This document is a Fire and Smoke Barrier Penetration Permit form used to authorize work involving penetrations through fire and smoke barriers in walls, floors, ceilings, and doors.

The permit template captures essential administrative information including permit number, issue date, and expiration date. The requestor section collects the department or company name, individual name, signature, and contact information (cell phone, office phone, email, and other). The form requires identification of the reason for penetration and includes a VHA (Veterans Health Administration) approval section with signature and print lines for the Facilities Management Representative authorizing the work. The document specifies three categories of barrier locations: walls (requiring building, floor, and room identification); floors (with corresponding location details); and ceilings in Buildings 1 and 2 on the first floor, including all corridors and electrical rooms. The permit requires final inspection signatures from both the Department/Contractor Representative (Company) and the Facilities Management Representative (Department), each with printed name and signature lines. This is a standard administrative and compliance form template for managing fire and smoke barrier penetrations in a healthcare facility environment.

View the file

Other files

File Type Posted
2024-12-03_HAZARDOUS AND UNIVERSAL WASTE POLICY.pdf PDF
2024-12-03_HAZARDOUS MATERIALS AND WASTE MANAGEMENT PLAN.pdf PDF
ALL-31-SINGLE-LINES-ONE-FILE-012325.pdf PDF
FMS 138-54 Hot Work Policy.doc DOC document
Confined Space Entry Program.pdf PDF
Electrical Safety Program.pdf PDF
7714_D_2017-04-06 ASBESTOS MANAGEMENT PROGRAM.pdf PDF
VHA Dir 7714 Asbestos Management Program.pdf PDF
Safety Coordination Meeting Safety Policies for SOW Project 642-22-104.pdf PDF
B6-SUB-PRIMARY-NORMAL-324-371-DWG-FINAL-070623.pdf PDF
Inspection Final RAC Blank Master.docx DOCX document
SAFE PRACTICES FOR WORKING WITH LIVE ELECTRICAL POWER.pdf PDF
36C24426R0088 0004.pdf PDF
RFI 2 Upgrade Substation 36C24426R0088.docx DOCX document
B02-SUB-3.pdf PDF
FMS SOP 138-44 Fire and Smoke Barrier Penetration Policy.pdf PDF
B02-SUB-2.pdf PDF
B6-SITE-POWER-WITH-MANHOLES-DWG-FINAL-070623.pdf PDF
2024-12-03_Green Procedure Program.pdf PDF
FIRE SYSTEM permit 2021 blank.pdf PDF
MANHOLES 19529-02 VA Hospital of Philedelphia 11.17.22.pdf PDF
VHA ICRA-1.2 Oct 1 2024.pdf PDF
B02-SUB-1.pdf PDF
Blank Above Ceiling Permit.pdf PDF
Asbestos Control Regulation.pdf PDF
Building 2_LS_SB_G_B FOR REFERENCE ONLY.pdf PDF
INFECTION PREVENTION AND CONTROL POLICY BEHAVIORAL HEALTH SERVICES.pdf PDF
Fire Plan.pdf PDF
FMS SOP 138-54 Hot Work Policy.pdf PDF
Safety and Health During Construction.pdf PDF
B02-SUB-4.pdf PDF
36C24426R0088 0003.pdf PDF
36C24426R0088 0003.pdf PDF
Attachment 1 RFI 1 Upgrade Substation 642-22-104.docx DOCX document
Attachment 3 General Decision Number PA20260003 10012026.docx DOCX document
Attachment 1 RFI 1 Upgrade Substation 642-22-104.docx DOCX document
Attachment 2 P09 Final SOW Rev1 Building 2 Substation Phase 1 642-22-104 10202026.docx DOCX document
36C24426R0088 0003.pdf PDF
36C24426R0088 0002.docx DOCX document
36C24426R0088 0001.docx DOCX document
S04 Pre-Bid Sign-In Sheet 36C24426R0088 - 642-22-104 - Upgrade Substation.pdf PDF
Substations Upgrade Building 2-Phase 1_Bid Documents_Specification_10-21-24.pdf PDF
Substations Upgrade Building 2-Phase 1 Combined Drawings.pdf PDF
36C24426R0088_1.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .