000_TABLE OF CONTENTS.pdf

PDF 70 KB Posted

Attached to
TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
Solicitation number
FA813726R0025
Issued by

About this file

This is a table of contents for Tinker Air Force Base General Requirements documentation dated January 2022. The document outlines the organizational structure of general requirements and special provisions for construction and contracting activities at Tinker AFB, organized into two main divisions.

Division 00 addresses procurement and contracting requirements, encompassing general construction requirements (00 70 00), general safety requirements for construction (00 71 00), general environmental requirements for construction (00 72 00), and special provisions for working on Tinker AFB (00 80 00 and 00 80 05). Division 01 covers general requirements including small project construction progress schedules (01 32 16.00 20), submittal procedures (01 33 00), design data for post-award design work (01 33 16.00 10), sources for reference publications (01 42 00), quality control (01 45 00.00 10), contractor facilities (01 50 00), and closeout submittals including operation and maintenance data (01 78 00 and 01 78 23). This document serves as an index to the full set of general requirements specifications that contractors and vendors must follow when working on construction or contracting projects at Tinker Air Force Base.

View the file

Other files

File Type Posted
Solicitation Amendment FA813726R00250005 SF 30.pdf PDF
WWYK160073 REPAIR FIRE RISER AS-RECORDED 3.18.24.pdf PDF
Att2_200051_IFC Rev1_Design_Analysis.pdf PDF
Att1_200051_SWITCHGEAR_IFC_REV_1_6-17-26_DRAWINGS.pdf PDF
PreBid Govt Revised Response for WWYK200051 Replace Switchgear Bldg 1 ( 06.22.2026).pdf PDF
Solicitation Amendment FA813726R00250004 SF 30.pdf PDF
Solicitation Amendment FA813726R00250003 SF 30.pdf PDF
WWYK200051_SWITCHGEAR_IFC_DRAWINGS.pdf PDF
Solicitation Amendment FA813726R00250002 SF 30.pdf PDF
Pre-Bid RFI Govt Response Att2_Pictures for Electrical Closet.pdf PDF
Pre-Bid RFI Govt Response Att1_Inspection Report - WWYK090044F.pdf PDF
Pre-Bid RFIs Govt Response for WWYK200051 Replace Switchgear Bldg 1 (06.08.2026).pdf PDF
WWYK200051_TAFB IFC_FINAL_SPECIFICATIONS.pdf PDF
870148.pdf PDF
841018.pdf PDF
Solicitation Amendment FA813726R00250001 SF 30.pdf PDF
710216.pdf PDF
WWYK200051_SWITCHGEAR_IFC_CAD (2).zip ZIP file
950213.pdf PDF
B-1MEP.pdf PDF
730072.pdf PDF
Bldg 1 - Electrical.pdf PDF
770142.pdf PDF
830009.pdf PDF
00 71 00.pdf PDF
01 32 16.00 20.pdf PDF
01 33 16.00 10.pdf PDF
00 80 00.pdf PDF
01 50 00.pdf PDF
01 33 00.pdf PDF
01 78 00.pdf PDF
00 80 05.pdf PDF
01 45 00.00 10.pdf PDF
01 42 00.pdf PDF
00 70 00.pdf PDF
01 78 23.pdf PDF
00 72 00.pdf PDF
WWYK200051 Initial Site Visit Sign In Sheet.pdf PDF
WWYK200051 WAGE Determinations.pdf PDF
WWYK200051 Initial Site Visit Location.pdf PDF
DRAWINGS.pdf PDF
Submittal Register.pdf PDF
Section M - Evaluation Factors for Award.pdf PDF
STATEMENT OF WORK (SOW).pdf PDF
Section L - Instructions to Offerors.pdf PDF
Solicitation FA813726R0025_WWYK200051_Replace_Switchgear .pdf PDF
EAL List.xlsx XLSX spreadsheet
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tinker AFB Tinker General Requirements

January 2022 Page 1 TABLE OF CONTENTS

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 70 00

00 71 00

00 72 00

00 80 00 00 80 05

GENERAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE

BASE

GENERAL SAFETY REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR

FORCE BASE

GENERAL ENVIRONMENTAL REQUIREMENTS FOR CONSTRUCTION ON

TINKER AIR FORCE BASE

SPECIAL PROVISIONS FOR WORKING ON TINKER AFB

SPECIAL PROVISIONS FOR WORKING ON OR NEAR THE AIRFIELD ON

TINKER AFB

DIVISION 01 - GENERAL REQUIREMENTS

01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

01 33 00 SUBMITTAL PROCEDURES

01 33 16.00 10 DESIGN DATA (DESGIN AFTER AWARD)

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 50 00 CONTRACTOR FACILITIES

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

-- End of Table of Contents –-