Signed_Roseville_Rd_-_Section_130_Railroad_Crossing_Project-signed2.pdf
PDF 3 MB Posted
- Solicitation number
- 40935
- Issued by
- California
About this file
The document is a set of engineering design and construction plans for the Roseville Road RR Crossing - Section 130 Street Light Installation Project, prepared by the Sacramento County Community Services Agency Department of Transportation. The project involves installing two street lights adjacent to the Roseville Road Railroad Crossing, with specific details outlined across seven detailed plan sheets. The plans include electrical layouts, pavement restoration specifications, pole location details, and construction notes. The project area spans along Roseville Road, with match lines connecting different sections of the design, and includes provisions for electrical utility trenches, light pole foundations, electrical wiring installation, pavement saw cutting, repaving, slurry seal placement, and roadway restriping.
The design documents provide technical specifications for bid alternatives, including different pavement restoration methods such as conform grinding, 6.5-inch wedge grinding, and 2-inch AC overlay. The plans include a comprehensive legend, construction notes, and utility representative contact information. The project appears to be funded through the county's transportation infrastructure budget, with detailed technical requirements for pole placement, electrical connections, and surface restoration. The design sheets are dated and include multiple revisions, suggesting careful planning and potential iterative design processes to meet specific engineering and municipal standards for road and lighting infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Roseville_Road_RR_Crossing_-_Street_Light_Installation.pdf | ||
| 40935_Specification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EARTH SAW TRENCH DETAIL
NOT TO SCALE
A
CD1
POLE LOCATION
NOT TO SCALE
C
CD1
SHOULDER TRENCH DETAIL
NOT TO SCALE
B
CD1
6'-6" MIN
AB AGGREGATE BASE
APN ASSESSOR'S PARCEL NUMBER
AVE AVENUE
AWG AMERICAN WIRE GAUGE
CGS CURB, GUTTER, SIDEWALK
C/L CENTERLINE
CLSM CONTROLLED LOW-STRENGTH MATERIAL
DTL DARK-TO-LIGHT
DWG DRAWING
EX EXISTING
EP EDGE OF PAVEMENT
JP JOINT POLE
LED LIGHT EMITTING DIODE
LF LINEAR FOOT
MIN MINIMUM
PEC PHOTOELECTRIC CELL
PL PROPERTY LINE
PROP PROPOSED
R/W RIGHT OF WAY
RD ROAD
RR RAILROAD
SL STREET LIGHT
SS SANITATION SEWER
UG UNDERGROUND
XING CROSSING
GAS GAS GAS GAS
D E
P A
R
TM
E N
T O
F
TR
A N
S P
O R
TA
TI
O N
C O
U N
TY
O
F S
A C
R A
M E
N
TO
C O
M M
U N
IT
Y
S E
R V
IC
E
S A
G E
N C
Y
SCALE
DRAWING
DA
TE
RE
VI
SI
ON
S
PREPARED BY
AP
PR
SHEET
DATE
2 7
RO
SE
VI
LL
E R
OA
D
RR
C
RO
SS
IN
G
- S
EC
TIO
N
CO
NS
TR
UC
TIO
N
DE
TA
ILS
/ L
EG
EN
DS
CD1 CD1
ST
RE
ET
LI
GH
T I
NS
TA
LL
AT
IO
N
PR
OJ
EC
T
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASGASGASGASGASGASGASGASGASGASGASGAS
GAS GAS GAS
G
AS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
G
AS
G
AS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
G
AS
GAS GAS GAS GAS
POLE & EQUIPMENT SCHEDULE
STANDARD LUMINAIRE & MAST ARM POLE LOCATION
NOTES
ID POLE TYPE HEIGHT LENGTH WATT TYPE STA Y
B TYPE-A 16'-0" 10'-0" 50 LED LIGHT PATTERN - TYPE 3
C TYPE-A 28'-6" 10'-0" 50 LED LIGHT PATTERN - TYPE 3
SC SERVICE
CAN
CONTRACTOR SHALL INSTALL METERED (120/240V) STREET LIGHT SERVICE PEDESTAL ENCLOSURE AT TWO LOCATIONS
SP SERVICE
POINT
INSTALL 17" X 30" SMUD PULLBOX AND 10LF 3" RISER AT SMUD POLE (UD#116159)
240'
32'
FH
6 6
550' TO PULLBOX
3'
D E
P A
R
TM
E N
T O
F
TR
A N
S P
O R
TA
TI
O N
C O
U N
TY
O
F S
A C
R A
M E
N
TO
C O
M M
U N
IT
Y
S E
R V
IC
E
S A
G E
N C
Y
SCALE
DRAWING
DA
TE
RE
VI
SI
ON
S
PREPARED BY
AP
PR
SHEET
DATE
3 7
RO
SE
VI
LL
E R
OA
D
RR
C
RO
SS
IN
G
- S
EC
TIO
N
EL
EC
TR
IC
AL
P
LA
N
E1 E3
ST
RE
ET
LI
GH
T I
NS
TA
LL
AT
IO
N
PR
OJ
EC
T
3'
5'
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASGAS
GASGASGASGASGASGASGASGASGASGAS
GAS G
AS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
D E
P A
R
TM
E N
T O
F
TR
A N
S P
O R
TA
TI
O N
C O
U N
TY
O
F S
A C
R A
M E
N
TO
C O
M M
U N
IT
Y
S E
R V
IC
E
S A
G E
N C
Y
SCALE
DRAWING
DA
TE
RE
VI
SI
ON
S
PREPARED BY
AP
PR
SHEET
DATE
4 7
RO
SE
VI
LL
E R
OA
D
RR
C
RO
SS
IN
G
- S
EC
TIO
N
EL
EC
TR
IC
AL
P
LA
N
E2 E3
ST
RE
ET
LI
GH
T I
NS
TA
LL
AT
IO
N
PR
OJ
EC
3'
D E
P A
R
TM
E N
T O
F
TR
A N
S P
O R
TA
TI
O N
C O
U N
TY
O
F S
A C
R A
M E
N
TO
C O
M M
U N
IT
Y
S E
R V
IC
E
S A
G E
N C
Y
SCALE
DRAWING
DA
TE
RE
VI
SI
ON
S
PREPARED BY
AP
PR
SHEET
DATE
5 7
RO
SE
VI
LL
E R
OA
D
RR
C
RO
SS
IN
G
- S
EC
TIO
N
EL
EC
TR
IC
AL
P
LA
N
E3 E3
ST
RE
ET
LI
GH
T I
NS
TA
LL
AT
IO
N
PR
OJ
EC
GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASGASGASGASGASGASGASGASGASGASGASGAS
GAS GAS GAS
G
AS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
G
AS
G
AS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
G
AS
GAS GAS GAS GAS GAS
D E
P A
R
TM
E N
T O
F
TR
A N
S P
O R
TA
TI
O N
C O
U N
TY
O
F S
A C
R A
M E
N
TO
C O
M M
U N
IT
Y
S E
R V
IC
E
S A
G E
N C
Y
SCALE
DRAWING
DA
TE
RE
VI
SI
ON
S
PREPARED BY
AP
PR
SHEET
DATE
6 7
RO
SE
VI
LL
E R
OA
D
RR
C
RO
SS
IN
G
- S
EC
TIO
N
PA
VE
M
EN
T R
ES
TO
RA
TIO
N
PL
AN
PR1 PR2
350'
36'
ST
RE
ET
LI
GH
T I
NS
TA
LL
AT
IO
N
PR
OJ
EC
T
50' 50' 50'
50'
18'
400'
190'
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASGAS
GASGASGASGASGASGASGASGASGASGAS
GAS G
AS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
D E
P A
R
TM
E N
T O
F
TR
A N
S P
O R
TA
TI
O N
C O
U N
TY
O
F S
A C
R A
M E
N
TO
C O
M M
U N
IT
Y
S E
R V
IC
E
S A
G E
N C
Y
SCALE
DRAWING
DA
TE
RE
VI
SI
ON
S
PREPARED BY
AP
PR
SHEET
DATE
7 7
RO
SE
VI
LL
E R
OA
D
RR
C
RO
SS
IN
G
- S
EC
TIO
N
PA
VE
M
EN
T R
ES
TO
RA
TIO
N
PL
AN
PR2 PR2
ST
RE
ET
LI
GH
T I
NS
TA
LL
AT
IO
N
PR
OJ
EC
T
120'
115' 50'
400'
| Sheets and Views |
| 1 Cover Sheet |
| Roseville Rd - Section 130 Railroad Crossing Project Rev47 (trans)-2 Construction Details.pdf |
| Sheets and Views |
| 2 Construction Details |
| Roseville Rd - Section 130 Railroad Crossing Project Rev47 (trans)-3 Electrical.pdf |
| Sheets and Views |
| 3 Electrical |
| Roseville Rd - Section 130 Railroad Crossing Project Rev47 (trans)-4 Electrical.pdf |
| Sheets and Views |
| 4 Electrical |
| Roseville Rd - Section 130 Railroad Crossing Project Rev47 (trans)-5 Electrical.pdf |
| Sheets and Views |
| 5 Electrical |
| Roseville Rd - Section 130 Railroad Crossing Project Rev47 (trans)-6 Pavement.pdf |
| Sheets and Views |
| 6 Pavement |
| Roseville Rd - Section 130 Railroad Crossing Project Rev47 (trans)-7 Pavement.pdf |
| Sheets and Views |
| 7 Pavement |
File details come from the government source that posted it. Updated .