4_FP and P - Renovate Building 4 IFC pages 86-109.pdf
PDF 6 MB Posted
- Attached to
- Z2AA - Renovate Historic Building 4
- Solicitation number
- 36C24624R0030
About this file
This file contains detailed plumbing and fire protection demolition and new work plans for the renovation of Building 4 at the Fayetteville VA Medical Center. The drawings show floor plans for the basement, first floor, second floor and attic levels, including fire protection sprinkler systems, domestic water supply, sanitary sewer, and vent piping layouts.
The plans indicate a fully sprinklered building with new 4" fire protection mains, domestic water systems including hot and cold water distribution, gas-fired water heaters, and complete plumbing fixture replacement throughout the facility. Key components include new water closets, lavatories, sinks, electric water coolers, and showers. The drawings contain detailed isometric views of the plumbing systems, equipment schedules for water heaters, expansion tanks, and pumps, as well as typical installation details for pipe hangers, wall penetrations, and equipment connections. The plans demonstrate compliance with VA standards for healthcare facilities while renovating the historic structure.
View the file
Other files
Show 40 more
Latest 50 of 64 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CRAWL SPACE
003A
MECHANICAL
OFFICE
ASSOCIATE CHIEF, CPS
PHARMACY RESIDENTS
FEMALE TOILET
MALE TOILET
AFGE STORAGE OFFICE
MECHANICAL
TRAINING ROOM
AFGE LIASISON OFFICE
STORAGE
STORAGE
007A
MECHANICAL ROOM
007B
STORAGE
STAIRS
4" FP
4" FP
4" FP4" FP
4" FP UP
1 1/2" FP
FP DRAIN
FP HOSE
CONNECTION
UG 4" FP
A. REMOVE ALL FIRE SPRINKLER PIPING AND ACCESSORIES IN ENTIRE BUILDING. A NEW AUTOMATIC
WET PIPE FIRE SPRINKLER SYSTEM WILL BE INSTALLED IN THE NEW WORK PHASE OF
CONTRCUTION. REFER TO FX DRAWINGS.
B. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:5
P
M
FD100
BASEMENT FIRE PROTECTION
DEMOLITION PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
BASEMENT FIRE PROTECTION DEMOLITION PLAN
G E N E R A L N O T E S :
D R A W I N G N O T E S :
1 REFER TO SITE UTILITY DRAWINGS FOR CONTINUATION.
2 PATCH FLOOR PENETRATION TO MATCH EXISTING AFTER REMOVAL OF PIPING.
3 REMOVE FIRE SPRINKLER PIPING AND ASSOCIATED VALVES AND HOSE CONNECTIONS.
4 REMOVE FIRE DEPARTMENT CONNECTION AND ASSOCIATED PIPING. PATCH WALL TO MATCH
EXISTING.
No. Revisions: Date:
REV 0 07/24/2023
07/24/2023
OFFICE
STORAGE
RESTROOM
OFFICE
STAIRS
OFFICE
RESTROOM
HOUSEKEEPING
OFFICE
CLOSET
109A
CLOSET
108A
CLOSET
107A
OFFICE
OFFICE
OFFICE
CLOSET
105A
BREAK
OFFICE
107B
OFFICE
CLOSET
104A
OFFICE
OFFICE
OFFICE
WAITING/ENTRY
OFFICE
CLASSROOM
CLASSROOM
OFFICE
4" FP UP & DN
1 2
A. REMOVE ALL FIRE SPRINKLER PIPING AND ACCESSORIES IN ENTIRE BUILDING. A NEW AUTOMATIC
WET PIPE FIRE SPRINKLER SYSTEM WILL BE INSTALLED IN THE NEW WORK PHASE OF
CONTRCUTION. REFER TO FX DRAWINGS.
B. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:0
P
M
FD101
FIRST FLOOR FIRE PROTECTION
DEMOLITION PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN
G E N E R A L N O T E S :
D R A W I N G N O T E S :
1 PATCH FLOOR PENETRATION TO MATCH EXISTING AFTER REMOVAL OF PIPING.
2 REMOVE FIRE SPRINKLER PIPING AND ASSOCIATED VALVES AND HOSE CONNECTIONS.
No. Revisions: Date:
OFFICE
CLOSET
216A
OFFICE
CLOSET
215A
RESTROOM
215B
OFFICE
RESTROOM
213B
CLOSET
213A
KITCHEN
STAIRS
114MEN
WOMEN
HOUSEKEEPING
OFFICE
CLOSET
208A
OFFICE
CLOSET
207A
CLOSET
206A
OFFICE
OFFICE
CLOSET
205A
RESTROOM
205B
RESTROOM
203B
OFFICE
CLOSET
203A
OFFICE
CLOSET
202A
RESTROOM
202B OFFICE
OFFICE
CLOSET
219A
RESTROOM
219B
CLOSET
201A
RESTROOM
218B
CLOSET
218A
OFFICE
OFFICE
4" FP UP & DN
A. REMOVE ALL FIRE SPRINKLER PIPING AND ACCESSORIES IN ENTIRE BUILDING. A NEW AUTOMATIC
WET PIPE FIRE SPRINKLER SYSTEM WILL BE INSTALLED IN THE NEW WORK PHASE OF
CONTRCUTION. REFER TO FX DRAWINGS.
B. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:0
P
M
FD102
SECOND FLOOR FIRE
PROTECTION DEMOLITION PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN
G E N E R A L N O T E S :
D R A W I N G N O T E S :
1 PATCH FLOOR PENETRATION TO MATCH EXISTING AFTER REMOVAL OF PIPING.
2 REMOVE FIRE SPRINKLER PIPING AND ASSOCIATED VALVES AND HOSE CONNECTIONS.
No. Revisions: Date:
2" FP
2" FP
1 1/2" FP
1 1/2" FP
2" FP
2" FP2" FP
2" FP
4" FP DN 1
A. REMOVE ALL FIRE SPRINKLER PIPING AND ACCESSORIES IN ENTIRE BUILDING. A NEW AUTOMATIC
WET PIPE FIRE SPRINKLER SYSTEM WILL BE INSTALLED IN THE NEW WORK PHASE OF
CONTRCUTION. REFER TO FX DRAWINGS.
B. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:1
P
M
FD103
ATTIC FIRE PROTECTION
DEMOLITION PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
ATTIC FIRE PROTECTION DEMOLITION PLAN
G E N E R A L N O T E S :
D R A W I N G N O T E S :
1 PATCH FLOOR PENETRATION TO MATCH EXISTING AFTER REMOVAL OF PIPING.
2 REMOVE FIRE SPRINKLER PIPING AND ASSOCIATED VALVES AND HOSE CONNECTIONS.
No. Revisions: Date:
6" DOUBLE
CHECK VALVE
6" SWING CHECK VALVE &
ALARM FLOW SWITCH
FPFP
STAIR A
S000A
ELEVATOR
E000
ELEC RM
E001
PIV VISITOR
GROUND DEFENSE TRAINING
PIV STAFF
STORAGE
DETECTIVE
TRAINING SARGENT
COMM DEVICE STO.
EVIDENCE STO.
PIV PICTURE RM
DEPUTY CHIEF
CHIEF
ADMIN/PIV/CHECK IN
EAST CORRIDOR
EMERGENCY MANAGER
BREAK/WORK RM
TOILET
007B
STAIR B
S000B
ELEC/UTILITY
F I R E H A Z A R D L E G E N D
LIGHT HAZARD
ORDINARY HAZARD GROUP 1
ORDINARY HAZARD GROUP 2
PIV STORAGE
ARMORY
SECURE CAGE
TOILET
006B
SHOWER
006A
H.C.SUPP.
WOMEN
SHOWER
007A
MEN
H.C.
FX501
UG 6" FP
FIRE DEPARTMENT
CONNECTION
6" FP
MAJOR OFFICE
SOUTH CORRIDOR
SUPPLY
FX501
6" FP
4" FP UP
2" FP DRAIN UP
FP
SOUTH CORRIDOR
NORTH CORRIDOR
STORAGE
ELEV LOBBY
2" FP DRAIN
4" FP
6" FP
FX501
UTILITY
2" FP
1" FP DRAIN
DRAIN
ELEV MACHINE RM
E002
6'x6'x2' PLUMBING
DRAINAGE PIT
4" BYPASS
PIPE
4" NC CONTROL VALVE WITH
SUPERVISORY SWITCH
A. INSTALL COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN ACCORDANCE WITH NFPA
13 AND VA FIRE PROTECTION MANUAL.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS WHEN SUCH
EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER DISCHARGE PATTERN AND
COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED TO PROVIDE A
COMPLETE INSTALLATION AND TO ELIMINATE INTERFERENCE WITH OTHER CONSTRUCTION.
D. PROVIDE AUXILIARY DRAIN WHERE CHANGE IN PIPING DIRECTION PREVENTS DRAINAGE OF
SYSTEM PIPING THROUGH MAIN DRAIN VALVE.
E. CONTRACTOR SHALL DETERMINE PIPE SIZES BY HYDRAULIC CALCULATION AND SUBMIT
SPRINKLER DESIGN.
F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER TRADES.
EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON PLANS IS TO CONVEY DESIGN INTENT AND
DOES NOT DICTATE THE MEANS AND METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD
CLASSIFICATIONS SHOWN.
G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES, SMOKE
PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
H. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS.
I. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD
ORDINARY HAZARD GROUP I
ORDINARY HAZARD GROUP II
0.10 GPM/SF OVER 1500 SF
0.15 GPM/SF OVER 1500 SF
0.20 GPM/SF OVER 1500 SF
100 GPM
250 GPM
250 GPM
30 MIN
60 MIN
90 MIN
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
BASE AREA
BASE AREA
BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
1 SPRINKLER PER 130 SF
1 SPRINKLER PER 130 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:1
P
M
FX100
BASEMENT FIRE SUPPRESSION
PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
BASEMENT FIRE SUPPRESSION PLAN
G E N E R A L N O T E S :D R A W I N G N O T E S :
1 REFER TO SITE UTILITY DRAWINGS FOR CONTINUATION.
2 CORE DRILL THROUGH FOUNDATION WALL FOR INSTALLATION OF NEW UNDERGROUND PIPING.
PROVIDE PIPE SLEEVE AND SEAL AROUND PENETRATION. REFER TO PIPE PENETRATION THROUGH
WALLS BELOW GRADE DETAIL ON SHEET PL501.
3 REFER TO FIRE SERVICE SECTIONS ON SHEET FX501 FOR WORK IN THIS AREA.
4 CORE DRILL THROUGH WALL FOR PIPE PENETRATION. PROVIDE PIPE SLEEVE AND SEAL AROUND
PENETRATION.
5 REFER TO FIRE RISER SECTION ON SHEET FX501 FOR WORK IN STAIRWELL.
6 INSTALL SIDEWALL SPRINKLER NOT MORE THAN 2'-0" ABOVE FLOOR OF ELEVATOR PIT. REFER TO
PLUMBING DRAWINGS FOR ELEVATOR PIT SUMP PUMP.
7 PIPING DISCHARGES TO PLUMBING DRAINAGE PIT. REFER TO ARCHITECTURAL AND STRUCTURAL
DRAWINGS FOR LOCATION OF PLUMBING DRAINAGE PIT.
8 REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR PLUMBING DRAINAGE PIT.
No. Revisions: Date:
4" FP UP & DN
FP
FP
FP
STAIR A
S100A
ELEVATOR
E100
ELEV LOBBY
SECURITY SCREEN AREA
QUALITY SAFETY STAFF
SYSTEM REDESIGN STAFF
QUALITY SAFETY SUP
WEST CORRIDOR
QUALITY MANAGER
CONFERENCE/INCIDENT
COMMAND
VOLUNTARY SERVICE
TR
SOUTH CORRIDOR
SHAFTELEC
STAIR B
S100B
MEN
WOMEN
BREAK/WORK RM
CHIEF, SYSTEM REDESIGN
EAST CORRIDOR
LEAF COORD OFFICE
LEAF COORD STAFF
F I R E H A Z A R D L E G E N D
LIGHT HAZARD
ORDINARY HAZARD GROUP 1
ORDINARY HAZARD GROUP 2
ENCLOSURE
SUPPLY
FX501
FP
2" FP DRAIN UP & DN
NORTH CORRIDOR
PORTICO NORTH
PORTICO SOUTH
A. INSTALL COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN ACCORDANCE WITH NFPA
13 AND VA FIRE PROTECTION MANUAL.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS WHEN SUCH
EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER DISCHARGE PATTERN AND
COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED TO PROVIDE A
COMPLETE INSTALLATION AND TO ELIMINATE INTERFERENCE WITH OTHER CONSTRUCTION.
D. PROVIDE AUXILIARY DRAIN WHERE CHANGE IN PIPING DIRECTION PREVENTS DRAINAGE OF
SYSTEM PIPING THROUGH MAIN DRAIN VALVE.
E. CONTRACTOR SHALL DETERMINE PIPE SIZES BY HYDRAULIC CALCULATION AND SUBMIT
SPRINKLER DESIGN.
F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER TRADES.
EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON PLANS IS TO CONVEY DESIGN INTENT AND
DOES NOT DICTATE THE MEANS AND METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD
CLASSIFICATIONS SHOWN.
G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES, SMOKE
PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
H. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS.
I. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD
ORDINARY HAZARD GROUP I
ORDINARY HAZARD GROUP II
0.10 GPM/SF OVER 1500 SF
0.15 GPM/SF OVER 1500 SF
0.20 GPM/SF OVER 1500 SF
100 GPM
250 GPM
250 GPM
30 MIN
60 MIN
90 MIN
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
BASE AREA
BASE AREA
BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
1 SPRINKLER PER 130 SF
1 SPRINKLER PER 130 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:1
P
M
FX101
FIRST FLOOR FIRE SUPPRESSION
PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
FIRST FLOOR FIRE SUPPRESSION PLAN
G E N E R A L N O T E S :D R A W I N G N O T E S :
1 REFER TO FIRE RISER SECTION ON SHEET FX501 FOR WORK IN STAIRWELL.
No. Revisions: Date:
FP
FP
STAIR A
S200B
ELEV LOBBY
ELEVATOR
E200
ELEV LOBBY
CHIEF OF STAFF
SECRETARY
SECRETARY
ASSISTANT DIRECTOR
VISITOR
SECRETARY
NURSE EXECUTIVE
HSS
HSS
HSS
HSS
PUBLIC AFFAIRS
COMPLIANT OFFICER
ASSOCIATE DIRECTOR
SECRETARY
SECRETARY
SUPPLY
PRIVATE TOILET
DIRECTOR
STAIR B
S201B
SHAFTELEC
WOMEN
BREAK/WORK RM
RECEP/WAITING
F I R E H A Z A R D L E G E N D
LIGHT HAZARD
ORDINARY HAZARD GROUP 1
ORDINARY HAZARD GROUP 2
EAST CORRIDOR
4" FP UP & DN
NORTH CORRIDOR
NORTH CORRIDOR-3
216-3
NORTH CORRIDOR-2
216-2
NORTH CORRIDOR-1
216-1
ENCLOSURE
SOUTH CORRIDOR-1
216-1
SUPPLY
FX501 1 1/2" FP DRAIN UP & DN
NORTH CORRIDOR
SOUTH CORRIDOR
A. INSTALL COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN ACCORDANCE WITH NFPA
13 AND VA FIRE PROTECTION MANUAL.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS WHEN SUCH
EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER DISCHARGE PATTERN AND
COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED TO PROVIDE A
COMPLETE INSTALLATION AND TO ELIMINATE INTERFERENCE WITH OTHER CONSTRUCTION.
D. PROVIDE AUXILIARY DRAIN WHERE CHANGE IN PIPING DIRECTION PREVENTS DRAINAGE OF
SYSTEM PIPING THROUGH MAIN DRAIN VALVE.
E. CONTRACTOR SHALL DETERMINE PIPE SIZES BY HYDRAULIC CALCULATION AND SUBMIT
SPRINKLER DESIGN.
F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER TRADES.
EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON PLANS IS TO CONVEY DESIGN INTENT AND
DOES NOT DICTATE THE MEANS AND METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD
CLASSIFICATIONS SHOWN.
G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES, SMOKE
PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
H. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS.
I. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD
ORDINARY HAZARD GROUP I
ORDINARY HAZARD GROUP II
0.10 GPM/SF OVER 1500 SF
0.15 GPM/SF OVER 1500 SF
0.20 GPM/SF OVER 1500 SF
100 GPM
250 GPM
250 GPM
30 MIN
60 MIN
90 MIN
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
BASE AREA
BASE AREA
BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
1 SPRINKLER PER 130 SF
1 SPRINKLER PER 130 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:2
P
M
FX102
SECOND FLOOR FIRE
SUPPRESSION PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
SECOND FLOOR FIRE SUPPRESSION PLAN
G E N E R A L N O T E S :D R A W I N G N O T E S :
1 REFER TO FIRE RISER SECTION ON SHEET FX501 FOR WORK IN STAIRWELL.
No. Revisions: Date:
4" FP DN
FX501
F I R E H A Z A R D L E G E N D
ORDINARY HAZARD GROUP 1
1 1/2" FP DRAIN DN
FP
FPFP
FP
FPFP
FP FP FP
ATTIC
FX501
A. INSTALL COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN ACCORDANCE WITH NFPA
13 AND VA FIRE PROTECTION MANUAL.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS WHEN SUCH
EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER DISCHARGE PATTERN AND
COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED TO PROVIDE A
COMPLETE INSTALLATION AND TO ELIMINATE INTERFERENCE WITH OTHER CONSTRUCTION.
D. PROVIDE AUXILIARY DRAIN WHERE CHANGE IN PIPING DIRECTION PREVENTS DRAINAGE OF
SYSTEM PIPING THROUGH MAIN DRAIN VALVE.
E. CONTRACTOR SHALL DETERMINE PIPE SIZES BY HYDRAULIC CALCULATION AND SUBMIT
SPRINKLER DESIGN.
F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER TRADES.
EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON PLANS IS TO CONVEY DESIGN INTENT AND
DOES NOT DICTATE THE MEANS AND METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD
CLASSIFICATIONS SHOWN.
G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES, SMOKE
PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
H. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS.
I. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD
ORDINARY HAZARD GROUP I
ORDINARY HAZARD GROUP II
0.10 GPM/SF OVER 1500 SF
0.15 GPM/SF OVER 1500 SF
0.20 GPM/SF OVER 1500 SF
100 GPM
250 GPM
250 GPM
30 MIN
60 MIN
90 MIN
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
BASE AREA
BASE AREA
BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
1 SPRINKLER PER 130 SF
1 SPRINKLER PER 130 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:2
P
M
FX103
ATTIC FIRE SUPPRESSION PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
ATTIC FIRE SUPPRESSION PLAN
G E N E R A L N O T E S :D R A W I N G N O T E S :
1 REFER TO FIRE SERVICE SECTIONS ON SHEET FX501 FOR WORK IN THIS AREA.
No. Revisions: Date:
1ST FLOOR
0'-0"
BASEMENT
-10'-0"
6" DOUBLE CHECK
DETECTOR VALVE
WITH SUPERVISORY
SWITCHES UG 6" FP
FROM SITE
6" SWING CHECK VALVE
WITH PRESSURE GAUGES &
DRAIN CONNECTION
MAIN DRAIN VALVE
6" WATER FLOW ALARM
SWITCH WITH RETARD
UTILITY ROOM FLOOR
2" DRAIN OUTLET
TO PLUMBING
DRAINAGE PIT
EXTERIOR FIRE
DEPARTMENT CONNECTION
6" FP
GRADE
1" DRAIN OUTLET TO
PLUMBING DRAINAGE PIT
1" FP DRAIN
BALL DRIP VALVE
4" CHECK VALVE
FX501
EXTERIOR WALL
CRAWL SPACE
-8'-0"
6" FP
4" FP
NORMALLY CLOSED CONTROL
VALVE WITH SUPERVISORY SWITCH
FOR FORWARD FLOW BACKFLOW
PREVENTER TESTING
4" BYPASS PIPE
1ST FLOOR
0'-0"
BASEMENT
-10'-0"
2ND FLOOR
11'-0"
ATTIC
21'-2"
FIRE HOSE
CONNECTION VALVE
FIRE HOSE
CONNECTION VALVE
FIRE HOSE
CONNECTION VALVE
6" FP
2" FP DRAIN
4" FP
4" FP
4" FP
4" FP
4" FP TO ATTIC
INSPECTOR'S TEST AND
DRAIN CONNECTION
1 1/2" FP
DRAIN
1 1/2" FP DRAIN
1 1/2" FP DRAIN
2" FP DRAIN RISER
2" FP DRAIN RISER
4" FP RISER
INSPECTOR'S TEST AND
DRAIN CONNECTION
INSPECTOR'S TEST AND
DRAIN CONNECTION
INDICATING TYPE
CONTROL VALVE WITH
SUPERVISORY SWITCH
CHECK VALVE
PRESSURE GAUGE
WATERFLOW SWITCH
INDICATING TYPE
CONTROL VALVE WITH
SUPERVISORY SWITCH
CHECK VALVE
PRESSURE GAUGE
WATERFLOW SWITCH
INDICATING TYPE
CONTROL VALVE WITH
SUPERVISORY SWITCH
CHECK VALVE
PRESSURE GAUGE
WATERFLOW SWITCH
1 1/2" FP DRAIN RISER
FROM ATTIC
6" FP
2" FP DRAIN TO
UTILITY 002
4" FP
1 1
ATTIC
21'-2"
ATTIC
21'-2"
4" FP
PRESSURE GAUGE
WATERFLOW SWITCH
CHECK VALVE
INDICATING TYPE CONTROL VALVE
WITH SUPERVISORY SWITCH
INSPECTOR'S TEST AND
DRAIN CONNECTION
1-1/2" FP DRAIN
4" FP RISER
1ST FLOOR
0'-0"
BASEMENT
-10'-0"
1ST FLOOR
0"
BASEMENT
-10'-0"
STAIR LANDING
-5'-0"
CRAWL SPACE
-8'-0"
WEST STAIR GRADE
-2'-7"
FX501
4" FP
6" FP
6" FP FROM SITE
BALL DRIP
VALVE
1" FP DRAIN
4" CHECK
VALVE
4" FP TO EXTERIOR FDC & BYPASS
FOR FORWARD FLOW BACKFLOW
PREVENTER TESTING
UTILITY ROOM FLOOR
CRAWL SPACE
-8'-0"
A. INSTALL COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN ACCORDANCE WITH NFPA
13 AND VA FIRE PROTECTION MANUAL.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS WHEN SUCH
EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER DISCHARGE PATTERN AND
COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED TO PROVIDE A
COMPLETE INSTALLATION AND TO ELIMINATE INTERFERENCE WITH OTHER CONSTRUCTION.
D. PROVIDE AUXILIARY DRAIN WHERE CHANGE IN PIPING DIRECTION PREVENTS DRAINAGE OF
SYSTEM PIPING THROUGH MAIN DRAIN VALVE.
E. CONTRACTOR SHALL DETERMINE PIPE SIZES BY HYDRAULIC CALCULATION AND SUBMIT
SPRINKLER DESIGN.
F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER TRADES.
EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON PLANS IS TO CONVEY DESIGN INTENT AND
DOES NOT DICTATE THE MEANS AND METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD
CLASSIFICATIONS SHOWN.
G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES, SMOKE
PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
H. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS.
I. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:3
P
M
FX501
FIRE SUPPRESSION SECTIONS
AND DETAILS
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
1/2" = 1'-0"
FIRE SERVICE SECTION 1
1/2" = 1'-0"
FIRE RISER SECTION - STAIR B
1/2" = 1'-0"
FIRE RISER SECTION - ATTIC
1/2" = 1'-0"
FIRE SERVICE SECTION 2
G E N E R A L N O T E S :
D R A W I N G N O T E S :
1 CORE DRILL THROUGH FLOOR FOR INSTALLATION OF PIPE PENETRATING FLOOR. REFER TO
SUPPORT/ANCHOR FOR PIPE RISERS DETAILS ON SHEET PL501.
No. Revisions: Date:
PLUMBING VALVE SYMBOLS
BALL VALVE
GATE VALVE WITH 3/4 " HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC FLOW CONTROL VALVE
PRESSURE RELIEF VALVE
GATE VALVE
MANUAL AIR VENT
TEST PLUG (PRESSURE/TEMPERATURE)
GLOBE VALVE
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
AUTOMATIC AIR VENTAV
GENERAL PLUMBING SYMBOLS
LIMIT OF DEMOLITION
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
POINT OF CONNECTION BETWEEN NEW AND
EXISTING WORK
PRESSURE GAGE
THERMOMETER
STRAINER
PIPE UP
PIPE DOWN
CO CLEAN OUT
HOSE BIB
DRAWING SYMBOLS
PL101
A
26-P 3
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
DRAWING NUMBER WHERE DRAWN
PL105
PIPING CONTINUATION
PLUMBING ABBREVIATIONS
REVISION NUMBER
PIPING SYMBOLS
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
VENT (SANITARY)
DCW
DHW
DHWR
SANITARY SEWER
SAN
STORM WATER
SW
V
NATURAL GAS
NG
PLUMBING GENERAL NOTES
A. THE FOLLOWING NOTES APPLY EQUALLY TO THE FULL SET OF PLUMBING DOCUMENTS.
B. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
C. REFER TO SCHEDULES, DETAILS, AND DIAGRAMS FOR PIPING, PIPE SIZES AND PIPELINE DEVICES NOT
INDICATED ON FLOOR PLAN.
D. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT
TO THE ATTENTION OF THE VA IN WRITING BEFORE PROCEEDING WITH THE WORK.
E. EACH CONTRACTOR SHALL COORDINATE THEIR WORK WITH THE WORK OF OTHERS.
F. ALL WORK SHALL BE IN COMPLIANCE WITH GOVERNING CODES AND VA STANDARDS.
G. PROVIDE ACCESS PANELS IN NON-ACCESSIBLE SUSPENDED CEILINGS FOR VALVES, CLEANOUTS, CONTROLS, ETC.
H. ALL PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/OR FIRESTOPPED AS REQUIRED TO MAINTAIN FIRE RATINGS. REFER TO ARCHITECTURAL PLANS FOR LOCATIONS OF FIRE-RATED
ASSEMBLIES.
I. CONTRACTOR TO IMMEDIATELY INFORM THE COR IN THE EVENT THAT MATERIALS OBSERVED ARE
SUSPECTED TO CONTAIN ASBESTOS.
J. PROVIDE OFFSETS AS NECESSARY TO COMPLETE SYSTEMS AND COORDINATE WORK WITH OTHER TRADES.
K. ADHERE TO VHA DIRECTIVE 1061 FOR PREVENTION OF HEALTHCARE-ASSOCIATED LEGIONELLA DISEASE
AND SCALD INJURY FROM POTABLE WATER DISTRIBUTION SYSTEMS.
L. INTERNAL PARTS OF ALL PLUMBING FIXTURES, WATER PIPING, FITTINGS, AND ACCESSORIES SHALL BE ABLE TO WITHSTAND DISINFECTING OPERATIONS OF CHEMICAL AND THERMAL TREATMENT OF WATER TEMPERATURES UP TO 82°C (180°F) FOR 30 MINUTES OR 50 MG/L (50 PPM) CHLORINE RESIDUAL
CONCENTRATION FOR 24 HOURS.
PIPING PENETRATION THROUGH FLOOR/ROOF
CIRCUIT SETTER
NEW PIPING
PIPING TO BE REMOVED
EXISTING PIPING
A/E ARCHITECT / ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER/AIR SEPARATOR
ASD ADJUSTABLE SPEED DRIVES/AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
AXF AXIAL FLOW
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BPW BEDPAN WASHER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CA COMPRESSED AIR
CGA COMPRESSED GAS ASSOCIATION
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM COUNTER MOUNTED/CUBIC METER
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPARTMENT
COR CONTRACTOR'S OFFICE REPRESENTATIVE
CS CLINICAL SINK
CV CONSTANT VOLUME/CONTROL VALVE
D DRAIN
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DI DEIONIZED WATER
DIA DIAMETERN
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWS DIALYSIS WATER SUPPLY
DWV DRAIN WASTE VENT
EL ELEVATION
EPA ENVIRONMENTAL PROTECTION AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
(E) EXISTING TO REMAIN
F FAHRENHEIT
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE) CONNECTION
FF FINISHED FLOOR
FM FLOW METER/FLOOR MOUNTED
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOT FUEL OIL TANK
FOV FUEL OIL VENT
FOHX FUEL OIL HEAT EXCHANGER
FPS FEET PER SECOND
FS FLOW SWITCH/FLOOR SINK
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FU FIXTURE UNITS
GAL GALLON
GCO GRADE CLEANOUT
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HD HUB DRAIN
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HS HAND SINK
HST HOT WATER STORAGE TANK (DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HX HEAT EXCHANGER
HYD HYDRANT
IBT INVERTED BUCKET TRAP
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IE INVERT ELEVATION
ICW INDUSTRIAL COLD WATER
IHW INDUSTRIAL HOT WATER
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KG KILOGRAM
KW KILOWATT
KWH KILOWATT HOUR
L LITER
L/H LITERS PER HOUR (or LITERS/HOUR) L/M LITERS PER MINUTE (or LITERS/MINUTE) L/S LITERS PER SECOND (or LITERS/SECOND)
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LF LINEAR FOOT (FEET)
LPG LIQUEFIED PETROLEUM GAS
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LV LABORATORY VACUUM
LW LOW WATER
M METER
M/S METERS PER SECOND (OR METERS/SECOND)
MA MEDICAL AIR
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH 1,000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MOU MEMORANDUM OF UNDERSTANDING
MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MS MOP SINK
MV MEDICAL VACUUM
N2 NITROGEN
N2O NITROUS OXIDE
NA NOT APPLICABLE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NGFM NATURAL GAS FLOWMETER
NO NORMALLY OPEN
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD REQUIRED
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAGE
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PTRV PRESSURE TEMPERATURE RELIEF VALVE
PW POTABLE WATER
RCP RECIRCULATING PUMP
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RP RECIRCULATION PUMP
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RTU ROOF TOP UNIT
RV RELIEF VALVE
SAN SANITARY SEWER
SCFM STANDARD CUBIC FEET PER MINUTE
SCW SOFTENED COLD WATER
SHW SOFTENED HOT WATER
SD SMOKE DETECTOR
SDMH STORM DRAIN MANHOLE
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SF SQUARE FOOT (FEET)
SH SHOWER
SMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCIATION
SMH SANITARY MANHOLE
SP SUMP PUMP/STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPRV STEAM PRESSURE REDUCING VALVE
SS STAINLESS STEEL
ST STORAGE TANK/STEAM TRAP
SW STORM WATER
SW SOFTWATER
SWHX STEAM TO WATER HEAT EXCHANGER
TCV TEMPERATURE CONTROL VALVE
TD TRENCH DRAIN/TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
UG UNDERGROUND
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VP VACUUM PUMP
VS VENT STACK
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W WASTE/WATTS
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT/WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER/WALL MOUNTED
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
YCO YARD CLEANOUT
YH YARD HYDRANT
ZV ZONE VALVE
FIRE PROTECTION
FP
OVERFLOW DRAIN
OD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:3
P
M
P001
PLUMBING LEGEND SHEET
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
No. Revisions: Date:
P-101
UG 3" SW
UG 4" SW
(E) UG 5" SAN
TO SITE
UG 5" SAN
UG 4" SANUG 4" SAN
UG 4" SAN
UG 4" SAN
CRAWL SPACE
003A
MECHANICAL
OFFICE
ASSOCIATE CHIEF, CPS
PHARMACY RESIDENTS
FEMALE TOILET
MALE TOILET
AFGE STORAGE OFFICE
MECHANICAL
TRAINING ROOM
AFGE LIASISON OFFICE
STORAGE
STORAGE
007A
MECHANICAL ROOM
007B
STORAGE
STAIRS
(E) UG 4" SW
TO SITE
(E) UG 4" SW
TO SITE
(E) UG 4" SW
TO SITE
(E) UG 4" SW
TO SITE
(E) UG 4" SW
TO SITE
(E) UG 4" SW
TO SITE
(E) UG 4" SW
TO SITE
(E) UG 4" SW
TO SITE
(E) UG 4" SW
TO SITE
(E) 4" SW UP
(E) 4" SW UP (E) 4" SW UP
(E) 4" SW UP
(E) 4" SW UP
(E) 4" SW UP(E) 4" SW UP(E) 4" SW UP
(E) 4" SW UP
3" FD-C
4" FD-C
4" FD-C
2" FD-C
4" SAN UP2" SAN UP
2" SAN UP
4" SAN UP
4" SAN UP
4" SAN UP
4" SAN UP2" SAN UP
4" SAN UP
A. PATCH PENETRATIONS TO MATCH EXISTING AFTER REMOVAL OF PIPING THROUGH FLOORS,
CONCRETE WALLS, OR ROOF.
B. REMOVE ALL PLUMBING FIXTURES AND DOMESTIC WATER, SANITARY, AND VENT PIPING UNLESS
NOTED OTHERWISE.
C. BASEMENT FLOOR SLAB WILL BE REMOVED AND REPLACED WITH NEW. COORDINATE SCHEDULE
FOR REMOVAL AND INSTALLATION OF UNDERGROUND PIPING. REFER TO ARCHITECTURAL AND
STRUCTURAL DRAWINGS FOR BASEMENT FLOOR SLAB WORK.
D. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:3
P
M
PD001
UNDERGROUND PLUMBING
DEMOLITION PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
UNDERGROUND PLUMBING DEMOLITION PLAN
G E N E R A L N O T E S :
D R A W I N G N O T E S :
1 REFER TO SITE UTILITY DRAWINGS FOR CONTINUATION.
2 REMOVE UNDERGROUND SANITARY PIPING BACK TO POINT SHOWN.
3 REMOVE UNDERGROUND STORM WATER PIPING.
4 REMOVE PLUMBING FIXTURE AND ASSOCIATED PIPING. REFER RO PLUMBING FIXTURES TO BE
REMOVED SCHEDULE ON SHEET PL601.
No. Revisions: Date:
P-201
P-414
P-101
P-401
P-414
DHW STORAGE TANK
& RECIRC PUMP
ELECTRIC WATER
HEATER
P-802
P-801 P-801
P-801
(E) UG 2-1/2"
DCW FROM SITE
2" DCW
1 1/2" DHW
1" DHWR
4" SAN
2" SAN
1" DCW
1" DHW
3/4" DHWR
CRAWL SPACE
003A
MECHANICAL
OFFICE
ASSOCIATE CHIEF, CPS
PHARMACY RESIDENTS
FEMALE TOILET
MALE TOILET
AFGE STORAGE OFFICE
MECHANICAL
TRAINING ROOM
AFGE LIASISON OFFICE
STORAGE
STORAGE
007A
MECHANICAL ROOM
007B
STORAGE
STAIRS
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT (E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT(E) 4" DOWNSPOUT(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
3" FD-C
4" FD-C3
2" FD-C
2" SAN UP
1" DCW UP
1" DHW UP
1/2" DHWR UP
1" DCW UP
1" DHW UP
1/2" DHWR UP
2" SAN UP
1 1/4" DCW UP
3/4" DHW UP
1/2" DHWR UP
1" DCW UP
1" DHW UP
1/2" DHWR UP
4" SAN UP
1/2" DHWR UP
3/4" DHW UP
1 1/4" DCW UP
2" SAN UP
3/4" DCW UP
3/4" DHW UP
4" SAN UP
4" SAN UP
2" V UP
1/2" DHWR UP
1" DHW UP
1" DCW UP
1 1/2" SAN UP
1/2" DHWR UP
1" DHW UP
1" DCW UP
2" SAN UP
1" DHW UP
1/2" DHWR UP
1" DHW UP
1 1/4" DHW UP
2" DCW UP
1/2" DHWR UP
2" V UP
3/4" DHW UP
1" DHW UP
1/2" DHWR UP
1" DCW UP
4" SAN UP
A. PATCH PENETRATIONS TO MATCH EXISTING AFTER REMOVAL OF PIPING THROUGH FLOORS,
CONCRETE WALLS, OR ROOF.
B. REMOVE ALL PLUMBING FIXTURES AND DOMESTIC WATER, SANITARY, AND VENT PIPING UNLESS
NOTED OTHERWISE.
C. BASEMENT FLOOR SLAB WILL BE REMOVED AND REPLACED WITH NEW. COORDINATE SCHEDULE
FOR REMOVAL AND INSTALLATION OF UNDERGROUND PIPING. REFER TO ARCHITECTURAL AND
STRUCTURAL DRAWINGS FOR BASEMENT FLOOR SLAB WORK.
D. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:4
P
M
PD100
BASEMENT PLUMBING
DEMOLITION PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
BASEMENT PLUMBING DEMOLITION PLAN
G E N E R A L N O T E S :
D R A W I N G N O T E S :
1 REMOVE ALL DOMESTIC WATER AND ASSOCIATED COMPONENTS BACK TO BUILDING
ENTRANCE.
2 REMOVE ALL ABOVE GROUND SANITARY AND VENT PIPING TO BUILDING EXITS.
3 REMOVE PLUMBING FIXTURE AND ASSOCIATED PIPING. REFER RO PLUMBING FIXTURES TO BE
REMOVED SCHEDULE ON SHEET PL601.
4 REMOVE DOMESTIC WATER TO HOSE BIBB. HOSE BIBB TO REMAIN INACTIVE.
No. Revisions: Date:
P-414
P-501
P-101
P-101
P-101
P-414
P-101
2" SAN UP & DN
1" DHW UP & DN
1/2" DHWR UP & DN
1/2" DHW UP & DN
1 1/2" V UP & DN
1/2" DHWR UP & DN
1" DHW UP & DN
1 1/4" DCW UP & DN
1 1/2" DCW UP & DN
1" DCW UP & DN
1/2" DHWR UP & DN
1" DHW UP & DN
3/4" DCW UP & DN
3/4" DHW UP & DN
4" SAN UP & DN
1 1/4" DHW UP & DN
2" DCW UP & DN
1/2" DHWR UP & DN
2" V UP & DN
1/2" DHWR UP & DN
1" DHW UP & DN
1" DCW UP & DN
4" V UP & DN
1/2" DHWR UP & DN
3/4" DHW UP & DN
1 1/4" DCW UP & DN
2" V UP & DN
3" V UP & DN
1 1/4" DCW UP & DN
3/4" DHW UP & DN
1/2" DHWR UP & DN
1" DCW UP & DN
1" DHW UP & DN
1/2" DHWR UP & DN
2" SAN UP & DN
1/2" DHWR UP & DN
1" DHW UP & DN
1" DCW UP & DN
1/2" DHWR UP & DN
1" DHW UP & DN
1" DCW UP & DN
2" SAN UP & DN
4" SAN
4" SAN
OFFICE
STORAGE
RESTROOM
OFFICE
STAIRS
OFFICE
RESTROOM
HOUSEKEEPING
OFFICE
CLOSET
109A
CLOSET
108A
CLOSET
107A
OFFICE
OFFICE
OFFICE
CLOSET
105A
BREAK
OFFICE
107B
OFFICE
CLOSET
104A
OFFICE
OFFICE
OFFICE
WAITING/ENTRY
OFFICE
CLASSROOM
CLASSROOM
OFFICE
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
A. PATCH PENETRATIONS TO MATCH EXISTING AFTER REMOVAL OF PIPING THROUGH FLOORS,
CONCRETE WALLS, OR ROOF.
B. REMOVE ALL PLUMBING FIXTURES AND DOMESTIC WATER, SANITARY, AND VENT PIPING UNLESS
NOTED OTHERWISE.
C. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:4
P
M
PD101
FIRST FLOOR PLUMBING
DEMOLITION PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
FIRST FLOOR PLUMBING DEMOLITION PLAN
G E N E R A L N O T E S :
D R A W I N G N O T E S :
1 REMOVE ALL DOMESTIC WATER AND ASSOCIATED COMPONENTS BACK TO BUILDING
ENTRANCE.
2 REMOVE ALL ABOVE GROUND SANITARY AND VENT PIPING TO BUILDING EXITS.
3 REMOVE PLUMBING FIXTURE AND ASSOCIATED PIPING. REFER RO PLUMBING FIXTURES TO BE
REMOVED SCHEDULE ON SHEET PL601.
No. Revisions: Date:
P-106
P-106
P-701 P-701
P-106
P-106
P-502
P-414P-414 P-414
P-414
P-701
P-701
P-414 P-201
P-414
P-414
P-106
P-106
P-524
P-604
P-414
P-106
P-701
P-106
P-401
P-701
P-701
P-401 P-106
P-414
P-414 P-106
P-401
P-701
P-701
P-106 P-401
2" V UP & DN
1 1/2" V UP & DN
2" V UP & DN
4" V UP & DN
2" V UP & DN
1 1/2" V UP & DN
4" V UP & DN
1 1/2" V UP & DN
2" V UP & DN
1 1/2" V UP & DN
2" V UP & DN
2" V UP & DN
2" V UP & DN
OFFICE
CLOSET
216A
OFFICE
CLOSET
215A
RESTROOM
215B
OFFICE
RESTROOM
213B
CLOSET
213A
KITCHEN
STAIRS
MEN
WOMEN
HOUSEKEEPING
OFFICE
CLOSET
208A
OFFICE
CLOSET
207A
CLOSET
206A
OFFICE
OFFICE
CLOSET
205A
RESTROOM
205B
RESTROOM
203B
OFFICE
CLOSET
203A
OFFICE
CLOSET
202A
RESTROOM
202B
OFFICE
OFFICE
CLOSET
219A
RESTROOM
219B
CLOSET
201A
RESTROOM
218B
CLOSET
218A
OFFICE
OFFICE
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT (E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT(E) 4" DOWNSPOUT
2 2 2
2 2
2 2
2 2
A. PATCH PENETRATIONS TO MATCH EXISTING AFTER REMOVAL OF PIPING THROUGH FLOORS,
CONCRETE WALLS, OR ROOF.
B. REMOVE ALL PLUMBING FIXTURES AND DOMESTIC WATER, SANITARY, AND VENT PIPING UNLESS
NOTED OTHERWISE.
C. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:5
P
M
PD102
SECOND FLOOR PLUMBING
DEMOLITION PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
SECOND FLOOR PLUMBING DEMOLITION PLAN
G E N E R A L N O T E S :
D R A W I N G N O T E S :
1 REMOVE ALL DOMESTIC WATER AND ASSOCIATED COMPONENTS BACK TO BUILDING
ENTRANCE.
2 REMOVE PLUMBING FIXTURE AND ASSOCIATED PIPING. REFER RO PLUMBING FIXTURES TO BE
REMOVED SCHEDULE ON SHEET PL601.
3 REMOVE ALL ABOVE GROUND SANITARY AND VENT PIPING TO BUILDING EXITS.
No. Revisions: Date:
2" V DN
1 1/2" V DN 2" V DN
4" V DN
2" V DN
2" V DN
1 1/2" V DN
1 1/2" V DN
2" V DN
2" V DN
2" V DN
(E) 4" VTR
1 1/2" V DN
4" V DN
A. PATCH PENETRATIONS TO MATCH EXISTING AFTER REMOVAL OF PIPING THROUGH FLOORS,
CONCRETE WALLS, OR ROOF.
B. REMOVE ALL PLUMBING FIXTURES AND DOMESTIC WATER, SANITARY, AND VENT PIPING UNLESS
NOTED OTHERWISE.
C. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:5
P
M
PD103
ATTIC PLUMBING DEMOLITION
PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
ATTIC PLUMBING DEMOLITION PLAN
G E N E R A L N O T E S :
D R A W I N G N O T E S :
1 REMOVE ALL ABOVE GROUND SANITARY AND VENT PIPING TO BUILDING EXITS.
2 REMOVE VENT THROUGH ROOF. PATCH ROOF TO MATCH EXISTING.
3 VENT THROUGH ROOF TO REMAIN.
No. Revisions: Date:
(E) UG 5" SAN
TO SITE
STORAGE
007A
(E) UG 4" SW
TO SITE
(E) UG 4" SW
TO SITE
(E) UG 4" SW
TO SITE
(E) UG 4" SW
TO SITE
(E) UG 4" SW
TO SITE(E) UG 4" SW
TO SITE
(E) UG 4" SW
TO SITE
(E) UG 4" SW
TO SITE
(E) UG 4" SW
TO SITE
(E) 4" SW UP
(E) 4" SW UP (E) 4" SW UP
(E) 4" SW UP
(E) 4" SW UP
(E) 4" SW UP(E) 4" SW UP(E) 4" SW UP
(E) 4" SW UP
EMERGENCY MANAGER
TOILET
007B
WOMEN
SHOWER
007A
STAIR B
S000B
GROUND DEFENSE TRAINING
BREAK/WORK RM
ELEC/UTILITY
ELEVATOR
E000
STAIR A
S000A
PIV STAFF
PIV PICTURE RM
DEPUTY CHIEF
CHIEF
ADMIN/PIV/CHECK IN
MEN
EAST CORRIDOR
TRAINING SARGENT
DETECTIVE
STORAGE
COMM DEVICE STO.
EVIDENCE STO.
ELEC RM
E001
H.C.
TOILET
006B
SHOWER
006A
PIV STORAGE
ARMORY
SECURE CAGE
H.C.SUPP.
SOUTH CORRIDOR
MAJOR OFFICE
SUPPLY
4" SAN UP FD-Z
P-502
1 1/2" V UP
UG 3" SAN
FD-Z
UG 4" SW
SP-1
2" SAN UP
2 1/2" V UP
4" FCO
4" FCO
UG 4" SANSTORAGE
ELEV LOBBY
4" SAN UP
6'x6'x2' PLUMBING
DRAINAGE PIT
UG 4" SAN
UG 5" SAN
UG 2" SAN
1 1/2" V UP
UG 4" SAN
5" FD-E
UG 5" SAN
UG 5" SAN
UG 1/2" DCW
1/2" DCW UP
UG 2 1/2" V
UG 2" SAN
ELEV MACHINE RM
E002
UTILITY
4" SW UP
A. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
B. BASEMENT FLOOR SLAB WILL BE REMOVED AND REPLACED WITH NEW. COORDINATE SCHEDULE
FOR REMOVAL AND INSTALLATION OF UNDERGROUND PIPING. REFER TO ARCHITECTURAL AND
STRUCTURAL DRAWINGS FOR BASEMENT FLOOR SLAB WORK.
C. REFER TO SHEETS PL901 AND PL902 FOR SANITARY & VENT AND DOMESTIC WATER ISOMETRICS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:0
P
M
PL001
UNDERGROUND PLUMBING NEW
WORK PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
UNDERGROUND PLUMBING NEW WORK PLAN
G E N E R A L N O T E S :
D R A W I N G N O T E S :
1 REFER TO SITE UTILITY DRAWINGS FOR CONTINUATION.
2 CONNECT UNDERGROUND SANITARY PIPING TO EXISTING AT POINT SHOWN.
3 ELEVATOR PIT SUMP PUMP. PROVIDE WITH OIL SENSING ALARM. PUMP DISCHARGE PIPING TO DRAIN
TO PLUMBING DRAINAGE PIT WITH AIR GAP. REFER TO SUMP PUMP DETAIL ON SHEET PL501.
4 REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR PLUMBING DRAINAGE PIT.
5 INSTALL FLOOR DRAIN AT BOTTOM OF PLUMBING DRAINAGE PIT.
No. Revisions: Date:
BFP
P-420
P-420
P-103
P-103
(E) UG 2 1/2" DCW
2" WATER
METER
2" DCW
3/4" DHWR
4" SW UP & DN
P-502
EMERGENCY MANAGER
TOILET
007B
WOMEN
SHOWER
007A
STAIR B
S000BGROUND DEFENSE TRAINING
PIV VISITOR
BREAK/WORK RM
ELEC/UTILITY
ELEVATOR
E000
STAIR A
S000A
PIV STAFF
PIV PICTURE RM
DEPUTY CHIEF
CHIEF
ADMIN/PIV/CHECK IN
MEN
EAST CORRIDOR
TRAINING SARGENT
DETECTIVE
STORAGE
COMM DEVICE STO.
EVIDENCE STO.
ELEC RM
E001
H.C.
TOILET
006B
SHOWER
006A
PIV STORAGE
ARMORY
SECURE CAGE
H.C.SUPP.
SOUTH CORRIDOR
MAJOR OFFICE
UG 2" NG
DHWRP-1
ET-1
2" NG
2 1/2" V UP
1" DHW
2" DCW
2" SAN
2" SAN
1 1/2" DCW UP
1/2" DHW UP
1/2" DHWR UP
2" V UP
4" SAN UP
P-528
P-420
1 1/2" DCW
P-420
GAS METER
2" V
2" SAN DN
4" WCO
1/2" DCW DN
1/2" DCW UP
4" SAN UP
2" V UP
1 1/2" DCW UP
1" DCW UP
1" DHW UP
3/4" DHWR UP
3" SAN UP
1 1/2" SAN UP
1 1/2" SAN UP
2" V
CO
CO
1 1/2" V DN
1 1/2" V DN
2 1/2" V DN
1 1/2" DCW
1/2" DHWR
3/4" DHW
1 1/2" DCW
1" DHW
3/4" DHWR
P-701
FD-Z
1 1/2" DCW
3/4" DHW
3/4" DCW
3/4" DHW
4" SAN DN 4" WCO
4" SAN DN
CO
FD-Z
P-701
4" WCO
4" OD UP
4" CO 4
2" SAN
ELEV LOBBY
4" FCO
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT (E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
STORAGE
4" FCO
TP-1
1" DCW
4" OD
UTILITY
6'x6'x2' PLUMBING
DRAINAGE PIT
ELEV MACHINE RM
E002
2" SAN
1 1/2" V
1/2" NG
GPR-1
GPR-2
GWH-1 8
2"ø EA
2"ø EA
A. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
B. BASEMENT FLOOR SLAB WILL BE REMOVED AND REPLACED WITH NEW. COORDINATE SCHEDULE
FOR REMOVAL AND INSTALLATION OF UNDERGROUND PIPING. REFER TO ARCHITECTURAL AND
STRUCTURAL DRAWINGS FOR BASEMENT FLOOR SLAB WORK.
C. REFER TO SHEETS PL901 AND PL902 FOR SANITARY & VENT AND DOMESTIC WATER ISOMETRICS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:0
P
M
PL100
BASEMENT PLUMBING NEW WORK
PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
BASEMENT & UNDERGROUND PLUMBING NEW WORK PLAN
G E N E R A L N O T E S :
D R A W I N G N O T E S :
1 REFER TO SITE UTILITY DRAWINGS FOR CONTINUATION.
2 ELEVATOR PIT SUMP DISCHARGE PIPING. ROUTE ABOVE CEILING. DRAIN TO MOP SINK WITH AIR GAP.
3 CONNECT WATER METER TO EXISTING BAS FOR MONITORING.
4 OVERFLOW STORM DRAIN DISCHARGE LOCATION. INSTALL DOWNSPOUT NOZZLE.
5 CONNECT DOMESTIC WATER PIPING TO EXISTING AT POINT SHOWN.
6 INSTALL NEW GAS METER AND EMERGENCY SAFETY SOLENOID SHUT-OFF VALVE ABOVE GRADE.
REFER TO NATURAL GAS SCHEMATIC ON SHEET PL501.
7 CORE DRILL THROUGH WALL FOR PIPE PENETRATION. PROVIDE PIPE SLEEVE AND SEAL AROUND
PENETRATION.
8 INSTALL NEW GAS WATER HEATER, EXPANSION TANK, AND HOT WATER RECIRCULATION PUMP. REFER
TO GAS WATER HEATER DETAIL ON SHEET PL501.
9 CORE DRILL THROUGH FLOOR FOR INSTALLATION OF PIPE PENETRATING FLOOR. REFER TO
SUPPORT/ANCHOR FOR PIPE RISERS DETAILS ON SHEET PL501.
10 INSTALL CIRCUIT SETTER AND CHECK VALVE. SET AT 1.0 GPM.
11 INSTALL 2" REDUCED PRESSURE BACKFLOW PREVENTER. DRAIN TO DISCHARGE INDIRECTLY TO
PLUMBING DRAINAGE PIT.
12 REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR PLUMBING DRAINAGE PIT.
13 INSTALL VENT PIPE TERMINATION FOR GAS WATER HEATER IN ACCORDANCE WITH MANUFACTURER'S
INSTRUCTIONS.
14 ELECTRIC TRAP PRIMER. REFER TO SPECIFICATION SECTION 22 13 00 AND TRAP PRIMER SCHEDULE
ON SHEET PL601 FOR FURTHER INFORMATION.
No. Revisions: Date:
P-609
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT (E) 4" DOWNSPOUT (E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
(E) 4" DOWNSPOUT
4" SW UP & DN
1" DCW UP
1/2" DCW UP
1/2" DHW UP
SOUTH CORRIDOR
LEAF COORD OFFICE
WEST CORRIDOR
QUALITY SAFETY STAFF
LEAF COORD STAFF
BREAK/WORK RM
WOMEN
MEN
STAIR B
S100B
SHAFTELEC
QUALITY MANAGER
SYSTEM REDESIGN STAFF
ELEV LOBBY
STAIR A
S100A
ELEVATOR
E100
CHIEF, SYSTEM REDESIGN
EAST CORRIDOR
QUALITY SAFETY SUP
CONFERENCE/INCIDENT
COMMAND
VOLUNTARY SERVICE
TR
SECURITY SCREEN AREA
ENCLOSURE
2 1/2" V UP & DN
1/2" DHW UP
1/2" DCW UP
1 1/2" V
1 1/2" DCW DN
1/2" DHW DN
1/2" DHWR DN
2" V DN
4" SAN DN
CO
4" SAN UP
2" V UP
P-801
P-528
P-103 P-103
P-420
P-420
P-801
1 1/2" SAN DN
1/2" DCW DN
1/2" DCW UP
3" SAN UP & DN
4" SAN UP & DN
2" V UP & DN
1 1/2" DCW UP & DN
1" DCW DN
1" DHW DN
3/4" DHWR DN
1/2" DCW UP
1/2" DHW UP
1/2" DHW UP
1/2" DCW UP
1 1/2" SAN UP
4" OD UP & DN
1 1/2" SAN UP
2 1
3" SW
3" OD
3" SW UP
3" OD UP
A. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
B. REFER TO SHEETS PL901 AND PL902 FOR SANITARY & VENT AND DOMESTIC WATER ISOMETRICS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:1
P
M
PL101
FIRST FLOOR PLUMBING NEW
WORK PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .