This document is a Hazardous Material Information report prepared for the Kent Memorial Library project in Kent, Connecticut, detailing existing environmental conditions and contractor responsibilities for remediation work.

The project involves the renovation of the Kent Memorial Library and an existing Firehouse building, both of which contain identified hazardous materials requiring abatement. Asbestos-containing tile flooring and adhesives have been identified in limited quantities, while lead paint has been confirmed in the 1922 Library Reading Room (Room 117) and the Existing Loft (Room 200) at toxic levels due to pre-1978 application. Additional lead paint and asbestos at non-toxic levels have been identified in various other locations. The General Contractor is responsible for all hazardous material removal and abatement work, which may include encapsulation where approved by the Owner and Authorities Having Jurisdiction. Related requirements are detailed in the Instructions to Bidders (Document 002113), Section 024119 (Selective Structure Demolition), and the Wyeth Architects Letter on hazardous materials and abatement requirements included in Addendum #3.

The document establishes that abatement activities must include preparation, cleanup, disposal, and re-occupancy clearance testing. If additional hazardous materials are discovered during construction that affect work progress, the General Contractor must propose a remediation strategy and plan to the Architect and Owner for approval before proceeding. All costs associated with remediation, schedule impacts, and required modifications must be fully documented and incorporated into a Change Order prior to work commencement. Supporting documentation includes environmental survey reports from Reliance Environmental, LLC dated November 4 and November 19, 2025, addressing asbestos and lead paint screening, along with applicable state and federal regulatory references.

View the file

Other files

File Type Posted
KML Addendum 1 - 2025-11-07.pdf PDF
Addendum 3 - 2025-11-20.pdf PDF
102800 - Toilet Bath and Custodial Accessories.pdf PDF
014523 - TESTING FOR INDOOR AIR QUALITY_rev1.pdf PDF
1-11-4-25-MAIN LIBRARY-01 INSP - 30-32 NORTH MAIN STREET KENT CT.pdf.crdownload CRDOWNLOAD file
Addendum 2 - 2025-11-12.pdf PDF
KML Drwgs for Printing 10-15-25.pdf.crdownload CRDOWNLOAD file
109990 - Tower Clock.pdf PDF
KML Arch Bid Set 10-15-25.pdf.crdownload CRDOWNLOAD file
2-11-4-25-LIBRARY-01 LEAD-XRF - FIREHOUSE-MAIN STREET KENT CT.pdf PDF
10-28-25 Bid Ad.docx DOCX document
000400 - BID FORM_rev1.pdf PDF
2025-11-20 KML Lead Asbestos Letter.pdf PDF
IQT-WA-32 North Main Street-Library-02-11-22.pdf PDF
33247_Jan_27_26_solicitation_doc.pdf PDF
3-11-19-25-LIBRARY-01 LEAD-XRF - 30-32 NORTH MAIN STREET KENT CT.pdf PDF
000100 Definitions and Standards.pdf PDF
KML MEP Bid Set Drwgs 10-15-25.pdf PDF
Addendum 4 - 2025-11-24.pdf PDF
KML Drwgs for Printing 10-15-25.pdf PDF
KML Civil Bid Set Drwgs 10-20-25.pdf.crdownload CRDOWNLOAD file
Addendum 4 drawings - 2025-11-24.pdf PDF
KML Arch Bid Set 10-15-25.pdf PDF
088000 - GLAZING_rev1.pdf PDF
2025-11-20 Addendum 3 drawings.pdf.crdownload CRDOWNLOAD file
KML Civil Bid Set Drwgs 10-20-25.pdf PDF
IQT-WA-32 North Main Street-Firehouse-02-04-22.pdf PDF
000200 General Information.pdf PDF
Addendum 5 - 2025-12-02.pdf PDF
KML Proj Manual- Bidding 10-15-25.pdf.crdownload CRDOWNLOAD file
3-11-19-25-LIBRARY-01 LEAD-XRF - 30-32 NORTH MAIN STREET KENT CT.pdf.crdownload CRDOWNLOAD file
10-20-25-abbreviated bid ad -1.docx DOCX document
Addendum 3 - 2025-11-20.pdf.crdownload CRDOWNLOAD file
IQT-WA-32 North Main Street-Firehouse-02-04-22.pdf.crdownload CRDOWNLOAD file
1-11-4-25-MAIN LIBRARY-01 INSP - 30-32 NORTH MAIN STREET KENT CT.pdf PDF
2025-11-20 Addendum 3 drawings.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KENT MEMORIAL LIBRARY

00 31 26 – EXISTING HAZARDOUS MATERIAL INFORMATION

October 15, 2025 revision 1

EXISTING HAZARDOUS MATERIAL INFORMATION

1.1 EXISTING STRUCTURAL and HAZARDOUS MATERIAL INFORMATION

A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information but are not a warranty of existing conditions.

B. There are limited amounts of asbestos tile flooring and likely to be asbestos in various adhesives. See the attached reports. Windows, trim and exterior wood carpentry have been around prior to 1978, so it is reasonable to assume that lead paint exists in the old Firehouse as well as portions of the Library that predate 1978.

C. The General Contractor shall be responsible for the removal and abatement of hazardous materials.

Abatement might include encapsulation if acceptable to the Owner and the Authorities Having Jurisdiction.

D. Related Requirements:

1. Document 002113 "Instructions to Bidders" for the Bidder's responsibilities for examination of

Project site and existing conditions.

2. Section 024119 Selective Structure Demolition

3. Wyeth Architects Letter: HAZARDOUS MATERIALS AND ABATEMENT REQUIREMENTS Required of the General Contractor (to be included in bids), dated: 11/20/25 – part of Addendum #3.

E. Additional Information:

1. Section 505011 - Building Inspection Report

2. Reliance Environmental, LLC Limited & Directed Pre-renovation Asbestos Survey Report, dated

11/4/25 (Existing Library and Firehouse Buildings)

3. Reliance Environmental, LLC Limited & Directed lead paint XRF screening of firehouse located at

30 North main Street, Kent, CT, dated 11/4/25 (Existing Firehouse Building)

4. Reliance Environmental, LLC Limited & Directed lead paint XRF screening of firehouse located at

30 North main Street, Kent, CT, dated 11/19/25 (Existing Library Building).

5. Department of Public Health and Addiction Services document 'Sec. 20-478 (2-98)’

6. EPA's Lead Renovation, Repair & painting (RRP) Rule

1.2 WHERE HAZARDOUS MATERIALS ARE ENCOUNTERED:

1.2.1 According to the report by Reliance Environmental, LLC dated 11/19/25: toxic levels of lead have been identified in the 1922 Library Reading Room 117 & the Existing Loft 200 in the form of paint applied prior to 1978. In order to perform the carpentry and millwork shown for these areas, existing millwork will be removed and/or modified. Abatement is required.

1.2.2 According to the report by Reliance Environmental, LLC dated 11/4/25: limited amounts of asbestos & lead have been identified in various other locations in non-toxic levels.

1.2.3 The General Contractor shall be responsible for the abatement of hazardous materials including (but not limited to) asbestos and lead. "Abatement" is defined in the Department of Public Health

KENT MEMORIAL LIBRARY

00 31 26 – EXISTING HAZARDOUS MATERIAL INFORMATION

October 15, 2025 revision 1 and Addiction Services document 'Sec. 20-478 (2-98): Standards for Licensure and Certification of Lead Abatement Contractors, Lead Consultants and Lead Abatement Personnel - Sec. 20-478-1 Definitions (1). Abatement includes (but is not limited to) the encapsulation, replacement, removal, enclosure or covering of paint, plaster, soil or other material containing toxic levels of lead and all preparation, clean-up, disposal and re-occupancy clearance testing.

1.2.4 If other hazardous materials are encountered in the course of the work; in some form that will affect the work and its progress, the discovered materials are to be brought to the attention of the architect and Owners for assessment.

1.2.4.1 Where remediation is required:

a. A strategy is to be proposed by the General Contractor

b. A remediation plan, schedule and cost determined

c. The Owner will review their options and select the best approach to move the Project forward.

d. Any and all costs, including impacts to the schedule and architect, must be determined and documented prior to the work. The work may proceed only after a Change Order is fully executed.

1.2.2 Where possible and allowed by code or regulation, by agreement with the Owner, certain hazardous materials may be encapsulated by approved method of the Authorities Having Jurisdiction.

END OF DOCUMENT 00 31 26