This is a technical specification document for Soil Erosion and Sediment Control measures required for the Whistlestop Park project in Montgomery Township, Pennsylvania. The specification establishes requirements for implementing and maintaining erosion and sediment control practices throughout construction and post-construction phases. The contractor must develop and execute a comprehensive Soil Erosion and Sediment Control Plan in accordance with Pennsylvania Department of Environmental Protection standards and PennDOT Publication 408 Specifications. Key control measures include installation and maintenance of silt fences, super silt fences, stabilized construction entrances, inlet protection devices, temporary sediment basins and traps, perimeter dikes, and perimeter swales. The specification requires weekly inspections of all erosion control devices and inspections following every storm event, with immediate maintenance as needed. Temporary control devices must remain in place throughout the project duration and be removed upon project completion and stabilization of all disturbed areas. Permanent seeding and mulching of all disturbed areas must be completed immediately following final grading, within seasonal constraints, as detailed in Section 32 92 00.
The specification mandates compliance with the latest edition of the Pennsylvania Department of Environmental Protection's "Soil Erosion and Sediment Pollution Control Manual" and prohibits dewatering or pumping of excavated areas directly into existing storm ditches or natural channels that would cause silt deposition or bank erosion. Material standards include AASHTO #1 aggregate for stabilized construction entrances and silt fence materials meeting Section 865 of PennDOT Publication 408 Specifications. The County Conservation District retains authority to require modifications to sediment control measures and to recommend additional measures that must be promptly implemented by the contractor. Upon project completion, all disturbed areas must be permanently stabilized through seeding and mulching in accordance with Section 32 93 00 specifications.
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOIL EROSION AND SEDIMENT CONTROL
01 57 13-1
SECTION 01 57 13
PART 1 - GENERAL
1.01 SECTION DESCRIPTION
A. The Work of This Section Includes:
1. Contractor shall implement and maintain the Soil Erosion and Sediment Control Plan prepared for the Project and/or Work as shown on the Drawings and described in this Section.
2. Contractor shall carry out the construction operations in such a manner that soil erosion and resulting turbid stormwater runoff and sedimentation are minimized.
1.02 RELATED SECTIONS
A. Related Work Specified Elsewhere:
1. Section 32 92 00: Finish Grading, Seeding and Sodding
1.03 QUALITY ASSURANCE
A. Reference Standards:
1. Pennsylvania Department of Environmental Protection Soil Erosion and Sediment Pollution Control Manual.
2. Pennsylvania Department of Transportation Publication 408 Specifications
1.04 JOB CONDITIONS
A. The associated work activities include but are not limited to the following items:
1. Temporary and permanent measures will have to be undertaken before, during and after construction to control sediment from being carried onto adjoining properties and into swales or watercourses as a result of stormwater runoff.
2. The use of temporary control devices as shown on the Drawings and as described in these Specifications are for providing the trapping of sediment resulting from construction activities and to reduce the velocities of the temporary stormwater courses to minimize erosion.
3. The erosion and sediment control devices shall be inspected on a weekly basis and after every storm event and shall be maintained throughout the life of this project.
These shall include, but are not limited to, temporary sediment basins and traps, stabilized construction entrances, perimeter dikes, perimeter swales and silt fences, as shown on the Drawings or other measures that are required for the construction of the Project and/or Work.
4. Upon completion of the Project and/or Work, and stabilization of disturbed areas, the temporary control devices shall be removed by Contractor.
5. Soil erosion and sediment control practices shall be consistent with the procedures outlined in the latest edition of the "Soil Erosion and Sediment Pollution Control Manual", Commonwealth of Pennsylvania, Department of Environmental Protection.
01 57 13-2
PART 2 - PRODUCTS
2.01 MATERIALS
A. Silt Fence:
1. Section 865, PennDOT Publication 408 Specifications.
B. Super Silt Fence:
1. Fabric attached to chain link fence in accordance with the PADEP’s Erosion and
Sediment Pollution Control Program Manual.
C. Coarse Aggregate (Stabilized Construction Entrance)
1. AASHTO #1, Table C, Section 703.2, Publication 408 Specifications.
D. Inlet Protection Devices
1. Section 860, PennDOT Publication 408 Specifications.
E. Final Grading, Seeding and Sodding
1. See Section 32 92 00
PART 3 - EXECUTION
3.01 TEMPORARY CONTROL MEASURES
B. Utility Construction:
1. Install erosion and sediment control measures in accordance with the Drawings and sequence of construction as approved by the County Conservation District.
2. Excavated material resulting from the installation of the water service line, sewage force main & appurtenances and gravity sanitary sewer shall be completely surrounded by silt fence or completely covered with a plastic sheet during non-work periods.
3. The crossing of a creek or water course is covered in Section 33 05 29 of these
Specifications.
4. Limit the removal of natural ground cover to the minimum area required for construction within non-paved areas.
5. Perform temporary seeding and mulching immediately upon completion of earthmoving, within seasonal constraints, of disturbed areas which are not actively being regraded until final grading and stabilization can be accomplished. Temporary seeding is covered in Section 32 93 00.
6. Dewatering or pumping out of excavated areas directly into existing storm ditches or natural channels which causes silt deposition, turbidity and/or possible erosion of banks is prohibited. Contractor must make use of sediment traps, filters, or other methods acceptable to the Resident Project Representative.
3.02 PERMANENT CONTROL MEASURES
A. Sewage Pumping Station Site and Wastewater Treatment Plant Site:
01 57 13-3
1. Perform permanent seeding and mulching of any disturbed areas immediately following final grading within seasonal constraints. Seeding is covered in Section 32 93 00.
B. Utility Construction:
1. Perform permanent seeding and mulching of any disturbed areas immediately following final grading of any non-paved areas within seasonal constraints. Seeding is covered in Section 32 93 00.
3.03 FIELD MODIFICATIONS
A. Owner reserves the right to require modifications to any or all sediment control measures provided in order to establish proper soil erosion and sedimentation control. In addition, any measures recommended or required by the County Conservation District shall be promptly implemented.
END OF SECTION