Roseville Road RR Crossing - Street Light Installation

Closed State & local contract opportunity

Solicitation number
40935
State
California
Responses due

Opportunity facts

UNSPSC codes
Show all 25
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

Sacramento County is procuring a street light infrastructure project through a competitive bid process for the Roseville Road Railroad Crossing. The project, identified as Contract #40935, requires a General Engineering Contractor (Class A) to complete comprehensive infrastructure improvements involving the installation of two street lights adjacent to the railroad crossing. Specific work includes light pole pier foundations, electrical utility trenches, electrical wiring installation, pavement saw cutting and repaving, slurry seal placement, and roadway restriping. Bidders must submit electronic responses through the Sacramento County Electronic Bidding Portal by April 14, 2022, at 2:00 pm, with pre-bid questions due by April 11, 2022, at 4:00 pm. Contractors must be registered with the California Department of Industrial Relations and comply with prevailing wage requirements. The project requires a bid guarantee of at least 10% of the total bid amount, which can be submitted as a bid bond, certified check, or cashier's check.

The contract has specific requirements for contractor qualifications and compliance, including mandatory registration with the California Department of Industrial Relations and adherence to prevailing wage standards determined by either the Davis-Bacon Act or California Labor Code. Successful bidders must provide payment and performance bonds for 100% of the contract price and submit documentation including a non-collusion declaration, subcontractor designation, and verification of business type, license, and registration information. The estimated construction cost is $190,000, with a project completion timeline of thirty (30) working days and liquidated damages of $3,000 per calendar day for exceeding the specified completion time. Contractors will be responsible for detailed technical specifications including street lighting, electrical systems, traffic control, and environmental controls. The project requires maintenance of specific insurance coverages and adherence to comprehensive technical installation and quality control standards for infrastructure modification.

Opportunity text

The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for doing work associated with the installation of two street lights adjacent to the Roseville Road Railroad Crossing. Associated work includes the installation of light pole pier foundations, installation of electrical utility trenches within soil and pavement areas, installation and connection of electrical wiring, saw cutting and repaving of pavement, placement of slurry seal, and restriping of roadway.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity