This document is Exhibit A of a GSA Real Estate Lease Proposal (RLP) template for new construction projects, issued February 2026, under RLP No. 36C10F26R0047.

The exhibit establishes mandatory submittal requirements for offerors proposing new construction. Offerors must provide three primary deliverables: (1) Fire Protection and Life Safety (FPLS) Submittal documentation that identifies the applicable Building Code edition and demonstrates commitment to meeting all mandatory FPLS lease requirements; (2) Green Globes for New Construction (GG-NC) Certification Documentation for projects 10,000 rentable square feet and above, evidencing Two Green Globes level certification, with optional identification of Green Globes Professionals (GGPs) if added to the project team; and (3) Construction Schedule for New Construction detailing permitting, design, and construction phases with completion dates aligned to the Government's required occupancy date and specified lease milestones. The exhibit also references a Department of Labor Wage Determination document (3 pages, Exhibit 21) as part of the RLP documents package. This template applies to VA federal leasing opportunities and serves as a standardized format for soliciting and evaluating new construction proposals.

View the file

Other files

File Type Posted
08 Attachment No. 1 to GSA Form 1364 - TEMPLATE_15-20 Yr_1.xlsx XLSX spreadsheet
17 - Offering Entity Acknowledgement Form.pdf PDF
04B - Lease Exhibit - New Construction_FEB 2026.pdf PDF
05A10 Appendix A10 Generic Extra-Small CSC Design Narrative.pdf PDF
09 - VA Form 10091 - FSC Vendor File Request.pdf PDF
05A06 Appendix A.6 VA_Leased_CBOC_Standard Layout Guide 10_29_25.pdf PDF
00 Global RLP Template R100 - VA Version_MAY 2026_ Macon.pdf PDF
12 - GSA Standard Form 330 - Architect Engineer Qualifications.pdf PDF
14 - Operations and Maintenance Plan Acknowledgement_FEB 2026.pdf PDF
10 - Past Performance List of References_FEB 2026.docx DOCX document
03 - Offeror Compliance Matrix_BVTO_FEB 2026.xlsx XLSX spreadsheet
05B Appendix B_LSN_Lease Service Narrative 7.28.26.pdf PDF
05A01 Appendix A.1 ProjectRoomContents_FY25 MACON GA HCC Final Excel 2026.07.08.xlsx XLSX spreadsheet
16 - Certification and Commitment of Building Energy Performance and Green Globes_FEB 2026.pdf PDF
02 - Pre-Bid Conference Registration Form_FEB 2026.docx DOCX document
04 Global Lease Template L100 - VA Version_MAY 2026.pdf PDF
C - RLP Exhibit - Prospectus_FEB 2026.pdf PDF
04A - Exhibit Lease - Broker Project_MAY 2026.pdf PDF
05A09 Appendix A.9 2 Visio-Generic Extra Small Data Center Design Package 2.pdf PDF
05A041 Appendix 05A.4.1 OIT Data Center Design.pdf PDF
00 No Proposal_Market Response Form_MAR 2026.docx DOCX document
05A11 Appendix A.11 3Generic Extra Small CFD Package.pdf PDF
13 - GSA Form 527 - Contractors Qualifications and Financial Information.pdf PDF
01- 3516 Solicitation Provisions_Feb. 2025.pdf PDF
07 - GSA Form 1364 - Proposal to Lease Space.pdf PDF
11 - Past Performance Questionnaire - PPQ_FEB 2026.pdf PDF
05A04 Appendix A.4 VA CBOC Info Transp Sys Specs 5_29_2025.pdf PDF
05A07 Appendix A.7 Macon HCC 2 Floors.pdf PDF
21-Bibb County Davis Bacon.pdf PDF
05A2 Appendix A.2_4-1 VA_Leased_CBOC_Design_Narrative_LDN_9-23-2026.pdf PDF
05A PFD_FY25 MACON GA HCC_Final_ 2026.07.29.pdf PDF
05A03 Appendix A.3 Room_Data_Matrix_7_3_24 _1.xlsx XLSX spreadsheet
04C - Exhibit Lease - Prospectus_MAY 2026.pdf PDF
05A05 Appendix A.5 VA Security Requirements_FSL Level II_ Oct 2024.pdf PDF
05 Agency Specific Requirements_ASR - Cover Page.pdf PDF
20 - VA Handbook 6500.6 - 3.12.10 FOR RLP.pdf PDF
06 - GSA Form 1217 - Lessors Annual Cost Statement.pdf PDF
18 - FAR 52.204-24 Representation Regarding Certain Telecom.pdf PDF
36C10F26R0088.docx DOCX document
05A2_1 Addendum A to LDN- Macon - Oct 2026.pdf PDF
05A08 Appendix A.8 Macon HCC 3 floor.pdf PDF
15 - GSA Form 12000 for Prelease Fire Protection and Life Safety Evaluation for an Office Building_May 2015.pdf PDF
B - RLP Exhibit - Broker Project_MAY 2026.pdf PDF
19 - 3517B General Clauses_Apr. 2026.docx.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RLP NO. 36C10F26R0047, PAGE 1 GSA TEMPLATE R100 for VA, NEW

CONSTRUCTION EXHIBIT A (2/26)

RLP EXHIBIT A NEW CONSTRUCTION

NC 1.01 LIST OF RLP DOCUMENTS – NEW CONSTRUCTION (FEB 2026)

The following is added to the RLP paragraph titled: “List of RLP Documents” in the table in sub-paragraph A:

Document Name No. of Pages Exhibit

DOL Wage Determination

NC 1.02 INSTRUCTIONS FOR OFFEROR AND SUBMITTALS – NEW CONSTRUCTION (FEB 2026)

The following is added to the RLP paragraph titled: “Instructions for Offeror and Submittals” as a requirements and additional submittals.

Document Name Exhibit A: New Construction

FPLS Submittal for New Construction NC 1.02 A

Green Globes for New Construction (GG-NC) Certification Documentation NC 1.02 B

Construction Schedule for New Construction NC 1.02 C

A. Fire Protection and Life Safety (FPLS) Submittal for New Construction. As part of the FPLS Submittal Information, for offers of new construction, documentation indicating the Building Code (including edition) to which the Building is being constructed and a written commitment to meet all of the mandatory FPLS lease requirements in the Lease.

B. Green Globes for New Construction (GG-NC) Certification Documentation. For projects 10,000 RSF and above, the Offeror must provide documentation of the proposed Green Globes for New Construction (GG-NC) credits for Two Green Globes level certification. If pursuing

Green Globes-NC, the Offeror may add GBI Green GlobesProfessionals (GGPs) to the project team, but it is not required. If one or more GGPs are added, the Offeror must identify any GGPs as team members, including their roles throughout the project.

C. Construction Schedule for New Construction. A construction schedule giving the dates on which the various phases of permitting, design and construction (including principal categories of work) will be completed to coincide with the Government's required occupancy date and the milestones as outlined under the Lease.