Submittal Register.pdf

PDF 175 KB Posted

Attached to
TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
Solicitation number
FA813726R0025
Issued by

About this file

This is a Submittal Register for federal construction contract WWYK200051, Replace Switchgear in Building 1 at Tinker Air Force Base. The register documents 132 line items of required contractor submissions across multiple specification sections covering preconstruction submittals, shop drawings, product data, test reports, certificates, manufacturer's instructions, and closeout submittals.

Key submission categories include: preconstruction requirements such as health and safety plans, quality control plans, construction schedules, and demolition plans; structural and electrical components including concrete mix designs, grout placement, structural steel fabrication, and switchgear drawings; testing and inspection documentation for concrete compressive strength, welds, anchors, and electrical systems; manufacturer certifications for materials including steel, aggregates, welding procedures, and equipment qualifications; and closeout deliverables such as as-built drawings, operation and maintenance manuals, and electrical studies (load flow, fault current, arc flash hazard, and system coordination studies). Government or A/E review and approval is required on numerous items indicated by the "G" classification. Several items require weekly submission with contract progress reports, while others must be provided during preconstruction, monthly during construction, or upon project completion. Specific items such as hazardous material reports and debris management reports require submission during the first week of each month, and baseline construction schedules must be provided within 10 days of Notice to Proceed.

View the file

Other files

File Type Posted
Solicitation Amendment FA813726R00250005 SF 30.pdf PDF
WWYK160073 REPAIR FIRE RISER AS-RECORDED 3.18.24.pdf PDF
Att1_200051_SWITCHGEAR_IFC_REV_1_6-17-26_DRAWINGS.pdf PDF
Att2_200051_IFC Rev1_Design_Analysis.pdf PDF
Solicitation Amendment FA813726R00250004 SF 30.pdf PDF
PreBid Govt Revised Response for WWYK200051 Replace Switchgear Bldg 1 ( 06.22.2026).pdf PDF
WWYK200051_SWITCHGEAR_IFC_DRAWINGS.pdf PDF
Solicitation Amendment FA813726R00250003 SF 30.pdf PDF
Pre-Bid RFI Govt Response Att2_Pictures for Electrical Closet.pdf PDF
Solicitation Amendment FA813726R00250002 SF 30.pdf PDF
Pre-Bid RFIs Govt Response for WWYK200051 Replace Switchgear Bldg 1 (06.08.2026).pdf PDF
Pre-Bid RFI Govt Response Att1_Inspection Report - WWYK090044F.pdf PDF
WWYK200051_TAFB IFC_FINAL_SPECIFICATIONS.pdf PDF
841018.pdf PDF
830009.pdf PDF
Solicitation Amendment FA813726R00250001 SF 30.pdf PDF
Bldg 1 - Electrical.pdf PDF
770142.pdf PDF
730072.pdf PDF
870148.pdf PDF
WWYK200051_SWITCHGEAR_IFC_CAD (2).zip ZIP file
B-1MEP.pdf PDF
950213.pdf PDF
710216.pdf PDF
00 80 00.pdf PDF
01 45 00.00 10.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
00 71 00.pdf PDF
00 80 05.pdf PDF
01 32 16.00 20.pdf PDF
01 78 00.pdf PDF
00 70 00.pdf PDF
00 72 00.pdf PDF
01 78 23.pdf PDF
01 33 00.pdf PDF
01 33 16.00 10.pdf PDF
01 42 00.pdf PDF
01 50 00.pdf PDF
WWYK200051 Initial Site Visit Sign In Sheet.pdf PDF
Section M - Evaluation Factors for Award.pdf PDF
Solicitation FA813726R0025_WWYK200051_Replace_Switchgear .pdf PDF
Section L - Instructions to Offerors.pdf PDF
WWYK200051 WAGE Determinations.pdf PDF
WWYK200051 Initial Site Visit Location.pdf PDF
EAL List.xlsx XLSX spreadsheet
STATEMENT OF WORK (SOW).pdf PDF
DRAWINGS.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Line

Acti vity

Transm ittal #

Specification Section

SD

# Submittal Description Item Submitted Paragraph #

Classification:

GOVT or A/E

Reviewer Submit

Approval Needed

By

Material Needed

By Action Code

Date Of Action

Date FWD to APPR / Auth

Date RCD From

CONTR

Date FWD To Other Revwr

Date RCD From Other Reviewer

Action Code

Date Of Action

Mailed To CONTR/ Date

RCD From

APPR

Authority Remarks

1 00 70 00 06 Test Reports Pre-Construction Testing Record 1.3.11 G

2 00 70 00 07 Certificates Welding, Cutting and Brazing Permit 1.4 G

3 00 70 00 07 Certificates Framed Instructions 1.8

4 00 71 00 01 Preconstruction Submittals Health and Safety Plan 1.3 G

5 00 71 00 07 Certificates Safety Meetings 1.3

6 00 71 00 07 Certificates FOD Awareness and Prevention Training 1.4

7 00 72 00 01 Preconstruction Submittals AF Form 3952 Chemical/Hazardous Material Request/Authorization 1.4 G

8 00 72 00 01 Preconstruction Submittals Spray Painting Plan 1.9 G

9 00 72 00 01 Preconstruction Submittals Environmental Management System Awareness Training 1.1

10 00 72 00 03 Product Data Affirmative Procurement Documentation or Green Statement 1.3.10 G Provide only one. Reference specification for additional information

11 00 72 00 07 Cerificates Monthly Hazardous Material Usage Report 1.4 G Provide 1st week of each month during construction

12 00 72 00 08 Manufacturer's Instructions Safety Data Sheets/Material Safety Data Sheets 1.4

13 00 72 00 - Attch 5 01 Preconstruction Submittals Construction Debris Analysis Plan 1.2.3 G

14 00 72 00 - Attch 5 07 Certificates Monthly Debris Management Report 2 G Provide 1st week of each month during construction

15 01 32 16.00 20 01 Preconstruction Submittals Baseline Construction Schedule 1.2 G Provide within 10 days of NTP.

16 01 32 16.00 20 07 Certificates Monthly Updates 1.4 Provide 1st week of each month during construction, or as directed by CO

17 01 32 16.00 20 07 Certificates 3-Week Look Ahead Schedule 1.6 Provide weekly with the Contract Progress Report

18 01 33 00 01 Preconstruction Submittals Submittal Register 1.8 G

19 01 45 00.00 10 01 Preconstruction Submittals Quality Control (QC) Plan 3.2 G

20 01 45 00.00 10 06 Test Reports QC Documentation 3.9 Provide weekly with the Contract Progress Report

21 01 50 00 01 Preconstruction Submittals Request for Contractor Staging Area 1.1 G

22 01 50 00 01 Preconstruction Submittals Photographic Record 1.3

23 01 78 00 03 Product Data Warranty Letter 1.7.1

24 01 78 00 03 Product Data Warranty Tags 1.7.3

25 01 78 00 03 Product Data Spare Parts Data 1.5

26 01 78 00 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.4 G Provide (2) electronic sets (optical media) and

(1) hard copy

27 01 78 00 11 Closeout Submittals Working As-Built Drawings 3.1 G Provide (2) electronic sets (optical media) and

(2) hard copies

28 01 78 00 11 Closeout Submittals Record Drawings 3.3 G Provide (2) electronic sets (optical media) and

(1) hard copy

29 01 78 23 10 Operation and Maintenance Data Operation and Maintenance Data 1.2 G Provide 30 days prior to scheduled Training

30 01 78 23 10 Operation and Maintenance Data O&M Database 1.3 G

31 SOW 07 Certificates Contract Progress Report(s) 2.4 G Provide weekly throughout life of contract.

Utilize AF Form 3065, Contract Progress Report (or equal)

32 02 41 00 1 Preconstruction Submittals Demolition Plan 1.2.2 G

33 02 41 00 1 Preconstruction Submittals Existing Conditions 1.1

34 03 30 53 2 Shop Drawings Installation Drawings 1.5 G

(d)

CONTRACTOR

ACTION

CONTRACTOR SCHEDULE

DATES APPROVING AUTHORITY

TITLE: Tinker AFB General Requirements Specification (Div 00-01)

SUBMITTAL REGISTER

JOB NAME: WWYK200051, Replace Switchgear in Building 1 LOCATION: Building 1 on Tinker Air Force Base

CONTRACT NO:

CONTRACTOR:

Submittal Register_v3_03/07/22

Acti vity

Transm ittal #

Specification Section

SD

# Submittal Description Item Submitted Paragraph #

Classification:

GOVT or A/E

Reviewer Submit

Approval Needed

By

Material Needed

By Action Code

Date Of Action

Date FWD to APPR / Auth

Date RCD From

CONTR

Date FWD To Other Revwr

Date RCD From Other Reviewer

Action Code

Date Of Action

Mailed To CONTR/ Date

RCD From

APPR

Authority Remarks

(d)

CONTRACTOR

ACTION

CONTRACTOR SCHEDULE

DATES APPROVING AUTHORITY

35 03 30 53 3 Product Data Air-Entraining Admixture 2.2.3.1

36 03 30 53 3 Product Data Accelerating Admixture

37 03 30 53 3 Product Data Water-Reducing or Retarding Admixture 2.2.3.2

38 03 30 53 3 Product Data Curing Materials 2.2.8

39 03 30 53 3 Product Data Chemical Floor Hardener 2.4.1

40 03 30 53 3 Product Data Batching and Mixing Equipment 41 03 30 53 3 Product Data Conveying and Placing Concrete 3.2 42 03 30 53 3 Product Data Formwork 2.2.6 43 03 30 53 3 Product Data Mix Design Data 2.3 G 44 03 30 53 3 Product Data Ready-Mix Concrete 2.3 45 03 30 53 3 Product Data Curing Compound 2.4.2 46 03 30 53 6 Test Reports Aggregates 2.2.2 47 03 30 53 6 Test Reports Concrete Mixture Proportions 2.1.3 G 48 03 30 53 6 Test Reports Measurement of Floor Tolerances 3.3.3.2 49 03 30 53 6 Test Reports Compressive Strength Testing 3.9.3 G 50 03 30 53 6 Test Reports Slump 3.9.3 G 51 03 30 53 6 Test Reports Air Content 3.9.3 52 03 30 53 6 Test Reports Water 2.2.4 53 03 30 53 7 Certificates Cementitious Materials 2.2.1 54 03 30 53 7 Certificates Pozzolan 2.2.1.2

55 03 30 53 7 Certificates CPG for recycled materials or appropriate Waiver Form

56 03 30 53 7 Certificates Aggregates 2.2.2 57 03 30 53 7 Certificates Delivery Tickets 2.3 58 03 30 53 8 Manufacturer's Instructions Chemical Floor Hardener 2.4.1 59 03 30 53 8 Manufacturer's Instructions Curing Compound 2.4.2 60 03 62 16 1 Preconstruction Submittals Grout Placement 1.3.1 G 61 03 62 16 4 Samples Aggregates 2.1.2 G 62 03 62 16 6 Test Reports Compressive Strength 3.3 G 63 03 62 16 6 Test Reports Grout Placement 1.3.1 G 64 03 62 16 6 Test Reports Portland Cement 2.1.1 G 65 03 62 16 7 Certificates Portland Cement 2.1.1 G 66 03 62 16 7 Certificates Aggregates 2.1.2 G 67 05 05 20 3 Product Data Mechanical Anchors in Concrete 2.1.1.3 G 68 05 05 20 3 Product Data Adhesive Anchor System in Concrete 2.1.1.4 G 69 05 05 20 3 Product Data Non-Shrink, Non-Metallic Grout 3.1.3 G

70 05 05 20 6 Test Reports Post-Installed Anchor Special Inspections Report 3.3.4 G

71 05 05 20 7 Certificates Post-Installed Anchor Certification 2.1.1.1 G

72 05 05 20 8 Manufacturer's Instructions Manufacturer's Printed Installation Instructions 2.1.1.2 G

73 05 05 20 8 Manufacturer's Instructions Non-Shrink, Non-Metallic Grout 3.1.3 G

74 05 05 20 8 Manufacturer's Instructions Manufacturer's Material Safety Data Sheets 1.5

75 05 12 00 1 Preconstruction Submittals Erection and Erection Bracing Drawings 1.4.1.1 G

76 05 12 00 2 Shop Drawings Fabrication Drawings 1.4.2 G 77 05 12 00 3 Product Data Shop Primer 78 05 12 00 3 Product Data Welding Electrodes and Rods 2.4.1 79 05 12 00 3 Product Data Non-Shrink Grout 2.4.2 80 05 12 00 3 Product Data Recycled Content for Structural Steel 2.2.1 S

81 05 12 00 3 Product Data Recycled Content for Structural Steel Tubing 2.2.2 S

82 05 12 00 3 Product Data Recycled Content for Steel Pipe S 83 05 12 00 5 Design Data Shoring and Temporary Bracing 1.4.2 G 84 05 12 00 6 Test Reports Class B Coating 85 05 12 00 6 Test Reports Bolts, Nuts, and Washers 2.3 86 05 12 00 6 Test Reports Weld Inspection Reports 3.7.1.2 87 05 12 00 6 Test Reports Bolt Testing Reports 88 05 12 00 7 Certificates Steel 2.2 89 05 12 00 7 Certificates Bolts, Nuts, and Washers 2.3 90 05 12 00 7 Certificates Galvanizing 2.5

91 05 12 00 7 Certificates AISC Structural Steel Fabricator Quality Certification 1.3

Acti vity

Transm ittal #

Specification Section

SD

# Submittal Description Item Submitted Paragraph #

Classification:

GOVT or A/E

Reviewer Submit

Approval Needed

By

Material Needed

By Action Code

Date Of Action

Date FWD to APPR / Auth

Date RCD From

CONTR

Date FWD To Other Revwr

Date RCD From Other Reviewer

Action Code

Date Of Action

Mailed To CONTR/ Date

RCD From

APPR

Authority Remarks

(d)

CONTRACTOR

ACTION

CONTRACTOR SCHEDULE

DATES APPROVING AUTHORITY

92 05 12 00 7 Certificates AISC Structural Steel Erector Quality Certification 1.3

93 05 12 00 7 Certificates Welding Procedures and Qualifications 1.4.3.1 94 05 12 00 7 Certificates Welding Electrodes and Rods 2.4.1 95 05 12 00 7 Certificates Certified Welding Inspector 3.7.1.1 96 05 12 00 7 Certificates NDT Technician 3.7.1.2

97 05 12 00 7 Certificates Welding Procedure Specifications

(WPS) 3.4

98 05 50 13 2 Shop Drawings Angles and Plates 2.4 G 99 26 05 73 1 Preconstruction Submittals Field Examination Plan 3.1 G

100 26 05 73 1 Preconstruction Submittals Arc Flash Label Formats 3.2.9 G 101 26 05 73 6 Test Reports Field Examination 3.1.1 102 26 05 73 7 Certificates System Analyzer 1.3.1 G 103 26 05 73 11 Closeout Submittals Model Files 3.3 G 104 26 05 73 11 Closeout Submittals Load Flow Study 3.2.4 G 105 26 05 73 11 Closeout Submittals Fault Current Study 3.2.5 G 106 26 05 73 11 Closeout Submittals System Coordination Study 3.2.6 G 107 26 05 73 11 Closeout Submittals Arc Flash Hazard Study 3.2.7 G 108 26 08 00 6 Test Reports Acceptance Tests and Inspections 3.1 G 109 26 08 00 7 Certificates Qualifications 1.4.1 G

110 26 08 00 7 Certificates Acceptance Test and Inspections Procedure 1.4.3 G

111 26 20 00 2 Shop Drawings Panelboards 2.7 G 112 26 20 00 2 Shop Drawings Transformers 2.8 G 113 26 20 00 3 Product Data Transformers 2.8 G 114 26 20 00 3 Product Data Metering 2.14 G 115 26 20 00 3 Product Data Secondary Bonding Busbar G 116 26 20 00 3 Product Data Surge Protective Devices 2.15 G 117 26 20 00 6 Test Reports 600-volt Wiring Test 3.5.2 G 118 26 20 00 6 Test Reports Grounding System Test 3.5.4 G 119 26 20 00 6 Test Reports Transformer Tests 3.5.3 G 120 26 20 00 9 Manufacturer's Field Reports Transformer Factory Tests 2.17.1 121 26 20 00 10 Operation and Maintenance Data Electrical Systems G 122 26 20 00 10 Operation and Maintenance Data Metering 2.14 G 123 26 23 00 2 Shop Drawings Switchgear Drawings 1.5.2 G 124 26 23 00 3 Product Data Switchgear 2.2 G 125 26 23 00 6 Test Reports Switchgear Design Tests 2.5.2 G 126 26 23 00 6 Test Reports Switchgear Production Tests 2.5.3 G 127 26 23 00 6 Test Reports Acceptance Checks and Tests 3.5.1 G 128 26 23 00 10 Operation and Maintenance Data Switchgear Operation and Maintenance 1.6.1 G

129 26 23 00 11 Closeout Submittals Assembled Operation and Maintenance Manuals 1.6.2 G

130 26 23 00 11 Closeout Submittals Equipment Test Schedule 2.5.1 G 131 26 23 00 11 Closeout Submittals Request for Settings 3.5 G

132 26 23 00 11 Closeout Submittals Service Entrance Available Fault Current Label 2.8 G

Submittal Register_General Requ

File details come from the government source that posted it. Updated .