Proposal Item III Cost Breakdown.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Z2AA - Renovate Historic Building 4
Solicitation number
36C24624R0030
Issued by

About this file

This is a cost breakdown spreadsheet template for Proposal Item III related to the renovation of Historic Building 4 at the VA facility in Fayetteville, NC (Project #565-20-101). The spreadsheet is structured to capture detailed cost estimates across 21 construction divisions including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood and Plastic, Thermal & Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety & Security, Earthwork, Exterior Improvements, and Utilities.

The template requires bidders to input labor and material costs for each division separately, with automatic calculations for division totals. The spreadsheet also includes fields for overhead percentage, profit percentage, and bond percentage, which are multiplied against the division subtotals to calculate the final proposal cost. All formulas are built into the template to automatically calculate totals and subtotals based on the contractor's inputs.

View the file

Other files

File Type Posted
36C24625C0027_1 Award Notice.docx DOCX document
230923 Direct-Digital Control System Connect to Existing N4.pdf PDF
36C24624R0030 0006.pdf PDF
1_b H - Renovate Building 4 IFC pages 12-14.pdf PDF
1_a G - Renovate Building 4 IFC pages 2-3.pdf PDF
1_a G - Renovate Building 4 IFC pages 4-6.pdf PDF
1_a G - Renovate Building 4 IFC pages 7-10.pdf PDF
1_a G - Renovate Building 4 IFC page 1.pdf PDF
5_Mech - Renovate Building 4 IFC pages 110-128.pdf PDF
Specification Section 00 01 15 - LIST OF DRAWING SHEETS 01 21 25.pdf PDF
6_Elec - Renovate Building 4 IFC pages 129-155.pdf PDF
3_Arch - Renovate Building 4 IFC pages 36-85.pdf PDF
2_C - L and S - Renovate Building 4 IFC pages 15-35.pdf PDF
36C24624R0030 0005.docx DOCX document
4_FP and P - Renovate Building 4 IFC pages 86-109.pdf PDF
Drawings.zip ZIP file
36C24624R0030 0004.docx DOCX document
36C24624R0030 0003.docx DOCX document
233400 - HVAC FANS.pdf PDF
230923 - DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC.pdf PDF
Proposal Item II Cost Breakdown.xlsx XLSX spreadsheet
233700 - AIR OUTLETS AND INLETS.pdf PDF
232300 - REFRIGERANT PIPING.pdf PDF
230711 - HVAC AND BOILER PLANT INSULATION.pdf PDF
Statement of Proposal Items - 0003.docx DOCX document
233100 - HVAC DUCTS AND CASINGS.pdf PDF
237200 - AIR TO AIR ENERGY RECOVERY EQUIPMENT.pdf PDF
PL902 - PLUMBING DOMESTIC WATER ISOMETRICS.pdf PDF
Asbestos Reinspection Report - August 2019.pdf PDF
Building 4 and 16 LBP Results.pdf PDF
Proposal Item I Cost Breakdown.xlsx XLSX spreadsheet
INSTRUCTIONS CONDITIONS AND OTHER STATEMENTS TO BIDDERS-OFFERORS .docx DOCX document
014529 - TESTING LABORATORY SERVICES.pdf PDF
234000 - HVAC AIR CLEANING DEVICES.pdf PDF
238200 - CONVECTION HEATING AND COOLING UNITS.pdf PDF
230512 - GENERAL MOTOR REQUIREMENTS FOR HAVAC AND STEAM GENERATION EQUIPMENT.pdf PDF
Fayetteville - Temp Fence.pdf PDF
230511 - COMMON WORK RESULTS FOR HVAC.pdf PDF
238216 - AIR COILS.pdf PDF
232113 - Hydronic Piping.pdf PDF
230541 - NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT.pdf PDF
Proposal Item IV Cost Breakdown.xlsx XLSX spreadsheet
Asbestos - Lead Paint Survey 12-31-2020.pdf PDF
238143 - AIR SOURCE UNITARY HEAT PUMPS.pdf PDF
230593 - TESTING ADJUSTING AND BALANCING FOR HVAC.pdf PDF
230800 - COMMISSIONING OF HVAC SYSTEMS.pdf PDF
Proposal Item V Cost Breakdown.xlsx XLSX spreadsheet
238129 - VARIABLE REFRIGERANT FLOW HVAC SYSTEMS.pdf PDF
Geotech Report_Fayetteville Bldg 4 Renovation.pdf PDF
36C24624R0030 0002.docx DOCX document
Show 40 more

Latest 50 of 64 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Proposal Item III Cost Breakdown

Project Number: 565-20-101 Edward L Roy: VA assigned project #

Date:
Project TitleRenovate Historic Bldg. 4

Edward L Roy: VA assigned Project Title

Project LocationFayetteville, NC
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0
Division 2Existing Conditions- 0
Division 3Concrete- 0
Division 4Masonry- 0
Division 5Metals- 0
Division 6Wood and Plastic- 0
Division 7Thermal & Moisture Protect- 0
Division 8Doors and Windows- 0
Division 9Finishes- 0
Division 10Specialties- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0
Division 22Plumbing- 0
Division 23HVAC- 0
Division 26Electrical- 0
Division 27Communications- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0
Division 32Exterior Improvements- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

ERROR:#VALUE!
Profit %
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).ERROR:#VALUE!
Bond %

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

ERROR:#VALUE!
Overhead/Profit Subtotals :ERROR:#VALUE!

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Proposal Item Cost $ - 0 $ - 0 ERROR:#VALUE!

File details come from the government source that posted it. Updated .