This is a Building Energy Performance and Green Globes® Certification and Commitment form for RLP No. 36C10F26R0088 (Macon GA HCC), a federal lease requirement document.

The form requires the lessor to certify energy performance compliance and commit to green building certification. For new construction offers, the lessor must ensure the project fully satisfies all applicable Federal energy efficiency requirements established in 10 CFR part 433 and obtain Two Green Globes® certification from the Green Building Initiative's Green Globes® for New Construction program within 12 months of occupancy, using the latest version of the Green Globes® NC Technical Reference Manual available at time of submittal. The lessor must submit two electronic copies of all Green Globes® documentation to the Government in Adobe PDF format generated from the online surveys and provide Government viewing access to the surveys during design and through the lease term. If the lessor fails to achieve Two Green Globes® certification within the first year of occupancy, the Government may implement a corrective action program and deduct associated costs, including administrative expenses, from rent consistent with the lease terms. For non-new construction offers, EISA/ENERGY STAR requirements apply per RLP paragraph 1.01, and Green Globes® new construction certification is not applicable. The offeror must sign the certification attesting that all statements are complete, accurate, and without additional conditions or exceptions.

View the file

Other files

File Type Posted
08 Attachment No. 1 to GSA Form 1364 - TEMPLATE_15-20 Yr_1.xlsx XLSX spreadsheet
17 - Offering Entity Acknowledgement Form.pdf PDF
04B - Lease Exhibit - New Construction_FEB 2026.pdf PDF
05A10 Appendix A10 Generic Extra-Small CSC Design Narrative.pdf PDF
09 - VA Form 10091 - FSC Vendor File Request.pdf PDF
05A06 Appendix A.6 VA_Leased_CBOC_Standard Layout Guide 10_29_25.pdf PDF
00 Global RLP Template R100 - VA Version_MAY 2026_ Macon.pdf PDF
12 - GSA Standard Form 330 - Architect Engineer Qualifications.pdf PDF
14 - Operations and Maintenance Plan Acknowledgement_FEB 2026.pdf PDF
10 - Past Performance List of References_FEB 2026.docx DOCX document
A- RLP Exhibit - New Construction_FEB 2026.pdf PDF
03 - Offeror Compliance Matrix_BVTO_FEB 2026.xlsx XLSX spreadsheet
05B Appendix B_LSN_Lease Service Narrative 7.28.26.pdf PDF
05A01 Appendix A.1 ProjectRoomContents_FY25 MACON GA HCC Final Excel 2026.07.08.xlsx XLSX spreadsheet
02 - Pre-Bid Conference Registration Form_FEB 2026.docx DOCX document
04 Global Lease Template L100 - VA Version_MAY 2026.pdf PDF
C - RLP Exhibit - Prospectus_FEB 2026.pdf PDF
04A - Exhibit Lease - Broker Project_MAY 2026.pdf PDF
05A09 Appendix A.9 2 Visio-Generic Extra Small Data Center Design Package 2.pdf PDF
05A041 Appendix 05A.4.1 OIT Data Center Design.pdf PDF
00 No Proposal_Market Response Form_MAR 2026.docx DOCX document
05A11 Appendix A.11 3Generic Extra Small CFD Package.pdf PDF
13 - GSA Form 527 - Contractors Qualifications and Financial Information.pdf PDF
01- 3516 Solicitation Provisions_Feb. 2025.pdf PDF
07 - GSA Form 1364 - Proposal to Lease Space.pdf PDF
11 - Past Performance Questionnaire - PPQ_FEB 2026.pdf PDF
05A04 Appendix A.4 VA CBOC Info Transp Sys Specs 5_29_2025.pdf PDF
05A07 Appendix A.7 Macon HCC 2 Floors.pdf PDF
21-Bibb County Davis Bacon.pdf PDF
05A2 Appendix A.2_4-1 VA_Leased_CBOC_Design_Narrative_LDN_9-23-2026.pdf PDF
05A PFD_FY25 MACON GA HCC_Final_ 2026.07.29.pdf PDF
05A03 Appendix A.3 Room_Data_Matrix_7_3_24 _1.xlsx XLSX spreadsheet
04C - Exhibit Lease - Prospectus_MAY 2026.pdf PDF
05A05 Appendix A.5 VA Security Requirements_FSL Level II_ Oct 2024.pdf PDF
05 Agency Specific Requirements_ASR - Cover Page.pdf PDF
20 - VA Handbook 6500.6 - 3.12.10 FOR RLP.pdf PDF
06 - GSA Form 1217 - Lessors Annual Cost Statement.pdf PDF
18 - FAR 52.204-24 Representation Regarding Certain Telecom.pdf PDF
36C10F26R0088.docx DOCX document
05A2_1 Addendum A to LDN- Macon - Oct 2026.pdf PDF
05A08 Appendix A.8 Macon HCC 3 floor.pdf PDF
15 - GSA Form 12000 for Prelease Fire Protection and Life Safety Evaluation for an Office Building_May 2015.pdf PDF
B - RLP Exhibit - Broker Project_MAY 2026.pdf PDF
19 - 3517B General Clauses_Apr. 2026.docx.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LESSOR: _______ GOVERNMENT: _______ Page 1 of 2

BUILDING ENERGY PERFORMANCE AND GREEN GLOBES®

CERTIFICATION AND COMMITMENT

RLP No.: 36C10F26R0088 Macon GA HCC

A. Check one:

☐ This offer is for new construction specifically constructed for the Government and the commitments in this Certification apply.

☐ This offer is not for new construction; EISA/ENERGY STAR requirements will be addressed in accordance with RLP paragraph 1.01, and this Green Globes® new construction certification is not applicable.

B. I certify that:

1. The energy performance of the above project will fully satisfy all applicable Federal energy efficiency requirements for new Federal commercial buildings, including those established in 10 CFR part 433, “Energy Efficiency Standards for the Design and Construction of New Federal Commercial and Multi-Family High-Rise Residential Buildings,” as amended.

2. Within 12 months of occupancy, the Lessor will obtain certification at the Two Green

Globes® level from the Green Building Initiative’s (GBI) Green Globes® for New Construction (Green Globes® NC) program, in accordance with the latest version of the Green Globes® NC Technical Reference Manual available at the time of submittal.

3. Upon completion of all documentation and receipt of final certification, the Lessor will provide the Government with two electronic copies of all documentation submitted to GBI, in Adobe PDF format generated from the Green Globes® online surveys and will provide the Government with viewing access to the Green Globes® online surveys during design and through the term of the Lease.

4. If the Lessor fails to achieve a Two Green Globes® certification within the first year of occupancy, the Government may assist the Lessor in implementing a corrective action program to achieve such certification and may deduct its costs, including administrative costs, from the rent, consistent with the Lease.

C. Signature:

By signing below, the undersigned certifies that the statements above are complete and accurate, and that no other conditions, exceptions, or qualifications apply to the Offeror’s energy performance and Green Globes® commitments under this RLP.

Offering Entity (Legal Name):

Offeror Name:

Offeror Title:

Signature: Date:

LESSOR: _______ GOVERNMENT: _______ Page 2 of 2