Sim
AE142
Sim
AE141
Sim
AE142
Sim
AE141
Sim
AE141
Sim
AE142
Sim
AE141
Sim
AE141
Sim
AE142
Sim
AE142
Sim
AE142
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE141
Sim
AE142
Sim
AE142
Sim
STEP UP ≈ 8"
S T
E P
U P
8" S
T E
P U
P
8"
AE143
Sim
AE143
Sim
AE143
Sim
AE143
Sim
AE143
Sim
AE143
Sim
AE143
Sim
AE143
Sim
A. MAINTAIN EXISTING R-VALUE AND INSULATION THICKNESS TO MATCH EXISTING IN ISOLATED REPLACEMENT AREAS AS IDENTIFIED ON DRAWINGS, UNLESS NOTED OTHERWISE. PROVIDE TAPERED INSULATION TO DIRECT WATER TO ROOF DRAINS.
MATCH ELEVATION WHERE TYING INTO EXISTING.
B. ALL EXISTING WALKWAY PADS SHALL BE REMOVED PRIOR TO REPLACEMENT/RESTORATION WORK. NEW WALKWAY LAYOUT IS SHOWN ON THE ROOF PLAN DRAWINGS AE101 THROUGH AE111. QUANTIFY TOTAL PRIOR TO BID.
C. REPLACE ALL MISSING, PLASTIC, OR BROKEN DRAIN BASKETS AND CLAMP RINGS ON EXISTING ROOF DRAINS. QUANTIFY TOTAL
PRIOR TO BID.
D. ELEVATION HEIGHT BASED ON GROUND FLOOR.
E. MATCH EXISTING ROOF SLOPE AT PARTIAL ROOF REPLACEMENT
F. MECHANICAL DUCTWORK AND PIPING ARE FOR REFERENCE ONLY. SIZING IS SCHEMATIC.
G. EXISTING ROOFING SYSTEM IS A SINGLE-PLY MEMBRANE OVER RIGID INSULATION UNLESS NOTED OTHERWISE. TPO ROOF SYSTEM EXTENSION ROOF 14 (A AND B). ALL OTHER EXISTING ROOFS USE A PVC ROOF SYSTEM.
H. ALL CONDENSING UNITS AND EQUIPMENT ON ROOF SUPPORTS NOT FLASHED INTO THE EXISTING ROOF SHALL BE DISCONNECTED AND TEMPORARILY REMOVED AND STORED WHILE ROOFING IS COMPLETED UNDER THE UNITS. PROTECT EQUIPMENT DURING THIS PERIOD. REFRIGERANT SHALL BE CAPTURED AND UTILITIES SERVING THIS EQUIPMENT WILL ALL BE
DISCONNECTED AND TEMPORARILY CAPPED.
I. CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING.
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM.
J. SEE ELECTRICAL DRAWINGS FOR NEW LIGHTNING PROTECTION SYSTEM.
K. PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
G E N E R A L N O T E S
L E G E N D
RESTORATION SCOPE
APPLICATION OF A FLUID APPLIED REHABILITATION SYSTEM OVER EXISTING ROOFING SYSTEM.
REPLACEMENT AND RESTORATION SCOPE
SELECTIVE REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION OF NEW ROOFING SYSTEM TO MATCH EXISTING AND APPLICATION OF A FLUID-APPLIED REHABILITATION
SYSTEM.
NOT IN SCOPE
REPLACEMENT SCOPE
REMOVE EXISTING ROOF SYSTEM DOWN TO THE STRUCTURAL DECK. INSTALL FLUID-APPLIED
WATERPROOFING AND PAVER ROOF SYSTEM
BIOHAZARDOUS EXHAUST AREA
ROOF ACCESS POINT
HIGH-POWERED RADIO FREQUENCY AREA
PIPE VENT
ELEC. GROUNDING TERMINAL
ANCHOR POST
BOOT FLASHING
ROOF-TOP LADDER
RAISED GRATING
WALKWAY SYSTEM
SLIP-RESISTANCE
AGGREGATE IN FLUID-
APPLIED MEMBRANE
FOR WALKING PATHS
EXISTING RUBBER
WALKING MAT
ROOF 7
ROOF 1D
ROOF 1B
ROOF 17A
ROOF 12
ROOF 6
ROOF 5B
ROOF 5A
ROOF 7A
1A 3A 3B
1B
1C 1D
17A
17B
14B
14A
6 5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
A u to d e s k D o c s /C o lu m b u s V
A
R e p la c e R o o f o n B ld g
A /F
F E
C o lu m b u s
R e p la c e
R o o f_ B
A
A
R C
H rv t
/2
/2
:4
:1
P
M
AE107
ENLARGED ROOF PLAN - ROOFS 5
& 7
05/06/2025 PRQ JLF
REPLACE ROOF BUILDING 1A 757-21-101
COLUMBUS, OHIO
BID DOCUMENTS
1A
CHALMERS P. WYLIE
VETERANS
OUTPATIENT CLINIC
Approved: Columbus VAMC
1/8" = 1'-0"
ENLARGED ROOF PLAN - ROOFS 5, 7, 8, 9 &11
D R A W I N G N O T E S :
2.01 EXISTING ROOF DRAIN AND OVERFLOW DRAIN TO REMAIN. - TYPICAL
2.02 EXISTING PIPE VENT PENETRATION TO REMAIN. - TYPICAL
2.04 EXISTING ANCHOR POST PENETRATION TO REMAIN. - TYPICAL
2.05 EXISTING HVAC EQUIPMENT TO REMAIN. - TYPICAL
2.07 EXISTING ELECTRICAL CONDUIT PENETRATION TO REMAIN. - TYPICAL
2.10 EXISTING AIR HANDLING UNIT TO REMAIN.
2.12 REMOVE/RELOCATE CONDENSER DURING ROOF REPLACEMENT. INSPECT CURB(S) FOR ANY NOTICEABLE DAMAGE;
CONTACT VA AND A/E TO DISCUSS ANY ISSUES DISCOVERED. INSTALL EXISTING CONDENSER IN PREVIOUS LOCATION
AFTER ROOF REPLACEMENT.
2.14 INSPECT EXISTING ROOF DRAIN AND OVERFLOW DRAIN DURING ROOF REPLACEMENT - CONTACT VA AND A/E TO
DISCUSS ANY ISSUES DISCOVERED.
D E
S C
O P
IN
G
R O
O F
W
O R
K
IS
P A
R T
O F
T H
E B
ID
A
L T
E R
N A
T E
BID DOCUMENTS 05/06/2025
1 ADDENDUM 01 04/27/2026
| Sheets |
| AE107 - ENLARGED ROOF PLAN - ROOFS 5 & 7 |
File details come from the government source that posted it. Updated .