Proposal Item V Cost Breakdown.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Z2AA - Renovate Historic Building 4 Federal contract opportunity
Solicitation number
36C24624R0030
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This is a cost breakdown Excel template for Proposal Item V related to the renovation of Historic Building 4 at the VA facility in Fayetteville, NC (Project #565-20-101). The template requires offerors to itemize labor and material costs across 21 construction divisions including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood and Plastic, Thermal & Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety & Security, Earthwork, Exterior Improvements, and Utilities.

The template includes cells for offerors to enter overhead percentage, profit percentage, and bond percentage, which are automatically calculated based on the division subtotals. The final total proposal cost is calculated by combining the division subtotals with the overhead, profit, and bond calculations. This pricing template appears to be part of a larger solicitation package for a complete renovation project that includes historical preservation requirements, elevator addition, and various building systems upgrades for the Department of Veterans Affairs.

View the file

Other files for this federal contract opportunity

Other files attached to Z2AA - Renovate Historic Building 4, newest first.
File Type Posted
36C24625C0027_1 Award Notice.docx DOCX document
230923 Direct-Digital Control System Connect to Existing N4.pdf PDF
1_b H - Renovate Building 4 IFC pages 12-14.pdf PDF
1_a G - Renovate Building 4 IFC page 1.pdf PDF
1_a G - Renovate Building 4 IFC pages 2-3.pdf PDF
1_a G - Renovate Building 4 IFC pages 4-6.pdf PDF
1_a G - Renovate Building 4 IFC pages 7-10.pdf PDF
2_C - L and S - Renovate Building 4 IFC pages 15-35.pdf PDF
4_FP and P - Renovate Building 4 IFC pages 86-109.pdf PDF
36C24624R0030 0005.docx DOCX document
3_Arch - Renovate Building 4 IFC pages 36-85.pdf PDF
5_Mech - Renovate Building 4 IFC pages 110-128.pdf PDF
6_Elec - Renovate Building 4 IFC pages 129-155.pdf PDF
Drawings.zip ZIP file
36C24624R0030 0004.docx DOCX document
INSTRUCTIONS CONDITIONS AND OTHER STATEMENTS TO BIDDERS-OFFERORS .docx DOCX document
Proposal Item I Cost Breakdown.xlsx XLSX spreadsheet
Fayetteville - Temp Fence.pdf PDF
230541 - NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT.pdf PDF
230512 - GENERAL MOTOR REQUIREMENTS FOR HAVAC AND STEAM GENERATION EQUIPMENT.pdf PDF
014529 - TESTING LABORATORY SERVICES.pdf PDF
234000 - HVAC AIR CLEANING DEVICES.pdf PDF
232300 - REFRIGERANT PIPING.pdf PDF
Asbestos - Lead Paint Survey 12-31-2020.pdf PDF
Geotech Report_Fayetteville Bldg 4 Renovation.pdf PDF
230593 - TESTING ADJUSTING AND BALANCING FOR HVAC.pdf PDF
238129 - VARIABLE REFRIGERANT FLOW HVAC SYSTEMS.pdf PDF
230923 - DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC.pdf PDF
238143 - AIR SOURCE UNITARY HEAT PUMPS.pdf PDF
230800 - COMMISSIONING OF HVAC SYSTEMS.pdf PDF
36C24624R0030 0003.docx DOCX document
Proposal Item II Cost Breakdown.xlsx XLSX spreadsheet
Proposal Item III Cost Breakdown.xlsx XLSX spreadsheet
Proposal Item IV Cost Breakdown.xlsx XLSX spreadsheet
PL902 - PLUMBING DOMESTIC WATER ISOMETRICS.pdf PDF
232113 - Hydronic Piping.pdf PDF
233400 - HVAC FANS.pdf PDF
238216 - AIR COILS.pdf PDF
238200 - CONVECTION HEATING AND COOLING UNITS.pdf PDF
36C24624R0030 0002.docx DOCX document
Statement of Work - Renovate Historic Building 4.pdf PDF
STRUCTRAL DRAWING SET.pdf PDF
Specifications - Renovate Building 4 Issued For Construction.pdf PDF
Wage Determination.pdf PDF
PLUMBING DRAWING SET.pdf PDF
MECHANICAL DRAWING SET.pdf PDF
LANDSCAPE DRAWING SET.pdf PDF
FIRE PROTECTION DRAWING SET.pdf PDF
ELECTRICAL DRAWING SET.pdf PDF
CIVIL DRAWING SET.pdf PDF
Show all 50

Z2AA - Renovate Historic Building 4 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Proposal Item V Cost Breakdown

Project Number: 565-20-101 Edward L Roy: VA assigned project #

Date:
Project TitleRenovate Historic Bldg. 4

Edward L Roy: VA assigned Project Title

Project LocationFayetteville, NC
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0
Division 2Existing Conditions- 0
Division 3Concrete- 0
Division 4Masonry- 0
Division 5Metals- 0
Division 6Wood and Plastic- 0
Division 7Thermal & Moisture Protect- 0
Division 8Doors and Windows- 0
Division 9Finishes- 0
Division 10Specialties- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0
Division 22Plumbing- 0
Division 23HVAC- 0
Division 26Electrical- 0
Division 27Communications- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0
Division 32Exterior Improvements- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

ERROR:#VALUE!
Profit %
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).ERROR:#VALUE!
Bond %

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

ERROR:#VALUE!
Overhead/Profit Subtotals :ERROR:#VALUE!

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Proposal Item Cost $ - 0 $ - 0 ERROR:#VALUE!

File details come from the government source that posted it. Updated .