TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
Closed Solicitation Posted
- Solicitation number
- FA813726R0025
- Agency
-
Air Force Sustainment Center
Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Tinker AFB, Oklahoma 73145, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Materiel Command at Tinker Air Force Base seeks replacement of electrical switchgear in Building 1, with proposals due July 10, 2026. This is a total small business set-aside restricted exclusively to Small Business MAC BOA (Multiple Award Contract Blanket Order Agreement) holders that attended the mandatory site visit on May 14, 2026.
Place of performance is Tinker Air Force Base, Building 1, Oklahoma City, Oklahoma. The project involves demolition of existing 480V and 208V unit substations and installation of new switchgear equipment: a 2500A, 480Y/277V main switchgear enclosure fed from the existing 1500 kVA OG&E transformer, a 500 kVA step-down transformer (480V to 208V/120V), and a new 1600A, 208V switchgear enclosure with two replacement 600A panelboards. Work must comply with 2026 Tinker AFB Electrical Standards, NFPA 70, UFC standards, and IBC 2024. The project location is the electrical equipment room within the 1,130-square-foot mechanical/electrical space with an occupant load of three persons.
Contractor performance period is 180 calendar days from notice to proceed. The estimated project value is below $25 million, with firm fixed-price contract award. The contract includes Clause 52.228-1 (Bid Guarantee) at 20 percent of bid price or $500,344.09, whichever is less, due within 10 calendar days of award. Performance and payment bonds are required within 10 calendar days after award. Normal working hours are 0700 to 1600, Monday through Friday, with weekend and after-hours work available upon approval. All coordination with OG&E and facility personnel requires 21 days' advance notice for utility outages.
Evaluation uses Lowest Priced Technically Acceptable (LPTA) source selection with award to the lowest-priced proposal meeting technical acceptability. Technical evaluation requires "Acceptable" ratings on Capability and Management (demonstrating on-site management team, sole source responsibility, and subcontractor coordination) and Schedule and Planning (realistic construction schedule meeting the mandatory completion date). The NAICS code is 236220, Commercial and Institutional Building Construction; PSC is Z2AA, Repair or Alteration of Office Buildings. Liquidated damages are $227.75 per calendar day of delay. All contractor personnel require base identification and potentially Common Access Cards for facility access. Final 10 percent of contract value is reserved until closeout items and punch list items are resolved and final inspection is completed.
Notice text
11 versions
Update #11 · Latest ·
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 06 July 2026
Description of update:
Amendment FA813726R00250005 has been officially added to the Attachments/Links section of this solicitation. The primary purpose of this amendment is to clarify, verify, and update the Contract Line Item Number (CLIN) titles.
Accordingly, the proposal submission deadline has been extended to Friday, July 10, 2026. All interested offerors are instructed to thoroughly review the newly uploaded solicitation document and submit updated pricing for both revised CLINs by this deadline
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 23 June 2026
Description of update:
WWYK160073 Repair Fire Riser has been added to the Attachments/Links in reference to the Revised Drawings 06.22.2026; specifically the Sheet SD101 (Keynote #3) and Sheet S101 (Keynote #4) for the overall dimensions and as-built location.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 22 June 2026
Description of update:
Solicitation Amendment FA813726R00250004 has been posted to the Attachments/Links section, extending the proposal due date to July 02, 2026, at 12:00 PM Central Time and to also correct the Titles for CLIN 0001 & 0002. Additionally, the Pre-Bid Revised RFI Govt Response, updated drawings (IFC_Drawings), and the IFC Rev1 Design Analysis have been uploaded and are now available in the Attachments/Links.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 12 June 2026
Description of update:
Solicitation Amendment FA813726R00250003 has been posted to the Attachments/Links section, extending the proposal due date to June 22, 2026, at 12:00 PM Central Time. Additionally, updated drawings (IFC_Drawings) have been uploaded and are now available in the Attachments/Links section.
Please note that the Government’s revised responses to the Pre-Bid RFIs are currently being finalized. We are researching the answer to one final outstanding question and will upload the Revised RFI Govt Response as soon as possible.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 08 June 2026
Description of update:
The Government's responses to the Pre-Bid RFIs have been posted in the Attachments/Links section, along with Attachment 1 and Attachment 2 (referenced in the RFI responses). Question #13 remains under evaluation and will be published as soon as possible. Additionally, a Solicitation Amendment (FA813726R00250002) has been created and added to the Attchments/Links to extend the proposal due date to June 19, 2026 at 12:00pm Central Time.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 03 June 2026
Description of update:
Project RFIs are still being researched for Government responses. Due to the unknown date to post the RFIs the current proposal due date will be extended with a solicitation amendment when the RFIs are posted.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 02 June 2026
Description of update:
The IFC Final Specifications Information have been uploaded and are now available in the Attachments section.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 28 May 2026
Description of update:
This solicitation has been amended to incorporate Clause 52.228-1. Additionally, the IFC Specifications and As-Built Information have been uploaded and are now available in the Attachments section.
The proposal due date remains unchanged: 06/12/2026.
-
Important Note: Contractors experiencing technical issues accessing the IFC Specifications must notify the Contracting Specialist immediately via email to ensure timely resolution.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 22 May 2026
Description of update:
WWYK200051 Switchgear Solicitation Due Date has been updated to 06/12/2026 to match the Solicitation.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 18 May 2026
Description of update:
WWYK200051 Switchgear Specs have been uploaded and attached in the Attachments.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. RFI are still due this upcoming Thursday May 21st at 5:00pm Central Time.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 14 May 2026
Description of update:
All Requests for Information (RFIs) from eligible attendees must be submitted via email to the Contracting Points of Contact no later than 21 May 2026 at 5:00 PM CST.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0025
Project Title: WWYK200051 Replace Switchgear, Bldg 1
Project Location: Tinker AFB - BUILDING 1.
Replace the 3000amp 208Volt switchgear in the center of building 1. There is a 3000amp main and two 600amp feeder breakers.
The estimated project value is below $25M and is restricted to SB MAC BOA holders only.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Current date/time for Initial Site Visit is set for Thursday May 14, 2026 at 10:00 AM Central Time. The location instructions and directions are in the attachments for the Initial Site Visit.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #10 ·
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 23 June 2026
Description of update:
WWYK160073 Repair Fire Riser has been added to the Attachments/Links in reference to the Revised Drawings 06.22.2026; specifically the Sheet SD101 (Keynote #3) and Sheet S101 (Keynote #4) for the overall dimensions and as-built location.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 22 June 2026
Description of update:
Solicitation Amendment FA813726R00250004 has been posted to the Attachments/Links section, extending the proposal due date to July 02, 2026, at 12:00 PM Central Time and to also correct the Titles for CLIN 0001 & 0002. Additionally, the Pre-Bid Revised RFI Govt Response, updated drawings (IFC_Drawings), and the IFC Rev1 Design Analysis have been uploaded and are now available in the Attachments/Links.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 12 June 2026
Description of update:
Solicitation Amendment FA813726R00250003 has been posted to the Attachments/Links section, extending the proposal due date to June 22, 2026, at 12:00 PM Central Time. Additionally, updated drawings (IFC_Drawings) have been uploaded and are now available in the Attachments/Links section.
Please note that the Government’s revised responses to the Pre-Bid RFIs are currently being finalized. We are researching the answer to one final outstanding question and will upload the Revised RFI Govt Response as soon as possible.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 08 June 2026
Description of update:
The Government's responses to the Pre-Bid RFIs have been posted in the Attachments/Links section, along with Attachment 1 and Attachment 2 (referenced in the RFI responses). Question #13 remains under evaluation and will be published as soon as possible. Additionally, a Solicitation Amendment (FA813726R00250002) has been created and added to the Attchments/Links to extend the proposal due date to June 19, 2026 at 12:00pm Central Time.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 03 June 2026
Description of update:
Project RFIs are still being researched for Government responses. Due to the unknown date to post the RFIs the current proposal due date will be extended with a solicitation amendment when the RFIs are posted.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 02 June 2026
Description of update:
The IFC Final Specifications Information have been uploaded and are now available in the Attachments section.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 28 May 2026
Description of update:
This solicitation has been amended to incorporate Clause 52.228-1. Additionally, the IFC Specifications and As-Built Information have been uploaded and are now available in the Attachments section.
The proposal due date remains unchanged: 06/12/2026.
-
Important Note: Contractors experiencing technical issues accessing the IFC Specifications must notify the Contracting Specialist immediately via email to ensure timely resolution.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 22 May 2026
Description of update:
WWYK200051 Switchgear Solicitation Due Date has been updated to 06/12/2026 to match the Solicitation.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 18 May 2026
Description of update:
WWYK200051 Switchgear Specs have been uploaded and attached in the Attachments.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. RFI are still due this upcoming Thursday May 21st at 5:00pm Central Time.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 14 May 2026
Description of update:
All Requests for Information (RFIs) from eligible attendees must be submitted via email to the Contracting Points of Contact no later than 21 May 2026 at 5:00 PM CST.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0025
Project Title: WWYK200051 Replace Switchgear, Bldg 1
Project Location: Tinker AFB - BUILDING 1.
Replace the 3000amp 208Volt switchgear in the center of building 1. There is a 3000amp main and two 600amp feeder breakers.
The estimated project value is below $25M and is restricted to SB MAC BOA holders only.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Current date/time for Initial Site Visit is set for Thursday May 14, 2026 at 10:00 AM Central Time. The location instructions and directions are in the attachments for the Initial Site Visit.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #9 ·
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 22 June 2026
Description of update:
Solicitation Amendment FA813726R00250004 has been posted to the Attachments/Links section, extending the proposal due date to July 02, 2026, at 12:00 PM Central Time and to also correct the Titles for CLIN 0001 & 0002. Additionally, the Pre-Bid Revised RFI Govt Response, updated drawings (IFC_Drawings), and the IFC Rev1 Design Analysis have been uploaded and are now available in the Attachments/Links.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 12 June 2026
Description of update:
Solicitation Amendment FA813726R00250003 has been posted to the Attachments/Links section, extending the proposal due date to June 22, 2026, at 12:00 PM Central Time. Additionally, updated drawings (IFC_Drawings) have been uploaded and are now available in the Attachments/Links section.
Please note that the Government’s revised responses to the Pre-Bid RFIs are currently being finalized. We are researching the answer to one final outstanding question and will upload the Revised RFI Govt Response as soon as possible.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 08 June 2026
Description of update:
The Government's responses to the Pre-Bid RFIs have been posted in the Attachments/Links section, along with Attachment 1 and Attachment 2 (referenced in the RFI responses). Question #13 remains under evaluation and will be published as soon as possible. Additionally, a Solicitation Amendment (FA813726R00250002) has been created and added to the Attchments/Links to extend the proposal due date to June 19, 2026 at 12:00pm Central Time.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 03 June 2026
Description of update:
Project RFIs are still being researched for Government responses. Due to the unknown date to post the RFIs the current proposal due date will be extended with a solicitation amendment when the RFIs are posted.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 02 June 2026
Description of update:
The IFC Final Specifications Information have been uploaded and are now available in the Attachments section.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 28 May 2026
Description of update:
This solicitation has been amended to incorporate Clause 52.228-1. Additionally, the IFC Specifications and As-Built Information have been uploaded and are now available in the Attachments section.
The proposal due date remains unchanged: 06/12/2026.
-
Important Note: Contractors experiencing technical issues accessing the IFC Specifications must notify the Contracting Specialist immediately via email to ensure timely resolution.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 22 May 2026
Description of update:
WWYK200051 Switchgear Solicitation Due Date has been updated to 06/12/2026 to match the Solicitation.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 18 May 2026
Description of update:
WWYK200051 Switchgear Specs have been uploaded and attached in the Attachments.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. RFI are still due this upcoming Thursday May 21st at 5:00pm Central Time.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 14 May 2026
Description of update:
All Requests for Information (RFIs) from eligible attendees must be submitted via email to the Contracting Points of Contact no later than 21 May 2026 at 5:00 PM CST.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0025
Project Title: WWYK200051 Replace Switchgear, Bldg 1
Project Location: Tinker AFB - BUILDING 1.
Replace the 3000amp 208Volt switchgear in the center of building 1. There is a 3000amp main and two 600amp feeder breakers.
The estimated project value is below $25M and is restricted to SB MAC BOA holders only.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Current date/time for Initial Site Visit is set for Thursday May 14, 2026 at 10:00 AM Central Time. The location instructions and directions are in the attachments for the Initial Site Visit.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #8 ·
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 12 June 2026
Description of update:
Solicitation Amendment FA813726R00250003 has been posted to the Attachments/Links section, extending the proposal due date to June 22, 2026, at 12:00 PM Central Time. Additionally, updated drawings (IFC_Drawings) have been uploaded and are now available in the Attachments/Links section.
Please note that the Government’s revised responses to the Pre-Bid RFIs are currently being finalized. We are researching the answer to one final outstanding question and will upload the Revised RFI Govt Response as soon as possible.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 08 June 2026
Description of update:
The Government's responses to the Pre-Bid RFIs have been posted in the Attachments/Links section, along with Attachment 1 and Attachment 2 (referenced in the RFI responses). Question #13 remains under evaluation and will be published as soon as possible. Additionally, a Solicitation Amendment (FA813726R00250002) has been created and added to the Attchments/Links to extend the proposal due date to June 19, 2026 at 12:00pm Central Time.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 03 June 2026
Description of update:
Project RFIs are still being researched for Government responses. Due to the unknown date to post the RFIs the current proposal due date will be extended with a solicitation amendment when the RFIs are posted.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 02 June 2026
Description of update:
The IFC Final Specifications Information have been uploaded and are now available in the Attachments section.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 28 May 2026
Description of update:
This solicitation has been amended to incorporate Clause 52.228-1. Additionally, the IFC Specifications and As-Built Information have been uploaded and are now available in the Attachments section.
The proposal due date remains unchanged: 06/12/2026.
-
Important Note: Contractors experiencing technical issues accessing the IFC Specifications must notify the Contracting Specialist immediately via email to ensure timely resolution.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 22 May 2026
Description of update:
WWYK200051 Switchgear Solicitation Due Date has been updated to 06/12/2026 to match the Solicitation.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 18 May 2026
Description of update:
WWYK200051 Switchgear Specs have been uploaded and attached in the Attachments.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. RFI are still due this upcoming Thursday May 21st at 5:00pm Central Time.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 14 May 2026
Description of update:
All Requests for Information (RFIs) from eligible attendees must be submitted via email to the Contracting Points of Contact no later than 21 May 2026 at 5:00 PM CST.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0025
Project Title: WWYK200051 Replace Switchgear, Bldg 1
Project Location: Tinker AFB - BUILDING 1.
Replace the 3000amp 208Volt switchgear in the center of building 1. There is a 3000amp main and two 600amp feeder breakers.
The estimated project value is below $25M and is restricted to SB MAC BOA holders only.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Current date/time for Initial Site Visit is set for Thursday May 14, 2026 at 10:00 AM Central Time. The location instructions and directions are in the attachments for the Initial Site Visit.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #7 ·
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 08 June 2026
Description of update:
The Government's responses to the Pre-Bid RFIs have been posted in the Attachments/Links section, along with Attachment 1 and Attachment 2 (referenced in the RFI responses). Question #13 remains under evaluation and will be published as soon as possible. Additionally, a Solicitation Amendment (FA813726R00250002) has been created and added to the Attchments/Links to extend the proposal due date to June 19, 2026 at 12:00pm Central Time.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 03 June 2026
Description of update:
Project RFIs are still being researched for Government responses. Due to the unknown date to post the RFIs the current proposal due date will be extended with a solicitation amendment when the RFIs are posted.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 02 June 2026
Description of update:
The IFC Final Specifications Information have been uploaded and are now available in the Attachments section.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 28 May 2026
Description of update:
This solicitation has been amended to incorporate Clause 52.228-1. Additionally, the IFC Specifications and As-Built Information have been uploaded and are now available in the Attachments section.
The proposal due date remains unchanged: 06/12/2026.
-
Important Note: Contractors experiencing technical issues accessing the IFC Specifications must notify the Contracting Specialist immediately via email to ensure timely resolution.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 22 May 2026
Description of update:
WWYK200051 Switchgear Solicitation Due Date has been updated to 06/12/2026 to match the Solicitation.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 18 May 2026
Description of update:
WWYK200051 Switchgear Specs have been uploaded and attached in the Attachments.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. RFI are still due this upcoming Thursday May 21st at 5:00pm Central Time.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 14 May 2026
Description of update:
All Requests for Information (RFIs) from eligible attendees must be submitted via email to the Contracting Points of Contact no later than 21 May 2026 at 5:00 PM CST.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0025
Project Title: WWYK200051 Replace Switchgear, Bldg 1
Project Location: Tinker AFB - BUILDING 1.
Replace the 3000amp 208Volt switchgear in the center of building 1. There is a 3000amp main and two 600amp feeder breakers.
The estimated project value is below $25M and is restricted to SB MAC BOA holders only.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Current date/time for Initial Site Visit is set for Thursday May 14, 2026 at 10:00 AM Central Time. The location instructions and directions are in the attachments for the Initial Site Visit.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #6 ·
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 02 June 2026
Description of update:
The IFC Final Specifications Information have been uploaded and are now available in the Attachments section.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 28 May 2026
Description of update:
This solicitation has been amended to incorporate Clause 52.228-1. Additionally, the IFC Specifications and As-Built Information have been uploaded and are now available in the Attachments section.
The proposal due date remains unchanged: 06/12/2026.
-
Important Note: Contractors experiencing technical issues accessing the IFC Specifications must notify the Contracting Specialist immediately via email to ensure timely resolution.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 22 May 2026
Description of update:
WWYK200051 Switchgear Solicitation Due Date has been updated to 06/12/2026 to match the Solicitation.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 18 May 2026
Description of update:
WWYK200051 Switchgear Specs have been uploaded and attached in the Attachments.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. RFI are still due this upcoming Thursday May 21st at 5:00pm Central Time.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 14 May 2026
Description of update:
All Requests for Information (RFIs) from eligible attendees must be submitted via email to the Contracting Points of Contact no later than 21 May 2026 at 5:00 PM CST.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0025
Project Title: WWYK200051 Replace Switchgear, Bldg 1
Project Location: Tinker AFB - BUILDING 1.
Replace the 3000amp 208Volt switchgear in the center of building 1. There is a 3000amp main and two 600amp feeder breakers.
The estimated project value is below $25M and is restricted to SB MAC BOA holders only.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Current date/time for Initial Site Visit is set for Thursday May 14, 2026 at 10:00 AM Central Time. The location instructions and directions are in the attachments for the Initial Site Visit.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #5 ·
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 28 May 2026
Description of update:
This solicitation has been amended to incorporate Clause 52.228-1. Additionally, the IFC Specifications and As-Built Information have been uploaded and are now available in the Attachments section.
The proposal due date remains unchanged: 06/12/2026.
-
Important Note: Contractors experiencing technical issues accessing the IFC Specifications must notify the Contracting Specialist immediately via email to ensure timely resolution.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 22 May 2026
Description of update:
WWYK200051 Switchgear Solicitation Due Date has been updated to 06/12/2026 to match the Solicitation.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 18 May 2026
Description of update:
WWYK200051 Switchgear Specs have been uploaded and attached in the Attachments.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. RFI are still due this upcoming Thursday May 21st at 5:00pm Central Time.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 14 May 2026
Description of update:
All Requests for Information (RFIs) from eligible attendees must be submitted via email to the Contracting Points of Contact no later than 21 May 2026 at 5:00 PM CST.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0025
Project Title: WWYK200051 Replace Switchgear, Bldg 1
Project Location: Tinker AFB - BUILDING 1.
Replace the 3000amp 208Volt switchgear in the center of building 1. There is a 3000amp main and two 600amp feeder breakers.
The estimated project value is below $25M and is restricted to SB MAC BOA holders only.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Current date/time for Initial Site Visit is set for Thursday May 14, 2026 at 10:00 AM Central Time. The location instructions and directions are in the attachments for the Initial Site Visit.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #4 ·
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 22 May 2026
Description of update:
WWYK200051 Switchgear Solicitation Due Date has been updated to 06/12/2026 to match the Solicitation.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 18 May 2026
Description of update:
WWYK200051 Switchgear Specs have been uploaded and attached in the Attachments.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. RFI are still due this upcoming Thursday May 21st at 5:00pm Central Time.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 14 May 2026
Description of update:
All Requests for Information (RFIs) from eligible attendees must be submitted via email to the Contracting Points of Contact no later than 21 May 2026 at 5:00 PM CST.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0025
Project Title: WWYK200051 Replace Switchgear, Bldg 1
Project Location: Tinker AFB - BUILDING 1.
Replace the 3000amp 208Volt switchgear in the center of building 1. There is a 3000amp main and two 600amp feeder breakers.
The estimated project value is below $25M and is restricted to SB MAC BOA holders only.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Current date/time for Initial Site Visit is set for Thursday May 14, 2026 at 10:00 AM Central Time. The location instructions and directions are in the attachments for the Initial Site Visit.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #3 ·
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 18 May 2026
Description of update:
WWYK200051 Switchgear Specs have been uploaded and attached in the Attachments.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. RFI are still due this upcoming Thursday May 21st at 5:00pm Central Time.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 14 May 2026
Description of update:
All Requests for Information (RFIs) from eligible attendees must be submitted via email to the Contracting Points of Contact no later than 21 May 2026 at 5:00 PM CST.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0025
Project Title: WWYK200051 Replace Switchgear, Bldg 1
Project Location: Tinker AFB - BUILDING 1.
Replace the 3000amp 208Volt switchgear in the center of building 1. There is a 3000amp main and two 600amp feeder breakers.
The estimated project value is below $25M and is restricted to SB MAC BOA holders only.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Current date/time for Initial Site Visit is set for Thursday May 14, 2026 at 10:00 AM Central Time. The location instructions and directions are in the attachments for the Initial Site Visit.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #2 ·
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 14 May 2026
Description of update:
All Requests for Information (RFIs) from eligible attendees must be submitted via email to the Contracting Points of Contact no later than 21 May 2026 at 5:00 PM CST.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0025
Project Title: WWYK200051 Replace Switchgear, Bldg 1
Project Location: Tinker AFB - BUILDING 1.
Replace the 3000amp 208Volt switchgear in the center of building 1. There is a 3000amp main and two 600amp feeder breakers.
The estimated project value is below $25M and is restricted to SB MAC BOA holders only.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Current date/time for Initial Site Visit is set for Thursday May 14, 2026 at 10:00 AM Central Time. The location instructions and directions are in the attachments for the Initial Site Visit.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #1 ·
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0025
Project Title: WWYK200051 Replace Switchgear, Bldg 1
Project Location: Tinker AFB - BUILDING 1.
Replace the 3000amp 208Volt switchgear in the center of building 1. There is a 3000amp main and two 600amp feeder breakers.
The estimated project value is below $25M and is restricted to SB MAC BOA holders only.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Current date/time for Initial Site Visit is set for Thursday May 14, 2026 at 10:00 AM Central Time. The location instructions and directions are in the attachments for the Initial Site Visit.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Files
Show all 48
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business | |
| 2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221 | Air Force Sustainment Center | Total Small Business | |
| WWYK250063 - install react VII facility, B9001, post V19 | Air Force Sustainment Center | Woman-Owned Small Business | |
| WWYK100209-Repair Perimeter Dr and Industrial Blvd | Air Force Sustainment Center | Woman-Owned Small Business Sole Source | |
| Geotechnical Engineering Services | Air Force Sustainment Center | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity