This document is a Schedule of Material Submittals template for the BARC EPSS (Generator/ATS/MTS) Maintenance and Repair IDIQ contract at the Beltsville Agricultural Research Center (BARC), USDA-ARS, Beltsville, MD.

The schedule outlines seven key submittal items required throughout the contract performance. Line items include: (1) Project Schedule with SWD Maintenance Schedule and Initial Inventory and Inspection Report; (2) Monthly Reports; (3) Project Record Documents; (4) Documentation on Diverting Project Waste to Recycle; (5) Safety Plan; (6) Project O&M Manuals (if required); and (7) Apparatus Inspection and Testing. The template is designed to track each submittal through its lifecycle, with columns for SOW/PWS/Specification numbers, submission types (certificates of compliance, shop drawings, samples, manufacturer data, test reports, and other documentation), required submission dates, COR receipt dates, return suspense dates, contractor notifications, and approval/disapproval status with submittal numbers. The document is to be completed by the Contracting Officer Representative (COR) and Contract Administrator, with rows provided for up to 23 line items to accommodate additional project-specific submittals as needed. This is a template designed to organize and manage contractual documentation and reporting requirements for the maintenance and repair services under this IDIQ vehicle.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BARC EPSS (Generator/ATS/MTS) Maintenance and Repair IDIQ Beltsville Agricultural Research Center (BARC) USDA-ARS, Beltsville, MD

Exhibit E Schedule of Material Submittals

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER:

PROJECT TITLE:

SOLICITATION/CONRTACT NUMBER:

TO BE COMPLETED BY COR TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LINE NO.

SOW /PWS/

SPECIFICATION NO: ITEM CE

RT

IF

IC

AT

E O

F

CO

M

PL

IA

N

CE

SH

O

P

DR

AW

IN

G S

SA

M

PL

ES

CO

LO

R

SE

LE

CT

IO

N

M

AN

U

FA

CT

U

RE

R'

S

RE

CO

M

M

EN

DA

TI

O N

S

M

AN

U

FA

CT

U

RE

R'

S W

AR

RE

N

TY

CA

TA

LO

G

PR

O

DU

CT

D

AT

A

O

PE

RA

TI

N G

IN

ST

RU

CT

IO

N

S

TE

ST

R

EP

O

RT

S

O

TH

ER

(S

EE

S

PE

CI

FI

CA

TI

O

N

REQUIRED

SUBMISSION

DATE

DATE TO

COR

DATE

CONTRACTING

OFFICER

RECEIVED

RETURN

SUSPENSE DATE

DATE

CONTRACTOR

NOTIFIED

APPROVED

(INSERT

SUBMITTAL

NUMBER)

DISAPPROVED

(INSERT

SUBMITTAL

NUMBER)

CONTRACTOR

RESUBMITTAL FINAL APPROVAL REMARKS

Specification Section 01

32 16.00 20 Project Schedule X

SWD Maintenance Schedule X SWD Initial Inventory and Inspection Report X

Specification Section 01

32 16.00 20 Monthly Reports X

Specification Section 01

78 00 Project Record Documents X X X X X

Specification Section 01

78 00 Documentation on Diverting Project Waste to Recycle

X

Specification Section 01

78 00 Safety Plan

Specification Section 01

78 00 Project O&M Manuals (if required) X

Specification Section 26

20 00 Apparatus Inspection and Testing X X X X X X

BARC EPSS (Generator/ATS/MTS) Maintenance and Repair IDIQ