Statement of Proposal Items - 0003.docx

DOCX document 25 KB Posted

Attached to
Z2AA - Renovate Historic Building 4 Federal contract opportunity
Solicitation number
36C24624R0030
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This Statement of Proposal Items outlines the pricing structure for the renovation of Historic Building 4 at a VA facility, with a contract completion time of 450 calendar days after Notice to Proceed. The work is divided into two main proposal items: Site Work (Item I) covering existing conditions, earthwork, exterior improvements, and utilities; and Building Renovation (Item II) encompassing comprehensive building systems including concrete, masonry, metals, thermal protection, openings, fire suppression, HVAC, electrical, and communications.

Three deduct alternates are specified: Alternate 1 reduces the performance period by 115 days and covers basement finishes; Alternate 2 reduces the period by 30 days and involves replacing wood plank with ACT; and Alternate 3 reduces the period by 7 days and covers sealed concrete in basement and utility areas. The offer must be valid for 120 calendar days after the due date. All alternates are to be deducted from Proposal Item II (Building Renovation), and bidders must provide total pricing for Items I and II, along with separate pricing for each deduct alternate.

View the file

Other files for this federal contract opportunity

Other files attached to Z2AA - Renovate Historic Building 4, newest first.
File Type Posted
230923 Direct-Digital Control System Connect to Existing N4.pdf PDF
1_b H - Renovate Building 4 IFC pages 12-14.pdf PDF
1_a G - Renovate Building 4 IFC pages 2-3.pdf PDF
1_a G - Renovate Building 4 IFC pages 4-6.pdf PDF
1_a G - Renovate Building 4 IFC pages 7-10.pdf PDF
1_a G - Renovate Building 4 IFC page 1.pdf PDF
3_Arch - Renovate Building 4 IFC pages 36-85.pdf PDF
5_Mech - Renovate Building 4 IFC pages 110-128.pdf PDF
6_Elec - Renovate Building 4 IFC pages 129-155.pdf PDF
2_C - L and S - Renovate Building 4 IFC pages 15-35.pdf PDF
4_FP and P - Renovate Building 4 IFC pages 86-109.pdf PDF
36C24624R0030 0005.docx DOCX document
Drawings.zip ZIP file
36C24624R0030 0004.docx DOCX document
INSTRUCTIONS CONDITIONS AND OTHER STATEMENTS TO BIDDERS-OFFERORS .docx DOCX document
Proposal Item I Cost Breakdown.xlsx XLSX spreadsheet
Fayetteville - Temp Fence.pdf PDF
230541 - NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT.pdf PDF
230512 - GENERAL MOTOR REQUIREMENTS FOR HAVAC AND STEAM GENERATION EQUIPMENT.pdf PDF
014529 - TESTING LABORATORY SERVICES.pdf PDF
234000 - HVAC AIR CLEANING DEVICES.pdf PDF
232300 - REFRIGERANT PIPING.pdf PDF
36C24624R0030 0003.docx DOCX document
Proposal Item II Cost Breakdown.xlsx XLSX spreadsheet
Proposal Item III Cost Breakdown.xlsx XLSX spreadsheet
Proposal Item IV Cost Breakdown.xlsx XLSX spreadsheet
PL902 - PLUMBING DOMESTIC WATER ISOMETRICS.pdf PDF
232113 - Hydronic Piping.pdf PDF
233400 - HVAC FANS.pdf PDF
238216 - AIR COILS.pdf PDF
238200 - CONVECTION HEATING AND COOLING UNITS.pdf PDF
Proposal Item V Cost Breakdown.xlsx XLSX spreadsheet
Asbestos - Lead Paint Survey 12-31-2020.pdf PDF
Geotech Report_Fayetteville Bldg 4 Renovation.pdf PDF
230593 - TESTING ADJUSTING AND BALANCING FOR HVAC.pdf PDF
238129 - VARIABLE REFRIGERANT FLOW HVAC SYSTEMS.pdf PDF
230923 - DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC.pdf PDF
238143 - AIR SOURCE UNITARY HEAT PUMPS.pdf PDF
230800 - COMMISSIONING OF HVAC SYSTEMS.pdf PDF
36C24624R0030 0002.docx DOCX document
Statement of Work - Renovate Historic Building 4.pdf PDF
STRUCTRAL DRAWING SET.pdf PDF
PLUMBING DRAWING SET.pdf PDF
MECHANICAL DRAWING SET.pdf PDF
LANDSCAPE DRAWING SET.pdf PDF
FIRE PROTECTION DRAWING SET.pdf PDF
ELECTRICAL DRAWING SET.pdf PDF
CIVIL DRAWING SET.pdf PDF
Specifications - Renovate Building 4 Issued For Construction.pdf PDF
Wage Determination.pdf PDF
Show all 50

Z2AA - Renovate Historic Building 4 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C246R0030 0003 Statement of Proposal Items

The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within one-hundred and twenty (120) calendar days after the date offers are due.

Contract completion time: Four Hundred and Fifty (450) calendar days after Notice to Proceed (NTP)

PROPOSAL ITEM I (SITE WORK):

Work includes all labor, material, equipment, and supervision to perform all work required of the following divisions in coordination with all associated drawings:

02 Existing Conditions, 31 Earthwork, 32 Exterior Improvements, and 33 Utilities

PROPOSAL ITEM II (BUILDING RENOVATION):

Work includes all labor, material, equipment, and supervision to perform all work required of the following divisions in coordination with all associated drawings:

02 Existing Conditions, O3 Concrete, 04 Masonry, O5 Metals, O6 Wood Plastics and Composites, 07 Thermal and Moisture Protection, 08 Openings, 10 Specialties, 12 Furnishings, 14 Conveying Equipment, 21 Fire Suppression, 22 Plumbing, 23 Heating Ventilation and Air Conditioning, 26 Electrical, 27 Communications, and 28 Electronic Safety and Security.

PROPOSAL TOTAL ITEMS I, II: $_______________________________________

PROPOSAL ALTERNATES: PROPOSAL ALTERNATES ARE TO BE DEDUCTED FROM PROPOSAL ITEM II – BUILDING RENOVATION.

PROPOSAL ITEM III (DEDUCT ALT 1): $ - _____________________________

Period of Performance (- 115 Calendar days)

Work includes all labor, material, equipment and supervision to perform the required Basement Finishes.

PROPOSAL ITEM IV (DEDUCT ALT 2): $ -______________________________

Period of Performance (- 30 Calendar days)

Work includes all labor, material, equipment and supervision to perform the required Replace Wood Plank for ACT

PROPOSAL ITEM V (DEDUCT ALT 3): $ ________________________________

Period of Performance ( - 7 Calendar days )

Work includes all labor, material, equipment and supervision to perform the required for Sealed Concrete in Basement and Utility Areas