Part 5 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf
PDF 8 MB Posted
- Attached to
- Z2NZ-- 658-23-108 Correct Stormwater Drainage
- Solicitation number
- 36C24626B0031
About this file
This document is a comprehensive set of drainage plans for the District of Veterans' Affairs facility, prepared by Mabbett in the 100% Final Design phase. The plans consist of multiple sheets (CU101-CU110) detailing stormwater management infrastructure, drainage routing, and pipe schedules for the project. The sheets include drainage plan layouts at various scales, proposed stormwater structure schedules identifying inlet and outlet parameters, pipe schedules specifying pipe sizes and materials, and detailed notes regarding drainage design standards, local regulations, and construction requirements. Key drainage features include multiple stormwater collection points, underground detention systems, and conveyance lines throughout the facility. The design references compliance with local jurisdictional requirements, addresses storm intensity parameters, and incorporates standard erosion and sediment control measures. All sheets are clearly cross-referenced, with notation boxes indicating relationships between adjacent sheets (e.g., "SEE SHEET CU102"). The document footer indicates project information including location (100% Subcontractor South, VA, VA 23510, 0604), project title (Drainage Plan), project number (CU101-CU110), and final design phase designation. The notes sections on each sheet provide essential construction guidance, material specifications, and compliance requirements for implementation of the drainage system.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .