About this file

GSA Form 12000 is a prelease fire protection and life safety evaluation form required by the General Services Administration for office buildings being considered for federal occupancy. The form contains two distinct parts based on the floor location of the proposed space: Part A applies to spaces below the sixth floor and must be completed by the offeror or their authorized representative, while Part B applies to spaces on or above the sixth floor and must be completed by a licensed fire protection engineer. Both parts are governed by Fundamental Code Requirements that mandate compliance evaluation against the most recent edition of local building and fire codes, with technical egress requirements specifically evaluated against the National Fire Protection Association (NFPA) 101, Life Safety Code.

Part A consists of nine sections addressing building address information, general building data (including floor identification and square footage), other building uses, automatic fire sprinkler systems, fire alarm systems, exit signs and emergency lighting, elevators, and additional information. The offeror must respond to yes/no/not applicable questions regarding fire protection and life safety systems and conclude with a signed statement of accuracy. Part B requires a detailed narrative report prepared by a fire protection engineer that comprehensively evaluates the entire building, including a physical walk-through and review of preventive maintenance records for fire alarm and sprinkler systems. The engineer's report must address at minimum nine categories: general information (citations, photographs, square footage, hazardous fuel loads, and ignition sources), occupancy classifications, building construction type, vertical openings, means of egress, automatic fire suppression systems, fire alarm systems, elevators, and any identified deficiencies with associated code references and corrective actions. An accepted Part B is valid for five years from the completion date, contingent on no major modifications to the building. The offeror must additionally provide a statement of correction attesting that any deficiencies will be remedied at the offeror's sole cost before government acceptance of the space.

View the file

Other versions and copies of GSA Form 12000

File Revision Posted Attached to
Exhibit H - GSA Form 12000 Prelease FPLS Eval Off Bldg rev.5.2015.pdf Rev. 5, 2015 X1AA--Annex-Pre-Proposal - Questions and Answers
Exhibit H - GSA Form 12000 Prelease FPLS Eval Off Bldg rev.5.2015.pdf Rev. 5, 2015 X1DB--Additional Files - West Branch 36C25024R0209
Exhibit H - GSA Form 12000 Prelease Fire Protection and Life Safety Evaluation Form (May. 2015).pdf May 2015 General Services Administration (GSA) seeks to lease office space in Port Angeles, WA and Sequim, WA
Exhibit H. GSA Form 12000 Prelease FPLS Evaluation May 2015 - Sussex County CBOC Annex.pdf May 2015 Lease of Space in Sussex County, DE for a CBOC Annex 7, 533 RSF / 6, 696 ABOA
Exhibit H - GSA Form 12000 - Fire Protection and Life Safety Evaluation.pdf Revision not stated U. S. Government Seeks Proposals to Lease 2, 405 to 2, 605 ABOA SQ FT of Office and Related Space in Washington, DC
Prelease Fire and Life Safety Evaluation_GSA Form 12000.pdf Revision not stated General Services Administration (GSA) Seeks To Lease The Following Space:
Exhibit H GSA Form 12000 Prelease Fire Protection and Life Safety Evaluation Form for an Office Building.pdf Revision not stated General Services Administration (GSA) seeks to lease 8, 161 USF- 8, 405 USF of office space in South Portland, Maine. Please see attachments for requirements and RLP Package.
H. GSAForm 12000, FPLS.pdf Revision not stated General Services Administration (GSA) Seeks to lease the following space: Solicitation No. 2TX1269
15. GSA Form 12000 - Prelease FPLS Evaluation - Part A or Part B.docx Revision not stated X1DB--Santa Cruz Outpatient Clinic, New Procurement Lease Package
12 GSA Form 12000 080626.pdf Revision not stated U. S. Department of Agriculture Seeks to Lease Office and Related Space in Huntington, Indiana
15 - GSA Form 12000 - Prelease FPLS Evaluation - Part A or Part B.docx Revision not stated X1DB--Canton OH Outpatient Clinic 62, 784 ANSI/BOMA RLP Extension
Exhibit H - Prelease FPLS Evaluation GSA Form 12000.pdf Revision not stated Vet Center space needed in Melbourne FL
36C25025R0027 Exhibit I GSA Form 12000 for Prelease Fire Protection and Life Safety Evaluation for an Office Building.pdf Revision not stated X1DB--Defiance New/Replacing
Exhibit F_GSA Form 12000 for Prelease FPLS.pdf Revision not stated General Services Administration (GSA) Request for Lease Proposal (RLP), Solicitation No. 6NE0072, Lincoln, Nebraska
Exhibit H GSA Form 12000.pdf Revision not stated OFFICE SPACE FOR US ARMY COE NASHVILLE TN
11 GSA Form 12000 060926.pdf Revision not stated U. S. Department of Agriculture seeks to Lease Office and Related Space in Millbrook, Dutchess County, New York
11 GSA Form 12000 060126.pdf Revision not stated U. S. Department of Agriculture Seeks to Lease Office and Related Space in Bedford, PA
Exhibit H - Prelease FPLS Evaluation GSA Form 12000.pdf Revision not stated Melbourne New/Replace Lease
MD Garrett Co Att 5 GSA Form 12000.pdf Revision not stated U. S. Department of Agriculture Seeks to Lease Office and Related Space in Mt. Lake Park, MD
4TX1080 - Exhibit G - GSA Form 12000 FPLS Prelease Evaluation.pdf Revision not stated Office of Leasing Seeks Office/Warehouse/Hangar Space within Brownsville/Harlingen, TX. Request for Lease Proposals (RLP)
Show all 20

Who attaches GSA Form 12000

Other files

File Type Posted
08 Attachment No. 1 to GSA Form 1364 - TEMPLATE_15-20 Yr_1.xlsx XLSX spreadsheet
17 - Offering Entity Acknowledgement Form.pdf PDF
04B - Lease Exhibit - New Construction_FEB 2026.pdf PDF
05A10 Appendix A10 Generic Extra-Small CSC Design Narrative.pdf PDF
09 - VA Form 10091 - FSC Vendor File Request.pdf PDF
05A06 Appendix A.6 VA_Leased_CBOC_Standard Layout Guide 10_29_25.pdf PDF
00 Global RLP Template R100 - VA Version_MAY 2026_ Macon.pdf PDF
12 - GSA Standard Form 330 - Architect Engineer Qualifications.pdf PDF
14 - Operations and Maintenance Plan Acknowledgement_FEB 2026.pdf PDF
10 - Past Performance List of References_FEB 2026.docx DOCX document
A- RLP Exhibit - New Construction_FEB 2026.pdf PDF
03 - Offeror Compliance Matrix_BVTO_FEB 2026.xlsx XLSX spreadsheet
05B Appendix B_LSN_Lease Service Narrative 7.28.26.pdf PDF
05A01 Appendix A.1 ProjectRoomContents_FY25 MACON GA HCC Final Excel 2026.07.08.xlsx XLSX spreadsheet
16 - Certification and Commitment of Building Energy Performance and Green Globes_FEB 2026.pdf PDF
02 - Pre-Bid Conference Registration Form_FEB 2026.docx DOCX document
04 Global Lease Template L100 - VA Version_MAY 2026.pdf PDF
C - RLP Exhibit - Prospectus_FEB 2026.pdf PDF
04A - Exhibit Lease - Broker Project_MAY 2026.pdf PDF
05A09 Appendix A.9 2 Visio-Generic Extra Small Data Center Design Package 2.pdf PDF
05A041 Appendix 05A.4.1 OIT Data Center Design.pdf PDF
00 No Proposal_Market Response Form_MAR 2026.docx DOCX document
05A11 Appendix A.11 3Generic Extra Small CFD Package.pdf PDF
13 - GSA Form 527 - Contractors Qualifications and Financial Information.pdf PDF
01- 3516 Solicitation Provisions_Feb. 2025.pdf PDF
07 - GSA Form 1364 - Proposal to Lease Space.pdf PDF
11 - Past Performance Questionnaire - PPQ_FEB 2026.pdf PDF
05A04 Appendix A.4 VA CBOC Info Transp Sys Specs 5_29_2025.pdf PDF
05A07 Appendix A.7 Macon HCC 2 Floors.pdf PDF
21-Bibb County Davis Bacon.pdf PDF
05A2 Appendix A.2_4-1 VA_Leased_CBOC_Design_Narrative_LDN_9-23-2026.pdf PDF
05A PFD_FY25 MACON GA HCC_Final_ 2026.07.29.pdf PDF
05A03 Appendix A.3 Room_Data_Matrix_7_3_24 _1.xlsx XLSX spreadsheet
04C - Exhibit Lease - Prospectus_MAY 2026.pdf PDF
05A05 Appendix A.5 VA Security Requirements_FSL Level II_ Oct 2024.pdf PDF
05 Agency Specific Requirements_ASR - Cover Page.pdf PDF
20 - VA Handbook 6500.6 - 3.12.10 FOR RLP.pdf PDF
06 - GSA Form 1217 - Lessors Annual Cost Statement.pdf PDF
18 - FAR 52.204-24 Representation Regarding Certain Telecom.pdf PDF
36C10F26R0088.docx DOCX document
05A2_1 Addendum A to LDN- Macon - Oct 2026.pdf PDF
05A08 Appendix A.8 Macon HCC 3 floor.pdf PDF
B - RLP Exhibit - Broker Project_MAY 2026.pdf PDF
19 - 3517B General Clauses_Apr. 2026.docx.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRELEASE

FIRE PROTECTION AND LIFE SAFETY EVALUATION FOR AN OFFICE BUILDING

GENERAL SERVICES ADMINISTRATION PAGE 1 of 6 GSA FORM 12000 (May 2015)

The prelease form contains two parts that must be completed depending on which floor the proposed offered space is located within a building. Part A must be completed when an offered space is located below the 6th floor of a building.

Part A shall be completed by the Offeror or their authorized representative. Part B must be completed when an offered space is located on or above the 6th floor of a building. Part B shall be completed by a professional engineer. The Fundamental Code Requirements apply to Part A and Part B.

Fundamental Code Requirements

a. The offered building shall be evaluated for compliance with the most recent edition of the building and fire code adopted by the jurisdiction in which the building is located; with the exception that the technical egress requirements of the building shall be evaluated based on the egress requirements of the most recent edition of the National Fire Protection Association (NFPA) 101, Life Safety Code. (Note: a building with a Certificate of Occupancy indicating that a building fully complies with the International Building Code shall be deemed to comply with this requirement.) All areas that do not meet the above stated criteria shall be identified as to the extent that they do comply.

b. A fire escape located on the floor(s) where the offered space is located shall not be counted as an approved exit stair.

c. An interlocking or scissor stair located on the floor(s) where the offered space is located shall only count as one exit stair.

d. The number of floors used to determine when Part A or Part B is applicable is based on counting the number of floors starting from the street floor.

GENERAL SERVICES ADMINISTRATION PAGE 2 of 6 GSA FORM 12000 (May 2015)

PART A

The Offeror or their representative shall complete Part A. Part A consists of a series of short answer and yes/no/not applicable questions related to general building information and fire protection and life safety systems. Upon completion of Part A, the Offeror must sign and date the “Offeror’s Statement”. Part A is applicable to offered space located below the 6th floor of the building.

I. BUILDING ADDRESS

Building Name:

Building Address:

City:

State:

9-Digit Zip Code:

II. GENERAL BUILDING INFORMATION

a. Identify each floor on which space is offered and the square footage of space on each floor offered to Government:

Floor Sq. Ft. Per Floor

b. Identify the total number of floors in the building starting at the street floor:

c. Identify the total number of floors in the building below the street floor:

d. Identify which floor(s) in the building permit reentry from the exit stair enclosure to the interior of the building:

III. OTHER USES IN BUILDING (Check All That Apply) Restaurants Laboratories Storage Retail

Parking Garage

Other (list)

IV. AUTOMATIC FIRE SPRINKLER SYSTEM

Please Check YES, NO, or N/A to the following questions: YES NO N/A

a. Is an automatic fire sprinkler system installed throughout the building?

b. If automatic fire sprinklers are installed within the building, is the automatic fire sprinkler system maintained in accordance with the applicable local codes or NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems?

V. FIRE ALARM SYSTEM

Please Check YES, NO, N/A to the following questions: YES NO N/A

a. Is a fire alarm system installed in the building?

b. Is an emergency voice/alarm communication system installed in the building?

c. If a fire alarm system is installed in the building, are audible devices (e.g., horns, bells, speakers, etc.) installed on the floor in which the offered space is located in the building?

d. If a fire alarm system is installed in the building, are strobe devices installed on the floor in which the offered space is located in the building?

e. If a fire alarm system is installed in the building, is the fire alarm system over 25 years old?

f. If a fire alarm system is installed in the building, does the operation of the fire alarm system automatically notify the local fire department via any of the following means: directly to the local fire department, to the (911) public communications center, to a central station, to a remote supervising station, or to a proprietary supervising station?

g. If a fire alarm system is installed in the building, is the fire alarm system maintained in accordance with the applicable local codes or NFPA 72, National Fire Alarm and Signaling Code?

GENERAL SERVICES ADMINISTRATION PAGE 3 of 6 GSA FORM 12000 (May 2015)

VI. EXIT SIGNS & EMERGENCY LIGHTING

Please Check YES, NO, or N/A to the following questions: YES NO N/A

a. Are exit signs installed in the paths of egress travel to the exit stairs or exits?

b. Is emergency lighting installed in the paths of egress travel to the exit stairs or exits?

c. If an emergency lighting system is installed in the building, is the emergency lighting system arranged to provide illumination automatically in the event of any interruption of the building’s normal lighting system?

VII. ELEVATORS

Please Check YES, NO, or N/A to the following questions: YES NO N/A Are elevators installed in the building?

If elevators are installed in the building, are the elevator cars equipped with a telephone or another two-way communication system?

If elevators are installed in the building, are the elevators recalled by smoke detectors located in the elevator lobbies and elevator machine rooms?

VIII. ADDITONAL INFORMATION

OFFEROR’S STATEMENT

I hereby attest that the above information is complete and accurate to the best of my knowledge.

Signature: Date:

Printed Name:

Title:

Name of Firm:

GENERAL SERVICES ADMINISTRATION PAGE 4 of 6 GSA FORM 12000 (May 2015)

PART B

The Offeror’s professional engineer shall complete Part B when an offered space is located on the 6th floor or higher of a building. Part B consists of a detailed narrative report based on an evaluation of the entire building that also includes a walk-through of the building and the review of the preventive maintenance records of the building’s fire alarm system and automatic fire sprinkler system. The fire protection engineer shall prepare a detailed narrative report. The detailed narrative report shall address at a minimum the items noted below as they apply to the offered space in the building, with specific attention to fire safety conditions that affect the floor(s) where the offered space to the Government is located, including those floors located below the offered space. In addition, the detailed narrative report shall include all deficiencies that do not meet the specified criteria (see Fundamental Code Requirements), the associated code reference(s), as well as any recommended corrective action(s).

NOTES:

a. The professional engineer must be licensed as a fire protection engineer in the same State in which the subject building is located unless the subject State does not formally recognize fire protection engineering. In such cases, GSA will accept the services of any professional engineer in the subject State provided the professional engineer is also recognized as a fire protection engineer in any other U.S. State or Territory.

b. Upon completion of Part B, the Offeror’s fire protection engineer must sign and date the “Fire Protection Engineer Statement.”

c. Upon completion of Part B, the Offeror must sign and date the “Offeror’s “Statement of Correction.”

d. The accepted GSA Form 12000, Part B is valid for a time period of 5 years from the noted date on the completed and accepted Part B. This acceptance is conditional in that no major modifications or construction has occurred associated with the building.

The detailed narrative report shall address at a minimum the items noted below as they apply to the offered space in the building.

1. General Information.

a. Identify all current citations or violations noted by the local jurisdiction regarding the building.

b. Provide digital pictures of the building. Include exterior views showing the front of the building and all sides of the building.

c. Identify the number of floors in the building (above and below grade).

d. Identify the approximate gross square footage per floor in the building.

e. Identify the gross square footage and associated floor of offered space proposed to the Government to occupy.

f. Identify by location and describe hazardous/significant fuel load areas (greater than normal for the type of occupancy).

g. Identify and describe potential fire ignition sources in hazardous/significant fuel load areas in the building.

2. Occupancy Classifications.

a. Identify all the different types of occupancies and particular uses on each floor of the subject building. For example, include retail, restaurants, mechanical equipment areas, storage areas, inside parking areas, etc.

3. Building Construction.

a. Identify the building construction type.

4. Vertical Openings.

a. Identify by location and describe the enclosure of vertical openings through floors, such as stairways, atriums, hoistways for elevators, escalators, and shafts.

b. Identify any deficiencies in the rated vertical enclosures that affect the integrity of the enclosure.

5. Means of Egress.

a. Identify the number of enclosed exit stairs on each floor of the building.

b. For each exit stair, describe:

i. The clear width of each stair tread and location of measurement.

ii. The egress capacity of each exit stair.

iii. The location of where each exit stair discharges.

iv. Identify and describe the operation and application of the exit stair re-entry provisions to the interior of the building, if provided.

GENERAL SERVICES ADMINISTRATION PAGE 5 of 6 GSA FORM 12000 (May 2015)

v. Any penetrations into and openings through each exit stair enclosure assembly.

vi. Any headroom obstruction within each exit stair enclosure.

vii. If any exit stair has been compromised in such a way to have the potential to interfere with its use as an exit; and

viii. The exit stair remoteness arrangement.

ix. Identify and describe if all exit stair doors are self-closing and self-latching.

c. Identify and describe all exit doors that do not swing in the direction of exit travel.

d. Identify and describe if all fire doors are in proper working order. Provide location of noted fire door and purpose.

e. Identify by floor and describe any concerns regarding the exit access system (i.e., corridor or open plan office concept), as it applies to the proposed offered space.

f. Identify by location and describe any concern regarding the exit signage within the building.

g. Describe the building’s emergency lighting system.

h. Identify and describe if emergency power is provided within the building.

i. If emergency power for life safety systems is provided by generator(s) or UPS systems describe if they are tested and maintained in accordance with NFPA 110, Standard for Emergency and Standby Power Systems or NFPA 111, Standard on Stored Electrical Energy Emergency and Standby Power Systems as applicable. If not complying with the applicable NFPA Standards; identify and evaluate the procedures being used.

6. Automatic Fire Suppression Systems.

a. Identify and describe if the building is protected or not protected throughout by an automatic fire sprinkler system. If the building is not protected throughout by an automatic fire sprinkler system, identify those areas of the building where partial fire sprinkler protection is provided.

b. Identify and describe the different types of automatic fire sprinkler systems (e.g., dry, wet, pre-action, etc.) that are installed within the building and their respective locations.

c. Identify and describe any other fire suppression systems installed within the building.

d. Identify and describe the types of standpipes installed in the building.

e. If automatic fire sprinkler systems are installed in the building, describe if they are tested and maintained in accordance with the applicable local codes or NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems. If not complying with the applicable NFPA Standards; identify and evaluate the procedures being used. If not complying with the applicable NFPA Standard;

identify and evaluate the procedures being used.

7. Fire Alarm System.

a. Identify and describe the fire alarm system, as a minimum, the date of installation, type, manufacturer and model, and components such as manual pull stations, etc.

b. Describe if the fire alarm system automatically notifies the local fire department via any of the following means: directly to the local fire department, to the (911) public communications center, to a central station, to a remote supervising station, or to a proprietary supervising station.

c. Describe in detail the operation of the fire alarm system, including if it has emergency voice/alarm communication capabilities.

d. Describe if the fire alarm system is tested and maintained in accordance with NFPA 72, National Fire Alarm and Signaling Code. If not complying with the applicable NFPA Standard; identify and evaluate the procedures being used.

8. Elevators.

a. Verify the elevators have a current certificate (date of inspection) of elevator inspection from the local jurisdiction.

b. Identify and describe the emergency recall operation features of the elevators. Describe all differences with the requirements of ASME/A17.1, Safety Code for Elevators and Escalators, Phase I Emergency Recall Operation requirements.

c. Identify and describe the emergency in car operation features of the elevators. Describe all differences with the requirements of ASME/A17.1, Safety Code for Elevators and Escalators, Phase II Emergency In-Car Operation requirements.

d. Identify and describe if the elevators are equipped with telephones or other two-way emergency signaling systems connected to an emergency communication location staffed 24 hours per day, 7 days per week.

GENERAL SERVICES ADMINISTRATION PAGE 6 of 6 GSA FORM 12000 (May 2015)

STATEMENT OF FIRE PROTECTION ENGINEER

I hereby attest that I have performed a full assessment of the subject premises; and that the above information is complete and accurate to the best of my knowledge. I have initialed at the bottom of each page. My official seal, professional license information, and signature are affixed below.

I have included findings, recommended corrective action(s), and made specific references to the applicable code sections as an attachment to this report. Such findings specifically identify instances where the building does not comply with the specified criteria, and recommendations have been made in order to rectify the situation and assure substantial compliance of the building to all applicable criteria.

(If no deficiencies were identified, during the evaluation, please explicitly state so in the findings and recommendations portion of the report.)

Name of Firm: Phone #: ( ) -

License Number:

Stamp Here:

OFFEROR’S STATEMENT OF CORRECTION

In the event any of the offered space does not meet the above criteria, the Offeror shall attest below that all work required to bring the offered space into full compliance with all applicable criteria will be completed at the Offeror's sole cost and expense prior to the Government's acceptance of the offered space under the terms of any prospective lease agreement.

NOTE: REPORTS SUBMITTED WITHOUT THE FPE’S FINDINGS, RECOMMENDED CORRECTIVE ACTIONS

AND CODE REFERENCES WILL BE RETURNED WITHOUT REVIEW BY THE GSA REGIONAL FIRE

PROTECTION ENGINEERING OFFICE.

Title:

Name of Firm:

Fundamental Code Requirements
a. The offered building shall be evaluated for compliance with the most recent edition of the building and fire code adopted by the jurisdiction in which the building is located; with the exception that the technical egress requirements of the buildin...
b. A fire escape located on the floor(s) where the offered space is located shall not be counted as an approved exit stair.
c. An interlocking or scissor stair located on the floor(s) where the offered space is located shall only count as one exit stair.
d. The number of floors used to determine when Part A or Part B is applicable is based on counting the number of floors starting from the street floor.
1. General Information.
a. Identify all current citations or violations noted by the local jurisdiction regarding the building.
b. Provide digital pictures of the building. Include exterior views showing the front of the building and all sides of the building.
c. Identify the number of floors in the building (above and below grade).
d. Identify the approximate gross square footage per floor in the building.
e. Identify the gross square footage and associated floor of offered space proposed to the Government to occupy.
f. Identify by location and describe hazardous/significant fuel load areas (greater than normal for the type of occupancy).
g. Identify and describe potential fire ignition sources in hazardous/significant fuel load areas in the building.
2. Occupancy Classifications.
a. Identify all the different types of occupancies and particular uses on each floor of the subject building. For example, include retail, restaurants, mechanical equipment areas, storage areas, inside parking areas, etc.
3. Building Construction.
a. Identify the building construction type.
4. Vertical Openings.
a. Identify by location and describe the enclosure of vertical openings through floors, such as stairways, atriums, hoistways for elevators, escalators, and shafts.
b. Identify any deficiencies in the rated vertical enclosures that affect the integrity of the enclosure.
5. Means of Egress.
a. Identify the number of enclosed exit stairs on each floor of the building.
b. For each exit stair, describe:
i. The clear width of each stair tread and location of measurement.
ii. The egress capacity of each exit stair.
iii. The location of where each exit stair discharges.
iv. Identify and describe the operation and application of the exit stair re-entry provisions to the interior of the building, if provided.
v. Any penetrations into and openings through each exit stair enclosure assembly.
vi. Any headroom obstruction within each exit stair enclosure.
vii. If any exit stair has been compromised in such a way to have the potential to interfere with its use as an exit; and
viii. The exit stair remoteness arrangement.
ix. Identify and describe if all exit stair doors are self-closing and self-latching.
c. Identify and describe all exit doors that do not swing in the direction of exit travel.
d. Identify and describe if all fire doors are in proper working order. Provide location of noted fire door and purpose.
e. Identify by floor and describe any concerns regarding the exit access system (i.e., corridor or open plan office concept), as it applies to the proposed offered space.
f. Identify by location and describe any concern regarding the exit signage within the building.
g. Describe the building’s emergency lighting system.
h. Identify and describe if emergency power is provided within the building.
i. If emergency power for life safety systems is provided by generator(s) or UPS systems describe if they are tested and maintained in accordance with NFPA 110, Standard for Emergency and Standby Power Systems or NFPA 111, Standard on Stored Electrica...
6. Automatic Fire Suppression Systems.
a. Identify and describe if the building is protected or not protected throughout by an automatic fire sprinkler system. If the building is not protected throughout by an automatic fire sprinkler system, identify those areas of the building where part...
b. Identify and describe the different types of automatic fire sprinkler systems (e.g., dry, wet, pre-action, etc.) that are installed within the building and their respective locations.
c. Identify and describe any other fire suppression systems installed within the building.
d. Identify and describe the types of standpipes installed in the building.
e. If automatic fire sprinkler systems are installed in the building, describe if they are tested and maintained in accordance with the applicable local codes or NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protec...
7. Fire Alarm System.
a. Identify and describe the fire alarm system, as a minimum, the date of installation, type, manufacturer and model, and components such as manual pull stations, etc.
b. Describe if the fire alarm system automatically notifies the local fire department via any of the following means: directly to the local fire department, to the (911) public communications center, to a central station, to a remote supervising stat...
c. Describe in detail the operation of the fire alarm system, including if it has emergency voice/alarm communication capabilities.
d. Describe if the fire alarm system is tested and maintained in accordance with NFPA 72, National Fire Alarm and Signaling Code. If not complying with the applicable NFPA Standard; identify and evaluate the procedures being used.
8. Elevators.
a. Verify the elevators have a current certificate (date of inspection) of elevator inspection from the local jurisdiction.
b. Identify and describe the emergency recall operation features of the elevators. Describe all differences with the requirements of ASME/A17.1, Safety Code for Elevators and Escalators, Phase I Emergency Recall Operation requirements.
c. Identify and describe the emergency in car operation features of the elevators. Describe all differences with the requirements of ASME/A17.1, Safety Code for Elevators and Escalators, Phase II Emergency In-Car Operation requirements.
d. Identify and describe if the elevators are equipped with telephones or other two-way emergency signaling systems connected to an emergency communication location staffed 24 hours per day, 7 days per week.