MANHOLES 19529-02 VA Hospital of Philedelphia 11.17.22.pdf
PDF 15 MB Posted
- Solicitation number
- 36C24426R0088
About this file
This is a cable maintenance final report documenting electrical testing and engineering services performed at the VA Hospital of Philadelphia on November 13, 2022.
The report documents inspection of seven underground cable manholes—four normal power distribution manholes and three emergency power distribution manholes—conducted by Potomac Testing, Inc. (PTI) for A Design Group LLC. All inspections occurred during a two-hour power shutdown window (06:00-08:00 for normal power; 09:00-11:00 for emergency power) with cable technicians observing and commenting on manhole and medium-voltage cable conditions. The normal power manholes contained XLP 1/0 15kV cables rated at 220mils with 133% insulation, featuring twelve feeders per manhole with varying numbers of splices (ranging from one to four sets) and spare pipes (ranging from four to eleven). The emergency power manholes contained newer EPR 4/0 15kV cables rated at 220mils with 133% insulation, installed in 2012, featuring three to six feeders with junction bars and load break elbows instead of splices. All normal power manholes showed some water and mud accumulation; emergency power manholes remained dry. The report concludes that cable conditions are suitable for continued service, though the normal power cables are well past the manufacturer's 30-year life expectancy. Field engineer Mervin Gray conducted the inspection. PTI Reference No. 19529-02.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .