000_TABLE OF CONTENTS.pdf
PDF 70 KB Posted
- Solicitation number
- FA813726R0025
About this file
This is a table of contents for Tinker Air Force Base General Requirements documentation dated January 2022. The document outlines the organizational structure of general requirements and special provisions for construction and contracting activities at Tinker AFB, organized into two main divisions.
Division 00 addresses procurement and contracting requirements, encompassing general construction requirements (00 70 00), general safety requirements for construction (00 71 00), general environmental requirements for construction (00 72 00), and special provisions for working on Tinker AFB (00 80 00 and 00 80 05). Division 01 covers general requirements including small project construction progress schedules (01 32 16.00 20), submittal procedures (01 33 00), design data for post-award design work (01 33 16.00 10), sources for reference publications (01 42 00), quality control (01 45 00.00 10), contractor facilities (01 50 00), and closeout submittals including operation and maintenance data (01 78 00 and 01 78 23). This document serves as an index to the full set of general requirements specifications that contractors and vendors must follow when working on construction or contracting projects at Tinker Air Force Base.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tinker AFB Tinker General Requirements
January 2022 Page 1 TABLE OF CONTENTS
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 70 00
00 71 00
00 72 00
00 80 00 00 80 05
GENERAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE
BASE
GENERAL SAFETY REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR
FORCE BASE
GENERAL ENVIRONMENTAL REQUIREMENTS FOR CONSTRUCTION ON
TINKER AIR FORCE BASE
SPECIAL PROVISIONS FOR WORKING ON TINKER AFB
SPECIAL PROVISIONS FOR WORKING ON OR NEAR THE AIRFIELD ON
TINKER AFB
DIVISION 01 - GENERAL REQUIREMENTS
01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
01 33 00 SUBMITTAL PROCEDURES
01 33 16.00 10 DESIGN DATA (DESGIN AFTER AWARD)
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 50 00 CONTRACTOR FACILITIES
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
-- End of Table of Contents –-