This document contains an end of action report and information about a related federal contract opportunity. The end of action report details range clearance operations at the Walker Lake Range over the second quarter of 2019, including the dates of sweeps, items located totaling 24, their descriptions and locations, how they were marked and disposed of, and the point of contact.

The related federal contract opportunity is a request for proposal for the operation and maintenance of the Hawthorne Army Depot for fiscal years 2021 through 2030. As a government-owned, contractor-operated facility, the work includes base support operations such as safety, security, and demilitarization. The best value subjective tradeoff source selection will award a firm-fixed price contract consisting of a base period and five option periods totaling up to 20 years. Technical data packages were made available on the dates listed. Questions regarding the solicitation must be submitted by January 6, 2020. An industry day will be held on January 14-15, 2020. The procuring agency is the Department of the Army Materiel Command Joint Munitions Command.

View the file

Other files

File Type Posted
W52P1J19R0069-0013.pdf PDF
W52P1J19R0069-0012.pdf PDF
Attachment 0040 HWAD QA 10 30JUN20.XLSX XLSX spreadsheet
Copy of beta.SAM.GOV DOCUMENT TRACKER 30JUN20.xlsx XLSX spreadsheet
W52P1J19R0069-0011.pdf PDF
W52P1J19R0069-0010.pdf PDF
Attachment 0016-0017-0018 Price Matrix 6-24-2020.xlsx XLSX spreadsheet
Copy of beta.SAM.GOV DOCUMENT TRACKER 26JUN20.xlsx XLSX spreadsheet
Exhibit A - Contract Data Requirements List 26JUN20.pdf PDF
Attachment 0039 HWAD Questions and Answers 9 - 26JUN20.XLSX XLSX spreadsheet
Attachment 0031 (6JUN26) HWAD Receipts Issues Demil thru CY31 - 26JUN20.xlsx XLSX spreadsheet
Attachment 0011 - PWS 11 - Fire and Emergency Services - (FINAL).pdf PDF
Attachment 0038 PWS 16 Transition.pdf PDF
Attachment 0030 PRS List - 26JUN20.pdf PDF
Attachment 0002 - PWS 2 - Demilitarization (FINAL).pdf PDF
Attachment 0038 - PWS 16 - Transition.pdf PDF
Exhibit A - Contract Data Requirements List.pdf PDF
W52P1J19R0069-0009.pdf PDF
Attachment 0030 PRS List.pdf PDF
Copy of beta.SAM.GOV DOCUMENT TRACKER 10JUN20.xlsx XLSX spreadsheet
Attachment 0016-0017-0018 Price Matrix 6-10-2020.xlsx XLSX spreadsheet
A01 Attachment 0012 - PWS 12 - Environmental.pdf PDF
Copy of beta.SAM.GOV DOCUMENT TRACKER 29MAY20 (R1).xlsx XLSX spreadsheet
A01 Attachment 0003 - PWS 3 - Maintenance.pdf PDF
A01 Attachment 0009 - PWS 9 - Safety.pdf PDF
A01 Attachment 0004 - PWS 4 - Government Staff Support.pdf PDF
A01 Attachment 0007 - PWS 7 - Housing.pdf PDF
A01 Attachment 0013 - PWS 13 - IT.pdf PDF
W52P1J19R0069-0008.pdf PDF
A01 Attachment 0011 - PWS 11 - Fire and Emergency Services.pdf PDF
A01 Attachment 0002 - PWS 2 - Demilitarization.pdf PDF
A01 Attachment 0037 HWAD Questions and Answers Number 8.xlsx XLSX spreadsheet
A01 Attachment 0001 - SDO PWS.pdf PDF
A01 Attachment 0005 - PWS 5 - Installation Security Anti-Terrorism PWS.pdf PDF
A01 Attachment 0008 - PWS 8 - Government Property.pdf PDF
Copy of beta.SAM.GOV DOCUMENT TRACKER 29MAY20.xlsx XLSX spreadsheet
EPAS Findings Log Q40.xlsx XLSX spreadsheet
Complete Permit application Vol 1_Rev_1_6-8-18-2 PART 2.pdf PDF
Complete Permit application Vol 1_Rev_1_6-8-18-2 PART 1.pdf PDF
BCA Range Sweep Response.pdf PDF
CY 19 4th QTR Clearance.pdf PDF
New Bomb Forms Part A Final wo sign.pdf PDF
01_28_2020 Walker Lake-NIOTC Freedom Ranges Larry M Cruz Hawthorne Army Depots Range Clearance rd_bd.pdf PDF
CY19 3rd QTR Sweep.pdf PDF
Complete Permit application Vol 1_Rev_1_6-8-18-2 PART 3.pdf PDF
NIOTC_Walkerlake ranges Q44.pdf PDF
Complete HWAD AQ Renewal Application.pdf PDF
Complete NB HWAD RCRA _Rev 1_Submitted 5-25-2018.pdf PDF
Draft HHERA New Bomb Area - July 2019.pdf PDF
Complete Permit application Vol 1_Rev_1_6-8-18 PART 4.pdf PDF
Show 40 more

Latest 50 of 105 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

End of Action Report

Report Date: 10 July 2019

Range/Area: Walker Lake Range

Range Schedule: 2nd Qtr CY-19

During the 2nd Quarter sweep operations at Walker Lake Range, the Range Clearance

Team swept the range on ATVs.

Sweeps began in the North Magazine area at the gate near the 107 compound. Sweeps were conducted nine consecutive weeks in the months of April, May and June on the following dates. 1– 4 April, 15–18 April, 22–25 April, 29–30 April, 1–2 May, 6–9 May, 13–16 May, 20–23 May, 27–30 May, and 3–6 June.

Sweeps were performed by three team members on ATVs sweeping both East-West transects, and North-South transects, spaced ten yards apart IAW SOP W65XME-0000-

K-013, until the team completed the Walker Lake Range. A copy of SOP W65XME-

0000-K-013 was provided with 4th Quarter CY-18 Range Clearance reports.

The Clearance Team located 24 items during this Quarter. Each item was physically marked, photographed, and the location marked by GPS coordinate. After initial investigation, items safe to move were taken to a shot consolidation point (CON on maps) and disposed of together in one shot. Items not safe to move were marked in the same way, not moved, and Blown in Place (BIP). With respect to the Q2CY19 Walker

Lake Range sweep, 22 items were safe to move (items 001-022) and two were BIP (items

023 and 024). All items were detonated on 27 June, 2019.

After disposal by detonation, remaining debris was inspected, collected, and transferred to the secure holding area in 107 compound for further processing.

Only UXO Tech III personnel retain the keys to the container locks, and only UXO Tech

III personnel are authorized to access containers to add or remove items. Munitions debris, or fragmentation, may be placed into the containers daily. However, items requiring disposal by detonation will only be placed into the containers on a quarterly basis, following the completion of quarterly disposal and detonation operations.

Once the containers in the 107 compound are full, the items are further refined by cutting, shredding or shearing at the Range Scrap recycling facility and then processed through the hot gas decontamination facility to remove any remaining residue. Finally, items are transferred to the Property Reutilization Office (PRO) to be sold as scrap and recycled.

All items found during the Q2CY19 Walker Lake range sweep are listed in the following table.

Point Item description Location Type of item Disposition

001 2.75 inch

Aircraft Rocket

N38° 38.055' W118°

40.584'

Practice Disposal by detonation

002 5 inch HVAR N38° 36.733' W118°

38.882'

Practice Disposal by detonation

003 5 inch ZUNI N38° 36.621' W118°

39.261'

Practice Disposal by detonation

004 5 inch HVAR N38° 36.842' W118°

39.622'

Practice Disposal by detonation

005 5 inch HVAR N38° 37.485' W118°

40.064'

Practice Disposal by detonation

006 2.75 inch

Aircraft Rocket

N38° 37.421' W118°

40.261'

Practice Disposal by detonation

007 M75

Submunition

N38° 37.484' W118°

40.064'

Practice Disposal by detonation

008 5 inch HVAR N38° 37.560' W118°

40.497'

Practice Disposal by detonation

009 5 inch HVAR N38° 37.702' W118°

40.842'

Practice Disposal by detonation

010 5 inch ZUNI N38° 37.633' W118°

40.452'

Practice Disposal by detonation

011 3.5 inch ASW N38° 37.614' W118°

40.589'

Practice Disposal by detonation

012 5 inch HVAR N38° 37.738' W118°

40.546'

Practice Disposal by detonation

013 5 inch HVAR N38° 37.677' W118°

40.763'

Practice Disposal by detonation

014 3.5 inch ASW N38° 37.773' W118°

40.669'

Practice Disposal by detonation

015 5 inch ZUNI N38° 37.806' W118°

40.116'

Practice Disposal by detonation

016 MK 29 PD Fuze N38° 38.084' W118°

40.277'

Live Fuze Disposal by detonation

017 5 inch HVAR N38° 38.097' W118°

40.543'

Practice Disposal by detonation

018 5 inch HVAR N38° 38.131' W118°

40.605'

Practice Disposal by detonation

019 3.5 inch ASW N38° 38.328' W118°

40.342'

Practice Disposal by detonation

020 5 inch HVAR N38° 37.657' W118°

40.123'

Practice Disposal by detonation

021 5 inch HVAR N38° 37.679' W118°

39.944'

Practice Disposal by detonation

022 5 inch HVAR N38° 37.580' W118°

40.040'

Practice Disposal by detonation

023 5 inch Spin

Stabilized (BIP)

N38° 37.527' W118°

39.736'

HE Disposal by detonation

(Blown in

Place)

024 5 inch Spin

Stabilized (BIP)

N38° 37.214' W118°

39.610'

HE Disposal by detonation

(Blown in

Place)

CON Consolidation

Point

N38° 37.332' W118°

39.904'

Practice and

Live Fuze

Disposal by detonation for items# 001-022

POC for this report is Dave Strange, UXO Technician III (775) 316-0497