This is an Environmental Inspection Report prepared by the 72 Air Base Wing, Civil Engineering Environmental (CEIE) for Building 1 at Tinker Air Force Base. The inspection was conducted on November 9, 2023, by Inspector Michael Green at the requestor's request (Elisa Mercado) and addresses asbestos and lead-based paint concerns associated with repair work on an emergency generator and transfer switch located in the North Dock EU 7121.

The inspection involved XRF (X-ray Fluorescence) testing of two painted surfaces: green and brown paint on the generator and gray paint on the transfer switch/station. Both materials were classified as miscellaneous surfacing in good condition with no visible damage or deterioration. The analysis results indicate no lead-based paint (LBP) was detected above the regulatory limit of 1.0 mg/cm² on the generator sample (ND and PASS result), and lead was not detected on the transfer switch sample (ND result). No suspect asbestos-containing materials were observed during the inspection, and therefore no asbestos samples were taken. The inspector confirmed that most paint appeared to be factory finish. Based on the findings, CEIE determined that no suspect asbestos or lead-based paint is present, and no remediation recommendations are applicable to this project.

View the file

Other files

File Type Posted
Solicitation Amendment FA813726R00250005 SF 30.pdf PDF
WWYK160073 REPAIR FIRE RISER AS-RECORDED 3.18.24.pdf PDF
Att2_200051_IFC Rev1_Design_Analysis.pdf PDF
Att1_200051_SWITCHGEAR_IFC_REV_1_6-17-26_DRAWINGS.pdf PDF
PreBid Govt Revised Response for WWYK200051 Replace Switchgear Bldg 1 ( 06.22.2026).pdf PDF
Solicitation Amendment FA813726R00250004 SF 30.pdf PDF
Solicitation Amendment FA813726R00250003 SF 30.pdf PDF
WWYK200051_SWITCHGEAR_IFC_DRAWINGS.pdf PDF
Solicitation Amendment FA813726R00250002 SF 30.pdf PDF
Pre-Bid RFI Govt Response Att2_Pictures for Electrical Closet.pdf PDF
Pre-Bid RFIs Govt Response for WWYK200051 Replace Switchgear Bldg 1 (06.08.2026).pdf PDF
WWYK200051_TAFB IFC_FINAL_SPECIFICATIONS.pdf PDF
870148.pdf PDF
841018.pdf PDF
Solicitation Amendment FA813726R00250001 SF 30.pdf PDF
710216.pdf PDF
WWYK200051_SWITCHGEAR_IFC_CAD (2).zip ZIP file
950213.pdf PDF
B-1MEP.pdf PDF
730072.pdf PDF
Bldg 1 - Electrical.pdf PDF
770142.pdf PDF
830009.pdf PDF
00 71 00.pdf PDF
01 32 16.00 20.pdf PDF
01 33 16.00 10.pdf PDF
00 80 00.pdf PDF
01 50 00.pdf PDF
01 33 00.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 78 00.pdf PDF
00 80 05.pdf PDF
01 45 00.00 10.pdf PDF
01 42 00.pdf PDF
00 70 00.pdf PDF
01 78 23.pdf PDF
00 72 00.pdf PDF
WWYK200051 Initial Site Visit Sign In Sheet.pdf PDF
WWYK200051 WAGE Determinations.pdf PDF
WWYK200051 Initial Site Visit Location.pdf PDF
DRAWINGS.pdf PDF
Submittal Register.pdf PDF
Section M - Evaluation Factors for Award.pdf PDF
STATEMENT OF WORK (SOW).pdf PDF
Section L - Instructions to Offerors.pdf PDF
Solicitation FA813726R0025_WWYK200051_Replace_Switchgear .pdf PDF
EAL List.xlsx XLSX spreadsheet
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

72 ABW/CEIE

INSPECTION REPORT PAGE 1 OF 2

Project Information

Project Name Repair Emergency Generator and Transfer Switch

Project ID WWYK090044

Project Building 1 Year Constructed Unknown

Room/Post Location North Dock EU 7121 Historical Samplings No

Requestor Elisa Mercado Inspector(s) Michael Green

Inspection Date 9 Nov 2023 Prepared By

Sampling Information:

Sample ID - Location Material Classification Condition Hazard Friable Analysis Results

LBPB1GEN01

Generator

Green and brown paint Misc Good LBP N/A XRF ND and PASS

LBPB1GEN02

Transfer Switch/Station

Gray paint Misc Good LBP N/A XRF ND

Condition:

Surfacing/Misc. Materials:

• Good Condition: Material with no visible damage or deterioration or showing only very limited damage or deterioration.

• Some Damage: Material crumbling, blistered, water-stained, gouged, marred, or abraded covering less than one tenth of the surface if the damage is evenly distributed (one quarter if the damage is localized).

• Significant Damage: Material crumbling, blistered, hanging from surface, deteriorated, adhesive failure, water-stained, gouged, marred, or abraded covering more than one tenth if the damage is evenly distributed (one quarter if the damage is localized).

Thermal System Insulation:

• Good Condition: Material with no visible damage or deterioration.

• Damage/Significant Damage: Material that has lost its structural integrity, its covering, in whole or in part, is crushed, water-stained, gouged, punctured, or not intact such that is not able to contain fibers.

Note: There is only one category of damage for TSI: Damaged or significantly damaged”.

Hazard:

• ACM = Asbestos Containing Material; defined by the EPA as any material containing more than 1 percent asbestos.

• LBP = Lead-Based Paint; defined by the EPA as paint with lead levels greater than or equal to 1.0 milligram per square centimeter

(mg/cm2), or more than 0.5% by weight.

Friable:

• Friable = Material, when dry, may be crumbled, pulverized, or reduced to powder by hand pressure, and includes previously nonfriable material that becomes damaged to the extent that it is now friable.

• NF = Nonfriable; Material, when dry may not be crumbled, pulverized, or reduced to powder by hand pressure.

Analysis/Results:

• PLM = Polarized Light Microscopy; Asbestos Present or Asbestos Not Present

• PACM = Presumed Asbestos Containing Material; TSI and SM found in buildings constructed no later than 1980.

• XRF = X-ray Fluorescence

• The XRF spectrometry identifies if lead is present and the quantifies the amount of lead present.

a. Pass = results for Pb are lower than the limit parameter (less than 1 mg/cm3)

b. Inconclusive = Quantitive analysis in the region defined as intermediate. Additional investigation performed with Pb check sticks.

Page | 2

c. Fail = Results for Pb are higher than the limit parameter (greater than 1 mg/cm3)

d. ND = Pb not detected

• Pb Stick = Lead Paint Check Stick; Qualitative analysis that determines if LBP is present on surfaces.

Inspection Observations:

• Civil Engineering Environmental (CEIE) conducted an inspection of the project equipment for asbestos and lead-based paint concerns.

Findings:

• Most paint appeared to be factory finish.

• No suspect asbestos containing material was observed and therefore no samples were taken.

• XRF analysis did not detect LBP above limits.

Recommendations:

• No suspect asbestos or LBP present. No recommendations applicable.

END OF REPORT

inspection report Page 1 of 2
Project Information
Sampling Information:
Condition:
Hazard:
Friable:
Analysis/Results:
Inspection Observations:
Findings:
Recommendations:
END OF REPORT
Project ID
Project Name
Year Constructed
Project Building
Historical Samplings
Room/Post Location
Inspector(s)
Requestor
Prepared By
Inspection Date
Results
Analysis
Friable
Condition
Classification
Material
Sample ID - Location
2023-11-13T11:11:31-0600
DUCK.LAURA.MICHELLE.1260792225

File details come from the government source that posted it. Updated .