1_a G - Renovate Building 4 IFC page 1.pdf
PDF 483 KB Posted
- Attached to
- Z2AA - Renovate Historic Building 4 Federal contract opportunity
- Solicitation number
- 36C24624R0030
About this file
This is a cover sheet drawing for a construction project at the Fayetteville VA Medical Center to renovate Historic Building 4 (Project #565-20-101). The drawing includes a vicinity map, project location map, and comprehensive drawing list that details all planned construction documents across multiple disciplines including General, Hazardous Materials, Civil, Landscape, Structural, and Architectural sheets.
The project is located at 2300 Ramsey Street in Fayetteville, NC 28301. The drawing list indicates extensive renovation work including demolition plans, new floor plans for basement through attic levels, structural modifications, exterior facade restoration, new elevator installation, stair additions, and complete interior renovations including new finishes and furnishings. The document is marked as "Issued for Construction" and includes stamps from FFE Engineering & Architecture as the Engineer of Record. The drawing is dated July 24, 2023 and is fully sprinklered according to the notes.
View the file
Other files for this federal contract opportunity
Show all 50
Z2AA - Renovate Historic Building 4 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
40T
49T
52T
51T
COCHRAN AVE.
R A
M S
E Y
S
T
FACILITY DR.
R A
M S
E Y
S
T
4' S
ID
E W
A L
K
9°
N O
R T
H
C B
PROJECT LOCATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n /F
F E
F a y e tt e v ill e
R e n o v a te
B
A rc h rv t
/2
/2
:5
:4
P
M
GI000
COVER SHEET
07/24/2023 SS KT
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
FAYETTEVILLE VA MEDICAL CENTER
#565-20-101
2300 RAMSEY STREET FAYETTEVILLE, NC 28301
V I C I N I T Y M A P P R O J E C T L O C A T I O N M A P
SHEET
NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI001 STAIR AND ELEVATOR ADDITION 3D VIEW
GI002 BASEMENT AXONOMETRIC DRAWINGS
GI003 FIRST FLOOR AXONOMETRIC DRAWINGS
GI004 SECOND FLOOR AXONOMETRIC DRAWINGS
GI005 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
GI006 BUILDING CODE SUMMARY
GI007 LIFE SAFETY PLAN
GI008 ACCESSIBILITY REQUIREMENTS AND STANDARD DETAILS
GI009 ACCESSIBILITY REQUIREMENT AND STANDARD DETAILS
GI010 PARTITION TYPES AND NOTES
HAZARDOUS
HA101 ABATEMENT PLAN - BASEMENT
HA102 ABATEMENT PLAN - FIRST FLOOR
HA103 ABATEMENT PLAN - SECOND FLOOR
CIVIL
CD100 DEMOLITION PLAN
CS100 CIVIL SITE PLAN
CG100 GRADING PLAN
CG200 EROSION CONTROL
CU100 UTILITY PLAN
CU200 STORM PLAN AND PROFILE 1
CU201 STORM PLAN AND PROFILE 2
CS500 TYPICAL DETAILS
CS501 TYPICAL DETAILS
LANDSCAPE
L-1 LANDSCAPE PLAN
L-2 LANDSCAPE NOTES & DETAILS
STRUCTURAL
SI000 GENERAL NOTES
SD101 OVERALL DEMOLITION PLANS
SD301 ENLARGED DEMOLITION PLANS
S101 OVERALL SLAB AND FRAMING PLANS
S201 STRUCTURAL ELEVATIONS
S301 ENLARGED PLANS
S302 ENLARGED PLANS
S501 STRUCTURAL SECTIONS
S502 STRUCTURAL SECTIONS
S601 STRUCTURAL DETAILS
ARCHITECTURAL
AD100 DEMOLITION PLAN - BASEMENT
AD101 DEMOLITION PLAN - FIRST FLOOR
AD102 DEMOLITION PLAN - SECOND FLOOR
AD103 DEMOLITION PLAN - ATTIC
AE104 FLOOR PLAN - BASEMENT
AE104A ALTERNATE BASEMENT PLAN
AE105 FLOOR PLAN - FIRST FLOOR
AE106 FLOOR PLAN - SECOND FLOOR
AE107 FLOOR PLAN - ATTIC
AE111 ENLARGED PLANS - RESTROOMS
AE112 ENLARGED PLANS - STAIR A
AE113 ENLARGED PLANS - STAIR B
AE114 ELEVATOR ENLARGED PLANS AND SECTION
AE131 ROOF PLAN
AC141 REFLECTED CEILING PLAN - BASEMENT
AC142 REFLECTED CEILING PLAN - FIRST FLOOR
AC143 REFLECTED CEILING PLAN - SECOND FLOOR
AE201 EXTERIOR ELEVATION - EAST
AE202 EXTERIOR ELEVATION - WEST
AE203 EXTERIOR ELEVATION - NORTH & SOUTH
AE211 HISTORIC FACADE RESTORATION
AE212 CURTAIN WALL AND WINDOW ELEVATIONS
AE301 BUILDING SECTION - NORTH SOUTH
AE302 BUILDING SECTION - EAST WEST
AE311 WALL SECTIONS
AE312 WALL SECTIONS
AE313 WALL SECTIONS
AE321 SECTIONS AND DETAILS - STAIR A
AE322 SECTIONS AND DETAILS - STAIR B
AE323 SECTIONS AND DETAILS - STAIR B
AE324 SECTIONS AND DETAILS - RAMP
AE325 SECTION DETAILS
AE326 SECTION DETAILS
AI401 INTERIOR ELEVATIONS
AI402 INTERIOR ELEVATIONS
AI403 INTERIOR ELEVATIONS
AI404 INTERIOR ELEVATIONS
AI405 INTERIOR ELEVATIONS
AE411 INTERIOR CEILING DETAILS
AE412 INTERIOR PLAN DETAILS
AI501 FURNITURE PLAN - BASEMENT
AI502 FURNITURE PLAN - FIRST FLOOR
AI503 FURNITURE PLAN - SECOND FLOOR
AW511 FIRST FLOOR SIGNAGE PLAN AND SCHEDULE
AW512 SECOND FLOOR SIGNAGE PLAN
AE601 DOOR SCHEDULE, HARDWARE SETS, DOOR AND FRAME DETAILS
AF701 FINISH PLAN - BASEMENT
AF702 FINISH PLAN - FIRST FLOOR
AF703 FINISH PLAN - SECOND FLOOR
AF704 FINISH SCHEDULE
D R A W I N G L I S T
DEPARTMENT OF VETERANS AFFAIRS
"RENOVATE HISTORIC BUILDING 4"
PLAN
NORTH
PLAN
NORTH
NTS NTS
SHEET
NUMBER SHEET NAME
FIRE PROTECTION
FD100 BASEMENT FIRE PROTECTION DEMOLITION PLAN
FD101 FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN
FD102 SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN
FD103 ATTIC FIRE PROTECTION DEMOLITION PLAN
FX100 BASEMENT FIRE SUPPRESSION PLAN
FX101 FIRST FLOOR FIRE SUPPRESSION PLAN
FX102 SECOND FLOOR FIRE SUPPRESSION PLAN
FX103 ATTIC FIRE SUPPRESSION PLAN
FX501 FIRE SUPPRESSION SECTIONS AND DETAILS
PLUMBING
P001 PLUMBING LEGEND SHEET
PD001 UNDERGROUND PLUMBING DEMOLITION PLAN
PD100 BASEMENT PLUMBING DEMOLITION PLAN
PD101 FIRST FLOOR PLUMBING DEMOLITION PLAN
PD102 SECOND FLOOR PLUMBING DEMOLITION PLAN
PD103 ATTIC PLUMBING DEMOLITION PLAN
PL001 UNDERGROUND PLUMBING NEW WORK PLAN
PL100 BASEMENT PLUMBING NEW WORK PLAN
PL101 FIRST FLOOR PLUMBING NEW WORK PLAN
PL102 SECOND FLOOR PLUMBING NEW WORK PLAN
PL103 ATTIC PLUMBING NEW WORK PLAN
PL501 PLUMBING DETAILS
PL601 PLUMBING SCHEDULES
PL901 PLUMBING SANITARY & VENT ISOMETRICS
PL902 PLUMBING DOMESTIC WATER ISOMETRICS
MECHANICAL
M001 MECHANICAL LEGEND
MD100 BASEMENT HVAC DEMOLITION PLAN
MD101 FIRST FLOOR HVAC DEMOLITION PLAN
MD102 SECOND FLOOR HVAC DEMOLITION PLAN
MD103 ATTIC HVAC DEMOLITION PLAN
MH100 BASEMENT HVAC PLAN
MP100 BASEMENT HVAC PIPING PLAN
MH101 FIRST FLOOR HVAC PLAN
MP101 FIRST FLOOR HVAC PIPING PLAN
MH102 SECOND FLOOR HVAC PLAN
MP102 SECOND FLOOR HVAC PIPING PLAN
MH103 ATTIC FLOOR HVAC PLAN
MH300 HVAC SHAFT SECTION VIEWS
MH301 HVAC SHAFT SECTION VIEWS
M501 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
M602 MECHANICAL SCHEDULES
M700 HVAC CONTROLS
M900 BASEMENT - ALTERNATE PLAN
ELECTRICAL
E001 LEGEND
EN100 BASEMENT - ALTERNATE PLAN
E501 TECHNOLOGY DETAILS
E502 ELECTRICAL DETAILS & MOTOR SCHEDULE
E600 SINGLE LINE DIAGRAM
E601 PANEL SCHEDULES
E602 PANEL SCHEDULES
E603 LIGHTING SCHEDULE
ES100 SITE PLAN - DEMOLITION
ED100 BASEMENT - DEMOLITION PLAN
ED101 FIRST FLOOR - DEMOLITION PLAN
ED102 SECOND FLOOR - DEMOLITION PLAN
EL100 BASEMENT - LIGHTING PLAN
EL101 FIRST FLOOR - LIGHTING PLAN
EL102 SECOND FLOOR - LIGHTING PLAN
EL103 ATTIC - LIGHTING PLAN
EP100 BASEMENT - POWER PLAN
EP100A BASEMENT - POWER UNDERGROUND PLAN
EP101 FIRST FLOOR - POWER PLAN
EP102 SECOND FLOOR - POWER PLAN
EP103 ATTIC - POWER PLAN
EP104 ROOF PLAN - LIGHTNING PROTECTION
ES101 SITE PLAN - NEW WORK
EY100 BASEMENT - TECH & FIRE ALARM
EY101 FIRST FLOOR -TECH & FIRE ALARM
EY102 SECOND FLOOR - TECH & FIRE ALARM
EY201 BUILDING 21 - FIRST FLOOR - TECHNOLOGY PLAN
No. Revisions: Date:
REV 0 07/24/2023
Steve Image
File details come from the government source that posted it. Updated .