This document comprises life safety assessment plans for Building 2 of the Corporal Michael J. Crescenz VA Medical Center in Philadelphia. The plans depict fire protection and life safety features in accordance with NFPA 101-2021 Edition requirements, as mandated by The Joint Commission (TJC) for a Statement of Conditions life safety assessment. The document includes four detailed floor plans: Sub-Basement, Pipe Basement/Ground Floor, Basement Utility Floor, and associated compartment schedules identifying occupancy classifications, square footage, occupancy loads, distances to exits and smoke barriers, and sprinkler system coverage.
The Sub-Basement contains three compartments totaling 46,272 square feet with business and industrial occupancies, distances to exits ranging from 130 to 177 feet 9 inches, and full sprinkler system protection. The Pipe Basement compartment (PB.1) encompasses 62,840 square feet with business occupancy varying by use area, a maximum exit distance of 262 feet, and sprinkler protection. The Basement Utility Floor compartment (BB.1) contains 64,477 square feet of business occupancy with no sprinkler system and exit distances up to 160 feet. Each plan includes life safety legends defining fire barriers, smoke barriers, exits, hazardous areas, and construction elements, along with door and corridor egress width specifications compared to code minimums and provided dimensions. The disclaimer notes these plans are solely for fire protection and life safety representation and should not be considered accurate for architectural or other design disciplines.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S S S S
S S S
S S S S
SSS
SS
SS
SSSSS
SSS
SSSSS
S S
S
SS
SS
SSSSS
S S
S S
S S
S S
S S
SS
SSSSS
SSSSS
SSSSS
SSSSS SSSSS
SSSSS
SS
SS SSSSS
SS
SS
SS
SS
S S S S
S S
HZ
LINEN/TRASH CHUTE
WITH 2 HR FIRE BARRIER
COMPARTMENT ID
SUITE ID
EXIT
HAZARDOUS AREA
HAZARDOUS AREA
(MULTIPLE ROOMS)
HZ
X-X-X1
DISTANCE SMOKE BARRIER
1 HOUR FIRE SMOKE BARRIER
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
DISTANCE TO EXIT
CONSTRUCTION AREA
EXIT STAIRWELL
2 HOUR FIRE SMOKE BARRIER
1 HOUR SMOKE BARRIER
SBB.2
SBI.1
SBB.1
MEGAVOLT
B3A103
E.C.
B3A102
IT
CLOSET
B3A101
HAC
B3A100
STAIR
No. 11
TOILET
B3A110
TOILET
B3A111
DRESS
B3A113A
DRESS
B3A113
EXAM
ROOM
B3A114
CONFERENCE
ROOM
B3A115
CORRIDOR
CB3-5
EXAM
B3A106
MOLD
ROOM
B3A112
EXAM
B3A107
OFFICE
B3A117LINEAR
ACCELERATOR
B3A105
CONTROL
ROOM
B3A104
STORAGE
ROOM
B3A104A
EXAM
B3A108
CORRIDOR
CB3-6
OFFICE
B3A116
OFFICE
B3A118
OFFICE
B3A119
CHIEF
B3A120
MULTI-VIEW
B3A109
OFFICE
B3A121
RECEPTION
B123
SOILED
UTILITY
B3A122
CLEAN
LINEN
B3A124
TOILET
B3A125
IV ROOM
B3A126
CHILLER
ROOM
B3A127A
STORAGE
B3A127B
STORAGE
B3A127C
SUPPLY
ROOM
B3A127
CORRIDOR
CB3-9
CORRIDOR
CB3-4
CORRIDOR
CB3-7
CONTROL
ROOM
B3A128A
VARIAN
SIMULATOR
B3A128
EXAM
ROOM
B3A129
OFFICE
B3A130
STRETCHER
WAITING
B3A131 WAITING
B3A132
STORAGE
B3A133
E.C.
B3A134
RESEARCH
REGIONAL
OFFICE /
MEDICAL /
GENERAL
STORAGE
B109
CORRIDOR
CB3-15
LOUNGE
B3B108
PERIPHERAL
SUITE
B3A136A
OFFICE
B3A136C
HAC
B3B101
TELECOM
B3A138F
OFFICE
B3A138A
COMPUTER
ROOM
B3A138
AFGE
B3A137A
MALE
LOCKER
ROOM
B3B107
FEMALE
LOCKER
ROOM
B3B106
AFGE
B3B102
FEMALE
LOCKER
ROOM
B3B104
CORRIDOR
CB3-13
SOUTH
PASSENGER
ELEVATOR
LOBBY
CB3-14
OFFICE
B3B100
SOUTH
SERVICE
ELEVATOR
LOBBY
CB3-16
MALE
LOCKER
ROOM
B3B105 TOILET
B3B112A
ENGINEERS
OFFICE
B3B111B
CORRIDOR
CB3-17
ELEVATOR
EQUIPMENT
ROOM
B3B110
STAIR
No. 9
LOUNGE
B3B103
STAIR
NO. 10
ELEVATOR
PIT
B3A135
OFFICE
B3B116
VISTA
SUITE
B3B115F
MECHANICAL
ROOM
SB1
OFFICE
B3A142
FIRE PUMP
ROOM
B3B111C
RECEPTION
B3A143
MECHANICAL
EQUIPMENT
ROOM
B3B111
MECH.
ROOM -AIR
HANDLERS
B3B111A
CRAWL SPACE
CRAWL SPACE
CRAWL SPACE
HZHZ
CART LIFT
B3A109G
RADIATION
THERAPY
STORAGE
B3A141
CONFERENCE
ROOM
B3A140
CAC & MSO
B3A144
OFFICE
B3A145
OFFICE
B3A146
OFFICE
B3A147
MULTI
PURPOSE
B3A150
STORAGE
B3A149
CONFERENCE
ROOM
B3A148
OFFICE
8A184
ELECTRIC
B3A152
ELEVATOR
MACHINE
ROOM
8A186
STAFF
B3A187
CORRIDOR
CB3-10A
CORRIDOR
CB3-11
CORRIDOR
CB3-11A
STORAGE
B3A138B FITS STAFF
B3A138E
STORAGE
B3A138D
EQUIPMENT
ROOM
B3A138C
OFFICE
B3B115D
CHIEF
OPERATIONS
OFFICE
B3B115C
KITCHEN
B3B115B
BUSINESS
OFFICE
B3B115E
CONFERENCE
ROOM
B3B115A
STORAGE
B3B114B
STORAGE
B3B114AFITS HELP
DESK
B3B114C
FITS
RECEPTION
B3B114
HZHZ
CORRIDOR
CB3-10
DISTANCE EXIT:
130' - 0"
DISTANCE SMOKE:
89' - 10"
DISTANCE EXIT:
128' - 10"
DISTANCE SMOKE:
113' - 0"
PHYSICS
LAB
B3A140A
STAIR
.3"/OCC
CODE MIN:
PROVIDED:
(E)
36" * 36.5"
36"
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
32" 44"
24"
STAIR
.3"/OCC
CODE MIN:
PROVIDED:
(E)
36" *
40"
27"
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
32" 44"
18"
CORRIDOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
44" 96"
18"
CORRIDOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
44" 90"
24"
DISTANCE EXIT:
145' - 0"
DISTANCE EXIT:
177' - 9"
CORRIDOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
44" 60 "
6"
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
32" 69"
3"
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
32" 44"
3"
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
32" 36"
6"
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
32" 36"
6"
SBB.1
SBB.2
SBI.1
EXISTING
BUSINESS
EXISTING
INDUSTRIAL
2 HOURS BUILDING
OCCUPANCY SEPARATION
CORRIDOR
CB3-2
CORRIDOR
CB3-8
CORRIDOR
CB3-12
CORRIDOR
CB3-18
C O
R R
ID
O
R C
B3 -1
SERVICE
ELEVATOR
S-10
SERVICE
ELEVATOR
S-9
PASSENGER
ELEVATOR
P-14
PASSENGER
ELEVATOR
P-13
PASENGER
ELEVATOR
P-16
PASSENGER
ELEVATOR
P-15
SERVICE
ELEVATOR
S-12
SERVICE
ELEVATOR
S-11
CORRIDOR
CB3-9
CORRIDOR
CB3-9
CORRIDOR
CB3-9
CORRIDOR
CB3-9
CORRIDOR
CB3-12
CORRIDOR
CB3-13
CORRIDOR
CB3-4
CORRIDOR
CB3-18
CORRIDOR
CB3-18
CORRIDOR
CB3-18
N
P N
KEYPLAN: SUB-BASEMENT
BUILDING 2
BUILDING 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJLH
C:
\U se rs\
AA
hm ed \D oc um en ts\
PH
ILA
V A
MA
ST
ER
F
ILE
_k sc hn ec kE
VB
MP
.rv t
9/1 1/2 3 3 :16 :11 P M
2-LS-00.1
BUILDING 2 SUB-BASEMENT LIFE SAFETY PLAN
9-12-2023
Corporal Michael J. Crescenz VA Medical Center Philadelphia
642-22-124LIFE SAFETY ASSESSMENT
22-USDVA-09
LIFE SAFETY LEGEND
COMPARTMENT KEY PLAN
BUILDING 2 - SUB-BASEMENT- EXISTING BUSINESS OCCUPANCY
COMPARTMEN
T ID
COMPARTMENT
SQ. FT.
OCCUPANCY
LOAD
AREA USE DISTANCE
TO EXIT
DISTANCE
TO SMOKE
SPRINKLER
SYSTEM
BUILDING 2
SBB.1 17185 SF 114 BUSINESS 177'-9" 89'-10" Yes SBB.2 19458 SF 129 BUSINESS 145'-0" 130'-0" Yes Grand total 36643 SF
BUILDING 2 - SUB-BASEMENT- EXISTING INDUSTRIAL OCCUPANCY
COMPARTMENT
ID
COMPARTMENT
SQ. FT.
OCCUPANCY
LOAD AREA USE
DISTANCE
TO EXIT
DISTANCE
TO SMOKE
SPRINKLER
SYSTEM
BUILDING 2
SBI.1 9629 SF MP MECHANICAL 130'-0" Yes Grand total 9629 SF
COMPARTMENT SCHEDULE
DISCLAIMER:
LIFE SAFETY PLANS DEPICT INFORMATION
PERTAINING TO NFPA 101-2021 EDITION ONLY.
THIS PLAN IS SOLELY FOR THE
REPRESENTATION OF THOSE FIRE
PROTECTION / LIFE SAFETY FEATURES
NECESSARY FOR A STATEMENT OF
CONDITIONS LIFE SAFETY ASSESSMENT AS
REQUIRED BY THE JOINT COMMISSION (TJC). IT
SHOULD NOT BE CONSIDERED AN ACCURATE
PLAN FOR ARCHITECTURE OR ANY OTHER
DESIGN OR CONSTRUCTION DISCIPLINE.
Revisions: Date:
S S S S
S S
S S S S S
S S S
S S
S S
S S
S S
S S
S
S S
S S
S S
S S S S
S S
SS
SSSSS
SSSSS
S S
S
HZ
LINEN/TRASH CHUTE
WITH 2 HR FIRE BARRIER
COMPARTMENT ID
SUITE ID
EXIT
HAZARDOUS AREA
HAZARDOUS AREA
(MULTIPLE ROOMS)
HZ
X-X-X1
DISTANCE SMOKE BARRIER
1 HOUR FIRE SMOKE BARRIER
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
DISTANCE TO EXIT
CONSTRUCTION AREA
EXIT STAIRWELL
2 HOUR FIRE SMOKE BARRIER
1 HOUR SMOKE BARRIER
PB.1
HZ
HZ
HZ
HZHZ
CRAWL SPACE
LOADING DOCK
HZ
HZ
HZ
FEMALE
TOILET
B2B117
MALE
TOILET
B2B118
MECHANICAL
EQUIPMENT
B2A105
ELECTRIC
ROOM
B2A104
MECHANICAL
EQUIPMENT
B2A103
WAREHOUSE
B2A117A
STERILE
STORAGE
B2A116
H.A.C.
B2A118B
TEL. CLO.
B2A117
E.C.
B2A116
MEN'S
LOCKER
B2A115A
HALLWAY
B2A115
WOMEN'S
LOCKER
B2A115D
CLERICAL
OFFICE
B2A114
SPD
OFFICE
B2A114C
E.C.
B2A102
TEL. CLO.
B2A101
STO.
B2A100
GARAGE
PASSENGER
ELEVATOR
LOBBY
CB2-1STAIR
No. 11
SPS
LOUNGE
B2A107
VEST
B2A108
MALE
LOCKERS
B2A108
H.A.C.
B2A109C
STORAGE
B2A109D
E.C.
B2A109F
STAIR
No. 12
CART LIFT
B2A140
MECH.
EQUIP.
B2A109H
LOBBY
CB2-5
ELEVATOR
MACHINE
ROOM
B2B105e
ROOM
B2A144
FEMALE
LOCKERS
B2A110A
VEST
B2A110
STORAGE
B2B119
OFFICE
B2B131a
SUPERVISORS,
TECHS &
CLERKS
B2B131
PRODUCT
& SERV.
CHIEF
B2B131b
INGREDIENT
CONTROL
B2B125
FOOD
STORAGE
B2B121 H.A.C.
B2B120
B2B115
NUTRITION
THERAPY
CHIEF
B2B136
SEC./
WAITING
B2B137
PROG.
MGT. &
PLANNING
CHIEF
B2B138
CLEAN
DISH
STORAGE
B2B139
DISHWASHING
B2B139b
SANITATION
SUPPLY
STORAGE
B2B139a
CHIEF
B2B104
SUBSTANCE
STORAGE
REFRIGERATOR
B2B105b
MECH.
EQUIP.
SHAFT
BREAK
DOWN
ROOM
B2A118A
HALL
B2A119
CORRIDOR
CB2-3
RECEIVING
& ISSUE
AREA
B2B105
VESTIBULE
B2B113
OFFICE
B2B114
FOOD
SERVICE
COORD.
CENTER
B2B135STORAGE
B2B135a TEL. CLO.
B2B134
ELEC. CLO.
B2B133
CLEAN
EQUIP.
FACIL.
B2B140
STORAGE/
FUTURE
MECH.
SHAFT
B2B132b
STORAGE/
FUTURE
MECH.
SHAFT
B2B132a
H.A.C.
B2B130
DAIRY
REFRIGERATOR
B2B126
VEG.
REFRIGERATOR
B2B124
ELECTRICAL
ROOM
B2B127
MEAT
REFRIGERATOR
B2B123
VEG.
FREEZER
B2B124a
MEAT
FREEZER
B2B123a
NON-FOOD
STORAGE
B2B122
UNPOSTED
STOCK
HOLDING
AREA
B2B113a
TEL. CLO.
B2B105g
E.C.
B2B105h
TOILET
ROOM
B2B105f
ELEV.
F-19
POT WASH
CENTER
B2B129
TRAY
MAKE-UP
B2B132
CORRIDOR
CB2-17
CORRIDOR
CB2-15
CORRIDOR
CB2-16
FOOD
PROCESSING
PREPARATION
B2B128
FLAMMABLE
STORAGE
VAULT
B2B110
GAS
STORAGE
B2B111
GAS
STORAGE
B2B112
W/C STAFF
TOILET
B2B102
W/C STAFF
TOILET
B2B101
H.A.C.
B2B103
SPD
OFFICE
B2B100
SOUTH
PASSENGER
ELEVATOR
LOBBY
CB2-6
SOUTH
SERVICE
ELEVATOR
LOBBY
CB2-10
CORRIDOR
CB2-12
CORRIDOR
CB2-11
CORRIDOR
CB2-7
CORRIDOR
CB2-8
CORRIDOR
CB2-9
FOOD
SERVICE
ELEV.
LOBBY
B2B141
STAIR
NO. 10
MECH.
SHAFT
B2B143
MECH.
SHAFT
B2B144
NARCOTICS
VAULT
B2B105d
DRUG
REFRIGERATOR
B2B105c
FORMS
ROOM
B2A118A
MANUAL
EQUIP
WASH
B2A109B
DECONTAMINATION
ROOM
B2A109
SHOWER
AUTO CAR
WASH
B2A109A
CART LIFT
B2A109G
SPD
STORAGE
B2A111
CORRIDOR
CB2-4
EXIT
CORRIDOR
CB2-13
VEST.
B2B107
VEST.
B2B108
ELECTRIC
ROOM
B2B106
MECHANICAL
EQUIPMENT
B2B109
STAIR
No. 8
CORRIDOR
CB2-8
PREP.
STERILIZATION
B2A112
MECH.
EQUIP.
SHAFT
OI & T
WAREHOUSE
B2A117
ROOM
B2A118
CRAWL SPACE
CRAWL SPACE
BATTERY
CHARGING
B2B105I
BREAK
ROOM
2BB105A
DISTANCE EXIT:
262' - 0"
DISTANCE EXIT:
196' - 0"
DISTANCE EXIT:
124' - 0"
HZ
STAIR
.3"/OCC
CODE MIN:
PROVIDED:
(E)
36" * 36.5"
24"
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
32" 44"
16"
CORRIDOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
44" 73"
16"
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
32" 70"
16"
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
32"
39.5"
16"
CORRIDOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
44" 96"
16"
OFFICE
B2A119B
CLERICAL
OFFICE
B2A119C
CONFERENCE
ROOM
B2A119A
SCOPE
PROCESSING
B2A113
SCOPE
DRY
B2A113A
ROOM
B2B105J
PANDEMIC
STORAGE
B2B105K
PB.1
2 HOURS BUILDING
OCCUPANCY SEPARATION
STAIR
No. 9
2 HOURS BUILDING
OCCUPANCY SEPARATION
CORRIDOR
CB2-2
CORRIDOR
CB2-8a
CORRIDOR
CB2-7
CORRIDOR
CB2-12
SERVICE
ELEVATOR
S-9
SERVICE
ELEVATOR
S-10
SERVICE
ELEVATOR
S-11
SERVICE
ELEVATOR
S-12
PASSENGER
ELEVATOR
P-15
PASSENGER
ELEVATOR
P-16
PASSENGER
ELEVATOR
P-13
PASSENGER
ELEVATOR
P-14
OFFICE
B2A114A
OFFICE
B2A114B
CORRIDOR
CB2-13
CORRIDOR
CB2-12
CORRIDOR
CB2-4
CORRIDOR
CB2-4
CORRIDOR
CB2-4
ANTE-ZONE
CB2-4A
N
P N
KEYPLAN: PIPE BASEMENT
BUILDING 2
BUILDING 1
BUILDING 21
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJLH
C:
\U se rs\
AA
hm ed \D oc um en ts\
PH
ILA
V A
MA
ST
ER
F
ILE
_k sc hn ec kE
VB
MP
.rv t
9/1 1/2 3 3 :16 :25 P M
2-LS-00.2
BUILDING 2 PIPE BASEMENT/ GROUND FLOOR- LIFE
SAFETY PLAN
9-12-2023
Corporal Michael J. Crescenz VA Medical Center Philadelphia
642-22-124LIFE SAFETY ASSESSMENT
22-USDVA-09
LIFE SAFETY LEGEND
COMPARTMENT KEY PLAN
BUILDING 2- PIPE BASEMENT EXISTING INDUSTRIAL OCCUPANCY
COMPARTMENT
ID
COMPARTMENT
SQ. FT.
OCCUPANCY
LOAD
AREA USE DISTANCE
TO SMOKE
DISTANCE
TO EXIT
SPRINKLER
SYSTEM
BUILDING 2
PB.1 62840 SF 418 BUSINESS - VARIES Yes Grand total 62840 SF
COMPARTMENT SCHEDULE
DISCLAIMER:
LIFE SAFETY PLANS DEPICT INFORMATION
PERTAINING TO NFPA 101-2021 EDITION ONLY.
THIS PLAN IS SOLELY FOR THE
REPRESENTATION OF THOSE FIRE
PROTECTION / LIFE SAFETY FEATURES
NECESSARY FOR A STATEMENT OF
CONDITIONS LIFE SAFETY ASSESSMENT AS
REQUIRED BY THE JOINT COMMISSION (TJC). IT
SHOULD NOT BE CONSIDERED AN ACCURATE
PLAN FOR ARCHITECTURE OR ANY OTHER
DESIGN OR CONSTRUCTION DISCIPLINE.
S S S S
SSSS
S S S S
SS S S S S
S S
S S
S S
S S
S S
S
SS
S S
S S
S S
S S
S S S S S S S S S S
S S S S
S S
S S
S S
SS
SS
SS
SS
S S S S
SSSSS
SSSSS
HZ
LINEN/TRASH CHUTE
WITH 2 HR FIRE BARRIER
COMPARTMENT ID
SUITE ID
EXIT
HAZARDOUS AREA
HAZARDOUS AREA
(MULTIPLE ROOMS)
HZ
X-X-X1
DISTANCE SMOKE BARRIER
1 HOUR FIRE SMOKE BARRIER
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
DISTANCE TO EXIT
CONSTRUCTION AREA
EXIT STAIRWELL
2 HOUR FIRE SMOKE BARRIER
1 HOUR SMOKE BARRIER
BB.1
HZ
CRAWL SPACE
CART LIFT
B1A100G
CART LIFT
B1A140
STAIR
No. 11
STAIR
No. 12
OFFICE
B1B100C
PLUMBING
SHOP
B1B100D
MECHANICAL
B1B100A
STORAGE
B1B100B
UTILITY
FLOOR
B1B100A
OFFICE
B1B102
OFFICE
B1B101
STAIRS
NO. 10
STAIRS
No. 8
A/C SHOP
B1B100E
CORRIDOR
CB-8C
STAIR
Q
DISTANCE EXIT:
132' - 0"
DISTANCE EXIT:
124' - 8"
DISTANCE EXIT:
150' - 0"
GARAGE
PASSENGER
ELEVATOR
LOBBY
CB1-1
SOUTH
SERVICE
ELEVATOR
LOBBY
CB-25
SOUTH
PASSENGER
ELEVATOR
LOBBY
CB-34
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
32" 44"
17"
STAIR
.3"/OCC
CODE MIN:
PROVIDED:
(E)
36" *
36"
3"
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
32" 42"
2"
STAIR
.3"/OCC
CODE MIN:
PROVIDED:
(E)
36" * 32.5"
25"
STAIR
.3"/OCC
CODE MIN:
PROVIDED:
(E)
36" *
48"
3"
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
32" 42"
2"
CORRIDOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
44" 73"
2"
BB.1
DISTANCE EXIT:160'- 0"
STAIR
No. 9
8 5/8"
EX
IS
TI
NG
BU
SI
NE
SS
EX
IS
BU
SI
NE
SS
HO
UR
S
BU
IL
DI
OC
CU
PA
NC
Y
SE
PA
RA
ON
EXISTING
BUSINESS
EXISTING
BUSINESS
2 HOURS BUILDING
OCCUPANCY SEPARATION
CORRIDOR
CB-23
SERVICE
ELEVATOR
S-10
SERVICE
ELEVATOR
S-11
SERVICE
ELEVATOR
S-12
SERVICE
ELEVATOR
S-9
PASSENGER
ELEVATOR
P-14
PASSENGER
ELEVATOR
P-13
PASSENGER
ELEVATOR
P-16
PASSENGER
ELEVATOR
P-15
CORRIDOR
CB-8B
CORRIDOR
CB-8
CORRIDOR
CB-8A
CORRIDOR
CB-8C
N
P N
KEYPLAN: BASEMENT
BUILDING 2
BUILDING 1
BUILDING 21
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJLH
C:
\U se rs\
AA
hm ed \D oc um en ts\
PH
ILA
V A
MA
ST
ER
F
ILE
_k sc hn ec kE
VB
MP
.rv t
9/1 1/2 3 3 :16 :39 P M
2-LS-00.3
BUILDING 2 BASEMENT UTILITY FLOOR LIFE SAFETY
PLAN
9-12-2023
Corporal Michael J. Crescenz VA Medical Center Philadelphia
642-22-124LIFE SAFETY ASSESSMENT
22-USDVA-09
LIFE SAFETY LEGEND
COMPARTMENT KEY PLAN
2-BU EXISTING BUSINESS OCCUPANCY
COMPARTMENT
ID
COMPARTMENT
SQ. FT.
OCCUPANCY
LOAD
AREA USE DISTANCE TO
SMOKE
DISTANCE
TO EXIT
SPRINKLER
SYSTEM
BUILDING 2
BB.1 64477 SF 429 BUSINESS - VARIES No
Grand total 64477 SF
COMPARTMENT SCHEDULE
DISCLAIMER:
LIFE SAFETY PLANS DEPICT INFORMATION
PERTAINING TO NFPA 101-2021 EDITION ONLY.
THIS PLAN IS SOLELY FOR THE
REPRESENTATION OF THOSE FIRE
PROTECTION / LIFE SAFETY FEATURES
NECESSARY FOR A STATEMENT OF
CONDITIONS LIFE SAFETY ASSESSMENT AS
REQUIRED BY THE JOINT COMMISSION (TJC). IT
SHOULD NOT BE CONSIDERED AN ACCURATE
PLAN FOR ARCHITECTURE OR ANY OTHER
DESIGN OR CONSTRUCTION DISCIPLINE.
PARTIAL
File details come from the government source that posted it. Updated .