This is a technical specification section (23 21 13) for hydronic piping systems as part of the renovation of Historical Building 4 project. The section details requirements for water piping to connect HVAC equipment, including drain piping.
The specification covers pipe materials, fittings, joints, and installation requirements. Key materials include copper water tube (ASTM B88) and Schedule 40 PVC for condensate drain piping, with PVC prohibited in exterior applications. Detailed requirements are provided for pipe joints, dielectric fittings where copper meets steel, and installation parameters including proper spacing, slopes, and support. The section requires leak testing of all joints, startup testing under operating conditions, and includes commissioning requirements. The contractor must provide 4 hours of manufacturer's technical representative training for VA personnel on system operation and maintenance. Quality assurance requirements include current welder certifications and single-manufacturer sourcing for couplings, fittings, valves and specialties. All work must comply with multiple referenced ASME, ASTM, AWS, EJMA, MSS, NFPA and TEMA standards.
View the file
Other files for this federal contract opportunity
Show all 50
Z2AA - Renovate Historic Building 4 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Renovation of Historical Building 4
Project #565 20 101
03-01-23
23 21 13-1
SECTION 23 21 13
HYDRONIC PIPING
PART 1 - GENERAL
1.1 DESCRIPTION
A. Water piping to connect HVAC equipment, including the following:
1. Drain piping.
B. A complete listing of common acronyms and abbreviations are included in
Section 23 05 11, COMMON WORK RESULTS FOR HVAC.
1.2 RELATED WORK
A. Section 01 00 00, GENERAL REQUIREMENTS.
B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
C. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS.
D. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.
E. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL
COMPONENTS.
F. Section 23 05 11, COMMON WORK RESULTS FOR HVAC.
G. Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND
EQUIPMENT.
H. Section 23 07 11, HVAC AND BOILER PLANT INSULATION.
I. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.
J. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC.
K. Section 23 82 00, CONVECTION HEATING AND COOLING UNITS.
1.3 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only. Where conflicts occur these specifications and the VHA standard will govern.
B. American Society of Mechanical Engineers (ASME):
B1.20.1-2013............Pipe Threads, General Purpose, Inch
B16.3-2016..............Malleable Iron Threaded Fittings: Classes 150 and 300
B16.4-2016..............Gray Iron Threaded Fittings: (Classes 125 and
250)
B16.5-2020..............Pipe Flanges and Flanged Fittings: NPS 1/2 through NPS 24 Metric/Inch Standard
B16.9-2018..............Factory Made Wrought Buttwelding Fittings
B16.11-2016.............Forged Fittings, Socket-Welding and Threaded
03-01-23
23 21 13-2
B16.18-2018.............Cast Copper Alloy Solder Joint Pressure
Fittings
B16.22-2018.............Wrought Copper and Copper Alloy Solder-Joint
Pressure Fittings
B16.24-2016.............Cast Copper Alloy Pipe Flanges, Flanged
Fittings, and Valves: Classes 150, 300, 600, 900, 1500, and 2500
B16.39-2019.............Malleable Iron Threaded Pipe Unions: Classes
150, 250, and 300
B16.42-2016.............Ductile Iron Pipe Flanges and Flanged Fittings:
Classes 150 and 300
B31.9-2020..............Building Services Piping
B40.100-2013............Pressure Gauges and Gauge Attachments
ASME Boiler and Pressure Vessel Code (BPVC):
BPVC Section VIII-2021..Rules for Construction of Pressure Vessels, Division 1
C. American Society for Testing and Materials (ASTM):
A47/A47M-1999(R2018)e1..Standard Specification for Ferritic Malleable
Iron Castings
A53/A53M-2020...........Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and
Seamless
A106/A106M-2019a........Standard Specification for Seamless Carbon
Steel Pipe for High-Temperature Service
A126-2004(R2019)........Standard Specification for Gray Iron Castings for Valves, Flanges, and Pipe Fittings
A183-2014(R2020)........Standard Specification for Carbon Steel Track
Bolts and Nuts
A216/A216M-2021.........Standard Specification for Steel Castings, Carbon, Suitable for Fusion Welding, for
High-Temperature Service
A307-2021...............Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60,000 PSI Tensile
Strength
A536-1984(R2019e1)......Standard Specification for Ductile Iron
Castings
B62-2017................Standard Specification for Composition Bronze or Ounce Metal Castings
03-01-23
23 21 13-3
B88-2020................Standard Specification for Seamless Copper
Water Tube
F439-2019...............Standard Specification for Chlorinated Poly
(Vinyl Chloride) (CPVC) Plastic Pipe Fittings, Schedule 80
F441/F441M-2020.........Standard Specification for Chlorinated Poly
(Vinyl Chloride) (CPVC) Plastic Pipe, Schedules
40 and 80
D. American Welding Society (AWS):
B2.1/B2.1M-2014.........Specification for Welding Procedure and
Performance Qualification
E. Expansion Joint Manufacturer’s Association, Inc. (EJMA):
EJMA 2017...............Standards of the Expansion Joint Manufacturers
Association, Tenth Edition
F. Manufacturers Standardization Society (MSS) of the Valve and Fitting
Industry, Inc.:
SP-67-2017..............Butterfly Valves
SP-70-2011..............Gray Iron Gate Valves, Flanged and Threaded
Ends
SP-71-2018..............Gray Iron Swing Check Valves, Flanged and
Threaded Ends
SP-80-2019..............Bronze Gate, Globe, Angle, and Check Valves
SP-85-2011..............Gray Iron Globe and Angle Valves, Flanged and
Threaded Ends
SP-110-2010.............Ball Valves Threaded, Socket-Welding, Solder
Joint, Grooved and Flared Ends
SP-125-2018.............Check Valves: Gray Iron and Ductile Iron, In-line, Spring-Loaded, Center-Guided
G. National Fire Protection Association (NFPA):
70-2020.................National Electrical Code (NEC)
H. Tubular Exchanger Manufacturers Association (TEMA):
TEMA Standards 2019.....10th Edition
1.4 SUBMITTALS
A. Submittals, including number of required copies, shall be submitted in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES.
03-01-23
23 21 13-4
B. Information and material submitted under this section shall be marked
“SUBMITTED UNDER SECTION 23 21 13, HYDRONIC PIPING”, with applicable paragraph identification.
C. Manufacturer's Literature and Data Including: Full item description and optional features and accessories. Include dimensions, weights, materials, applications, standard compliance, model numbers, size, and capacity.
1. Pipe and equipment supports.
2. Pipe and tubing, with specification, class or type, and schedule.
3. Pipe fittings, including miscellaneous adapters and special fittings.
4. Flanges, gaskets and bolting.
5. Couplings and fittings.
6. Valves of all types.
7. Strainers.
8. Flexible connectors for water service.
9. Pipe alignment guides.
10. Expansion joints.
11. Expansion compensators.
12. All specified hydronic system components.
13. Water flow measuring devices.
14. Gauges.
15. Thermometers and test wells.
D. Submit the welder’s qualifications in the form of a current (less than
1-year old) and formal certificate.
E. Coordination Drawings: Refer to paragraph, SUBMITTALS of Section 23 05
11, COMMON WORK RESULTS FOR HVAC.
F. As-Built Piping Diagrams: Provide drawings as follows for chilled water, condenser water, and heating hot water system and other piping systems and equipment.
1. 1wall-mounted stick file with complete set of prints. Mount stick file in the chiller plant or control room along with control diagram stick file.
2. 1 complete set of reproducible drawings.
3. 1 complete set of drawings in electronic AutoCAD and pdf format.
G. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replacement parts, and troubleshooting guide:
03-01-23
23 21 13-5
1. Include complete list indicating all components of the systems.
2. Include complete diagrams of the internal wiring for each item of equipment.
3. Diagrams shall have their terminals identified to facilitate installation, operation and maintenance.
H. Completed System Readiness Checklist provided by the CxA and completed by the contractor, signed by a qualified technician, and dated on the date of completion, in accordance with the requirements of Section 23
08 00, COMMISSIONING OF HVAC SYSTEMS.
I. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.
1.5 QUALITY ASSURANCE
A. Refer to Section 23 05 11, COMMON WORK RESULTS FOR HVAC, which includes welding qualifications.
B. Submit prior to welding of steel piping a certificate of Welder’s certification. The certificate shall be current and not more than
1-year old.
C. All couplings, fittings, valves, and specialties shall be the products of a single manufacturer.
1. All castings used for coupling housings, fittings, valve bodies, etc., shall be date stamped for quality assurance and traceability.
D. Bio-Based Materials: For products designated by the USDA’s
Bio-Preferred Program, provide products that meet or exceed USDA recommendations for bio-based content, so long as products meet all performance requirements in this specifications section. For more information regarding the product categories covered by the
Bio-Preferred Program, visit http://www.biopreferred.gov.
E. Refer to Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS for additional sustainable design requirements.
1.6 AS-BUILT DOCUMENTATION
A. Comply with requirements in paragraph AS-BUILT DOCUMENTATION of Section
23 05 11, COMMON WORK RESULTS FOR HVAC.
1.7 SPARE PARTS
A. For mechanical pressed sealed fittings provide tools required for each pipe size used at the facility.
03-01-23
23 21 13-6
PART 2 - PRODUCTS
2.1 PIPE AND EQUIPMENT SUPPORTS, PIPE SLEEVES, AND WALL AND CEILING PLATES
A. Provide in accordance with Section 23 05 11, COMMON WORK RESULTS FOR
HVAC.
2.2 PIPE AND TUBING
A. Cooling Coil Condensate Drain Piping:
1. From Air Handling Units: Copper water tube, ASTM B88, Type M, or
Schedule 40 PVC plastic piping. Use of PVC piping is prohibited in exterior applications.
2. From Fan Coil or Other Terminal Units: Copper water tube, ASTM B88, Type M for runouts and Type L for mains.
B. Pipe supports, including insulation shields, for aboveground piping:
Section 23 05 11, COMMON WORK RESULTS FOR HVAC.
2.3 FITTINGS FOR COPPER TUBING
A. Joints:
1. Solder Joints: Joints shall be made up in accordance with recommended practices of the materials applied. Apply 95/5 tin and antimony on all copper piping.
2. Mechanically Formed Tee Connection In Water and Drain Piping: Form mechanically extracted collars in a continuous operation by drilling pilot hole and drawing out tube surface to form collar, having a height of not less than 3 times the thickness of tube wall.
Adjustable collaring device shall ensure proper tolerance and complete uniformity of the joint. Notch and dimple joining branch tube in a single process to provide free flow where the branch tube penetrates the fitting.
B. Bronze Flanges and Flanged Fittings: ASME B16.24.
C. Fittings: ASME B16.18 cast copper or ASME B16.22 solder wrought copper.
2.4 FITTINGS FOR PLASTIC PIPING
A. Schedule 40, socket type for solvent welding.
B. Schedule 40 PVC Drain Piping: Drainage pattern.
C. Chemical Feed Piping for Condenser Water Treatment: CPVC, Schedule 80, ASTM F439.
2.5 DIELECTRIC FITTINGS
A. Provide where copper tubing and ferrous metal pipe are joined.
B. 50 mm (2 inches) and Smaller: Threaded dielectric union, ASME B16.39.
03-01-23
23 21 13-7
C. 63 mm (2-1/2 inches) and Larger: Flange union with dielectric gasket and bolt sleeves, ASME B16.42. Dielectric gasket material shall be compatible with hydronic medium.
D. Temperature Rating: 99 degrees C (210 degrees F).
E. Contractor’s Option: On pipe sizes 50 mm (2 inch) and smaller, screwed end brass ball valves may be used in lieu of dielectric unions.
2.6 SCREWED JOINTS
A. Pipe Thread: ASME B1.20.1.
B. Lubricant or Sealant: Oil and graphite or other compound approved for the intended service.
PART 3 - EXECUTION
3.1 INSTALLATION
A. If an installation is unsatisfactory to the COR, the Contractor shall correct the installation at no additional cost or time to the
Government.
B. The contract documents show the general arrangement of pipe and equipment but do not show all required fittings and offsets that may be necessary to connect pipes to equipment, fan-coils, coils, radiators, etc., and to coordinate with other trades. Provide all necessary fittings, offsets and pipe runs based on field measurements and at no additional cost or time to the Government. Coordinate with other trades for space available and relative location of HVAC equipment and accessories to be connected on ceiling grid. Pipe location in the contract documents shall be altered by contractor where necessary to avoid interferences and clearance difficulties.
C. Store materials to avoid excessive exposure to weather or foreign materials. Keep inside of piping relatively clean during installation and protect open ends when work is not in progress.
D. Support piping securely. Refer to PART 3, Section 23 05 11, COMMON WORK
RESULTS FOR HVAC. Install heat exchangers at height sufficient to provide gravity flow of condensate to the flash tank and condensate pump.
E. Install piping generally parallel to walls and column center lines, unless shown otherwise in the contract documents. Space piping, including insulation, to provide 25 mm (1 inch) minimum clearance between adjacent piping or other surface. Unless shown otherwise, slope drain piping down in the direction of flow not less than 25 mm (1 inch)
03-01-23
23 21 13-8 in 12 m (40 feet). Provide eccentric reducers to keep bottom of sloped piping flat.
F. Locate and orient valves to permit proper operation and access for maintenance of packing, seat and disc. Generally, locate valve stems in overhead piping in horizontal position. Provide a union adjacent to one end of all threaded end valves. Control valves usually require reducers to connect to pipe sizes shown in the contract documents. Install butterfly valves with the valve open as recommended by the manufacturer to prevent binding of the disc in the seat.
G. Offset equipment connections to allow valving off for maintenance and repair with minimal removal of piping. Provide flexibility in equipment connections and branch line take-offs with 3-elbow swing joints where noted in the contract documents.
H. Tee water piping runouts or branches into the side of mains or other branches. Avoid bull-head tees, which are two return lines entering opposite ends of a tee and exiting out the common side.
I. Connect piping to equipment as shown in the contract documents.
J. Firestopping: Fill openings around uninsulated piping penetrating floors or fire walls, with firestop material. For firestopping insulated piping refer to Section 23 07 11, HVAC AND BOILER PLANT
INSULATION.
K. Where copper piping is connected to steel piping, provide dielectric connections.
3.2 PIPE JOINTS
A. Solvent Welded Joints: As recommended by the manufacturer.
3.3 SEISMIC BRACING ABOVEGROUND PIPING
A. Provide in accordance with Section 13 05 41, SEISMIC RESTRAINT
REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS.
3.4 LEAK TESTING ABOVEGROUND PIPING
A. Inspect all joints and connections for leaks and workmanship and make corrections as necessary, to the satisfaction of the COR. Tests shall be either of those below, or a combination, as approved by the COR.
3.5 STARTUP AND TESTING
A. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.
03-01-23
23 21 13-9
B. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.
C. The CxA will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with
COR and CxA. Provide a minimum notice of 10 working days prior to startup and testing.
3.6 COMMISSIONING
A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.
B. Components provided under this section of the specification will be tested as part of a larger system.
3.7 DEMONSTRATION AND TRAINING
A. Provide services of manufacturer’s technical representative for 4 hours to instruct each VA personnel responsible in operation and maintenance of the system.
B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.
- - - E N D - - -