Part 3 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf
PDF 4 MB Posted
- Attached to
- Z2NZ-- 658-23-108 Correct Stormwater Drainage
- Solicitation number
- 36C24626B0031
About this file
This document is a Demolition Plan set of architectural drawings prepared for the Office of Construction and Facilities Management of the U.S. Department of Veterans Affairs. The plan consists of multiple sheets (CD101 through CD109) depicting a phased demolition strategy for the Overland Oven Visitor Discharge project, marked as 100% Final Design Phase.
The demolition plan provides detailed site layouts identifying structures, utilities, and infrastructure designated for removal across different phases of work. Key notes on the drawings specify that the contractor must exercise care for safe closure, abatement, and removal of facilities, with particular emphasis on environmental compliance, utility disconnections, and hazardous material management. The plans indicate demolition sequences, selective demolition areas, and sections requiring phased work to maintain ongoing facility operations. Coordination with Veterans Affairs management and adherence to regulatory requirements regarding hazardous materials, asbestos, and general construction protocols are mandatory. The drawings reference cross-sheet coordination (sheets CD101-CD109) to ensure comprehensive coverage of all demolition scope and identify relationships between demolished and retained structural elements. The document is prepared by Mabbett (an engineering and design firm) and includes standard architectural annotations, legends, and reference callouts throughout the sheet set.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .