This is a Request for Proposals (RFP) issued by Forsyth County, Georgia, for progressive design-build services for SPLOST IX Transportation Bundle 5, specifically the Old Atlanta Road Safety Improvements project (Corridor Safety and Operational Improvement - PERS1). The RFP solicits proposals for design-build services to be delivered in two stages: a Preliminary Stage and a Completion Stage. Proposals are due by July 9, 2026, at 2:00 PM through the Euna Solutions electronic procurement portal. A non-mandatory pre-proposal conference will be held via Teams prior to the submission deadline. The Preliminary Stage work must be completed within 150 calendar days of the Notice to Proceed, while Completion Stage work must achieve substantial completion within 240 calendar days after Owner approval of the binding Completion Stage Price and issuance of a Notice to Proceed. Site visits are encouraged but not required, though right-of-entry to private properties has not yet been secured by the Owner. The County will issue a Notice of Award within 90 days after the proposal opening date.
The RFP requires a two-part pricing structure: a stipulated price (lump sum) for Preliminary Stage work and a cost-plus-fee arrangement for Completion Stage work, with the Design-Builder's fee expressed as a percentage of the Cost of the Work. Proposers must submit proposal security equal to five percent of their total price proposal in the form of a surety bond. The successful Design-Builder must self-perform not less than 30 percent of the total construction work, excluding design services. Technical proposals will be evaluated on a 100-point scale based on project understanding and technical approach (30 points), key personnel experience and capabilities (20 points), proposer experience and capabilities (25 points), schedule (15 points), and price proposal (10 points). The evaluation will use a best value selection process, with the county calculating an Evaluated Price that combines the Preliminary Stage price and the Completion Stage fee percentage applied to the County's construction cost estimate. The design-build authority is granted pursuant to O.C.G.A. § 32-4-74 and a Forsyth County Board of Commissioners Resolution adopted February 5, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EJCDC® D-111, Request for Proposals—Design-Build Project.
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
REQUEST FOR PROPOSALS
RFP #: 26-65-1514
Progressive Design-Build Services for the SPLOST IX Transportation Bundle 5
Closing Date:
July 9, 2026 2:00 PM
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved Page i
REQUEST FOR PROPOSALS
PROGRESSIVE DESIGN-BUILD SERVICES FOR THE
SPLOST IX TRANSPORTATION BUNDLE 5
TABLE OF CONTENTS
Page
ARTICLE 1 – DEFINITIONS; RFP DOCUMENTS
ARTICLE 2 – PRE-PROPOSAL CONFERENCE
ARTICLE 3 – PROPOSER’S REPRESENTATIONS
ARTICLE 4 – EXAMINATION OF SITE AND SITE-RELATED DOCUMENTS; OWNER’S SAFETY
PROGRAM; OTHER WORK AT THE SITE
ARTICLE 5 – INTERPRETATIONS AND ADDENDA
ARTICLE 6 – TECHNICAL PROPOSAL
ARTICLE 7 – PRICE PROPOSAL
ARTICLE 8 – PROPOSAL SECURITY
ARTICLE 9 – CONTRACT TIMES
ARTICLE 10 – LIQUIDATED DAMAGES
ARTICLE 11 – FORMAL REQUIREMENTS
ARTICLE 12 – SUBCONTRACTORS, DESIGN PROFESSIONALS, SUPPLIERS, AND OTHERS .. 10
ARTICLE 13 – SUBMITTAL OF PROPOSALS
ARTICLE 14 – MODIFICATION AND WITHDRAWAL OF PROPOSAL
ARTICLE 15 – OPENING OF PROPOSALS
ARTICLE 16 – PROPOSALS TO REMAIN SUBJECT TO ACCEPTANCE
ARTICLE 17 – INTERVIEWS WITH PROPOSERS
ARTICLE 18 – EVALUATION OF PROPOSALS
ARTICLE 19 – REJECTION OF ALL PROPOSALS; DISCREPANCIES
ARTICLE 20 – AWARD OF CONTRACT
ARTICLE 21 – BONDS AND INSURANCE
ARTICLE 22 – SIGNING OF AGREEMENT
ARTICLE 23 – PROPOSAL COMPENSATION (NOT USED)
ARTICLE 24 – SALES AND USE TAXES
ARTICLE 1 – OWNER AND PROPOSER
ARTICLE 2 – ATTACHMENTS TO THIS PROPOSAL
ARTICLE 3 – PROPOSAL PRICE
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved Page ii
ARTICLE 4 – TIME OF COMPLETION
ARTICLE 5 – PROPOSER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD, INSTRUCTIONS,
AND RECEIPT OF ADDENDA
ARTICLE 6 – PROPOSER’S REPRESENTATIONS AND CERTIFICATIONS
CORPORATE CERTIFICATE FORM
CONTRACTOR AFFIDAVIT AND AGREEMENT
SUBCONTRACTOR AFFIDAVIT
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved Page i
REQUEST FOR PROPOSALS
PROGRESSIVE DESIGN-BUILD SERVICES FOR THE
SPLOST IX TRANSPORTATION BUNDLE 5
ARTICLE 1 – DEFINITIONS; RFP DOCUMENTS
1.01 Definitions
A. Terms used in this Request for Proposals (RFP) have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms have the meanings indicated below:
1. Issuing Office: The office from which the RFP Documents are to be issued.
2. RFP Documents: This Request for Proposals; and any forms, Project information, technical information, site information, budget information, proposed Contract Documents, or other documents issued with or incorporated by the RFP.
3. Proposer: An entity that submits a Proposal to Owner.
4. Euna Solutions: Forsyth County utilizes the Euna Solutions (formerly known as Bonfire) as its official electronic procurement portal. All current solicitations and associated documents are available through this system.
5. Bundle 5: Term used to describe a package of one (1) individual project.
• Old Atlanta Road Safety Improvements (Corridor Safety and Operational Improvement - PERS1).
B. In addition to terms specifically defined, terms with initial capital letters in the RFP include references to identified articles and paragraphs, and the titles of other documents or forms.
1.02 Obtaining and Using RFP Documents
A. The RFP Documents may be viewed and obtained online through Euna Solutions at https://forsythco.bonfirehub.com/opportunities/236959. Following registration, complete sets of RFP Documents may be downloaded from the Issuing Office’s website as portable document format (PDF) files.
B. Proposers must use complete sets of RFP Documents in preparing the Proposal. Neither Owner nor Owner’s Consultant (if any) assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of RFP Documents.
C. Copies of RFP Documents available on the above terms are only for the purpose of obtaining Proposals and do not confer a license or grant to Proposers for any other use.
ARTICLE 2 – PRE-PROPOSAL CONFERENCE
2.01 Date, Location, and Terms of Pre-Proposal Conference
A. A non-mandatory Pre-Proposal conference will be held through Teams at the time indicated in the Advertisement. Representatives of Owner and Owner’s Consultant will be present to discuss the Project. Proposers are encouraged to attend and participate in the conference;
however, attendance at this conference is not required to submit a Proposal.
https://forsythco.bonfirehub.com/opportunities/236959
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved Page ii
B. Information presented at the Pre-Proposal conference does not alter the RFP Documents.
Issuing Office will issue Addenda to make any changes to the RFP. Information presented, and statements made at the Pre-Proposal conference will not be binding or legally effective unless incorporated in an Addendum.
ARTICLE 3 – PROPOSER’S REPRESENTATIONS
3.01 Representations: It is the responsibility of each Proposer before submitting a Proposal to:
A. Examine and carefully study the RFP Documents, and any data and reference items identified in the RFP Documents.
B. Visit the Site(s), conduct a thorough, alert visual examination of the Site(s) and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work. See Article 4 for more information, including Site access limitations.
C. Become familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site, and all drawings of physical conditions relating to existing surface or subsurface structures at the Site, if any, that Owner has identified or made available to Proposer, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that Owner has identified or made available to Proposer, especially with respect to Technical Data in such reports and drawings.
E. Consider the information known to Proposer itself, and to members of Proposer’s design-build team; information commonly known to design professionals, design-builders, and contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the RFP Documents; and the Site-related reports and drawings (if any) identified in the RFP Documents or otherwise made available to Proposer, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the project design; (3) the means, methods, techniques, sequences, and procedures of construction to be employed by Proposer; and (4) Proposer’s safety precautions and programs.
F. Agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Proposal no further examinations, investigations, explorations, tests, studies, or data are necessary for the preparation of its Proposal for performance of the Work at the prices stated and within the times required, and in accordance with the other terms and conditions of the RFP Documents.
G. Become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the RFP Documents.
H. Promptly give Owner written notice of all conflicts, errors, ambiguities, or discrepancies that Proposer discovers in the RFP Documents, and confirm that the written response from Owner is acceptable to Proposer.
I. Determine that the RFP Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work.
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved Page iii
J. Agree that the submission of a Proposal will constitute an incontrovertible representation by Proposer that Proposer has complied with every requirement of this Article, that without exception the Proposal and all prices in the Proposal are premised upon performing and furnishing the Work required by the RFP Documents.
ARTICLE 4 – BY SUBMISSION OF A PROPOSAL, PROPOSER REPRESENTS THAT NEITHER IT NOR ANY
AFFILIATED ENTITY HAS PARTICIPATED IN THE PLANNING, PRELIMINARY DESIGN, OR OTHER
DEVELOPMENTAL ACTIVITIES RELATED TO THIS PROJECT. FIRMS WITH SUCH PRIOR INVOLVEMENT ARE
DISQUALIFIED FROM PARTICIPATION. EXAMINATION OF SITE AND SITE-RELATED DOCUMENTS;
OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE
4.01 Site and Other Areas
A. The Site is identified in the RFP Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished, or to be furnished, by Owner for the use of the Design- Builder. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Design-Builder.
1. Right-of-Way (ROW) has not been acquired. Owner will acquire needed ROW prior to the Completion Stage.
4.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions.
1. The Supplementary Conditions identify:
a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.
b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).
c. reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any Proposer on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Proposer is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Proposer is responsible for any interpretation or conclusion Proposer draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Information and data shown or indicated in the RFP Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract Documents. No utility information has been furnished to Owner by owners of such Underground Facilities.
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved Page iv
C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Proposers with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the RFP Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Proposers with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.
4.03 Site Visit and Testing by Proposers
A. The SPLOST IX Transportation Bundle 5 consists of one (1) project:
• Old Atlanta Road Safety Improvements (Corridor Safety and Operational Improvement - PERS1).
Site visits, though encouraged, are not required and right of entry to private properties has not yet been secured by Owner.
B. Proposer is not required to conduct any Pre-Proposal Site subsurface testing, or exhaustive investigations of Site conditions.
C. On request to the extent Owner has control over the Site, schedule permitting, the Owner will provide Proposer access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Proposer deems necessary for preparing and submitting a successful Proposal. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.
D. Proposer shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Proposer shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
4.04 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. As the General Conditions indicate, if an Owner safety program exists, it will be noted in the Supplementary Conditions.
4.05 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these RFP Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Proposer access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved Page v
ARTICLE 5 – INTERPRETATIONS AND ADDENDA
5.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Proposal Documents.
5.02 Proposer shall submit all questions about the meaning or intent of the Proposal Documents to the Issuing Office in writing via the Euna Solutions. Contact information and submittal procedures for such questions are as follows:
• It is the sole responsibility of each Proposer to notify the Issuing Office utilizing the question/answer feature provided in Euna Solutions and request modification or clarification of any ambiguity, conflict, discrepancy, omission, or other error discovered in this competitive solicitation.
• All questions and requests for information submitted through Euna Solutions will be addressed by written Addendum issued by the Issuing Office and posted to Euna Solutions.
• All addenda are a part of the competitive solicitation documents, and each Proposer will be bound by such addenda. It is the responsibility of each Proposer to read and comprehend all addenda issued.
5.03 Interpretations or clarifications considered necessary by the Issuing Office in response to such questions will be issued by Addenda via the Euna Solutions. Questions received less than five (5) days prior to the date for opening of Proposals may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
ARTICLE 6 – TECHNICAL PROPOSAL
6.01 Technical Proposal Criteria
A. Proposer shall submit a Technical Proposal that meets the following criteria:
1. Submission Format
The Proposal must not exceed 40 total pages (8 ½ x 11 or 11x17 where allowed, with 1 inch or greater margins, excluding table of contents, front and back covers, title pages/separation tabs, resumes, required forms and appendices. Eleven-point (11) font or larger must be used for text content.
2. Submission Content
The content requirements set forth in this RFP represent the minimum content requirements for the RFP. It is the Proposer’s responsibility to include information in its RFP to present all relevant qualifications and other materials. The RFP, however, should not contain standard marketing or other general materials. It is the Proposer’s responsibility to modify such materials so that only directly relevant information is included in the RFP.
The Technical Proposal must include the following information in the order below:
• Part 1 - Transmittal Letter,
• Part 2 – Project Understanding, Technical Approach, and Quality Control,
• Part 3 – Experience and Capabilities of Key Personnel, including Principal-in- Charge (PIC), Project Manager (PM), Survey Lead, Constructability Lead, Drainage Design Lead, Utility Coordination Lead, Construction Superintendent, and
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved Page vi
Construction Safety Representative (up to three [3]pages allowed, resumes not included in page count)
• Part 4 – Proposer’s Experience and Capabilities
• Part 5 – Preliminary Stage Schedule (up to three [3] 11”x17” pages allowed)
• Part 6– Acknowledgement that the Proposer will sign the form of Agreement and the form of Payment and Performance Bonds included in this RFP
3. Technical Proposal
Part 1 - Transmittal Letter Proposer must submit a transmittal letter on the Proposer’s letterhead. The transmittal letter must be signed by a representative of the Proposer who is authorized to sign such material and to commit the Proposer to the representations and obligations contained in the Proposal. The transmittal letter must include the name, address, phone number and e- mail address for the Proposer’s Contact and must specify who would be the Proposer’s proper, legal signatory to any contract documents executed with the Owner. State whether your firm and engineering/design firm have been involved in any litigation within the past five (5) years arising out of Proposer’s performance.
Part 2 – Project Understanding, Technical Approach, and Quality Control Provide description of the Proposer’s approach for managing and delivering the Project during Preliminary Stage and Completion Stage that will satisfy the Owner’s objectives for this Project. The following items should be addressed:
• Identify the work components critical to the Project’s success and how these components would be achieved.
• Describe any potential challenges (if any) and how they will be mitigated.
• Describe any innovative approaches (if any) the Proposal may implement to enhance delivery of this project.
• Provide a schedule and discussion identifying the major milestones of the Proposer’s Progressive Design Build Approach to provide a preliminary schedule to meet the Preliminary Stage Services, Guaranteed Maximum Price (GMP) development objectives, and the Completion Stage.
• Discuss how a collaborative relationship with the Owner would be established and maintained during the Preliminary Stage Services for design development, scheduling, and cost estimating and in the Completion Stage Services.
• Discuss how the design and construction processes will interface, including how Value Engineering and constructability issues will be addressed.
• Provide a description on cost model development leading up to formal cost estimate submittals, including the use of an open book cost estimation process and establishment of a proposed GMP.
• Discuss how key risk factors will be identified and addressed throughout the Preliminary and Completion Stages of the project.
• Provide a narrative of the Proposer’s safety approach.
• Provide a summary of the plans/actions to provide quality control and quality assurance throughout the Preliminary and Completion Stages of the Project.
• Discuss how the construction project will be managed , challenges this may present, and how resource constraints will be addressed.
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved Page vii
Part 3 – Experience and Capabilities of Key Personnel Submit a description of the Proposer’s Team identifying all entity members, subconsultants, the anticipated legal relationship among the Prime Team Members (for example, partners, shareholders, client-consultant, etc.), clearly defined and articulated decision-making bodies, and Prime Entity Members’ roles and responsibilities for the key functions. Provide information for the design and construction phases of the project.
Submit an organizational chart (up to three (3) 11”x17” pages allowed) to illustrate how the key team personnel and the firms will function together and the reporting structure. If subconsultants and subcontractors are not yet known, list the type of subconsultants and subcontractors. In the organizational chart, illustrate how each type of subcontractor or subconsultant fits into the team. If not named, Owner retains the right to approve subcontractors and subconsultants. Resumes for any added personnel should be included.
Key Team Personnel including Principal-in-Charge (PIC), Project Manager (PM), Survey Lead, Constructability Lead, Drainage Design Lead, Utility Coordination Lead, Construction Superintendent, and Construction Safety Representative. Indicate any shared resources, if applicable.
Personnel Experience (limit 1 page per person, excluded from overall page count) – Please submit resumes for identified key team personnel. After the RFP step and selection of the Design-Builder entity, changes in Design-Builder entity key members will require prior written approval from the Owner.
Part 4 – Proposer’s Experience and Capabilities Provide a description of the Proposer’s experience, specifically as the Lead Contractor, with at least four (4) transportation projects of similar scope completed within the last seven (7) years. (Design-Builder must self-perform at least thirty (30) percent of the project.) For each firm, provide:
1. Firm name and role
2. Description of relevant transportation project experience
3. Summary of qualifications and capabilities related to similar roadway or pedestrian improvements.
Part 5 – Schedule Provide a detailed project schedule (up to three (3) 11”x17” pages allowed) and critical path analysis illustrating key project milestones, decision deadlines, including Owner review and approval timeframes, construction packages, equipment lead times and other schedule drivers.
Part 6 – Acknowledgement Provide acknowledgement (1 page) that the Proposer will sign the form of Agreement and the form of Payment and Performance Bonds included in this RFP.
6.02 Ownership Rights
A. An unsuccessful Proposer shall retain an ownership and property interest in the Technical Proposal. Owner may retain a record copy for information purposes. Such documents are not intended or represented to be suitable for use or reuse by Owner or others on the Project
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved Page viii or on any other project. Any such use or reuse will be at Owner’s sole risk and without liability or legal exposure to unsuccessful Proposer.
6.03 Deviations from Conceptual Documents
A. Technical Proposals may include deviations from the Conceptual Documents provided that such deviations are called to the Owner’s attention in a clear, express manner.
6.04 Evaluation of Technical Proposals
A. The Proposals will be reviewed and evaluated by the Owner’s selection committee according to the requirements and criteria outlined in this Section. The Owner may require that any Proposer that submitted a Proposal reasonably susceptible of being selected for award participate in discussions, negotiations and revisions.
B. Responsiveness: Each Proposal will be reviewed to determine whether it is responsive to the RFP. Failure to comply with the requirements of this RFP may result in a Proposal being rejected as non-responsive.
C. Evaluation Criteria: The selection committee will evaluate and rank the responsive Proposals by applying the weighted comparative evaluation criteria set forth in the table below.
Proposal Section Points
Required Forms (Section 2.01 of Proposal Form) Pass/Fail
Transmittal Letter Pass/Fail
Project Understanding, Technical Approach, and Quality Control
Key Personnel Experience and Capabilities 20
Proposer Experience and Capabilities 25
Schedule 15
Price Proposal 10
Total 100
In ranking the Proposals, the selection committee will utilize a 100-point scale. The committee will apply the non-price evaluation and complete its awarding of the non-price criteria points before opening the separately sealed file containing the Price Proposal.
D. Selection: After the evaluation process is complete, the Owner will notify Proposers of the Proposal recommended for award of the Project.
6.05 Authority
A. This solicitation is issued pursuant to O.C.G.A. § 32-4-74 and the Forsyth County Board of Commissioners Resolution adopted February 5, 2026, authorizing the use of the design-build delivery method for transportation projects. This is being conducted as a one-step Request for Proposals utilizing a best value selection process with weighted technical and cost components.
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved Page ix
ARTICLE 7 – PRICE PROPOSAL
7.01 Stipulated Price
A. Proposers shall submit a Price Proposal on a stipulated price (lump sum) basis as set forth in the Price Proposal Form for the base price for Preliminary Stage Work for the following project:
• Old Atlanta Road Safety Improvements (Corridor Safety and Operational Improvement -
PERS1).
7.02 Cost-Plus-Fee Price Proposals
A. Proposers shall submit a Price Proposal for the Design-Builder’s fee, which shall be in addition to compensation for Cost of the Work, for the Completion Stage for the following project.
• Old Atlanta Road Safety Improvements (Corridor Safety and Operational Improvement -
PERS1).
Such fee shall be percentages of categories of costs, as set forth in the Price Proposal Form.
1. If the Design-Builder’s fee, as set forth in the Price Proposal Form, is to be based on percentages of categories of cost, Proposers shall enter a maximum amount limiting the total fee if required by the Price Proposal Form to do so.
ARTICLE 8 – PROPOSAL SECURITY
8.01 Each Proposer shall furnish Proposal security made payable to Owner in an amount equal to five percent (5%) of the Proposer’s total Price Proposal and in the form of a Surety Bond (on the form attached) issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions.
The Proposal security shall be submitted with the Proposal but shall not be included within the separately sealed Price Proposal file. Failure to submit the required Proposal security in the manner specified may result in the Proposal being deemed non-responsive.
8.02 The proposal guaranty of the lowest reliable Proposer will be retained until such Proposer has executed the Agreement, furnished all required contract security, and satisfied all conditions of the Notice of Award. If the lowest reliable Proposer fails to execute and deliver the Agreement and furnish required contract security within ten (10) days after issuance of the Notice of Award, the County may annul the Notice of Award and the proposal guaranty shall be forfeited. If no contract award is made within thirty (30) days after the date set for the opening of Proposals, all Proposals shall be rejected and all proposal guaranties shall be returned, unless the County and the lowest reliable Proposer agree in writing to a longer period of time.
8.03 A proposal guaranty will be returned to a Proposer upon receipt by the County of the Proposer’s written withdrawal of its Proposal, provided such receipt occurs prior to the time scheduled for opening of Proposals. Upon determination of the lowest reliable Proposer, the County will return the proposal guaranties to all other Proposers.
ARTICLE 9 – CONTRACT TIMES
9.01 Completion of the Work
A. The number of days within which, or the dates by which, the Work is to be completed, are set forth in the Agreement.
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved Page x
ARTICLE 10 – LIQUIDATED DAMAGES
10.01 Late Completion
A. Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement, the form of which is included as a part of the Project solicitation documents.
ARTICLE 11 – FORMAL REQUIREMENTS
11.01 Proposal Execution Requirements
A. A Proposal by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign.
The corporate address and state of incorporation shall be shown.
B. A Proposal by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown.
C. A Proposal by an individual shall show the Proposer’s name and official address.
D. A Proposal by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Proposal Form. The official address of the joint venture shall be shown.
E. All names shall be printed below the signatures.
F. The Proposal shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Proposal Form.
G. Postal and e-mail addresses and telephone number for communications regarding the Proposal shall be shown.
ARTICLE 12 – SUBCONTRACTORS, DESIGN PROFESSIONALS, SUPPLIERS, AND OTHERS
12.01 Subcontractors and Suppliers
A. Proposer must submit a list of Subcontractors and Suppliers as required herein.
12.02 Minimum Self Performance Requirement
A. In accordance with O.C.G.A. § 32-4-74 and the Forsyth County Design-Build Resolution, the successful Design-Builder shall self-perform not less than thirty percent (30%) of the total Construction Work, excluding design services. Self-performance shall be measured based on the value of the Construction Work performed directly by the Design-Builder and its employees. The Design-Builder shall identify in its Proposal the anticipated portions of the Work to be self-performed.
ARTICLE 13 – SUBMITTAL OF PROPOSALS
13.01 Proposals, including all their component parts, shall be submitted via the Euna Solutions no later than the date and time specified in the Advertisement. No paper proposals shall be considered.
13.02 Each Proposer assumes full responsibility for timely submission of its Proposal. The Price Proposal shall be submitted in a separately sealed file in the Euna Solutions. The Proposal shall be accompanied by the Proposal Security and other required documents.
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved Page xi
ARTICLE 14 – MODIFICATION AND WITHDRAWAL OF PROPOSAL
14.01 A Proposal may be modified or withdrawn prior to the date and time established in the Proposal Documents for the receipt for proposals; however, no oral modifications will be allowed. The Proposal Security will be returned or released to a Proponent upon receipt by the Owner of the Proponent’s written withdrawal of its proposal if such receipt is before the time scheduled for the opening of proposals.
14.02 If a Proposer wishes to modify its Proposal prior to the submission deadline, Proposer must withdraw its initial Proposal in the manner specified in Paragraph 14.01 of this Article and submit a new Proposal prior to the date and time established in the solicitation documents. Modifications shall not be allowed following the submission deadline.
14.03 If within 24 hours after Proposals are opened any Proposer files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Proposal, that Proposer may withdraw its Proposal, and the Proposal Security will be returned.
ARTICLE 15 – OPENING OF PROPOSALS
15.01 Proposals will be opened at the time and place specified in the Advertisement. Only the names of the Proposers will be read aloud.
ARTICLE 16 – PROPOSALS TO REMAIN SUBJECT TO ACCEPTANCE
16.01 All Proposals will remain subject to acceptance for the period of time stated in the Proposal Form, but Owner may, in its sole discretion, release any Proposal and return the Proposal Security prior to the end of that period.
ARTICLE 17 – INTERVIEWS WITH PROPOSERS
17.01 Interviews
A. Interviews may be scheduled for this RFP solicitation.
ARTICLE 18 – EVALUATION OF PROPOSALS
18.01 Technical Proposals: The procedures applicable to evaluating and scoring the Technical Proposal are set forth in Article 6 of this RFP.
18.02 Price Proposals: For purposes of price evaluation and scoring only, the County will calculate an Evaluated Price for each Proposal using the following formula:
Evaluated Price = Proposed Preliminary Stage Price + (County Construction Cost Estimate x Proposed Completion State Fee Percentage)
The procedures applicable to evaluate and rank the Price Proposals are as follows:
Cost Scoring Formula: L/R x P = Z
• Where L = Price of the Proposer’s response for Bundle 5 project with the lowest cost.
• Where R = Total cost for Bundle 5 project of the Proposal being ranked.
• Where P = Total points available for cost scoring.
• Where Z = Assigned points.
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved Page xii
18.03 Accounting for Technical Proposal and Price Proposal: An evaluation of the submitted information by a committee in accordance with the scoring criteria outlined in Article 6.04.
18.04 In evaluating a Proposal, Owner may consider whether the Proposal complies with the RFP and includes any prescribed documents and other data requested in the RFP.
18.05 Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Proposal and to establish the responsibility, qualifications, and financial ability of Proposers and proposed engineers, project design professionals, construction subcontractors, suppliers, and other individuals and entities to perform and furnish the Work in accordance with the Contract Documents.
ARTICLE 19 – REJECTION OF ALL PROPOSALS; DISCREPANCIES
19.01 Owner reserves the right to reject any or all Proposals, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Proposals. Owner will reject the Proposal of any Proposer that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Proposer purports to add terms or conditions to its Proposal, takes exception to any provision of the RFP Documents, or attempts to alter the contents of the Contract Documents for purposes of the Proposal, then the Owner may reject the Proposal as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving qualifications, price, time, or changes in the Work.
ARTICLE 20 – AWARD OF CONTRACT
20.01 If the Contract is awarded, Owner will award the Contract to the Proposer whose Proposal is in the best interests of the Project, and pursuant to the procedures set forth in this RFP.
20.02 If the Contract is awarded, Owner will give Successful Proposer a Notice of Award within 90 days after the day of the Proposal opening.
ARTICLE 21 – BONDS AND INSURANCE
21.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Design-Builder’s requirements as to performance and payment bonds and insurance. When the Successful Proposer delivers the executed Agreement to Owner, it must be accompanied by the required Bonds.
ARTICLE 22 – SIGNING OF AGREEMENT
22.01 When Owner issues a Notice of Award to the Successful Proposer, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within ten (10) business days thereafter, Successful Proposer shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to Owner.
ARTICLE 23 – PROPOSAL COMPENSATION (NOT USED)
ARTICLE 24 – SALES AND USE TAXES
Proposer must include in their proposal all sales, consumer, use and other similar taxes required to be paid in accordance with the Laws and Regulations applicable during the performance of the Work. Forsyth County is exempt from taxes, but the successful Proposer shall pay all taxes required by law. Forsyth County cannot exempt others from tax.
PROPOSAL FORM
The terms used in this Proposal with initial capital letters have the meanings stated in the Request for Proposals, the General Conditions, and the Supplementary Conditions.
ARTICLE 1 – OWNER AND PROPOSER
1.01 This Proposal is submitted electronically via Euna Solutions Bonfire.
1.02 The undersigned Proposer proposes and agrees, if this Proposal is accepted, to enter into an Agreement with Owner in the form included in the RFP Documents, to perform all Work as specified or indicated in the RFP for the prices and within the times indicated in this Proposal, and in accordance with the other terms and conditions of the RFP.
ARTICLE 2 – ATTACHMENTS TO THIS PROPOSAL
2.01 The following documents are submitted with and made a condition of this Proposal:
A. Required Proposal Security
B. List of Proposed Subcontractors and qualifications
C. List of Proposed Suppliers and qualifications
D. Evidence of authority to conduct business in the State of Georgia; or a written covenant to obtain such authority within the time for acceptance of Proposals
E. Corporate Certificate Form
F. Non-Collusion Affidavit
G. Contractor Affidavit and Agreement
H. Subcontractor Affidavit
ARTICLE 3 – PROPOSAL PRICE
3.01 The Price Proposal Form is submitted in a separate file in Euna Solutions.
ARTICLE 4 – TIME OF COMPLETION
4.01 Proposer agrees that the Work will be completed as follows:
A. Design-Builder shall complete the Work under the Preliminary Stage as indicated below for each project:
1. Old Atlanta Road Safety Improvements (Corridor Safety and Operational Improvement
- PERS1): not to exceed 150 calendar days after issuance of Notice to Proceed.
B. The Work under the Completion Stage will be substantially completed as indicated below for each project:
1. Old Atlanta Road Safety Improvements (Corridor Safety and Operational Improvement
- PERS1): not to exceed 240 calendar days after Owner approves a binding Completion Stage Price and issues a Notice to Proceed for Completion Stage Work.
https://forsythco.bonfirehub.com/portal/?tab=openOpportunities
4.02 Proposer accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 5 – PROPOSER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD, INSTRUCTIONS, AND RECEIPT
OF ADDENDA
5.01 Proposal Acceptance Period
A. This Proposal will remain subject to acceptance for 90 days after the Proposal opening, or for such longer period of time that Proposer may agree to in writing upon request of Owner.
5.02 Proposal Acceptance Period
A. Proposer accepts all of the terms and conditions of the RFP, including without limitation those dealing with the disposition of Proposal Security.
5.03 Receipt of Addenda
A. Proposer hereby acknowledges receipt of the following Addenda:
Addendum Number Addendum Date
ARTICLE 6 – PROPOSER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Proposer’s Representations
A. In submitting this Proposal, Proposer represents the following:
1. Proposer has examined and carefully studied the RFP Documents, including Addenda, and any data and reference items identified in the RFP Documents.
2. Proposer has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
3. Proposer is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.
4. Proposer has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, with respect to the Technical Data in such reports and drawings.
5. Proposer has carefully studied the reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, with respect to Technical Data in such reports and drawings.
6. Proposer has considered the information known to Proposer itself; and to members of Proposer’s design-build team; information commonly known to design professionals, design-builders, and contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the RFP Documents; and the Site-related reports and drawings (if any) identified in the RFP Documents or otherwise made available to Proposer, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the project design, (3) the means, methods, techniques, sequences, and procedures of construction to be employed by Proposer, if selected as Design-Builder; and (4) Proposer’s (Design- Builder’s) safety precautions and programs.
7. Based on the information and observations referred to in the preceding paragraph, Proposer agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the preparation of its Proposal for performance of the Work at the prices stated and the times required, and in accordance with the other terms and conditions of the RFP Documents.
8. Proposer is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the RFP Documents.
9. Proposer has given Owner written notice of all conflicts, errors, ambiguities, or discrepancies that Proposer has discovered in the RFP Documents, and of discrepancies between Site conditions and the RFP Documents, and the written resolution thereof by Owner is acceptable to Proposer.
10. The RFP Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
11. The submission of this Proposal constitutes an incontrovertible representation by Proposer that Proposer has complied with every requirement of the RFP Documents, that without exception the Proposal and all prices in the Proposal are premised upon performing and furnishing the Work required by the RFP Documents.
6.02 Any entity that has participated in the planning, preliminary design, or other development of this Project is not eligible to submit a Proposal or participate as a member of a proposing team.
Proposer’s Certifications
B. The Proposer certifies the following:
1. This Proposal is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation.
2. Proposer has not directly or indirectly induced or solicited any other Proposer to submit a false or sham Proposal.
3. Proposer has not solicited or induced any individual or entity to refrain from proposing.
4. Proposer has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 6.02.A:
a. Corrupt practice means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the proposal process.
b. Fraudulent practice means an intentional misrepresentation of facts made (a) to influence the proposing process to the detriment of Owner, (b) to establish proposal prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition.
c. Collusive practice means a scheme or arrangement between two or more Proposers, with or without the knowledge of Owner, a purpose of which is to establish proposal prices at artificial, non-competitive levels.
d. Coercive practice means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the proposing process or affect the execution of the Contract.
PROPOSER hereby submits this Proposal as set forth above:
Proposer:
(typed or printed name of organization)
By:
(individual’s signature)
Name:
(typed or printed)
Title:
Date:
If Proposer is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.
Attest:
(individual’s signature)
Date:
Address for giving notices:
Proposer’s Contact:
Phone:
Email:
Address:
Proposer’s Contractor License No.: (if applicable)
Price Proposal Form
[legal name of Progressive Design/Builder]
[address of Progressive Design/Builder]
[federal taxpayer identification number]
A. Preliminary Stage
Progressive Design/Builder’s proposed Preliminary Stage stipulated price including all costs, overhead and profit is:
1. Preliminary Stage Price for 1. Old Atlanta Road Safety Improvements (Corridor Safety and Operational Improvement - PERS1)
Category Compensation Method Amount
Study and Report Phase Stipulated Price $
Preliminary Technical Documents Stipulated Price $
Construction Planning Stipulated Price $
Total: Preliminary Stage Price (PERS1)
Preliminary Stage Total :
___________________________________________________________dollars ($_________________)
B. Completion Stage
The Progressive Design-Builder Completion Stage Fee Percentage shall include the following costs, which shall not be charged as a Cost of the Work:
a. All profit of the Design-Builder for this project phase; and
b. All regional and home office overhead expenses.
Progressive Design-Builder’s proposed fee, expressed as a percentage of the Cost of the
Work, for all Completion Stage Services is _____%.
By submission of the Price Proposal Design-Builder represents and warrants that the Design-Builder has read and understands the RFP and all attachments and appendices and this Price Proposal is made in accordance to all included requirements as stated.
Respectfully, [typed name of Design/Builder]
By: [seal] [signature]
[typed name and title]
[address of Design-Builder]
[business telephone number]
[date of execution]
PROPOSAL SECURITY (BOND)
Proposer Surety
Name: Name:
Address (principal place of business): Address (principal place of business):
Owner RFP
Name: Forsyth County, Georgia Project (name and location):
Address (principal place of business): SPLOST IX Transportation Bundle 5: 1. Old Atlanta Road Safety Improvements (Corridor Safety and Operational Improvement - PERS1).
2435 Freedom Parkway Suite 4100 Cumming, GA 30041
RFP Due Date: July 9, 2026
Bond
Penal Sum:
Date of Bond:
Surety and Proposer, intending to be legally bound hereby, subject to the terms set forth in this Proposal Bond, do each cause this Proposal Bond to be duly executed by an authorized officer, agent, or representative.
Proposer Surety
(Full formal name of Proposer) (Full formal name of Surety) (corporate seal)
By: By:
(Signature) (Signature) (Attach Power of Attorney)
Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Attest: Attest:
(Signature) (Signature)
Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Notes: (1) Note: Addresses are to be used for giving any required notice. (2) Provide execution by any additional parties, such as joint venturers, if necessary.
1. Proposer and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Proposer the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Proposer’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond will be Owner’s sole and exclusive remedy upon default of Proposer.
2. Default of Proposer occurs upon the failure of Proposer to deliver within the time required by the RFP Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the RFP Documents and any performance and payment bonds required by the RFP Documents.
3. This obligation will be null and void if:
3.1. Owner accepts Proposer’s…