This document is a phasing and erosion control key plan for a federal construction project managed by the U.S. Department of Veterans Affairs (VA). The plan is prepared by Mabbett, an architectural and engineering firm, and is designated as 100% Final Design documentation for the District Obtain Visitor Discharge project.

The document consists of ten detailed site plans showing six construction phases (Phases 1 through 6) with corresponding erosion and sediment control measures. Each phase map identifies construction areas, materials and equipment storage locations, staging areas, and the placement of erosion control devices including silt fences, construction entrances, sediment barriers, and other environmental protection features. The plans include comprehensive legends identifying temporary erosion control infrastructure, permanent site improvements related to erosion control, and designated no-disturbance areas. Key notes on each plan address contractor responsibilities regarding materials staging, compliance with environmental specifications, proper installation and maintenance of erosion controls, coordination with safety requirements, and the requirement that erosion control devices be installed prior to construction beginning and removed after completion. The phased approach ensures sequential development while maintaining environmental protection throughout the project duration. The project number is QC101, and the documents are dated within the 2010-2025 timeframe based on the footer information provided.

View the file

Other files

File Type Posted
S07 Correct Storm Water 11-19-2026.pdf PDF
Amendment 9.pdf PDF
Amendment 8.pdf PDF
VAAR 852.219-75.pdf PDF
Amendment _7.pdf PDF
4 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
1 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
7 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
6 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
5 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
3 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
2 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
Final CSD Questions 9.10.26 - Combined Rev 06.pdf PDF
Amendment 7.pdf PDF
Item 55 - Suggested Soil Boring Location to Bidders.pdf PDF
Amendment 6.pdf PDF
Part 1 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
Amendment 6.pdf PDF
Part 5 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
658-23-108 Specifications-Addendum A.pdf PDF
Part 7 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Final CSD Questions 9.10.26 - Combined Rev 05.pdf PDF
Part 6 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Part 4 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Part 3 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
36C24626B0031 0005.pdf PDF
Amendment 4.pdf PDF
Amendment 3.pdf PDF
Amendment 3.pdf PDF
Amendment P0002.pdf PDF
Scanned_from_a_Lexmark_Multifunction_Product09-03-2026-135209.pdf PDF
Amendment 1.pdf PDF
Wage Determination_2.pdf PDF
658-23-108 Specifications-Correct Storm Water Drainage Combined.pdf PDF
658-23-108_Drawings.pdf PDF
Amendment 1.pdf PDF
Solicitation - 36C24626B0031.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .