Scanned_from_a_Lexmark_Multifunction_Product09-03-2026-135209.pdf

PDF 255 KB Posted

Attached to
Z2NZ-- 658-23-108 Correct Stormwater Drainage
Solicitation number
36C24626B0031
Issued by

About this file

Summary of Project Title: Correct Storm Water Drainage

Project Overview and Submission Information

This document is a handwritten federal contracting solicitation for a storm water drainage correction project. The project involves corrective work on water drainage in a location identified as Salem (potentially a specific site). The solicitation indicates a site visit is scheduled for Thursday, September 3rd, 2026, with responses due by 2026. The primary contact information and email are provided for inquiries regarding the project details and submission requirements.

Scope of Work and Requirements

The project requires comprehensive drainage system improvements including replacement of existing drain pipes, installation of new drainage infrastructure, and correction of drainage patterns to address current deficiencies. The work encompasses multiple drainage points and interconnected systems requiring coordination of various components. The solicitation references specific technical specifications and drainage standards that must be met. Multiple aspects of the drainage system are identified as requiring attention, including surface drainage, subsurface components, and structural elements related to water management. The document notes various materials, installation methods, and performance standards that contractors must address in their proposals. This appears to be a standard federal construction or facility improvement contract with detailed technical requirements for storm water management infrastructure.

View the file

Other files

File Type Posted
S07 Correct Storm Water 11-19-2026.pdf PDF
Amendment 9.pdf PDF
Amendment 8.pdf PDF
VAAR 852.219-75.pdf PDF
Amendment _7.pdf PDF
4 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
1 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
7 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
6 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
5 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
3 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
2 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
Final CSD Questions 9.10.26 - Combined Rev 06.pdf PDF
Amendment 7.pdf PDF
Item 55 - Suggested Soil Boring Location to Bidders.pdf PDF
Amendment 6.pdf PDF
Part 1 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
Amendment 6.pdf PDF
Part 5 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
658-23-108 Specifications-Addendum A.pdf PDF
Part 7 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Final CSD Questions 9.10.26 - Combined Rev 05.pdf PDF
Part 2 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Part 6 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Part 4 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Part 3 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
36C24626B0031 0005.pdf PDF
Amendment 4.pdf PDF
Amendment 3.pdf PDF
Amendment 3.pdf PDF
Amendment P0002.pdf PDF
Amendment 1.pdf PDF
Wage Determination_2.pdf PDF
658-23-108 Specifications-Correct Storm Water Drainage Combined.pdf PDF
658-23-108_Drawings.pdf PDF
Amendment 1.pdf PDF
Solicitation - 36C24626B0031.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .