Attachment 0030 PRS List - 26JUN20.pdf
PDF 1 MB Posted
- Solicitation number
- 19R0069
About this file
This document is a request for proposal for the operation and maintenance of Hawthorne Army Depot from fiscal year 2021 through 2030. The solicitation seeks a single firm-fixed price contract to provide base support operations such as safety, security, and demilitarization at the government-owned, contractor-operated facility in Hawthorne, Nevada. A best value tradeoff source selection will be used to award the contract consisting of a base period and five one-year ordering periods, a three-year evaluated option with one-year ordering periods, and a two-year evaluated option with one-year ordering periods. Questions regarding the solicitation are due by January 6, 2020 and an industry day will be held on January 14-15, 2020.
View the file
Other files
Show 40 more
Latest 50 of 105 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
SOW
Paragraph
Contract Data Requirements List
What the contractor is to accomplish
What record the ACO staff needs to verify compliance
What condition the contractor must satisfy to comply
How often the ACO staff will monitor
Goal is always 100% complete. However, if condition is met less than this level, formal PCO notification of unacceptable performance will take place.
Para. # Number Requirement Data source Measure Frequency Acceptance level Annual unannounced inspections by QASAS. 100% Critical/Major
Monthly Gov. staff visual reviews for approved drawings and safety standard compliance.
Annual QASAS magazine inspections.
Quarterly Command count V program.
inspections by QASAS. 100% Critical/Major inspections. 95% Minor
100% Critical/Major
No critical or major findings authorized and 2 minor deficiencies per inspection/ event authorized.
No critical or major findings authorized and 2 minor deficiencies per inspection
AMC-R 740-25 and
LMP.
Properly perform storage planning and management process.
2.3
95% for Minor 2.1
Approved storage drawings and as approved by Government staff.
No outside storage permitted unless prior approval was granted. No critical or major findings authorized and 2 minor deficiencies per inspection/ event
2.2 Stowage of IPE and other government owned equipment.
Properly Store Items.
DoE Pamphlet 75-5 drawings, AMC 19-48 Series Drawings, DA PAM 385-64 and AR 190-11.
Monthly receipt process reviews to ensure that local storage activity approved the receipt's initial/ permeant storage location condition is met less than this level, formal PCO notification of unacceptable
Monthly LMP review and sampling.
Contingency ATR log as required.
inspections by QASAS.
drawings and safety standard compliance.
2.6 LMP Utilization AR 740-27, AMC Policy
Contractor will utilize LMP to the maximum extent for all Class V, components, packing material and associated equipment for accountability purposes.
Quarterly Government staff reviews. 100%
2.5
2.4 Storage Location
Changes
98%
MDCs must have 0 discrepancies and must be filled out IAW AMC 740-25. There will be no more than one correction per MDC.
AMC-R 740-25
Maintenance of Magazine Data Cards (MDCs)
AMC-R 740-25, LMP
reports, Custodial Records
All location changes must be approved, have a record of movement and properly recorded in LMP. Contractor must use LMP and its hardware for all location changes.
Contingency plan using ATRs will be in place in the event LMP is down.
condition is met less than this level, formal PCO notification of unacceptable
Satisfactory housekeeping concepts must be used at all storage locations. Housekeeping includes but not limited to:
regular cleaning of facilities to prevent acumination of bat guano, rat facile matter, dead rodents, accumulation of dust/dirt etc.
All variables exceeding regulatory requirements is unacceptable.
drawings and safety standard compliance.
2.8 A002
Maximum storage space use and Lot fragmentation
AMC-R 740-25, LMP
records, AMC 19-48 series drawings, DA Pamphlet 75-5 drawings
Ensure all storage achieves maximum efficiency. Deliberate Lot frag will decrease by a minimum of 5% per month.
Deliberate Lot frag does not include demil or shipments.
Factors beyond contractor control will not be considered.
Monthly or more frequent reviews of LMP Lot frag report.
2.7 A001 Storage Practices DA PAM 385-64
Storage of MHE, equipment dunnage etc. will be IAW DA
PAM 385-64.
condition is met less than this level, formal PCO notification of unacceptable
2.9.1 A003 Repelletization List
LMP Records, AMC-R
740-25, AMC 19-48
series drawings, DA
Contractor shall provide a list of all stocks not unitized for Repelletization to the Government each year by 31 January.
Annual submission 100%
2.9.2 Non-SMCA Stocks
series drawings, DA
The list will be in spreadsheet format with data elements approved by the government.
2.9.3 Ranking of list
series drawings, DA
List shall be ranked by priorities developed by the contractor with Government approval. Priorities will be : safety, serviceable and contingency stocks then all others.
2.9.4 JMC Review
series drawings, DA
The contractor shall not submit the list directly to HQ-JMC. Annual submission 100%
2.9.5 Submit the list through appropriate channels
series drawings, DA
Contractor shall submit the list to QASAS in charge. Annual submission 100% condition is met less than this level, formal PCO notification of unacceptable
2.9.6 Repelletization of
other stocks series drawings, DA
Any item not provided on the list will be the responsibility of the contractor to unitize and must be corrected immediately.
2.10 A004
Propellant Reporting (bulk, bulk packaged, and separate loading charges).
DA PAM 742-1,
Propellant Stability Guide, LMP records
Report must include accurate and complete NSN, Lot and Qty in a format satisfactory to Government staff.
Annually, by 10th working day of December. 100% drawings and safety standard compliance.
2.11 100%
All ammunition and munition components requiring fencing IAW data source will meet the requirements of AR 190-11.
AR 190-11, USACE
DEF drawing 872-90-01
Fencing for Class V munitions.
condition is met less than this level, formal PCO notification of unacceptable
2.12
Repairs to explosive facilities and storage structures.
DA PAM 385-64, NFPA
780, AR 190-11, COE
Design drawings.
Critical repairs will be corrected within 8 working days of reporting. Major repairs will be corrected within 30 days of reporting. Minor repairs will be corrected within 60 days of reporting.
Government staff will follow up on completed repairs within two weeks of notification of repair.
100%
2.13 QASAS terminology AR 700-12
CP-20 carrier program title Quality Assurance Specialist (Ammunition Surveillance) will not be used by contractor. The acronym QASAS will also not be used.
Periodic Reviews 100%
2.13.2 A005 Stock Inspeection
Status PWS
The contractor shall make available stock inspection status of all materiel in storage.
Monthly 100%
2.14 ASRP and ASP Surveillance Programs
PWS Minimum 4,000 lots per year. Annual 100%
2.15 Provide calibration
equipment PWS
The contractor shall provide calibration, load test and all associated inspections services for QASAS surveillance equipment, gages and instruments as determined by the senior QASAS.
As required 100% condition is met less than this level, formal PCO notification of unacceptable
2.16 QASAS Support PWS, Senior QASAS
The contractor shall provide $75,000, retail value, of tools and other identified supplies and service support to government QASAS operations as identified by the senior QASAS.
2.17 Lot Numbers PWS
Only QASAS are authorized to changed, created or modified Lot Numbers. For every Lot MIXED the contractor will create a spreadsheet showing every lot number within the lot MIXED.
2 days after creation of a MIXED lot 100%
2.18 Storage structure
modifications PWS
The contractor shall be responsible for construction and removal of any temporary ramps or extensions that are required to place items in storage. The contractor shall make any minor modifications to storage structures that would be required for storage.
condition is met less than this level, formal PCO notification of unacceptable
3.1 Properly process received requisitions
AR 725-50, A&E item specific out loading drawings, DOT regulations.
Each on-line and off-line requisition received will be completely accounted for and processed for issue/shipment or denials. Issuance of out-bound material will include: traffic management, loading, tallying, inspecting, handling, and blocking and bracing
3.2 Coordinate shipments with
QASAS.
DA PAM 385-64, 49
CFR, DTR, DA PAM
742-1
Contractor shall provide scheduled shipments and promptly provide shipping documents to QASAS for shipment clearance.
Daily 100%
3.3 Discrepancies during issuance of ammo.
DD Form 581, SB 742-
Report discrepancies to QASAS immediately. Follow all QASAS guidance.
Monthly reports 100%
3.4 Properly post and close out each requisition in LMP
AR 725-50, AMC-R 740-
Processed requisitions are promptly posted to the custodial records and closed out in LMP no later than 3 days after actual physical shipment.
Monthly review samples 100%
3.5 Loading
conveyances PWS
Contractor shall provide necessary material/equipment needed for loading conveyances.
condition is met less than this level, formal PCO notification of unacceptable
3.6 IPE support PWS
Contractor is responsible for all functions necessary in managing
IPE.
Monthly review of compliance. 100%
3.7 Support of
shipments
49 CFR, DOT
regulations, DTR, AMC load drawings
Required to properly prepare all material for shipment in compliance with DOT and Army regulations.
3.8 Review of Concept
(ROC) Drill PWS
The contractor shall conduct a Review of Concept (ROC) drill utilizing sand tables, maps, diagram pictures, ammo operators, etc. on all large scale issuance of HWAD stocks.
4.1 Receiving
load drawings
The contractor shall receive AA&E, IPE and other government-owned items to an agreed upon maximum. In-bound shipments shall be receipted and supported IAW current regulations.
Daily observations 100%
Required to unload carriers equipment, inspect, sort and place material in proper storage.
condition is met less than this level, formal PCO notification of unacceptable
Contractor will immediately notify QASAS of each incoming and outgoing truck. Contractor shall also provide all documentation to QASAS on request.
Contractor shall bring stocks received to record as identified on receipt documentation.
Changing Lots to MIXED or other than received document must be approved by QASAS.
4.3 A006
Notification of shortages or overages
AR 190-11, DA PAM
742-1
Contractor shall report damage to QASAS immediately. As required 100%
4.4 A007 Reporting damage
and tampering
DA PAM 385-64, AR
190-11
All anomalies will be reported to QASAS immediately. As required 100%
4.5 Repair of packaging
defects
DA PAM 385-64, AR
190-11, Item packaging drawing, AMC 19-48 series drawings
Contractor shall correct all unsafe packaging as directed by
4.6 TU assignment AMC-R 740-27
Each A&E in-bound shipment will be assigned a TU. SOC will be responsible for maintaining an electronic arrivals log.
Monthly Review 100%
Monthly Review 100%4.2 Unload carriers.
load drawings, AMC 19- 48 series storage condition is met less than this level, formal PCO notification of unacceptable
4.7 Temporary ramps PWS
The contractor shall be responsible for construction and removal of any temporary ramps. The contractor is responsible for supplying all equipment needed for unloading.
4.8 Ammunition
receipts
AR 750-50, AMC-R 740-
All material received will be picked up to record within timeframes outlines per AR 750-50, table 5-1 (6 calendar days for procurement and redistribution and 9 calendar days for all other receipts) and AMC-R 740-27 CAT I/II with 24 hours of receipt and consistent with the JMC Standardized Processes.
4.9 Ammunition
security AR 190-11 Storage will be in accordance with AR 190-11. Monthly 100%
4.10 Rehearsal of
Concept (ROC) drill PWS
The contractor shall conduct a Review of Concept (ROC) drill utilizing sand tables, maps, diagram pictures, ammo operators, etc. on all large scale receipts such as retrogrades from OCONUS as determined by the government staff.
condition is met less than this level, formal PCO notification of unacceptable
5.1 Regulatory
DOD 4500.9-R, DOD
5100.76-M, 49 CFR
The contractor must always be in compliance with regulatory guidance.
Daily review/ spot check 100%
5.2 Ordering
conveyances MFTRP No. 1C Carrier routings must be obtained from SDDC. Monthly 100%
The contractor shall schedule carrier equipment in a manner that prevents any additional charges to the government.
Contractor shall make all shipping arrangements so as to prevent any late RDDs.
Contractor shall make shipping arrangements so as to prevent any late or missed RDDs.
All extensions for shipments must first be approved by the senior QASAS/ Transportation Manager.
5.2.2 Report service
failures
PWS, DOD 4500.9-R,
DOD 5100.76-M, 49
CFR
The contractor shall document and report carrier shipment refusals, late deliveries, supplying improper equipment etc. as outlined in regulations under "Data source".
5.2.1 Monthly 100%DOD 4500.9-R, DOD
5100.76-M, 49 CFRRDDs met condition is met less than this level, formal PCO notification of unacceptable
5.2.3 Driver verification
The contractor shall verify driver's identification, company affiliation authentication and security clearance prior to release of shipment.
5.3 A008 Quarterly
Exemption Usage
Contractor will report quarterly exemption usage (EUs), CAAs and COEs to Transportation Manager.
Quarterly 100%
5.5 Mode or method of
transportation DTR, PWS
Contractor shall utilize government staff transportation officer or senior QASAS for determining mode of method of shipment.
5.6 Secure holding DTR 4500.9-R, PWS Provide secure holding for all Class V IAW "Data source". As required 100%
All export shipments, with the exception of FMS (unless mandated), of DoD owned material at the freight container/air pallet level require RFID tags. 100%
5.4 A009 Use of ISO
containers Annually 100%
5.7 RFID DTR 4500.9-R and
DOD RFID Policy As required
DTR, DID DI-PACK-
80877A and DoD 4500.9R
Contractor must use and have the capability of using ISO/ MILVAN containers when directed by the Government staff.
condition is met less than this level, formal PCO notification of unacceptable
All incoming RFID tags will be salvaged, packaged and shipped when instructed by Transportation Officer/senior
5.7.1 Apply RFID tag PWS, DTR 4500.9-R
No more than 1 documented instances of non-compliance per year.
Monthly visual checks. 98%
5.7.2 Creation of RFID
tag PWS, DTR 4500.9-R
All data entered must be accurate and complete. No more than 1 documented instances of non-compliance per year.
5.7.3 Application of RFID
tags PWS, DTR 4500.9-R
No more than 1 documented instance of non-observation compliance per year.
5.8 WPM compliance DoD 4140.01-M-1, DA
PAM 385-64, 49 CFR
All aspects of the WPM program will be implemented IAW "Data source" with no instances of missed shipments due to WPM.
Annual 100%
Contractor shall be responsible for all contractor caused detention/demurrage.
DOD RFID Policy q
D t ti / condition is met less than this level, formal PCO notification of unacceptable
Contractor shall notify the Walker River Paiute Tribe 24 hours in advance of cars passing through reservation.
5.10 GFM DTR 4500.9-R
Contractor shall electronical send GFM system shipment data as directed by Transportation Officer.
5.11 AIT MIL-STD 129-R, DTR
4100.9-R
Contractor shall intergrade automated identification technology into all ammunition processes to include but not limited to: receipt, shipment, storage, inventory.
Monthly observations 100%
5.12 Trouble calls/issues PWS
Contractor shall utilize JMC provided ADA PMO Configuration Control Board (CCB) website. No more than 1 documented instance of non-observed compliance per year.
Monthly observation 100%
Contractor shall maintain accountable records IAW "Data source".
Contractor shall utilize LMP to its fullest capacity.
6.1 A010 Accountable
records
AMC-R 740-27, AR 740-
26 Annual 100%
5.9 Detention/
Demurrage DTR 4500.9-R, PWS condition is met less than this level, formal PCO notification of unacceptable
6.2 Audit support PWS
Contractor shall support all audits and any testing performed on ammunition activities.
6.3 Inventory
adjustments AMC-R 740-27
Contractor shall post all physical inventory adjustments to LMP within 3 days.
Contractor shall post all transfer/ ownership changes received within 3 business days.
Contractor shall notify senior QASAS, SDO and JMC via e-mail immediately once transfer/ ownership changes have been completed.
6.5 IPE/ VLS data base PWS
The contractor shall maintain a computer data base. The contractor shall allow the Government staff real time access to the approved Property Control Data Base.
Quarterly 100%
6.4 Transfer/
Ownership change AMC-R 740-27 As required 100% condition is met less than this level, formal PCO notification of unacceptable
6.6 Audit support PWS
Contractor shall be required to generate packages containing information related to financial balance sheet for auditor review. To include any records deemed necessary by Army Auditors. Packets will be required to be uploaded into Army Audit Response Tool
(AART).
Contractor shall maintain a spreadsheet with format approved by Government staff for all personnel training.
Contractor shall provide to Government staff training status of all contractor personnel.
Contractor shall comply with all training requirements of referenced "Data source".
7.1, 7.2, 7.3
Training AMC-R 350-4, DA PAM 385-64
QASP - Explosives Facility
Requirements List
What the contractor is to accomplish What record the ACO staff needs to verify compliance
How often the ACO staff will monitor
Goal is always 100% complete.
However, if condition is met less than this level, formal PCO notification of unacceptable performance will take place.
2.3 T001 The Transition-In Plan shall be reviewed
and updated as necessary Transition-In Plan Receive government acceptance of the Transition-In Plan submission
Within 30 days after contract award, as required
Table 1
Paragrap h
Requiremen ts
What the contractor is to accomplish
What record the ACO staff
What condition the contractor must satisfy to comply
How often the ACO staff will condition is met less than this level, formal PCO notification of unacceptable
Para. # Number Requirement Data source Measure Frequency Acceptance level
a) Submit DPP - 90 Days prior to assuming operational control of the facility
Review and inspection DPP Each Submit 90 days prior to assuming operational control of the facility
100%, except if granted extension
b) Plan should be
IAW AR 525-27
Contractor generated report
Each Annually once approved 100%
a) Submit Training Curriculum 30 days prior to assuming operational control of the facility
Each Submitted 30 days prior to assuming operational control of the facility.
Annually thereafter
b) Curriculum must meet regulatory requirements
Each Submitted 30 days prior to assuming ooerational control of the facility.
a) Provide Security Personnel Uniforms to meet AR 190-56 requirements.
a) The contractor shall provide an initial memorandum stating that all personnel have been issued the required safety and security equipment and annually thereafter.
As required
b) Provide Security Personnel Protective equipment that meets all standards listed in CDRL E005.
b) Provide requested information specific to safety equipment. Document Dry fit test when required.
2.2 E005
Visual inspection of uniforms and review of certification of information related to safety equipment to verify equipment meets specified CDRLS standards.
1.2 E001
2.1.2 E002
Review and inspect Contractor Generated Training Plan and Curriculum
2.5.1 E006
Drug Test Security Personnel IAW AR 600- 85 and Para 2-4 of AR 190-56
Report of Individual Drug Test from outside agencies
Each 100% of Contract Security Guards will be drug tested at the time of hiring and at least 20% of Contract Security Guards will be drug tested Annually thereafter.
Drug Test results will be supplied to Government Security via DA Form 7708 as soon as the results are received.
2.5.2 E007
Contractor shall ensure all Security personnel undergo a medical examination annually
Contractors documentation of medical examinations
Each 100% of security personnel will undergo a medical examination at the time of hire and annually thereafter. Annual review of Medical Records will be documented on DA Form 7708.
2.5.5 E008
Contractor shall certify Security personnel meet PAT standards per AR 190-56
Contractor generated report Each Document PAT annually for each Security Guard and advise Government Staff prior to PAT being conducted
All contractor Upon notification by the Government, the As required Employees will obtain Contractor will have 120 days to initiate a CAC. Contractor NACI investigations for all of its shall follow the employees for the purposes of obtaining guidelines in CDLR a CAC. Upon notification by the
2.8 E009 E009 Contactor generated
Government security officer that the NACI investigations have been successfully submitted for investigation, the operating contractor will obtain DoD Common Access Cards for all employees within 180 days.
All Contractor Complete DA Form 7708 on all Annually employees who employees in involved with AA&E per preform duties Contractor Generated CDRL E010
2.9 E010 involving AA&E will DA Form 7708 with 100%
have a DA Form local agency check 7708 on file per
CDRL 010
Produce a Each Produce and update a informational video visitors video and show it to presentation to be viewed by all HWAD visitors. IAW CDRL
Contractor generated Video all visitors to HWAD. Semi- Annual review of Video. 100%
E011 Submit a vouching Provide Vouching Authority List 30 days Initial 30 Days every 90 authority list for prior to assuming operational control of days there after.
approval to the the facility and update every 90 days.
HWAD Government Security Officer 30
2.19 E012
days prior to assuming operational control of the facility
Contractor Generated List and update every 90 days thereafter.
a) Install a fixed mounted duress alarm in Dispatch Center.
Provide duress alarm for the Guard operating center/dispatch center within 90 Days of assuming operational control of the facility.
b) Developed a emergency notification matrix
Matrix submitted within 30 days of assuming operational control of the facility.
2.31 E014
Notification of Criminal Offense with 15 minute of the event
Contractor Generated report and Phone record
Notification NLT 15 Minutes of a Criminal offense per CDRL E014
2.32 E015
Develop and Maintain Emergency Plans IAW
CDRL E015
Emergency Plans
Provide Formalized Emergency Plans that address preparation for and recovery from emergency incidents addressed in CDRL E015 to be included as Annexes/appendices in the DPP Within 30 days of assuming operational control of the facility.
2.36.2.3 E016
Utilize SNS Medication City of HWAD Department of Public Health Emergency Response Plan
Ensure all requirements in CDRL E016 are met
As Required
2.38 E017
Implement, maintain and manage OPSEC program
IAW AR 530-1 Ensure all requirements in CDRL E017 are met
2.27
Visual inspection and operational check of the duress alarm. Review and approve the emergency notification matrixE013
2.16 E011
2.18 E018
Foreign Visitor Notification
Notification report
The contractor shall notify the HWAD Commander or Commander's Representative, ACO and HWAD Government Security Officer of any foreign visits to HWAD. Notifications shall be completed 30 days in advance of scheduled visit dates.
2.25 E019
Establish security at Access Control Points (ACPs) and patrols
Contractor Generated DPP Any changes to contractor’s ACP or patrol configuration shall be approved by the ACO; if the changes affect the DPP, they shall be submitted to the PCO for approval.
2.29 E020
Enforce local traffic rules and regulations
Telephonic Notification and annual written report
Commander or Commander's Representative and the HWAD Government Security Officer immediately (within 15 minutes) if a traffic accident on the installation involves a death and/or great bodily injury. The contractor shall record traffic accidents by location and provide this data to the ACO on an annual basis.
As required / Annually
2.30 E021
Telephonic / Written reports of serious incidents
Telephonic Notification and written after action report
Commander or Commander's Representative and the HWAD Government Security Officer immediately (within 15 minutes) if a serious incident (fire, explosion, injuries, AA&E loseses, fatalities, etc) occurs on the installation. Written reports will be submitted by the contractor to the HWAD Commander or Commander's Representative by 1000hrs the following day.
2.33 E022
FPCON Transition Plan Contractor Generated Force Evevation Plan
The transition plan shall be documented in a force elevation plan, which shall be provided to the ACO for approval 90 days prior to assuming operational control of the facility.
The transition plan should be updated as regulations are updated.
2.40 E023
HWAD Hunting Program Contractor Generated tally of Harvested Animals during the Hunting Season
The contractor’s security officers shall be responsible for ensuring that hunters adhere to the requirements identified in HWAD 200-1 upon entry, exit and during their hunt on the installation.
Annually
Table 1
What the contractor is to accomplish
What condition the contractor must satisfy to comply
How often the ACO staff will monitor condition is met less than this level, formal PCO notification of unacceptable
2 N/A
Manage and maintain Army Family Housing and Barracks
IAW 420-
1, Chapter 3
Customer Satisfaction forms and direct observation.
No more than one incident per month where response time to service orders is longer than AR 420-1, Chapter 3, 3-4, page 93.
Per Tenant Survey/Observation
3 N/A Update/maintain Housing Database
Government Housing Database
Ensure all assignments are current in housing database
As Required 99%
3.1 N/A
Comply with all state and federal laws.
State/Federal/AR 420-1 requirement As Required
3.2 N/A
Shall keep all common areas of the premises in a clean safe condition.
Contractor must ensure residents are responsible for maintaining grounds within the established boundaries established for each dwelling unit.
Garbage, trash, vehicles and other items causing unsightly and unsafe condition must be controlled in common areas
Routine visual inspections will be performed by Government POC
3.3 N/A
Collection of rents established by the CoE.
Issue 30 day notices after rents are established
Notification to all tenants of rent changes. As Required condition is met less than this level, formal PCO notification of unacceptable
3.4.1 G001
Long Range Work Plan for Qtrs. A and other permanent Military occupants.
Annual work plan is a 5 year plan-broken out by FY (Oct 1 - Sept
30) updated annually
IAW 420-1 and PWS 3.4.1. Annually Mar 1st to Government POC and IMCOM West Budget Officer
3.4.2 G002
Collection of civilian rents will be forwarded to HQ IMCOM.
Prepare occupant/tenant list with amounts paid and send to Government
POC.
Spreadsheet of all rents collected by tenant occupancy on a monthly basis by the 10th of each month, per PWS
Send rents/damages collected to HQ using the DD Form 1131.
Separated by the six categories.
Monthly by 10th of each month
3.5 N/A
Management of Army Family Housing rental assignments
Assign Housing units IAW
AR 420-1
Chapter 3-14. Priority given to Military personnel, DOD Civilians, and then Installation Commander or
Commander's Representative specific personnel assigned selected Key and essential positions (Contractor personnel).
Preparation of Agreement for occupancy of Army Housing (lease) on all recommendations and submit to the Government POC for signature. The Government reserves the right for final determinations on evictions.
condition is met less than this level, formal PCO notification of unacceptable
3.6
Provide all utilities, refuse collection and disposal and entomology services.
AR 420-1,
Commanders Policy, Housing PWS.
Comply with Commanders policy and AR 420-1 on the heating and cooling schedule. Sept 1 to May 31. Refer to the
PWS
Per Tenant Survey/Observation
3.7 G003
Fire/building Inspections
AR 420-1, Housing PWS Annual Fire/building inspections will completed every September with final report 30 days after inspections
Annually with final report 30 days after inspection. 85%
3.8 G004
Housing Management Plan
AR 420-1, Housing PWS After contract award and annually the contractor shall measure the efficiency of the plan at the beginning of the period and at the end.
First report due 15 days after award, Annually by Feb 1st to the Government
85%
3.9 G005
Preventive Maintenance Plan
AR 420-1, Housing PWS During first 6 month of full performance, shall prepare an automated Preventive Maintenance Plan for maintenance of building and structures.
Submit first plan before end of 6th month of full performance for approval and resubmit annually every October 31 to the Government
3.10 Incorporate with G006
Quality Control Plan AR 420-1, Housing PWS Elements will be addressed in the Housing Maintenance plan para 3.11.
condition is met less than this level, formal PCO notification of unacceptable
3.11 G006
Housing Maintenance
AR 420-1, Housing PWS
Develop and submit for approval a Maintenance plan for the restoration and modernization IAW 420-1.
When funding is requested must be in C- Projects.
Within 120 days of contract award for approval and Annually by Jan 15th to the Government POC.
3.12 N/A
Movement of Military Household furnishings
AR 420-1, Housing PWS Properly move, store and protect when property is not required for immediate use.
Visual inspection by Government POC 85%
4.1 N/A
Operation and Maintenance of Army Family Housing (AFH) and Unaccompanied Personnel Housing
(UPH) IAW 420-1,
Chapter 3 Section VII Operation and Maintenance
AR 420-1, Housing PWS, section 4 -4.8
No more then one incident per month of failure to operate and maintain AFH/UPH and infrastructure to good weather tight condition.
Visual inspection by Government POC and Tenant Survey.
99%
4.9.2 N/A
Maintenance and Repair work is done when a work order is issued. A work order is categorized as a service order (SO) or as an individual job order
(IJO)
AR 420-1 Housing PWS
Work order completed in a timely manor IAW 420-1, and to ensure corrective actions are resolved.
Tenant Survey/ observation of the maintenance database and direct visual observations of dwelling units by
99% condition is met less than this level, formal PCO notification of unacceptable
4.12.2 G007
Historic Consultation
36 CFR 800, title 36, AR 200-1 and Housing
PWS
Contractor will submit request on all Housing modifications, new construction, or any projects in the housing area will be cleared through the Government POC prior to work started to ensure historical compliance.
Visual inspection of housing area and request letter for improvement submitted to
As required.
4.13.4.2 N/A
Disclosure of LBP and LBP hazards, per
EPA/HUD
requirements
24 CFR 35 and 40 CFR 745 and AR 420-
1, Housing PWS
Ensure all assignments include all EPA pamphlet and hazard report for each unit.
Government POC will review all attachments with leases
Table 1
What the contractor is to accomplish What record the ACO staff
What condition the contractor must satisfy to
How often the ACO staff will
Goal is always 100% complete.
However, if condition is met less than this level, formal PCO
a) Explosive Safety Site Plan
(ESSP)
ACO staff will provide access to existing ESSP after award
Use/establish an approved ESSP before demil operations As required 100%
b) Recommend any changes if needed, and establish new/modified
ESSP
Contractor to submit plan for recommendations to modify
ESSP
Any new/modified ESSP must be approved before any affected demil operations As required 100%
5 B002 Standard Operating Procedures
(SOP)
Contractor to prepare and maintaine demil SOPs for each item
SOPs acceptance by ACO and QASAS before performance of demil operations As required 100%
10.2 B003 Lot Stabilizer Test Report Report submission
Coordinate all High Performance Liquid Chromatography (HPLC) propellant stability tests/analysis with QASAS. Submit report within 10 days of completed testing
Testing-As required; report within 10 days of completed testing
13.1 B004 Certificate of Demil Report submission List and certify that the item(s) has/have been demilitarized in Wide Area Work Flow (WAWF). As required 100%
13.2 B005 Inert Certification Report submission
Submit inert certification of two 100% independent inspections of inert scrap/packaging and packing material
13.3 B006 End Use Certificate Report submission Submit end use certificate of salvaged parts after demil for resale As required 100%
13.4 B007 Inert Ammunition Item Certifcation Report submission
Submit certification of inert ammunition item after inspection to prevent dangerous material from being turned in to DLA or contractor/commercial re-utilization office.
14.1 B008 Monthly Status Report Report submission
Provide monthly status report on or before the 5th day of each month covering scheduled vs.
actual tons for each funded demil project.
14.2 B009 Weekly Demil Report Report submission Provide weekly demil report by Close of Business (COB) every Friday to the QASAS. Weekly 100%
15 B010 Demil Schedule Report submission
Upon receipt of a list of assets to be demiled, provide an estimated schedule prior to issuance of delivery order. Format to be mutually agreeable and acceptable between the Government and contractor.
21 B011 Program Reviews Program Management Review meetings
Conduct semi-annual Program Reviews with the Government After contract award 100%
Demil PWS - CDRL BXXX
2.1 B001
23 J013 Accident/Incident Report Report submission
Submit electronic notification within 1 hour of becoming aware of an accident's occurrence as specified by the Safety PWS. Meets DoD4145.26M, reports all property damage over $5K, includes all ammunition and explosive accidents/incidents.
Table 1
What the contractor is to accomplish What record the ACO staff needs to verify compliance
How often the ACO staff will condition is met less than this level, formal PCO notification of unacceptable performance will take place.
a) Submit Maintenance Plan Contractor generated plan
Within 45 days (new contractor) Within 30 days (returning contractor)
Annually 100%, except if granted extension
b) Edit/resubmit plan in response to Gov't identified deficiencies)
Contractor within extension deadline Annually 100%
a) 12-month scheduled Preventive Maintenance plan
Within 45 days (new contractor) Within 30 days (returning contractor)
Annually 100%
b) Monthly Preventive Maintenance Progress report MS Excel format and content correct - monthly progress report provided within first 5 work days of the following month
Monthly 80%
c) Submitted electronically Submitted electronically Each 100%
3.2 Maintain a preventive maintenance instruction per OEM O&M manuals for each active piece of equipment
ACO staff provided with Read only access to all CMMS information
Provide CMMS read only access to ACO staff as required As required 100%
3.3 Utilize a Computerized Maintenance Management System (CMMS) to manage all maintenance activities
ACO staff provided with Read only access to all CMMS
Provide CMMS read only access to ACO staff as required As required 100%
a) High Pressure Boiler Inspection reports
b) repair records
c) Submitted electronically
4.8
Us monthly reports to verify work is being performed
4.10.2 Contractor
generated report
2 CDRL C001
CDRL C002
CDRL C004
CDRL C005
report submissions4.5.2 CDRL C003
a) Monthly Rail Equipment Report
3.1
Submitted by 30 November Annually 100%
a) Liquid Propane (LP) Gas System Inspection Report report submission Submitted by 30 November Annually 100%
Submit by the 5th working day each month Monthly 100% condition is met less than this level, formal PCO notification of
a) Periodic Technical Inspection of Dams and Spillways
Within 60 months 100%
b) Annual Maintenance Inspection of Dams and Spillways
Every 12
c) Special Inspection of Dams and Spillways As required 100%
a) Ultrasonic Rail Defect Inspection Inspection reports submitted within 90 days of inspection
Every 60
b) Detailed Visual Rail Inspection
5.14 Unimproved Grounds Maintenance periodic inspection
Preclude hazards and avoid land damage IAW Security PWS and
Maintenance Plan periodically 100%
5.15 Improved Grounds Maintenance periodic inspection
sustainment of the grass, landscaping, trees, shrubs, and irrigation systems.
periodically 100%
6.1 CDRL C008
a) List of Abnormal Maintenance Projects (Prioritized and with Cost Estimates)
Electronically submitted list of prioritized projects with cost estimates
MS Word formatted document describing each deficiency and proposed project approach and timeline to address the deficiencies.
5.4 CDRL C006 IAW AR 420-1
Electronic submission of inspection reports
Every 12
5.6 CDRL C007
Inspection reports submitted within 90 days of inspection
IAW UFC 4-860-03 and AR 420-1
QASP - Maintenance
What the contractor is to accomplish What record the ACO
What condition the contractor must satisfy to comply condition is met less than this level, formal PCO
1.1 and 52.245-1
N/A Establish Property Management System for stewardship responsibilities and records for GFP
Contractor records Complete and accurate records for functions cited in 52.245-1
As required and Property Management System Analysis
(PMSA)
1.2 Various Maintain Government asset records
(documentation and data system information) for all Government Property located at HWAD; both the GFP in possession of the Contractor and assets in the possession of the Government.
Asset records Complete and accurate records necessary for the Government to meet accountability and fiduciary compliance.
As needed and
PMSA
2.2.2 (and 3.4, 6.7.9, 6.8.6)
H001 Reconcile GP listings; i.e., Contractor, Government, and Contract.
Report Report to GPA results and any corrective action necessary
Minimum annually and PMSA 100%
(DFARS
252.211- 7007)
N/A Utilize Wide Area Work Flow's GFP Module for electronic record of receipt, shipment and transfer of GFP (Personal Property/General Equipment)
Copies of the transaction to support Contractor stewardship and Government asset
Use of the GFP Module As required
3.1 and
H002 Submit plan for establishing Contractor Property Management System as part of solicitation process.
Annual Review of Property Plan and CPMS, submission of updated plan to
GPA
Initial Plan submitted for solicitation evaluation;
annual submission of Plan review/update.
Evidence of plans, procedures, processes that will assure proper stewardship of GP and accuracy of
Initial with solicitation; annual review and PMSA
3.4 (and 2.2.2, 6.7.9, 6.8.6)
3.5 and
H003 Self assessment of CPMS Report Submit report by 30 Jun each year Minimum annually
6.1.1 H004 Lost, Theft, Damage and Destroyed GP Reports Initial notification within 24 hours of discovery of LTDD; subsequent report in DCMA eTool
PMSA 100%
6.1.2.4 H005 Physical Inventories (Personal
Property/General Equipment)
Reports Inventory frequencies per PWS; results reported to GPA along with any required corrective actions
6.2.1.4 H006 Report inventory, utilization, cost and fuel
data for Army owned vehicles into Federal Automotive Statistical Tool
(FAST).
completion to GPA
Accurate entry of inventory, utilization, cost and fuel data for Army owned vehicles into Federal Automotive Statistical Tool (FAST) by a prescribed suspense.
Annual
6.3.1 H007 Provide information on changes needed
for Tables of Distribution and Allowances (TDA) authorizations
Technical Exhibit to the Contract
Submit needed changes to Technical Exhibit for any increases/ decreases needed for TDA authorizations
As required;
minimum annual review/ update by 31 Aug
6.4 N/A Support Taskers/data calls on fleet
data/requirements
Contractor submissions for Tasker/data
Complete/accurate input by suspense's. As required. 100%
6.6 H008 Report of Disposition of Contractor
Inventory (DD Form 1638)
Contractor submissions Quarterly submission of DD Form 1638 Quarterly 100%
6.7.9
3.4, 6.8.6)
6.8.6
3.4, 6.7.9)
Government, and Contract (Incidental List).
6.9.3 H009 Report on projects/transactions, receipts
and expenses for PP/GE disposal efforts.
Report Quarterly submission of report on projects/transactions, receipts and expenses for PP/GE disposal efforts.
minimum review of quarterly report 100%
6.9.4 N/A Submit a Scrap plan to GPA for approval Scrap plan; part of
CPMS
Submission and adherence Initial approval and GPA PMSA 100%
7.1.4 H010 Documentation and Voucher Register for
Real Property transactions.
Asset documentation, data system records, Accuracy of asset documentation, data system information, Voucher Register and submission of quarterly report on transactional changes.
minimum review of quarterly report 100%
7.1.5.2 H011 Physical Inventories of GP (Real
Property)
Reports Inventory frequency per PWS; results reported to GPA along with any required
7.1.6 H012 RP Utilization Report Reports Submit final report with draft memo for Cdr signature.
Annual 100%
7.1.5 H013 Installation Status Report Data Reports Accuracy of ISR data Quarterly and as required 100%
Property
ARMS QASP
Data Requirem ents List
What record the ACO staff needs to condition is met less than this level, formal PCO notification of unacceptable
4.1.1
New Tenant Proposal Request for Use of Facilities (RUF) Documentation Submittal
ARMS RUF Package: Cover Letter, ARMS Proposal Mandatory Checklist, ARMS Proposal Mandatory Safety Checklist, all appropriate environmental documentation, waiver to 10 USC 2692 (if required). Documentation shall include consideration as defined in para. 4.7-4.7.4
Accurate, complete and professional submission provided to the Government for review.
Within 10 days of receipt of from tenant 100%
4.1.1.1
New Tenant Conceptual Proposal Submittal (optional prior to Technical RUF submittal)
Conceptual Tenant Use Proposal:
Proposal containing all pertinent details, descriptions, technical data/information necessary for appropriate Government review.
Documentation shall include consideration as defined in para. 4.7- 4.7.4
95%
4.1.3
Existing tenant proposal for expansion, extension or revision.
Revised ARMS RUF package (as described in 4.1.1), formal letter explaining need/reason for expansion, extension or revision.
Documentation shall include consideration as defined in para. 4.7- 4.7.4 condition is met less than this level, formal PCO notification of unacceptable
4.1.4
ARMS Investment Funding Request
ARMS funding request documentation
Submission must include supporting details of project cost, schedule, and a complete description/statement of work for project, submitted to ACO and PCO for review and approval/disapproval.
4.1.5
Immediate Use Funding Request
Immediate Use Funding Request Forms/Documentation
Completed Immediate Use Funding Request Form, SOW, cost/price data and anticipated return on investment for project requested, submitted for PCO/ACO review/approval.
4.1.6
Third Party Use Proposals and Agreements
Third Party Request for Use of Facility Paperwork
ARMS Proposal Mandatory Checklist, ARMS Proposal Mandatory Safety Checklist, all appropriate environmental documentation, waiver to 10 USC 2692 (if required), white paper/proposal of third party project. Documentation shall include consideration as defined in para. 4.7-4.7.4 condition is met less than this level, formal PCO notification of unacceptable
5.1 F001
ARMS Marketing Plan Annual ARMS Marketing Plan On-time submittal containing sufficient detail to include surveys, anticipated marketing efforts and programs, target market, expected consideration, areas of concern.
5.2 F002
ARMS Quarterly Activity Report
Quarterly Activity Report On-time submittal containing all efforts associated with current and future marketing efforts, tenant information and FCA status for each fiscal year.
Quarterly
5.3 F003
ARMS Monthly Activity
Monthly Activity Report On-time submittal containing all information identified in para, 5.3 of ARMS PWS.
Monthly
ARMS QASP
condition is met less than this level, formal PCO notification of unacceptable
3.1 M001 Fire Prevention
Program needs to be established
Contractor to submit Fire Prevention & Public Education Regulation
Develop, publish, and implement installation fire prevention and public education regulation
3.2 M002 Conduct Fire Risk
Management Surveys
Contractor to submit Fire Risk management Surveys
Fire Risk Management Surveys will be submitted NLT 30 days.
NLT 30 Days after the effective date of contract.
3.3 M003 Determine and
establish inspection frequency
Establish inspection frequency
Inspection frequency submitted to COR
4.2 M004 Provide a Commander
Critical Information Request (CCIR)
Incidents that meet the criteria for a CCIR shall be submitted
Incidents outlined in FRAGORD 01 to OPORD 17-115 requires notification
4.3 M005 Review Emergency
Response Times
Response times shall be IAW Army Standards
Alarm Handling Time, Turnout Time, and Travel Time shall equate to a total response time, not to exceed time outlined in HQDA ACSIM "Army Fire & Emergency Services Scope of Services Policy Memorandum" 18 Jan 2017.
Fire and Emergency Services PWS - CDRL MXXX
4.4 M006 Fier Chief will conduct
Annual Self- Assessments
Report submission utilzing the Fire & Emergency Services Program Assessment Checklist
(FESPA)
Self Assessment shall be completed annually with findings submitted COR NLT 30 days after completion.
ACO receipt of assessment within stated timeframe with a copy provided to HQ JMC and HQ AMC.
4.5 M007 Community Risk
Assessment / Standard of Cover
The Fire Chief / Contractor will define and document the scope of services, risk assessments, and service delivery performance standards the fire department is expected to provide (DODI 6055.06)
Community Risk Assessment / Standard of Cover shall be completed
NLT 1 year after the
4.6 M008 Standard Operating
Guides (SOG) and/or Standard Operating Procedures (SOP)
The Fire Chief will develop Standard Operating Guides or Procedures IAW AR 420- 1, Appendix R
SOGs and/or SOPs will be developed and reviewed annually (documented)
ACO review annually while documenting
4.7 M009 Facility Response Plan Report Submission A facility respone plan completed for structures or operations
Then biannual submission after that
4.8 M010 Be a member of the
Installation Emergency Management Working Group
Report Submission The fire department shall attend IEMWG with minutes and agendas documenting attendance.
ACO receipt and acknowledgement.
Submit as required.
4.9 M011 Establish and maintain
a Disaster Preparedeness Plan
Report submission Acceptable plan submitted and plan is exercised annually
Plan submitted NLT 30 Days after the effective date of contract. AOC will verify plan is exercised annually.
4.10 M012 Fire Reporting Report submission Report Fire & Non Fire Emergency Runs in system compatible with NFIRS.
4.11 M013 Fire Equipment Report submission Maintain, track, and inventory all equipment to ensure inspections, testing, and maintenance is completed as outlined by NFPA standards
ACO receipt of testing and inspection records as
4.12 M014 Hydrant Flow Testing Report Submission Perform flows testing of hydrants while documenting results. Out of service fire hydrants will be repaired on a priority basis.
5.2 M015 Emergency Medical
Services
Report submission All contract fire fighter personnel shall be trained and certified as Emergency Medical Technicians.
As required, ACO receipt of certifications
5.4, 5.6, 5.7 M016 Operational Medical Director
The Contractor shall ensure that EMS services will be provided under the supervision of a qualified Operational Medical Director
(OMD)
OMD will provide approved protocols and review EMS run reports for accuracy.
ACO will review OMD responses and feedback.
Submit as required.
6.1 M017 Physical and Medical
Report Submission The contractor shall require that all F&ES personnel receive an initial and annual Firefighter physical to include drug and alcohol testing.
As required, ACO will ensure personnel are fit for duty
6.2 M018 Fit Testing All F&ES personnel will be fit
tested for the type of SCBA and respirator utilized
Receive fit testing upon completion of an annual firefighter physical or when required. Fit testing shall be documented annually.
6.4 M019 Training Program Report Submission Develop an annual training plan and prepare lesson plans. Fire Chief will review and approvie training schedules
6.5 M020 Training Hours Report Submission Fire Chief will ensure personnel are receiving the minimum 120 hours of training annually
Annually, ACO will review reports to ensure compliance. A report will be generated and sent to JMC and HQ AMC
6.6 M021 Live Fire Training Report Submission The Fire Department shall conduct live fire training annually to include one day and one night fire utilizing an approved training device.
Training will be documented
6.7 M022 Significant Incident
Reporting
Report Submission Prepare a brief for the Government POC of any fire or incident involving an injury, fatality, equipment, or real property damage. Brief will be forwarded to HQ JMC and
HQ AMC F&ES.
As Required 100%
10 M023 Fire Loss Report Report Submission Prepare electronic input for fire losses greater than $500.00.
Information shall include what was damaged and whether or not government or privately owned.
6.3 M024 Emergency
Management Training
Certification Submission PROVIDE FEDERAL
EMERGENCY
MANAGEMENT AGENCY
CERTIFICATIONS (I.E. IS-
100, IS-200, IS-700, IS-800,
ETC) IAW AR 525-27,
TABLE 11.1
Table 1 the ACO staff
Goal is always 100% complete.
However, if condition is met less than this level, formal PCO notification of unacceptable performance will take place.
a) Respond to external inspections
Inspection report
Within 30 days Each 100%, except if granted extension
b) Quarterly report for uncorrected items Contractor generated report
Quarterly Each
a) Submit site plans Submitted as required by regulation Each 90%
b) Content meets requirements Format and content correct Each 100%
c) Follow on questions before submitting to final approval authority
(DDESB)
Requested clarifications on plan are provided within 14 calendar days
Each 80%
d) Submitted electronically Submitted electronically Each 100%
J003 Documented storage license(s) which tracks each AE storage location
Initial Submission is within 60 days of award of contract 100%
J004 Written review/validation of license(s) every 12 months
Submitted 365 days after initial submission
J005
Notify of any Net Explosives Weight changes in current storage license(s) regarding change(s)
As required/submitted As required
a) Notify of outside agency's arrival on site Notification regarding arrival
Notify of outside agency on site upon arrival (within 1 hour or reasonable time).
1.3.3 Site plan
submissions
1.3.2 J001
J002
1.3.4
Explosives Storage License(s)
However, if condition is met less than this level, formal PCO notification of unacceptable
b) Provide copy of outside agency report Report issued by federal or state SOH agency
Copy of report provided within 15 calendar days of report receipt
90%
c) Contractor's response to outside agency reports Contractor response to outside agency
Copy of response provided ACO…
This is the start of the file's text. The full file is on GovTribe.