Blank Above Ceiling Permit.pdf
PDF 34 KB Posted
- Solicitation number
- 36C24426R0088
About this file
This is a Fire and Smoke Barrier Penetration Permit form (Appendix A to MCM 138-36) used to authorize and document penetrations through fire and smoke barriers in building structures.
The permit serves as a control document for penetrations in walls, floors, ceilings, and doors within Veterans Health Administration (VHA) facilities. The form requires identification of the requestor (department or company) and the individual authorized to perform work, along with contact information. The permit specifies the locations of barriers to be penetrated, identified by building, floor, and room designations. The form documents two levels of approval: initial approval by a VHA Facilities Management Representative and final inspection sign-off by both a Department/Contractor Representative and a Facilities Management Representative. A note indicates that for after-hours work, the requestor must furnish photographic documentation of penetrated areas that have been sealed or replaced. The permit includes fields for permit number, issue date, and expiration date to establish the authorization period for the work. This is a template form without specific contract details, pricing terms, or response requirements.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDXATo MCM 138-36
FIRE AND SMOKE BARRIER PENETRATION PERMIT
Covers — walls, floors, ceilings, doors
Permit Number Issue Date Expires on
REQUESTOR: Name of dept. or company>
Permit issued to: (Dept./Contractor):
Individuals Name: Print> Sign>
Contact numbers: Cell phone> Office phone> Email> Other>
Reason for
Penetration(s):
VHA APPROVAL: Print>
Approved By: (Facilities Management Representative
Sign>
Location of Barrier(s) to be penetrated Building(s)> Floor(s)> Room(s)>
WALLS
Location of Barrier(s) to be penetrated Building(s)> Floor(s)> Room(s)>
FLOORS
Location of Barrier(s) to be penetrated Building(s)> 1 and 2 Floor(s)> 1st Room(s)> CEILINGS corridors all and electrical rooms
Final Inspection by: Company>
Department/Contractor Representative Print>
Sign> zgrr
Final Inspection by: Dept.> Facilities Management Representative
Print>
Sign>