This document is an electrical system plan for Repair Electric Service, Building 1 at an Air Force installation in Oklahoma City, Oklahoma. The plan consists of two pages: Page 1 contains a detailed electrical floor plan showing circuit layouts, wiring routes, panel board locations, and electrical fixture placements throughout the building. Page 2 provides a Panel Board Schedule and Notes & Schedules section with accompanying site location maps.

The Panel Board Schedule details specifications for multiple distribution panels, including voltage ratings (120/208V, 60 Hz), amperage capacity (225A main lugs), and grounding requirements. The schedule identifies existing lighting on various panels and specifies modifications including relocated circuits, spare capacity allocations, new receptacle installations, and wire routing changes. General notes address critical requirements such as premature system disconnection procedures, demolition protocols for existing infrastructure, material specifications for new installations (copper conductor, bolt-on type disconnects), raceway standards, and receptacle placement specifications. The document includes detailed instructions for panel modifications, wire management, ceiling-mounted components, and coordination procedures for interconnected systems. The notes emphasize compliance with existing electrical code standards and specify exact locations for panel boards, receptacle circuits, and associated electrical infrastructure throughout Building 1.

View the file

Other files

File Type Posted
Solicitation Amendment FA813726R00250005 SF 30.pdf PDF
WWYK160073 REPAIR FIRE RISER AS-RECORDED 3.18.24.pdf PDF
Att1_200051_SWITCHGEAR_IFC_REV_1_6-17-26_DRAWINGS.pdf PDF
Att2_200051_IFC Rev1_Design_Analysis.pdf PDF
Solicitation Amendment FA813726R00250004 SF 30.pdf PDF
PreBid Govt Revised Response for WWYK200051 Replace Switchgear Bldg 1 ( 06.22.2026).pdf PDF
Solicitation Amendment FA813726R00250003 SF 30.pdf PDF
WWYK200051_SWITCHGEAR_IFC_DRAWINGS.pdf PDF
Pre-Bid RFI Govt Response Att2_Pictures for Electrical Closet.pdf PDF
Solicitation Amendment FA813726R00250002 SF 30.pdf PDF
Pre-Bid RFIs Govt Response for WWYK200051 Replace Switchgear Bldg 1 (06.08.2026).pdf PDF
Pre-Bid RFI Govt Response Att1_Inspection Report - WWYK090044F.pdf PDF
WWYK200051_TAFB IFC_FINAL_SPECIFICATIONS.pdf PDF
Solicitation Amendment FA813726R00250001 SF 30.pdf PDF
Bldg 1 - Electrical.pdf PDF
770142.pdf PDF
841018.pdf PDF
830009.pdf PDF
870148.pdf PDF
WWYK200051_SWITCHGEAR_IFC_CAD (2).zip ZIP file
B-1MEP.pdf PDF
950213.pdf PDF
710216.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
00 71 00.pdf PDF
00 80 05.pdf PDF
01 32 16.00 20.pdf PDF
01 78 00.pdf PDF
00 80 00.pdf PDF
01 45 00.00 10.pdf PDF
00 70 00.pdf PDF
00 72 00.pdf PDF
01 78 23.pdf PDF
01 33 00.pdf PDF
01 33 16.00 10.pdf PDF
01 42 00.pdf PDF
01 50 00.pdf PDF
WWYK200051 Initial Site Visit Sign In Sheet.pdf PDF
Section M - Evaluation Factors for Award.pdf PDF
Solicitation FA813726R0025_WWYK200051_Replace_Switchgear .pdf PDF
Section L - Instructions to Offerors.pdf PDF
WWYK200051 WAGE Determinations.pdf PDF
WWYK200051 Initial Site Visit Location.pdf PDF
EAL List.xlsx XLSX spreadsheet
STATEMENT OF WORK (SOW).pdf PDF
DRAWINGS.pdf PDF
Submittal Register.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0007FM

0007FN

File details come from the government source that posted it. Updated .