This document is a Drainage Plan (Sheet CU101) for a stormwater correction project at a U.S. Department of Veterans Affairs facility located at 1970 Roanoke Boulevard, Salem, Virginia 24153-6404. The project number is 658-23-108, prepared by Mabbett & Associates, Inc., with an issue date of January 28, 2026, at 100% Final Design phase.

The drainage plan depicts comprehensive stormwater infrastructure improvements including proposed underground piping systems, catch basins, drainage manholes, infiltration ponds, subsurface infiltration systems (SIS-1, SIS-2A, SIS-2B, SIS-3A, SIS-3B), subsurface detention systems, outlet control structures, flared end sections, headwalls, and trench drains throughout the facility. The contractor is required to furnish and install PVC, HDPE, RCP, and other piping materials ranging from 3 inches to 40 inches in diameter at specified slopes, support and protect existing retaining walls and utilities, perform field verification of existing underground utilities (sewer, communications, electrical, water, gas, and steam), and coordinate with the VA and design engineers regarding any deviations. Key work includes replacing interfering utilities to match in kind, installing roof drain laterals with minimum 6-inch diameter PVC at 1% slope and 1-foot minimum cover, repairing and lining existing pipes, and compliance with International Plumbing Code and Uniform Plumbing Code guidelines. The plan incorporates existing stormwater and sanitary infrastructure with connections to the City of Salem MS4 system and identifies karst formation areas requiring special subsurface infiltration system consideration.

View the file

Other files

File Type Posted
Amendment _7.pdf PDF
4 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
1 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
7 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
6 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
5 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
3 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
2 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
Final CSD Questions 9.10.26 - Combined Rev 06.pdf PDF
Amendment 7.pdf PDF
Amendment 6.pdf PDF
Part 1 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
Amendment 6.pdf PDF
Part 5 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
658-23-108 Specifications-Addendum A.pdf PDF
Part 7 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Final CSD Questions 9.10.26 - Combined Rev 05.pdf PDF
Part 2 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Part 6 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Part 4 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Part 3 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
36C24626B0031 0005.pdf PDF
Amendment 4.pdf PDF
Amendment 3.pdf PDF
Amendment 3.pdf PDF
Amendment P0002.pdf PDF
Scanned_from_a_Lexmark_Multifunction_Product09-03-2026-135209.pdf PDF
Amendment 1.pdf PDF
Wage Determination_2.pdf PDF
658-23-108 Specifications-Correct Storm Water Drainage Combined.pdf PDF
658-23-108_Drawings.pdf PDF
Amendment 1.pdf PDF
Solicitation - 36C24626B0031.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W

W

E

E

G

A

S

G A

S

GAS

GAS

G A

S

G A

S

GAS

E

E

E

EE

E

E

E

E

E

C

W

W

W

W

W

W

C

C

C

C

C

E

E

E

E

W

W

SS

S

C

C

E

E

ST

ST

ST

C

C

C

C

C

C

C

C

C

C

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W

C

C

C

C

C

E

E

E

E

E

E

E

E

E

E

E

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

G

AS

G

AS

E

S

S

S

S

S

S

S

S

S

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

C

C

C

C

C

C

E

E

E

E

E

C

C

C

C

C

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S T

ST

ST

S

T

EX.

WMH

EX.

WV

EX.

FH

EX.

WV

EX.

WV

EX.

FH EX. FH

EX. WV EX.

SSWR-MH4B EX.

WV

EX. STM-MH

EX. LP

EX. LP

EX. LP

EX.

STM-MH

EX.

SSWR-MH4A

EX. SSWR-MH4

EX. CMH

EX. EMH

EX. EMH

EX. CMH

EX. EMH EX. LP

EX. LP

EX. LP

EX. LP

EX. LP

EX. WV

EX. FP

EX. STM-MH

EX. STM-MH

EX. 20 MPH SIGN

(SOLAR SPEED)

EX. BENCH

PLCC CURBCONC. SIDEWALK

DY/4"

PATRIOT BLVD.

CONC. SIDEWALK

CONC. SIDEWALK

EX. LP

EX.

EX.

WMH

EX.

EMERG. BOX

W/ BOLLARDS

EX.FH

EX.WV EX. BENCH

EX. DECID. 24"

EX.TWS

EX.TWS

EX. AMBULANCE

SIGN

EX. ARMY RD.

DY/4"

E.O.P.

ST

S

T

ST

BLDG . 17

BLDG . 25

SWIMMING

POOL

BLDG.

BLDG.

BLDG. 26

BLDG.

BLDG.

LOT T

LOT Z

EX. LP

EX. LP

EX. LP

EX. LP

EX. LP

EX.

STM-MH

EX. LP

EX. LP

EX. LP

EX. SIGNS

(TYP.)

EX. SIGN

EX. LP

EX. SIGNS

EX. LP

EX. SIGN

EX. SIGNS

EX. LPEX. LP

EX. LP

EX.

WV

EX. LP

EX. LP

EX. SIGN

EX. SIGN

EX. SIGN

S

EX.

SSWR-MH

EX.

FH

EX. GATE

EX.

STM-MH

EX. SIGN

BLDG. 23

VALLEY

CO

X

X

X

X

X

X

X

S

S

S S

W

X

X

S

ST

EX.

STM-MH

EX.

SSWR-MH3

EX.

SSWR-MH4D

CITY OF SALEM

SSWR-MH

S

S

S

S

S

S

S

S

S

S

S

S

S

S

EX.

SSWR-MH4A

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

CO

CO

CO

CO

CO

CO

X

X

X

X

X X

X

X

CE

D D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

DMH-65 DMH-66

CB-2

CB-1

STORM

STRUCTURE

CB-3

DMH-64

DMH-63

CB-5

CB-4

DMH-62

DMH-61

DMH-60

DMH-17

CB-7

CB-8

CB-13

CB-14

CB-6

DMH-15

DMH-B1

DMH-16

DMH-101W

DMH-100W

DMH-72

24" CMP OUTFALL

TO VALLEY

EX. FH

EX. EMH EX. CMH

EX.

RET. WALL

EX.TWS

EX. FENCE

EX. FENCE

EX. LP

EX. LP

EX. GATE

PL

CC

C

UR

B

PL

CC

C

UR

B

EX. FH

EX. SIGNSEX. VAMC

ENTRANCE SIGN

(DIGITAL)

EX.

WMH

E.O.P.

EX.

SSWR-MH

EX. UP

PP-3946-2768

E.O.P.

EX. EB

EX.

FENCE

EX. LP

DY/4"

BLDG. 163

C

C

C

C

C

C

C C

C

C

C

C

OUTFALL 1A/1B CONNECTING

TO THE MS4 SYSTEM OF

THE CITY OF SALEM

E

E

E

E

E

E

E

E

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

8" CI

24" CMP

10" VCP

8" CI

@1.46%

32" RCP

@1.27%

10" CI

@3.47%

32" RCP

32" RCP

@2.84%

24" RCP

24" AC

@0.59%

30" RCP

@1.81%

32" RCP

@0.98%

10" CI

@0.50%I

6" CI

6" CI

8" CI

@0.47%

10" VCP

@0.64%

24" RCP

6" PVC

@0.14%

6" PVC

@0.15%

6" CI CAPPED END

6" CI6" CI

24" CMP

6" CI

6" CI

6" CI

APPROXIMATE LOCATION

OF KARST FORMATION

AREA PER ARCGIS "KARST

AREAS" LAYER

SUBSURFACE

INFILTRATION

SYSTEM 1 (SIS-1)

I

N

F

I

L

T

R

A

T

I

O

N

P

O

N

D

I

P

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

DMH-130

DMH-131

CB-115

DMH-132

DMH-136

OCS-4

FES-7

OCS-5

FES-8

INV= 1064.00

INV= 1067.00

D

D

D

D

D

D

D

D

D

D

D

D

D

5+26

2+93

5+08

2+00

3+00

D

D

0+70

0+00

DMH-59

7 & 22

W

D

D

INSPECTION MH

RIM= 1073.00

INSPECTION MH

RIM= 1075.52

HP=1057.50

1. REFER TO SHEET C-001 FOR CIVIL LEGEND, ABBREVIATIONS, AND GENERAL NOTES.

2. SUPPORT AND PROTECT IN PLACE THE EXISTING RETAINING WALLS.

3. SUPPORT AND PROTECT EXISTING UTILITIES UNLESS INDICATED OTHERWISE. CONTRACTOR

SHALL REPAIR ANY DISTURBED UTILITIES.

4. REFER TO SHEETS CU110 TO CU112 FOR PROPOSED STORMWATER PIPES AND STRUCTURES

DETAILS.

5. PROPOSED UNDERGROUND ROOF DRAIN LATERALS SHALL BE A MINIMUM OF 6-INCH DIA,

PVC AND AT A 1% SLOPE. UNDERGROUND ROOF DRAIN LATERALS SHALL HAVE A MINIMUM

COVER OF 1 FOOT. AT LOCATIONS WHERE EXISTING ROOF LATERAL IS FOUND TO BE A

LARGER DIAMETER, CONTRACTOR SHALL FURNISH NEW PIPE OF THE SAME SIZE AND SLOPE

AS THE EXISTING STRUCTURE. CONTRACTOR SHALL FOLLOW INTERNATIONAL PLUMBING

CODE (IPC) AND UNIFORM PLUMBING CODE (UPC) GUIDELINES FOR FITTINGS, CLEANOUTS

AND ROOF DRAIN LATERAL CONNECTIONS.

6. GRAY COLORED KEY NOTE MEANS NOT USED ON THIS SHEET

7. AT LOCATIONS WHERE PROPOSED NEW PIPE CONNECTS TO EXISTING STRUCTURES, THE

FORMER OPENING FROM EXISTING PIPE TO BE REMOVED SHALL BE BRICK AND MORTAR

SEALED AND NEW PIPE INSTALLED/CORED.

8. EXISTING UNDERGROUND UTILITIES' INVERT AND SIZE INFORMATION FOR SEWER, COMMUNICATIONS, ELECTRICAL, WATER, GAS AND STEAM ARE BASED ON ENGINEERING ASSUMPTIONS AND LIMITED

SURVEY INFORMATION. THESE UTILITIES ARE ASSUMED TO HAVE A NOMINAL 2 FT OF COVER AT A

MINIMUM. CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF EXISTING UTILITIES AND INFORM THE VA

AND ENGINEERS OF ANY FIELD DEVIATIONS THAT WOULD COMPROMISE OVERALL DESIGN.

9. THE CONTRACTOR SHALL FIELD VERIFY IF EXISTING UTILITIES INTERFERES WITH THE NEW PROPOSED

STORMWATER SYSTEM, IF THE EXISTING UTILITY DOES NOT CONFLICT, THE CONTRACTOR SHALL NOT

DEMOLISH OR FURNISH A NEW UTILITY. IF THE EXISTING UTILITY DOES CONFLICT WITH THE NEW

PROPOSED STORMWATER SYSTEM, THE CONTRACTOR SHALL REPLACE SECTION OF EXISTING

INTERFERING UTILITY TO MAKE INVERTS WORK AND MATCH IN KIND.

CU101

DRAINAGE PLAN

SCALE: 1" = 50'

0 100 150 200

KEY NOTES

NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

Correct Storm Water Drainage

1970 Roanoke Boulevard Salem, VA 24153-6404

658-23-108

01.28.2026 RBB KRS/PEH

100% FINAL DESIGN

# Revisions Date

Scientists I Engineers I Program Managers

Mabbett & Associates, Inc.

105 Central Street Stoneham, MA 02180-1248

T. 781-275-6050 www.mabbett.com

Mabbett

C

U d w g

Page of 59

S E

E

S

H E

E T

C

U

SEE SHEET CU105

SEE SHEET CU106

1. FURNISH AND INSTALL COUPLING TO JOINT CONNECTION. SEE NOTE 2. SEE SHEET CK501, DETAIL F5

2. FURNISH AND INSTALL NEW LADDER RUNGS AND PATCH & MORTAR TOP BRICK LAYER OF STRUCTURE. SEE SHEET CK503, DETAIL C4

3. SEAL OPENING AROUND PIPE INSIDE MANHOLE

4. FURNISH AND INSTALL NEW LADDER RUNGS. SEE SHEET CK503, DETAIL C4

5. RE-ESTABLISH BACKDROP MANHOLE CONNECTION IF DISTURBED DURING WORK

6. PERFORM PIPE LINING AND REPAIR

7. FURNISH AND INSTALL CATCH BASIN & COVER. SEE SHEET CK501, DETAILS D6, E8, F3 & F8

8. PATCH & MORTAR TOP BRICK LAYER OF STRUCTURE

9. PUMP OUT WATER FROM FLOODED CATCH BASIN INLET. CONTRACTOR TO FURTHER INVESTIGATE INLET AND OUTLET

CONNECTIONS TO DETERMINE FLOOD ISSUE WITHIN INLET STRUCTURE

10. FURNISH AND INSTALL PVC PIPING. SEE NOTE 5

11. FURNISH AND INSTALL HDPE PIPING

12. FURNISH AND INSTALL MANHOLE & COVER. SEE SHEET CK503, DETAIL C1 AND SHEET CK502, DETAIL F9

13. FURNISH AND INSTALL CATCH BASIN GRATE. SEE SHEET CK501, DETAILS D6 & F8.

14. REMOVE INTRUDING ROOT IN PIPE

15. JET OUT AND VACUUM DEBRIS TO REMOVE BLOCKAGE

16. FURNISH AND INSTALL CURB INLET & COVER. SEE SHEET CK503, DETAIL E3

17. FURNISH AND INSTALL RCP PIPING

18. FURNISH AND INSTALL OUTLET CONTROL STRUCTURE. SEE SHEET CK501, DETAIL D4 FOR INFILTRATION POND OCS AND

SHEET CK502, DETAIL C6 FOR SUBSURFACE INFILTRATION CHAMBER OCS

19. FURNISH AND INSTALL FLARED END SECTION. SEE SHEET CK502, DETAIL C1

20. FURNISH AND INSTALL RIP RAP. SEE SHEET CK501, DETAIL C1

21. FURNISH AND INSTALL TRENCH DRAIN. SEE SHEET CK504, DETAIL C6

22. FURNISH AND INSTALL CATCH BASIN HOOD. SEE SHEET CK501, DETAIL F1

23. FURNISH AND INSTALL NEW HEADWALL. SEE SHEET CK502, DETAIL E1

24. RELOCATE EXISTING LIGHT POLE

25. FURNISH AND INSTALL NEW ELECTRICAL SERVICE. MATCH IN KIND

26. FURNISH AND INSTALL NEW DI WATER SERVICE. MATCH SIZE IN KIND. SEE SHEET CK505, DETAILS B1, B4, B7, C1 & C4

27. FURNISH AND INSTALL NEW SEWER SERVICE

Kevin Sifuentes Oval

Kevin Sifuentes Callout

PERFORM SOIL BORING INVESTIGATION HERE FOR STRUCTURE BUOYANCY PURPOSES

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

E

E

E

E

E

E

E

E

E

E

E

C

C

C

C

E

E

E

E

E

E

E

E

E

E

E

C

C

W

E

E

E E

W

W

W

W

W

W

W

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

S

E

E

E

E

E

E

E

E S

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E C

E

E

E

E

E

E

E

E

E

C

C

C

C

C

C

C

S

S

S

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

S

D

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E C

CO

E

E

E

E

E

E

E

E

E

E

G A

S

G A

S

G A

S

G A

S

G A

S

G A

S

G A

S

BLDG.

BLDG . 9

BLDG . 10

BLDG . 8

BLDG . 7

BLDG . 170

BLDG . 168

BLDG .

144BLDG .

LOT J

LOT H

LOT JJ

LOT K

LOT L

D

D

D

S

D

D

CO

BLDG .

S

S

S

BLDG .

CO

E

C

CO

CO

S

X

X

X

X

X

X

X

X

X

X

X

XS

X

X

E

CO

CO

CO

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

CO

CO

S

X

X

X

X

X

X

X

X

X

S

S

S

S

TENNIS

COURT

E C

COCO

S

S

BLDG .

E

E

S

E C

X

X

S

C

CO

E

E

E

E

E

E

W

W

W

W

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

C

C

C

C

C

C

C

C

W

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

S

S

S

C

E

E

E

S

BNMRK

EX. EMH

EX. SIGNS

(TYP.)

EX. EMH

EX.

EB

EX. FENCE

W/ GATE

EX.LP

EX. LOT L

SIGN

EX. SIGNS

(TYP.)

EMERG.

CALL

EX.

RIP-RAP

EX. EMH

BRIDGE

W/ RAILING

BRIDGE

W/ RAILING

EX. EB

EX. EB

EX.

RIP-RAP

EX. SIGNS

(TYP.)

EX.LP

EX.

EMH

EX.

SSWR-MH

EX.

SSWR-MH

EX.LP

EX.LP

EX.

SSWR-MH

EX.LP

EX. FENCE

EX.

FENCE

EX.LPEX.LP EX. LOT K

SIGN

EX.LP

EX. SIGNS

(TYP.)

EX. GATE

EX. GATE

EX. CMH

EX.

EMH

EX.

EMH

EX. EMH

EX. EMH

EX. EMH

EX. CMH

EX. SSWR-MH

EX.

SSWR-MH

EX.

EMH

EX. TRANS.

EX. HVAC

EQUIP.

EX. CMH

EX. FDC

EX. HVAC

EQUIP.

EX.

TRANS.

EX. WV

EX. FDC

EX.

WV

EX. WV

EX.

WMH

EX.

WV

EX.

WV

EX. FH

EX. FH

EX.

WV

EX. FH

EX. FH

EX.

WV

EX.

WV

EX. FH

EX.

WV

EX. FENCE

EX. FENCE

EX. GATE

EX.

RIP-RAP

EX.

RIP-RAP

EX. TRANS.

EX.

WV

EX. WV

EX.

WV

EX.

WV

EX. FH

EX.

WV

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SSWR-MH-21A

BLDG. 134

E

S

EX. SSWR-MH

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X X X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

CO

PLCC CURB

EX. SIGNS

(TYP.)

EX. SSWR-MH

EX. WV

EX.LP

EX.LP

EX.LPEX. FH

EX. WV

EX.LP

EX.LP EX.LP

EX.SSWR-MH

EX. SIGNS

(TYP.)

EX.LP

EX.LP

EX.LP

EX. FH

EX.

SSWR-

MHEX. FH

EX. SIGNS

(TYP.)

EX. SIGNS

(TYP.)

EX. SSWR-MH

EX. FH

EX. WMH

EX. LP

(TYP.)

EX.SSWR-MH

EX.LP

EX. EMH

EX. EMH

EX. CMH

EX.

SSWR-MH

EX. SSWR-MH

EX. WV

EX. WV

EX. FH

EX. EMH

EX. SIGNS

(TYP.)

EX. SIGN (TYP.)

EX. SSWR-MH

EX.

SSWR-MH

EX. SSWR-MH

EX.

SSWR-MH

EX.

SSWR-MH EX. FENCE

EX. SSWR-MH

EX. SSWR-MH

EX. SIGNS

(TYP.)

EX. LP

EX. LP

EX. LP

EX.SSWR-MH

EX. LP

EX. LP

EX. LP

EX.

CMH

EX.

SIGNS

(TYP.)

EX.

SIGNS

(TYP.)

EX. SIGNS (TYP.)

EX. LP

EX. SIGNS (TYP.)

EX.

SIGNS

(TYP.)

EX. SIGNS

(TYP.)

EX. SIGNS

(TYP.)

EX. SIGN

(TYP.)

EX.

SHED

EX.

SHED

X

X

X

X

X

X

BLDG . 34 BLDG . 117

BLDG . 97

EX. WATER TOWER

CO

D

CO

CO

CO

CO

CO

CO

D

D

D

D

D

D

D

D

D D

D

D

D

D

CO

CO

D

CO

CO

CO

CO

CO

CO

CO

CO

D

D

D

D

D

D

D

D

D

CB-52

CB-53

CB-58

DMH-67

CB-82

DMH-38

DMH-37

DMH-39

HEADWALL-3

14" PIPE END

INV. 1016.64

14" PIPE END

INV. 1018.29

HEADWALL-4

HEADWALL-5

40" PIPE END

INV. 1072.93

DMH-82

CB-59

CB-60

CB-61

DMH-95B

CB-63

18" PIPE END

INV. 1081.49

18" PIPE END

INV. 1095.02

CB-62

DMH-103

DMH-91

DMH-92

DMH-93

DMH-18

DMH-100E

DMH-101E

DMH-102E

DMH-83

DMH-84

DMH-87

DMH-88

TD-17

CB-96

CB-98

CB-89

CB-94

CB-97

CB-87

CB-99

CB-88

CB-91

CB-100

CB-101

CB-102

DMH-35A

DMH-97

DMH-95D

26" PIPE END

INV. 1007.96

DMH-95C

CB-25

CB-27

DMH-95

CB-115

(BURIED)

TD-10

TD-11

TD-15

TD-16

DMH-89

(BURIED)

DMH-9

(BURIED)

DMH-35

DMH-95E

D

DMH-35B

D

DMH-94

EX.LP

EX. SIGNS (TYP.)

EX. FENCE

EX. EMH

EX.LP

EX. SIGNS

(TYP.)

E.O.P.

E.

O.

P.

E.O.P.

E.

O.

P.

EX. LP

EX. LP

EX. RET.

WALL EX. LP

EX. RET.

WALL

E.O.P.

E.O.P.

E.O.P.

E.

O.

P.

E.O.P.

BLDG. 126

BLDG. 133

BLDG. 139

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

EX

. S

W

AL

E

EX

. S

W

AL

E

EX

. S

W

AL

E

CO

CO

SWALE-1

SWALE-2

SWALE-3

D

S

EX.

RIP-RAP

18" PIPE END

INV. 1079.39

CB-P3

HEADWALL-8

HEADWALL-7

W

W

W

W

W

W

W

W

W

W

W

W

W

W

E

E

E

E

E

E

E

E

E

E

E

E

E

8" CI

@7.25%

12" CONC.

@4.13%

6" CI

@2.59%

6" CI

@0.50%

8" CI

@10.11%

24" HDPE

@0.25%

10" HDPE

@1.05%

8" DI

8" DI

8" CI

@1.13%

8" CI

@0.50%

10" CI

@1.04%

8" CI 30" RCP

@2.04%

30" RCP

@1.06%

30" RCP

@12.33%

18" RCP

@2.28%

10" CONC.

8" CONC.

@1.71%

8" CONC.

6" CI

@0.68%

12" VCP

30" RCP

@0.48%

18" RCP

@2.60%

8" CI

8" CI

4" CI

18" RCP

24" HDPE

@0.81%

8" PVC

@0.50%

8" PVC

8" CI

@0.00%

24" HDPE

@0.94%

24" HDPE

@0.19%

6" PVC

@0.50%

12" HDPE

@0.76%

16" HDPE

@2.30%

8" CI

6" CPP

8" PVC

@3.55%

6" CPP

@0.50%

12"

PVC

18" HDPE

36" RCP

3" CI

@0.50%

3" CI

@0.50%

4" CI

@0.50%

4" CI

4" CI

3" CI

@0.50%

4" CI

@0.00%

6" RCP

@0.50%

8" CI

@0.50%

4" CI

@0.50%

4" CI

@0.45%

4" CI

@0.67%

6" CI

@0.50%

4" CI

@0.50%

6" CI

@0.50%

10" VCP

@4.00%

10" PVC

@1.61%

4" CI

4" CI

@0.43%

18" CI

@1.50%

8" PVC

@0.15%

6" CI

4" CI

@0.00%

6" CI

@0.50%

6" CI6" CI

4" CI

@0.50%

6" CI

6" CI

6" CI

@0.50%

18" RCP

@8.00%

18" RCP

@8.00%

8" CI

6" CI

10" CONC.

24" HDPE

@0.59%

4" CI

@0.50%

4" CI

@0.50%

4" CI

@0.45%

6" CI

@0.50%

18" HDPE

8" PIPE

18" RCP

20" RCP

@15.34%

24" RCP

@10.51%

10" CI

@8.00%

10" VCP

@1.30%

10" CI

@1.03%

8" PVC

@1.30%

8X10 PVC

REDUCER

10" VCP

@1.03%

10" CI

@4.00%

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

CB-126

CB-127

FES-6

CB-138

CB-139

CB-140

CB-141

OCS-8

OCS-9

INV= 1076.03

INV= 1074.19

INV= 1074.17

INV= 1074.15

INV= 1074.15

TD-2A

CB-160

CB-161

CB-162

CB-163

CB-167

7 & 22

7 & 22

7 & 22

7 & 22

7 & 22

7 & 22

7 & 22

7 & 22

D

SUBSURFACE

INFILTRATION

SYSTEM 2A (SIS-2A)

SUBSURFACE

INFILTRATION

SYSTEM 2B (SIS-2B)

4+00

2+50

4+10

D

D

D

D

E

E

E

C

E

D

D

D

D

1. REFER TO SHEET C-001 FOR CIVIL LEGEND, ABBREVIATIONS, AND GENERAL NOTES.

2. SUPPORT AND PROTECT IN PLACE THE EXISTING RETAINING WALLS.

3. SUPPORT AND PROTECT EXISTING UTILITIES UNLESS INDICATED OTHERWISE. CONTRACTOR

SHALL REPAIR ANY DISTURBED UTILITIES.

4. REFER TO SHEETS CU110 TO CU112 FOR PROPOSED STORMWATER PIPES AND STRUCTURES

DETAILS.

5. PROPOSED UNDERGROUND ROOF DRAIN LATERALS SHALL BE A MINIMUM OF 6-INCH DIA,

PVC AND AT A 1% SLOPE. UNDERGROUND ROOF DRAIN LATERALS SHALL HAVE A MINIMUM

COVER OF 1 FOOT. AT LOCATIONS WHERE EXISTING ROOF LATERAL IS FOUND TO BE A

LARGER DIAMETER, CONTRACTOR SHALL FURNISH NEW PIPE OF THE SAME SIZE AND SLOPE

AS THE EXISTING STRUCTURE. CONTRACTOR SHALL FOLLOW INTERNATIONAL PLUMBING

CODE (IPC) AND UNIFORM PLUMBING CODE (UPC) GUIDELINES FOR FITTINGS, CLEANOUTS

AND ROOF DRAIN LATERAL CONNECTIONS.

6. GRAY COLORED KEY NOTE MEANS NOT USED ON THIS SHEET

7. AT LOCATIONS WHERE PROPOSED NEW PIPE CONNECTS TO EXISTING STRUCTURES, THE

FORMER OPENING FROM EXISTING PIPE TO BE REMOVED SHALL BE BRICK AND MORTAR

SEALED AND NEW PIPE INSTALLED/CORED.

8. EXISTING UNDERGROUND UTILITIES' INVERT AND SIZE INFORMATION FOR SEWER, COMMUNICATIONS, ELECTRICAL, WATER, GAS AND STEAM ARE BASED ON ENGINEERING ASSUMPTIONS AND LIMITED

SURVEY INFORMATION. THESE UTILITIES ARE ASSUMED TO HAVE A NOMINAL 2 FT OF COVER AT A

MINIMUM. CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF EXISTING UTILITIES AND INFORM THE VA

AND ENGINEERS OF ANY FIELD DEVIATIONS THAT WOULD COMPROMISE OVERALL DESIGN.

9. THE CONTRACTOR SHALL FIELD VERIFY IF EXISTING UTILITIES INTERFERES WITH THE NEW PROPOSED

STORMWATER SYSTEM, IF THE EXISTING UTILITY DOES NOT CONFLICT, THE CONTRACTOR SHALL NOT

DEMOLISH OR FURNISH A NEW UTILITY. IF THE EXISTING UTILITY DOES CONFLICT WITH THE NEW

PROPOSED STORMWATER SYSTEM, THE CONTRACTOR SHALL REPLACE SECTION OF EXISTING

INTERFERING UTILITY TO MAKE INVERTS WORK AND MATCH IN KIND.

CU107

DRAINAGE PLAN

SCALE: 1" = 50'

0 100 150 200

KEY NOTES

NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

Correct Storm Water Drainage

1970 Roanoke Boulevard Salem, VA 24153-6404

658-23-108

01.28.2026 RBB KRS/PEH

100% FINAL DESIGN

# Revisions Date

Scientists I Engineers I Program Managers

Mabbett & Associates, Inc.

105 Central Street Stoneham, MA 02180-1248

T. 781-275-6050 www.mabbett.com

Mabbett

C

U d w g

Page of 59

S E

E

S

H E

SEE SHEET CU103

S E

E

S

H E

S E

E

S

H E

SEE SHEET CU108

S E

E

S

H E

1. FURNISH AND INSTALL COUPLING TO JOINT CONNECTION. SEE NOTE 2. SEE SHEET CK501, DETAIL F5

2. FURNISH AND INSTALL NEW LADDER RUNGS AND PATCH & MORTAR TOP BRICK LAYER OF STRUCTURE. SEE SHEET CK503, DETAIL C4

3. SEAL OPENING AROUND PIPE INSIDE MANHOLE

4. FURNISH AND INSTALL NEW LADDER RUNGS. SEE SHEET CK503, DETAIL C4

5. RE-ESTABLISH BACKDROP MANHOLE CONNECTION IF DISTURBED DURING WORK

6. PERFORM PIPE LINING AND REPAIR

7. FURNISH AND INSTALL CATCH BASIN & COVER. SEE SHEET CK501, DETAILS D6, E8, F3 & F8

8. PATCH & MORTAR TOP BRICK LAYER OF STRUCTURE

9. PUMP OUT WATER FROM FLOODED CATCH BASIN INLET. CONTRACTOR TO FURTHER INVESTIGATE INLET AND OUTLET

CONNECTIONS TO DETERMINE FLOOD ISSUE WITHIN INLET STRUCTURE

10. FURNISH AND INSTALL PVC PIPING

11. FURNISH AND INSTALL HDPE PIPING

12. FURNISH AND INSTALL MANHOLE & COVER. SEE SHEET CK503, DETAIL C1 AND SHEET CK502, DETAIL F9

13. FURNISH AND INSTALL CATCH BASIN GRATE. SEE SHEET CK501, DETAILS D6 & F8

14. REMOVE INTRUDING ROOT IN PIPE

15. JET OUT AND VACUUM DEBRIS TO REMOVE BLOCKAGE

16. FURNISH AND INSTALL CURB INLET & COVER. SEE SHEET CK503, DETAIL E3

17. FURNISH AND INSTALL RCP PIPING

18. FURNISH AND INSTALL OUTLET CONTROL STRUCTURE. SEE SHEET CK501, DETAIL D4 FOR INFILTRATION POND OCS AND

SHEET CK502, DETAIL C6 FOR SUBSURFACE INFILTRATION CHAMBER OCS

19. FURNISH AND INSTALL FLARED END SECTION. SEE SHEET CK502, DETAIL C1

20. FURNISH AND INSTALL RIP RAP. SEE SHEET CK501, DETAIL C1

21. FURNISH AND INSTALL TRENCH DRAIN. SEE SHEET CK504, DETAIL C6

22. FURNISH AND INSTALL CATCH BASIN HOOD. SEE SHEET CK501, DETAIL F1

23. FURNISH AND INSTALL NEW HEADWALL. SEE SHEET CK502, DETAIL E1

24. RELOCATE EXISTING LIGHT POLE.

25. FURNISH AND INSTALL NEW ELECTRICAL SERVICE. MATCH IN KIND.

26. FURNISH AND INSTALL NEW DI WATER SERVICE. MATCH SIZE IN KIND. SEE SHEET CK505, DETAILS B1, B4, B7, C1 & C4

27. FURNISH AND INSTALL NEW SEWER SERVICE.

Kevin Sifuentes Oval

Kevin Sifuentes Callout

PERFORM SOIL BORING INVESTIGATION HERE FOR STRUCTURE BUOYANCY PURPOSES

Kevin Sifuentes Oval

Kevin Sifuentes Callout

PERFORM SOIL BORING INVESTIGATION HERE FOR STRUCTURE BUOYANCY PURPOSES

E

W

E

D

BLDG . 96

SOUTH PONDBLDG . 31

DD

LOT L

BLDG .

D

D

D

S

X

X

X

X X

X

S

E

D

E

D

X

X

CO

CO

E

CO

CO

D

D D

S

S

E E

E

E

E

GAS

G

A

S

G

A

S

G

A

S

G A

S

GAS GAS

GAS

GAS

GAS

GAS GAS

GAS

GAS

GAS

G A

S

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

S

S

G

A

S

GAS

G

A

S

G

A

S

G

A

S

G

A

S

C

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

E

E

E

W

W

W

W

W

W

W

W

E S

S

S

E

E

C

C

E

E

S

S

S

S

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

S

S

EX. HVAC EQUIP.

EX.

SSWR-MHEX. FUEL

TANKS

EX. EMH

EX. TRANS.

EX. TRANS.

EX. FH

EX. SIGN

EX. FH

EX. FDC

EX. EB

EX. EMH

EX. FENCE

W/ GATE

EX.LP

EX.LP

EX. EB

EX. FH

EX. PIV

EX. EMH

EX.LP

EX. FENCE

W/ GATE

EX. GAS

METERS

EX. RET.

WALL

EX. SIGN EX. ELEC.

VAULT

EX. ELEC.

VAULT

EX. FH

EX. WV

EX. OXYGEN

TANK

EX. EMH

EX.

GENERATOR EX. TRANS.

EX.

RIP-RAP

EX.

RIP-RAP

EX.

SSWR-MH

EX.

TRANS.

EX.

SSWR-MH

BOILER

PLANT

X

X

X

S

S

S

S

S

S

S

S

S

S

S

S

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

EX. FENCE

EX.

SSWR-MH

EX. GATE

EX.LP

EX.LP

EX.

SSWR-VAULT

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

EX.

WV

BLDG. 116

X

X

X

X

X

BLDG.

D

D D

D

DMH-33A

CB-48 CB-49

TD-9

CB-52

CB-50

CB-51

HEADWALL-1

CB-47

CB-83

HEADWALL-2

SSMH-13

CB-85

DMH-35A

DMH-68

DMH-69

DMH-70

CB-103

DMH-34

DMH-36

CB-114 DMH-42

DMH

CONTECH

CB-22

CB-23

DMH-40

TD-8

DMH-33

EX.LP

EX. GATE

PLCC CURB

E.O.P.

E.O.P.

E.O.P.

E.O.P.

EX.

RET. WALL

E.

O.

P.

EX

. S

WAL

E

WET VEGETATION AREA

S18" PIPE END

INV. 1079.39

D

D

D

DMH-71

SERVICE TUNNEL

EX.

UNDERGROUND

FUEL TANK LIDS

EX. STORMWATER

DETENTION FACILITY

DMH-41

CITY OF SALEM

CITY OF ROANOKE

20" RCP

4" PVC

15" HDPE

@1.63% 12" PVC

@3.24%

12" CPP

15" HDPE

@4.27%

15" HDPE

15" HDPE

@2.05%

24" HDPE

@7.52% 24" HDPE

@20.00%

24" HDPE

@8.34%

24" HDPE

24" HDPE

@10.41%

8" HDPE (2) 18" HDPE

@0.18% @0.03%

18" RCP

@0.90%

18" HDPE

@9.60%

18" HDPE

12" HDPE

@8.17%

12" HDPE

@0.26%

12" HDPE

@0.50%

4" PVC

8" PVC

@0.15%

@15.34%

12" HDPE

WETLAND DELINEATION BASED ON

"PRELIMINARY JURISDICTIONAL DETERMINATION,

NAO-2023-1077 (MAGGODEE CREEK)", DATED

SEPTEMBER 21, 2023; AND "STREAM AND

WETLAND ID MAP", DEVELOPED BY FROEHLING &

ROBERTSON, INC., DATED APRIL 2023

STREAM LOCATION IS BASED ON "PRELIMINARY

JURISDICTIONAL DETERMINATION, NAO-2023-1077

(MAGGODEE CREEK)", DATED SEPTEMBER 21, 2023;

AND "STREAM AND WETLAND ID MAP", DEVELOPED BY

FROEHLING & ROBERTSON, INC., DATED APRIL 2023

D

D

D

D

D

D

D

25 FT VEGETATIVE WETLAND BUFFER

SUBSURFACE

INFILTRATION SYSTEM

3A (SIS-3A)

D

D

D

D

D

D

D

D

D

D

D

D

D

DMH-160

DMH-161

CB-157

CB-158

DMH-162

INV= 977.75

INV= 977.75

OCS-10

D

D

SUBSURFACE

DETENTION SYSTEM

3 (SDS-3)

SUBSURFACE

INFILTRATION SYSTEM

3B (SIS-3B)

D

D

D

DMH-164

HEADWALL-1A

4+14

1+50

D

D

D

D

D

DMH-173

DMH-172

5+84

INV= 984.00

INV= 987.20

D

D

D

D

1. REFER TO SHEET C-001 FOR CIVIL LEGEND, ABBREVIATIONS, AND GENERAL NOTES.

2. SUPPORT AND PROTECT IN PLACE THE EXISTING RETAINING WALLS.

3. SUPPORT AND PROTECT EXISTING UTILITIES UNLESS INDICATED OTHERWISE. CONTRACTOR

SHALL REPAIR ANY DISTURBED UTILITIES.

4. REFER TO SHEETS CU110 TO CU112 FOR PROPOSED STORMWATER PIPES AND STRUCTURES

DETAILS.

5. PROPOSED UNDERGROUND ROOF DRAIN LATERALS SHALL BE A MINIMUM OF 6-INCH DIA,

PVC AND AT A 1% SLOPE. UNDERGROUND ROOF DRAIN LATERALS SHALL HAVE A MINIMUM

COVER OF 1 FOOT. AT LOCATIONS WHERE EXISTING ROOF LATERAL IS FOUND TO BE A

LARGER DIAMETER, CONTRACTOR SHALL FURNISH NEW PIPE OF THE SAME SIZE AND SLOPE

AS THE EXISTING STRUCTURE. CONTRACTOR SHALL FOLLOW INTERNATIONAL PLUMBING

CODE (IPC) AND UNIFORM PLUMBING CODE (UPC) GUIDELINES FOR FITTINGS, CLEANOUTS

AND ROOF DRAIN LATERAL CONNECTIONS.

6. GRAY COLORED KEY NOTE MEANS NOT USED ON THIS SHEET

7. AT LOCATIONS WHERE PROPOSED NEW PIPE CONNECTS TO EXISTING STRUCTURES, THE

FORMER OPENING FROM EXISTING PIPE TO BE REMOVED SHALL BE BRICK AND MORTAR

SEALED AND NEW PIPE INSTALLED/CORED.

8. EXISTING UNDERGROUND UTILITIES' INVERT AND SIZE INFORMATION FOR SEWER, COMMUNICATIONS, ELECTRICAL, WATER, GAS AND STEAM ARE BASED ON ENGINEERING ASSUMPTIONS AND LIMITED

SURVEY INFORMATION. THESE UTILITIES ARE ASSUMED TO HAVE A NOMINAL 2 FT OF COVER AT A

MINIMUM. CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF EXISTING UTILITIES AND INFORM THE VA

AND ENGINEERS OF ANY FIELD DEVIATIONS THAT WOULD COMPROMISE OVERALL DESIGN.

9. THE CONTRACTOR SHALL FIELD VERIFY IF EXISTING UTILITIES INTERFERES WITH THE NEW PROPOSED

STORMWATER SYSTEM, IF THE EXISTING UTILITY DOES NOT CONFLICT, THE CONTRACTOR SHALL NOT

DEMOLISH OR FURNISH A NEW UTILITY. IF THE EXISTING UTILITY DOES CONFLICT WITH THE NEW

PROPOSED STORMWATER SYSTEM, THE CONTRACTOR SHALL REPLACE SECTION OF EXISTING

INTERFERING UTILITY TO MAKE INVERTS WORK AND MATCH IN KIND.

CU108

DRAINAGE PLAN

SCALE: 1" = 50'

0 100 150 200

KEY NOTES

NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

Correct Storm Water Drainage

1970 Roanoke Boulevard Salem, VA 24153-6404

658-23-108

01.28.2026 RBB KRS/PEH

100% FINAL DESIGN

# Revisions Date

Scientists I Engineers I Program Managers

Mabbett & Associates, Inc.

105 Central Street Stoneham, MA 02180-1248

T. 781-275-6050 www.mabbett.com

Mabbett

C

U d w g

Page of 59

S E

E

S

H E

SEE SHEET CU107

S E

E

S

H E

1. FURNISH AND INSTALL COUPLING TO JOINT CONNECTION. SEE NOTE 2. SEE SHEET CK501, DETAIL F5

2. FURNISH AND INSTALL NEW LADDER RUNGS AND PATCH & MORTAR TOP BRICK LAYER OF STRUCTURE. SEE SHEET CK503, DETAIL C4

3. SEAL OPENING AROUND PIPE INSIDE MANHOLE

4. FURNISH AND INSTALL NEW LADDER RUNGS. SEE SHEET CK503, DETAIL C4

5. RE-ESTABLISH BACKDROP MANHOLE CONNECTION IF DISTURBED DURING WORK

6. PERFORM PIPE LINING AND REPAIR

7. FURNISH AND INSTALL CATCH BASIN & COVER. SEE SHEET CK501, DETAILS D6, E8, F3 & F8

8. PATCH & MORTAR TOP BRICK LAYER OF STRUCTURE

9. PUMP OUT WATER FROM FLOODED CATCH BASIN INLET. CONTRACTOR TO FURTHER INVESTIGATE INLET AND OUTLET

CONNECTIONS TO DETERMINE FLOOD ISSUE WITHIN INLET STRUCTURE

10. FURNISH AND INSTALL PVC PIPING

11. FURNISH AND INSTALL HDPE PIPING

12. FURNISH AND INSTALL MANHOLE & COVER. SEE SHEET CK503, DETAIL C1 AND SHEET CK502, DETAIL F9

13. FURNISH AND INSTALL CATCH BASIN GRATE. SEE SHEET CK501, DETAILS D6 & F8

14. REMOVE INTRUDING ROOT IN PIPE

15. JET OUT AND VACUUM DEBRIS TO REMOVE BLOCKAGE

16. FURNISH AND INSTALL CURB INLET & COVER. SEE SHEET CK503, DETAIL E3

17. FURNISH AND INSTALL RCP PIPING

18. FURNISH AND INSTALL OUTLET CONTROL STRUCTURE. SEE SHEET CK501, DETAIL D4 FOR INFILTRATION POND OCS AND

SHEET CK502, DETAIL C6 FOR SUBSURFACE INFILTRATION CHAMBER OCS

19. FURNISH AND INSTALL FLARED END SECTION. SEE SHEET CK502, DETAIL C1

20. FURNISH AND INSTALL RIP RAP. SEE SHEET CK501, DETAIL C1

21. FURNISH AND INSTALL TRENCH DRAIN. SEE SHEET CK504, DETAIL C6

22. FURNISH AND INSTALL CATCH BASIN HOOD. SEE SHEET CK501, DETAIL F1

23. FURNISH AND INSTALL NEW HEADWALL. SEE SHEET CK502, DETAIL E1

24. RELOCATE EXISTING LIGHT POLE.

25. FURNISH AND INSTALL NEW ELECTRICAL SERVICE. MATCH IN KIND.

26. FURNISH AND INSTALL NEW DI WATER SERVICE. MATCH SIZE IN KIND. SEE SHEET CK505, DETAILS B1, B4, B7, C1 & C4

27. FURNISH AND INSTALL NEW SEWER SERVICE.

Kevin Sifuentes Oval

Kevin Sifuentes Oval

Kevin Sifuentes Callout

PERFORM SOIL BORING INVESTIGATION HERE FOR STRUCTURE BUOYANCY PURPOSES

Kevin Sifuentes Line