About this file

This file is a Request for Information (RFI) response document for the Upgrade Substation Building 2 Phase 1 project at the Philadelphia Corporal Michael J. Crescenz Veterans Affairs Medical Center (CMCVAMC). The RFI addresses 31 questions and clarifications submitted by prospective offerors regarding contract requirements, missing attachments, specifications, and procurement terms.

Key clarifications from the RFI include: the government will not extend the past performance evaluation period beyond the specified timeframe; the General Contractor Superintendent serves as the Infection Control Competent Person and must be on-site during all construction with 8-hour ICRA training; the government intends to proceed with Option 2 only, which includes retaining a third temporary substation for future use and utilizing a permanent wall for the third substation, with no bid schedule to be provided; and pricing shall be submitted on SF 1442. All contractor and subcontractor key personnel must obtain PIV badges under Tier 1 background investigation, with flash badges no longer issued. Missing attachments including drawings (B02-SUB-3, B02-SUB-4, B6-SUB-PRIMARY-NORMAL-324-371-DWG-FINAL-070623, B6-SITE-POWER-WITH-MANHOLES-DWG-FI), VA policies (infection control, hot work permits, lock-out/tag-out, fire alarm/suppression, security, asbestos abatement, confined space), hazardous material surveys, and manhole reports are provided in Amendment 0004. The procurement requires both performance and payment bonds at 100% of contract price under FAR 28.102 and FAR 52.228-15, a bid bond, and 180-calendar-day price validity. Offerors must quote only keyed notes on drawings with any additional devices or changes resulting from field conditions to be submitted to the Contracting Officer Representative and Architect/Engineer for review and approval.

View the file

Other files

File Type Posted
2024-12-03_HAZARDOUS AND UNIVERSAL WASTE POLICY.pdf PDF
2024-12-03_HAZARDOUS MATERIALS AND WASTE MANAGEMENT PLAN.pdf PDF
ALL-31-SINGLE-LINES-ONE-FILE-012325.pdf PDF
FMS 138-54 Hot Work Policy.doc DOC document
Confined Space Entry Program.pdf PDF
Electrical Safety Program.pdf PDF
7714_D_2017-04-06 ASBESTOS MANAGEMENT PROGRAM.pdf PDF
VHA Dir 7714 Asbestos Management Program.pdf PDF
Fire and Smoke Barrier Pentration Permit.pdf PDF
Safety Coordination Meeting Safety Policies for SOW Project 642-22-104.pdf PDF
B6-SUB-PRIMARY-NORMAL-324-371-DWG-FINAL-070623.pdf PDF
Inspection Final RAC Blank Master.docx DOCX document
SAFE PRACTICES FOR WORKING WITH LIVE ELECTRICAL POWER.pdf PDF
36C24426R0088 0004.pdf PDF
B02-SUB-3.pdf PDF
FMS SOP 138-44 Fire and Smoke Barrier Penetration Policy.pdf PDF
B02-SUB-2.pdf PDF
B6-SITE-POWER-WITH-MANHOLES-DWG-FINAL-070623.pdf PDF
2024-12-03_Green Procedure Program.pdf PDF
FIRE SYSTEM permit 2021 blank.pdf PDF
MANHOLES 19529-02 VA Hospital of Philedelphia 11.17.22.pdf PDF
VHA ICRA-1.2 Oct 1 2024.pdf PDF
B02-SUB-1.pdf PDF
Blank Above Ceiling Permit.pdf PDF
Asbestos Control Regulation.pdf PDF
Building 2_LS_SB_G_B FOR REFERENCE ONLY.pdf PDF
INFECTION PREVENTION AND CONTROL POLICY BEHAVIORAL HEALTH SERVICES.pdf PDF
Fire Plan.pdf PDF
FMS SOP 138-54 Hot Work Policy.pdf PDF
Safety and Health During Construction.pdf PDF
B02-SUB-4.pdf PDF
36C24426R0088 0003.pdf PDF
36C24426R0088 0003.pdf PDF
Attachment 1 RFI 1 Upgrade Substation 642-22-104.docx DOCX document
Attachment 3 General Decision Number PA20260003 10012026.docx DOCX document
Attachment 1 RFI 1 Upgrade Substation 642-22-104.docx DOCX document
Attachment 2 P09 Final SOW Rev1 Building 2 Substation Phase 1 642-22-104 10202026.docx DOCX document
36C24426R0088 0003.pdf PDF
36C24426R0088 0002.docx DOCX document
36C24426R0088 0001.docx DOCX document
S04 Pre-Bid Sign-In Sheet 36C24426R0088 - 642-22-104 - Upgrade Substation.pdf PDF
Substations Upgrade Building 2-Phase 1_Bid Documents_Specification_10-21-24.pdf PDF
Substations Upgrade Building 2-Phase 1 Combined Drawings.pdf PDF
36C24426R0088_1.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Upgrade Substation | RFI 2 | Philadelphia VAMC (CMCVAMC)

1. Missing response: Would the VA extend the period for past performance to 8 years?

Q1 Answer: No, the government will not extend past performance to 8 years.

1. What are the requirements for the Competent Infection Control Person? Is this a full-time, onsite role?

Q2 Answer: The GC Superintendent is typically designated as the Infection Control Competent Person and is required to have an ICRA 8-hour training. The Superintendent shall always be on-site during construction and oversee all ICRA barrier installation.

1. Missing attachment - B02-SUB-3, B02-SUB-4.

Q3 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment - B6-SUB-PRIMARY-NORMAL-324-371-DWG-FINAL-070623.

Q4 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment - VA's policy for infection control for construction & renovation projects.

Q5 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment - permit application forms for opening ceilings and above ceiling work.

Q6 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment - hazardous material surveys for the construction areas noted in this project.

Q7 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment - MANHOLES 19529-02 VA Hospital of Philadelphia 11.17.22 Q8 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment - warehouse building as-builts by floor.

Q9 Answer: Attachment is provided with Amendment 0004.

1. Contradiction Q50, Q81,Q82 – Responses state “There is no option 1 or 2” – We need to know which version to quote.

9. Specifications clearly mention Options

9. Drawings clearly identify Options 1 & 2

1. One requires fencing vs. a permanent wall

1. Equipment and Temp. Substation room are different dimensions for Option 1 vs. Option 2

1. We are missing a Bid Schedule that aligns with 01 00 00 1.3 – Statement of Bid Item (s)

2. ITEM I, GENERAL CONSTRUCTION:

2. ITEM II, Electrical Work:

2. ITEM III, Mechanical Work:

Q10 Answer: The Government intends to proceed with Option 2 as identified in the contract specifications. Offerors shall base their pricing proposal solely on Option 2, which includes retaining the third temporary substation for future use and utilizing a permanent wall for the third substation. No bid schedule will be provided for this project.

1. Missing attachment - copy of the local VA's Infectious Control Risk Assessment Policy.

Q11 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment - copy of the local VA's Hot Work Permit Policy.

Q12 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment - FMS 011 LOTO SOP Q13 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment - copy of the local VA's Firewall/Smoke Wall penetration Policy and the permitting and approval process for penetrating a rated wall.

Q14 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment - copy of the local VA's Construction Safety Policy.

Q15 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment - provide a copy of the local VA's Lock-Out/Tag-Out Policy.

Q16 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment - copy of the local VA's Fire Alarm and Fire Suppression Impairment Policy.

Q17 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment - copy of the local VA's Security Policy for Contractor Employees, i.e., badging requirements and access requirements.

Q18 Answer:

Security –

a. All Contractor and Subcontractor Presidents, Project Managers, Superintendents, and other Key Personnel shall obtain and always display a PIV badge on-site. If the Contractor or Subcontractor does not have a PIV badge contact the project COR and/or authorized PIV Sponsor to begin the sponsorship process for obtaining a PIV badge.

Flash (6-month) badges are no longer issued to Contractors. All PIV badges shall be issued under Tier 1 (fingerprint and NBIS background investigation).

b. Card access to Federal facilities is governed by the site Physical Security Specialist. Key access to Federal facilities is governed by the site Locksmith. The Contractor shall coordinate all access requirements with the VA COR.

1. Missing attachment - copy of the local VA's Asbestos Abatement or Containment Policy.

Q19 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment - copy of the latest Asbestos Assessment and Conditions report for the construction areas.

Q20 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment - copy of the Confined Space Policy for the interstitial and any electrical manholes.

Q21 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment - SE Manhole report Q22 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment Q73 - B6-SITE-POWER-WITH-MANHOLES-DWG-FI; B6-SUB-PRIMARY-NORMAL-324-371-DWG-FINAL-070623 NAL-070623 Q23 Answer: Attachment is provided with Amendment 0004.

1. Missing attachment Q74 - B02-SUB-1, B02-SUB-2 Q24 Answer: Attachment is provided with Amendment 0004.

1. Q77 response states “Refer to responses for question 76.” Should this reference Q75 response, not 76?

Q25 Answer: Refer to response on question 75 on RFI 1.

1. Q78: Please confirm this is a single-phase best value RFP and that pricing is due on 8/31/26 with the technical proposal.

Q26 Revised Answer: This procurement is being conducted as an RFP and will be evaluated in accordance with the evaluation factors identified in the solicitation. Offerors shall submit pricing and technical proposals by the proposal due date specified in the solicitation.

1. Contradiction Q79 – Q14 states no SF1442 is not required; Q79 says that price is to be submitted on SF1442 – which is it?

Q27 Answer: Price is to be submitted on SF1442.

1. Missing response: Submitted 8.6.2026 - Reference block12a and 12b of SF1442. Block 12a is checked no, yet block 12b states 10 days.

Q28 Answer: Under FAR 28.102 and FAR 52.228-15, federal construction contracts over $150,000 USD require both performance and payment bonds at 100% of the original contract price. Please see Amendment 0003 on SAM.gov.

1. Missing response: Submitted 8.6.2026 - Reference block 13b of SF1442. Please confirm that no bid bond (offer guarantee) is required.

Q29 Answer: Bid bond is required. Please see Amendment 0003 on SAM.gov.

1. Missing response: Submitted 8.6.2026 - Reference block 13d. of the SF1442. Please confirm that 180 calendar days is correct. 6 months is quite a long time in this economic environment to hold prices for. We typically see 90 days.

Q30 Answer: The 180-calendar-day period is correct.

1. Missing response: Reference E-104 – General Notes – Fire Alarm – 2 & 12. Are we to only quoting the keyed notes for New Work or is the VA going to provide an allowance to cover the additional devices? These notes will prompt an unreasonable contingency to cover the ambiguity in “additional devices…. without any additional cost to the government.”

Q31 Answer: Please quote the keyed notes on E-104. Any additional devices or overall changes required due to field conditions, assessments, differing or unforeseen conditions, shall be brought to the attention of the COR and A/E for review.

File details come from the government source that posted it. Updated .