This is a technical specification section (23 82 16) for Air Coils as part of the renovation of Historical Building 4 (Project #565 20 101). The specification covers requirements for heating and cooling coils used in air handling units and duct applications.
The document details specific technical requirements including: minimum 16mm (0.625 inch) diameter seamless copper tubing, aluminum or copper fins (0.1397mm or 0.1143mm thickness), copper/welded steel/cast iron headers, and 1.6mm galvanized steel coil casing. Coils must be tested and certified to AHRI Standard 410 and bear AHRI certification labels. Test pressures are specified at 2070 kPa (300 PSIG) and working pressures at 1725 kPa (250 PSIG). The specification includes requirements for volatile refrigerant coils, installation procedures, startup testing, commissioning documentation, and manufacturer training requirements of 4 hours for VA personnel. All work must comply with referenced standards from ASTM, NFPA, NEMA, and UL.
View the file
Other files for this federal contract opportunity
Show all 50
Z2AA - Renovate Historic Building 4 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Renovation of Historical Building 4
Project #565 20 101
03-01-20
AIR COILS
23 82 16 - 1
SECTION 23 82 16
AIR COILS
PART 1 - GENERAL
1.1 DESCRIPTION
Heating and cooling coils for air handling unit and duct applications
1.2 RELATED WORK
A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES
B. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS
C. Section 23 05 11, COMMON WORK RESULTS FOR HVAC
D. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS
E. Section 23 09 23, DDC SYSTEMS for HVAC
F. Section 23 31 00, HVAC DUCTS AND CASINGS
G. Section 23 72 00, AIR TO AIR ENERGY RECOVERY EQUIPMENT
I. Section 23 73 00, INDOOR CENTRAL-STATION AIR-HANDLING UNITS.
J. Section 23 82 00, CONVECTION HEATING AND COOLING UNITS
1.3 QUALITY ASSURANCE
A. Refer to paragraph, QUALITY ASSURANCE, Section 23 05 11, COMMON WORK
RESULTS FOR HVAC.
B. Unless specifically exempted by these specifications, heating and cooling coils shall be tested, rated, and certified in accordance with
AHRI Standard 4l0 and shall bear the AHRI certification label.
1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, and SAMPLES.
B. Manufacturer's Literature and Data for Heating and Cooling Coils:
Submit type, size, arrangements and performance details. Present application ratings in the form of tables, charts or curves.
C. Provide installation, operating and maintenance instructions.
D. Certification Compliance: Evidence of listing in current ARI Directory of Certified Applied Air Conditioning Products.
E. Coils may be submitted with Section 23 73 00, INDOOR CENTRAL-STATION
AIR-HANDLING UNITS, or Section 23 82 00, CONVECTION HEATING AND COOLING
UNITS.
F. Completed System Readiness Checklists provided by the Commissioning
Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS.
03-01-20
AIR COILS
23 82 16 - 2
1.5 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. Air Conditioning and Refrigeration Institute (AHRI):
Directory of Certified Applied Air Conditioning Products
AHRI 4l0-2001...........Forced-Circulation Air-Cooling and Air-Heating
Coils
C. American Society for Testing and Materials (ASTM):
B75/75M-2019............Standard Specifications for Seamless Copper
Tube
D. National Fire Protection Association (NFPA):
70-2017.................National Electric Code
E. National Electric Manufacturers Association (NEMA):
250-2014................Enclosures for Electrical Equipment (1,000
Volts Maximum)
F. Underwriters Laboratories, Inc. (UL):
1996-2014...............Electric Duct Heaters
PART 2 - PRODUCTS
2.1 HEATING AND COOLING COILS
A. Conform to ASTM B75 and AHRI 410.
B. Tubes: Minimum 16 mm (0.625 inch) tube diameter; Seamless copper tubing.
C. Fins: 0.1397 mm (0.0055 inch) aluminum or 0.1143 mm (0.0045 inch) copper mechanically bonded or soldered or helically wound around tubing.
D. Headers: Copper, welded steel or cast iron. Provide seamless copper tubing or resistance welded steel tube for volatile refrigerant coils.
E. "U" Bends, Where Used: Machine die-formed, silver brazed to tube ends.
F. Coil Casing: 1.6 mm (l6 gage) galvanized steel with tube supports at
1200 mm (48 inch) maximum spacing. Construct casing to eliminate air bypass and moisture carry-over. Provide duct connection flanges.
G. Pressures kPa (PSIG):
Pressure Refrigerant Coil
Test 2070 (300)
Working 1725 (250)
03-01-20
AIR COILS
23 82 16 - 3
H. Protection: Unless protected by the coil casing, provide cardboard, plywood, or plastic material at the factory to protect tube and finned surfaces during shipping and construction activities.
I. Vents and Drain: Coils that are not vented or drainable by the piping system shall have capped vent/drain connections extended through coil casing.
J. Cooling Coil Condensate Drain Pan: Section 23 73 00, INDOOR CENTRAL-
STATION AIR-HANDLING UNITS.
2.2 VOLATILE REFRIGERANT COILS
A. Continuous circuit, straight tubes, dry expansion type equipped with multi-port distribution header, less expansion valve.
B. Minimum 16 mm (5/8-inch) tube diameter.
C. Designed for EPA approved refrigerants.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Follow coil manufacturer's instructions for handling, cleaning, installation and piping connections.
B. Comb fins, if damaged. Eliminate air bypass or leakage at coil sections.
3.2 STARTUP AND TESTING
A. The Commissioning Agent will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with the COR and Commissioning Agent. Provide a minimum of 7 calendar days prior notice.
3.3 COMMISSIONING
A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS and as required by
Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for all inspection, start up, and contractor testing required above and required by the
System Readiness Checklist provided by the Commissioning Agent.
B. Components provided under this section of the specification will be tested as part of a larger system. Refer to Section 23 08 00 –
COMMISSIONING OF HVAC SYSTEMS and related sections for contractor responsibilities for system commissioning.
3.4 DEMONSTRATION AND TRAINING
A. Provide services of manufacturer’s technical representative for four hours to instruct VA personnel in operation and maintenance of units.
03-01-20
AIR COILS
23 82 16 - 4
B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS.
- - - E N D - - -