Progressive Design Build Services for SPLOST IX Bundle 5
Closed State & local contract opportunity Posted
- Solicitation number
- 26-65-1514
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90625 Design Build Services
- 90638 General Construction - Architectural
- 90646 Highways; Streets; Airport Pay-Parking Lots - Architectural
- 91327 Construction, Highway And Road
- 92504 Agricultural Engineering
- 92517 Civil Engineering
- 92549 Highways; Streets; Airport Pay-Parking Lots - Engineering
- 92593 Traffic And Transportation Engineering
- UNSPSC codes
- 72141002 Highway and road sign or guardrail construction and repair service
- 72141004 Highway reflector installation service
- 72141509 Trenching service
- 95111614 Single carriageway
- 95111502 Right of way
- 95121647 Elevated roadway or highway
- 81101500 Civil engineering
- 81102202 Urban transport network
- 81102203 Inland waterways
- 95111500 Limited traffic thoroughfares
Show all 32
- 95111600 Open traffic thoroughfares
- 95111503 Access roads
- 95111601 Street or avenue or road or boulevard
- 95111611 Trunk road
- 81101532 Agricultural engineering
- 72141000 Highway and road construction services
- 72141100 Infrastructure building and surfacing and paving services
- 72141001 Highway and road new construction service
- 72141106 Gravel or dirt road construction service
- 95111504 Highway ramp or slip road
- 95111612 Secondary road
- 95111613 Dual carriageway
- 95111602 Intrastate highway or freeway or turnpike
- 95110000 Thoroughfares
- 95111615 Road junction
- 95111609 Crossroad
- 95111501 Easement
- 95111603 Interstate highway or freeway or turnpike
- 95111610 Ring road
- 81101510 Highway engineering
- 81102200 Transportation engineering
- 81102201 Traffic engineering
Opportunity details come from forsythco.bonfirehub.com. Updated .
About this opportunity
Forsyth County, Georgia is requesting proposals for progressive design-build services for SPLOST IX Transportation Bundle 5, specifically the Old Atlanta Road Safety Improvements project (Corridor Safety and Operational Improvement — PERS1), with proposals due July 9, 2026 at 2:00 PM and a non-mandatory pre-proposal conference on June 10, 2026 at 10:00 AM via Microsoft Teams. The Design-Builder must self-perform not less than 30 percent of total construction work by cost, exclusive of design services, in accordance with O.C.G.A. 32-4-74.
The scope encompasses 1.32 miles of roadway design and construction along Old Atlanta Road, including northbound dual left-turn lane provision, southbound receiving lane extension, right-turn auxiliary lanes at Melody Mizer Road, Daves Creek Drive, and Ronald Reagan Boulevard, and additional turn-lane storage between Brannon Road and Daves Creek Drive. The Design-Builder must conduct comprehensive surveys (property boundary, topographic at one-foot contour increments, utility location) tied to Georgia State Plane Coordinate System West Zone and NAVD 88; perform Subsurface Utility Engineering Quality Level B investigation; prepare GDOT-compliant design documentation; obtain environmental permits (Section 404/401, NPDES, MS4 compliance); and perform hydrologic and hydraulic analyses with stormwater and drainage infrastructure design. All work must comply with GDOT Plan Development Process, current design policies, and GDOT Standard Specifications Construction of Transportation Systems 2021 Edition. CAD files must be delivered in Bentley OpenRoads Designer format; GIS data in Esri format using State Plane GA West projection.
The contract is structured in two stages: Preliminary Stage (150 calendar days after Notice to Proceed) compensated through stipulated prices; Completion Stage (240 calendar days after Owner approval of binding Completion Stage Price, plus 90 days for final completion) using Cost of the Work Plus Design-Builder's Fee methodology subject to a Guaranteed Maximum Price. Progress payments are made monthly at 95 percent of completed work with retainage held per O.C.G.A. 13-10-80. Liquidated damages are $1,000 per day for delays beyond Substantial Completion and $500 per day for failure to complete remaining work within contract time.
Technical proposals are evaluated on a 100-point scale: project understanding and technical approach (30 points), key personnel experience and capabilities (20 points), proposer experience and capabilities (25 points), schedule (15 points), and price proposal (10 points). The County will use a best value selection process, calculating an Evaluated Price combining Preliminary Stage price and Completion Stage fee percentage applied to the County's construction cost estimate. The County will issue a Notice of Award within 90 days after proposal opening. Proposals must include proposal security equal to 5 percent of total price in surety bond form. The successful Design-Builder must furnish performance and payment bonds equal to 100 percent of contract value. Questions are due June 29, 2026 by 12:00 PM EST. All submissions must be electronic via Euna Solutions (Bonfire) at https://forsythco.bonfirehub.com/opportunities/236959. The Owner's Consultant is BCC Engineering, LLC dba Heath & Lineback, with John N. Jefferson (Capital Projects, 2435 Freedom Parkway, Cumming, Georgia 30041) as Forsyth County's authorized representative. E-Verify compliance and comprehensive insurance coverage including professional liability of $5 million per claim and $5 million annual aggregate are required.
Opportunity text
Progressive Design Build Services for SPLOST IX Bundle 5 • Old Atlanta Road Safety Improvements (Corridor Safety and Operational Improvement - PERS1
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity