Part 5 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf

PDF 8 MB Posted

Attached to
Z2NZ-- 658-23-108 Correct Stormwater Drainage
Solicitation number
36C24626B0031
Issued by

About this file

This document is a comprehensive set of drainage plans for the District of Veterans' Affairs facility, prepared by Mabbett in the 100% Final Design phase. The plans consist of multiple sheets (CU101-CU110) detailing stormwater management infrastructure, drainage routing, and pipe schedules for the project. The sheets include drainage plan layouts at various scales, proposed stormwater structure schedules identifying inlet and outlet parameters, pipe schedules specifying pipe sizes and materials, and detailed notes regarding drainage design standards, local regulations, and construction requirements. Key drainage features include multiple stormwater collection points, underground detention systems, and conveyance lines throughout the facility. The design references compliance with local jurisdictional requirements, addresses storm intensity parameters, and incorporates standard erosion and sediment control measures. All sheets are clearly cross-referenced, with notation boxes indicating relationships between adjacent sheets (e.g., "SEE SHEET CU102"). The document footer indicates project information including location (100% Subcontractor South, VA, VA 23510, 0604), project title (Drainage Plan), project number (CU101-CU110), and final design phase designation. The notes sections on each sheet provide essential construction guidance, material specifications, and compliance requirements for implementation of the drainage system.

View the file

Other files

File Type Posted
S07 Correct Storm Water 11-19-2026.pdf PDF
Amendment 9.pdf PDF
Amendment 8.pdf PDF
VAAR 852.219-75.pdf PDF
Amendment _7.pdf PDF
4 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
1 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
7 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
6 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
5 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
3 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
2 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
Final CSD Questions 9.10.26 - Combined Rev 06.pdf PDF
Amendment 7.pdf PDF
Item 55 - Suggested Soil Boring Location to Bidders.pdf PDF
Amendment 6.pdf PDF
Part 1 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
Amendment 6.pdf PDF
658-23-108 Specifications-Addendum A.pdf PDF
Part 7 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Final CSD Questions 9.10.26 - Combined Rev 05.pdf PDF
Part 2 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Part 6 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Part 4 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Part 3 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
36C24626B0031 0005.pdf PDF
Amendment 4.pdf PDF
Amendment 3.pdf PDF
Amendment 3.pdf PDF
Amendment P0002.pdf PDF
Scanned_from_a_Lexmark_Multifunction_Product09-03-2026-135209.pdf PDF
Amendment 1.pdf PDF
Wage Determination_2.pdf PDF
658-23-108 Specifications-Correct Storm Water Drainage Combined.pdf PDF
658-23-108_Drawings.pdf PDF
Amendment 1.pdf PDF
Solicitation - 36C24626B0031.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .