15-Sec 01 57 13 - SOIL EROSION AND SEDIMENT CONTROL.pdf

PDF 72 KB Posted

Attached to
2201256.01 - Whistlestop Park
Solicitation number
US.160528
Issued by
Montgomery County, Pennsylvania

About this file

This is a technical specification document for Soil Erosion and Sediment Control measures required for the Whistlestop Park project in Montgomery Township, Pennsylvania. The specification establishes requirements for implementing and maintaining erosion and sediment control practices throughout construction and post-construction phases. The contractor must develop and execute a comprehensive Soil Erosion and Sediment Control Plan in accordance with Pennsylvania Department of Environmental Protection standards and PennDOT Publication 408 Specifications. Key control measures include installation and maintenance of silt fences, super silt fences, stabilized construction entrances, inlet protection devices, temporary sediment basins and traps, perimeter dikes, and perimeter swales. The specification requires weekly inspections of all erosion control devices and inspections following every storm event, with immediate maintenance as needed. Temporary control devices must remain in place throughout the project duration and be removed upon project completion and stabilization of all disturbed areas. Permanent seeding and mulching of all disturbed areas must be completed immediately following final grading, within seasonal constraints, as detailed in Section 32 92 00.

The specification mandates compliance with the latest edition of the Pennsylvania Department of Environmental Protection's "Soil Erosion and Sediment Pollution Control Manual" and prohibits dewatering or pumping of excavated areas directly into existing storm ditches or natural channels that would cause silt deposition or bank erosion. Material standards include AASHTO #1 aggregate for stabilized construction entrances and silt fence materials meeting Section 865 of PennDOT Publication 408 Specifications. The County Conservation District retains authority to require modifications to sediment control measures and to recommend additional measures that must be promptly implemented by the contractor. Upon project completion, all disturbed areas must be permanently stabilized through seeding and mulching in accordance with Section 32 93 00 specifications.

View the file

Other files

File Type Posted
13-Doc 00 43 13 - Bid Bond (penal sum form).pdf PDF
50-Doc 00 65 19.16 Contractors Release of Liens.pdf PDF
54-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
48-Sec 32 18 23.13-Natural Grass Sports Field Construction.pdf PDF
41-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
26-Doc 00 91 13 - 01 Appendix I - Cover.pdf PDF
29-Doc 00 73 00 06 - Appendix C - Cover.pdf PDF
38-Doc 00 73 00 12- Appendix F - Cover.pdf PDF
44-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
69-Doc 00 73 00 15 - Appendix G - Other DCED Requirements.pdf PDF
55-Doc 00 73 00 03 - Appendix A 2026-02-02 - prevailing wages whistlestop SN26-00920.pdf PDF
7-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
67-Sec 32 93 02 Exterior Planting.pdf PDF
77-Sec 33 44 15 Boxes and Endwalls.pdf PDF
28-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
78-06 FINAL Site Drawings - Gilmore 2026-03-12.pdf PDF
47-Sec 01 57 14 Erosion Control Blanket.pdf PDF
17-Doc 00 62 76 - C-620 Appl for Payment 2007.pdf PDF
19-Sec 31 20 00 Earthwork.pdf PDF
21-Doc 00 61 13.16 - Payment Bond.pdf PDF
76-Doc 00 73 00 17 - Appendix H - DCNR Signage Policy.pdf PDF
40-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
46-Sec 01 33 00 - Submittals.pdf PDF
12-Doc 00 73 00 13 - Appendix F - Nondiscrimination-Sexual Harassment Provisions.pdf PDF
43-Doc 00 45 10 - BIDDERS ACKNOWLEDGEMENT FORM.pdf PDF
9-Doc 00 73 00 08 - Appendix D - Cover.pdf PDF
51-Sec 31 23 16.26 Rock Removal.pdf PDF
75-Sec 32 92 00 Finish Grading Seeding and Sodding.pdf PDF
27-Sec 33 44 14 Storm Inlets Catch Basins Endwalls End Sections.pdf PDF
56-Sec 31 11 00 Clearing and Grubbing.pdf PDF
35-Doc 00 73 00 11- Appendix E - Americans with Disabilities Act.pdf PDF
62-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
65-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
34-Doc 00 65 19.13 - Contractors Affidavit.pdf PDF
58-Sec 32 18 23.53-Acrylic Color Coat - Generic.pdf PDF
3-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
57-Sec 32 12 00 - Asphalt Paving.pdf PDF
20-Doc 00 73 00 09 - Appendix D - Architectural Barriers Act.pdf PDF
10-Doc 00 61 19 - Maintenance Bond.pdf PDF
71-Doc 00 73 00 07 - Appendix C - State Contractor Responsibility Program.pdf PDF
52-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
2-Doc 00 41 00 - Bid Form.pdf PDF
14-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
22-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT - 2024.pdf PDF
25-Doc 01 01 01 - Appendix J Technical Specs Cover Sheet.pdf PDF
59-Doc 00 41 00 - BID FORM - EBID.pdf PDF
30-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
36-Doc 00 73 00 10- Appendix E - Cover.pdf PDF
45-Doc 00 73 00 1 - SUPPLEMENTARY CONDITIONS.pdf PDF
60-Doc 00 73 00 05 - Appendix B - Public Works Employment Verification Form.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOIL EROSION AND SEDIMENT CONTROL

01 57 13-1

SECTION 01 57 13

PART 1 - GENERAL

1.01 SECTION DESCRIPTION

A. The Work of This Section Includes:

1. Contractor shall implement and maintain the Soil Erosion and Sediment Control Plan prepared for the Project and/or Work as shown on the Drawings and described in this Section.

2. Contractor shall carry out the construction operations in such a manner that soil erosion and resulting turbid stormwater runoff and sedimentation are minimized.

1.02 RELATED SECTIONS

A. Related Work Specified Elsewhere:

1. Section 32 92 00: Finish Grading, Seeding and Sodding

1.03 QUALITY ASSURANCE

A. Reference Standards:

1. Pennsylvania Department of Environmental Protection Soil Erosion and Sediment Pollution Control Manual.

2. Pennsylvania Department of Transportation Publication 408 Specifications

1.04 JOB CONDITIONS

A. The associated work activities include but are not limited to the following items:

1. Temporary and permanent measures will have to be undertaken before, during and after construction to control sediment from being carried onto adjoining properties and into swales or watercourses as a result of stormwater runoff.

2. The use of temporary control devices as shown on the Drawings and as described in these Specifications are for providing the trapping of sediment resulting from construction activities and to reduce the velocities of the temporary stormwater courses to minimize erosion.

3. The erosion and sediment control devices shall be inspected on a weekly basis and after every storm event and shall be maintained throughout the life of this project.

These shall include, but are not limited to, temporary sediment basins and traps, stabilized construction entrances, perimeter dikes, perimeter swales and silt fences, as shown on the Drawings or other measures that are required for the construction of the Project and/or Work.

4. Upon completion of the Project and/or Work, and stabilization of disturbed areas, the temporary control devices shall be removed by Contractor.

5. Soil erosion and sediment control practices shall be consistent with the procedures outlined in the latest edition of the "Soil Erosion and Sediment Pollution Control Manual", Commonwealth of Pennsylvania, Department of Environmental Protection.

01 57 13-2

PART 2 - PRODUCTS

2.01 MATERIALS

A. Silt Fence:

1. Section 865, PennDOT Publication 408 Specifications.

B. Super Silt Fence:

1. Fabric attached to chain link fence in accordance with the PADEP’s Erosion and

Sediment Pollution Control Program Manual.

C. Coarse Aggregate (Stabilized Construction Entrance)

1. AASHTO #1, Table C, Section 703.2, Publication 408 Specifications.

D. Inlet Protection Devices

1. Section 860, PennDOT Publication 408 Specifications.

E. Final Grading, Seeding and Sodding

1. See Section 32 92 00

PART 3 - EXECUTION

3.01 TEMPORARY CONTROL MEASURES

B. Utility Construction:

1. Install erosion and sediment control measures in accordance with the Drawings and sequence of construction as approved by the County Conservation District.

2. Excavated material resulting from the installation of the water service line, sewage force main & appurtenances and gravity sanitary sewer shall be completely surrounded by silt fence or completely covered with a plastic sheet during non-work periods.

3. The crossing of a creek or water course is covered in Section 33 05 29 of these

Specifications.

4. Limit the removal of natural ground cover to the minimum area required for construction within non-paved areas.

5. Perform temporary seeding and mulching immediately upon completion of earthmoving, within seasonal constraints, of disturbed areas which are not actively being regraded until final grading and stabilization can be accomplished. Temporary seeding is covered in Section 32 93 00.

6. Dewatering or pumping out of excavated areas directly into existing storm ditches or natural channels which causes silt deposition, turbidity and/or possible erosion of banks is prohibited. Contractor must make use of sediment traps, filters, or other methods acceptable to the Resident Project Representative.

3.02 PERMANENT CONTROL MEASURES

A. Sewage Pumping Station Site and Wastewater Treatment Plant Site:

01 57 13-3

1. Perform permanent seeding and mulching of any disturbed areas immediately following final grading within seasonal constraints. Seeding is covered in Section 32 93 00.

B. Utility Construction:

1. Perform permanent seeding and mulching of any disturbed areas immediately following final grading of any non-paved areas within seasonal constraints. Seeding is covered in Section 32 93 00.

3.03 FIELD MODIFICATIONS

A. Owner reserves the right to require modifications to any or all sediment control measures provided in order to establish proper soil erosion and sedimentation control. In addition, any measures recommended or required by the County Conservation District shall be promptly implemented.

END OF SECTION