This is an IFC (Issued for Construction) Design Analysis document for the replacement of electrical switchgear at Tinker Air Force Base Building 1. The project (WWYK200051) involves replacing outdated 480V and 208V unit substations with new prefabricated walk-in switchgear enclosures and associated equipment. The scope includes demolition of existing equipment, installation of new 480V switchgear (rated 3200A) fed from a 1500 kVA OG&E transformer, installation of a 500 kVA step-down transformer to supply new 208V switchgear (rated 1600A), replacement of panelboards, removal of existing step-up transformers, and provision of housekeeping pads for equipment mounting. All work must comply with UFC 3-301-01, IBC 2024, NFPA standards, and Tinker AFB facility standards. The project will be executed in four phases with temporary power provisions to maintain building operations throughout switchover.

The design incorporates structural analysis for equipment pad foundations, electrical distribution with arc flash labeling and fault current analysis performed by the contractor, and fire protection compliance as an Alteration-Level 2 project under IEBC standards. Existing feeders will be retained and reconnected to new equipment; splicing of existing conductors has been approved as an exception to Tinker Electrical Standards where necessary due to equipment relocation. All interconnected systems including lighting, mechanical, civil, and fire protection elements have been evaluated for code compliance. Special inspections are not required due to the minor nature of the work, though structural observations by a registered professional are mandated due to Risk Category III classification. The estimated construction cost is $2,300,847, with equipment quotes from Schneider Electric totaling approximately $2.37 million for the 480V switchgear lineup and $724,819 for the 208V lineup.

View the file

Other files

File Type Posted
Solicitation Amendment FA813726R00250005 SF 30.pdf PDF
WWYK160073 REPAIR FIRE RISER AS-RECORDED 3.18.24.pdf PDF
Solicitation Amendment FA813726R00250004 SF 30.pdf PDF
PreBid Govt Revised Response for WWYK200051 Replace Switchgear Bldg 1 ( 06.22.2026).pdf PDF
Att1_200051_SWITCHGEAR_IFC_REV_1_6-17-26_DRAWINGS.pdf PDF
WWYK200051_SWITCHGEAR_IFC_DRAWINGS.pdf PDF
Solicitation Amendment FA813726R00250003 SF 30.pdf PDF
Solicitation Amendment FA813726R00250002 SF 30.pdf PDF
Pre-Bid RFIs Govt Response for WWYK200051 Replace Switchgear Bldg 1 (06.08.2026).pdf PDF
Pre-Bid RFI Govt Response Att1_Inspection Report - WWYK090044F.pdf PDF
Pre-Bid RFI Govt Response Att2_Pictures for Electrical Closet.pdf PDF
WWYK200051_TAFB IFC_FINAL_SPECIFICATIONS.pdf PDF
841018.pdf PDF
830009.pdf PDF
870148.pdf PDF
WWYK200051_SWITCHGEAR_IFC_CAD (2).zip ZIP file
B-1MEP.pdf PDF
950213.pdf PDF
710216.pdf PDF
Solicitation Amendment FA813726R00250001 SF 30.pdf PDF
Bldg 1 - Electrical.pdf PDF
770142.pdf PDF
730072.pdf PDF
00 80 00.pdf PDF
01 45 00.00 10.pdf PDF
00 70 00.pdf PDF
00 72 00.pdf PDF
01 78 23.pdf PDF
01 33 00.pdf PDF
01 33 16.00 10.pdf PDF
01 42 00.pdf PDF
01 50 00.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
00 71 00.pdf PDF
00 80 05.pdf PDF
01 32 16.00 20.pdf PDF
01 78 00.pdf PDF
WWYK200051 Initial Site Visit Sign In Sheet.pdf PDF
Solicitation FA813726R0025_WWYK200051_Replace_Switchgear .pdf PDF
Section L - Instructions to Offerors.pdf PDF
WWYK200051 WAGE Determinations.pdf PDF
WWYK200051 Initial Site Visit Location.pdf PDF
EAL List.xlsx XLSX spreadsheet
STATEMENT OF WORK (SOW).pdf PDF
DRAWINGS.pdf PDF
Submittal Register.pdf PDF
Section M - Evaluation Factors for Award.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IFC Design Analysis

Replace Switchgear in Building 1

Architect-Engineering Services for 100% Design

Revision 01

Project Number:

WWYK200051

Work Order:

25505

Tinker Air Force Base, Oklahoma

June 8, 2026

Prepared By:

HDR Engineering, Inc.

9311 San Pedro Ave., Suite 1100

San Antonio, TX 78216

WWYK200051– Replace Switchgear, Bldg 1

IFC – Revision 01

TINKER AIR FORCE BASE, OKLAHOMA

Architect-Engineering Services for

100% Design Services

CLIENT PROJECT NUMBER: WWYK200051

WORK ORDER: 25505

Construction Documents

Project Manual – Issued for

Construction

06/08/2026

HDR Engineering, Inc.

TPBE Firm Registration No. F-754

Design Professionals and Areas of

Responsibility

Electrical

06/08/26

IFC Design Analysis – Rev 1

WWYK200051 Replace Switchgear in Building 1

June 8, 2026 | 1

Contents

1 Overview

2 Applicable Codes and Standards

3 Existing Non-Conforming Conditions

4 Anti-Terrorism / Force Protection (AT/FP) Design

5 Architectural

6 Structural

6.1 Design Approach

6.2 General Design Parameters and Assumptions

6.2.1 Structural Loads

6.2.2 Special Inspections

6.2.3 Structural Observations

6.3 Demolition

6.4 Construction

7 Mechanical

8 Electrical

8.1 Design Approach

8.2 General Design Parameters and Assumptions

8.3 Demolition

8.3.1 Lighting

8.3.2 Power

8.4 Construction

8.4.1 Lighting

8.4.2 Power

8.5 Arc Flash Analysis

9 Civil

10 Fire Protection and Life Safety

10.1 Fire Protection and Life Safety Analysis Approach

10.2 Types of Construction

10.3 General Building Heights and Areas

10.4 Occupancy Classification

10.5 Passive Fire Protection

10.6 Interior Finishes

10.7 Means of Egress

10.7.1 Occupant Load

10.7.2 Dead-End Limits and Common Path of Travel

10.7.3 Travel Distance

10.7.4 Arrangement of Means of Egress

10.7.5 Illumination of Means of Egress

10.7.6 Emergency Lighting

10.7.7 Marking of Means of Egress

10.8 Fire Pumps and Water Supply

2 | June 8, 2026

10.9 Fire Department Connections

Automatic Sprinkler and Suppression Systems Analysis

10.11 Standpipe Systems

10.12 Fire Alarm System

10.13 Fire Alarm Reporting System

10.14 Fire Department (Emergency) Vehicle Access

10.15 Portable Fire Extinguishers

11 Phasing

Tables

Table 10-1. Interior Finishes Requirements

Table 10-2. Occupancy Specific Criteria

Table 10-3. Maximum Allowable Dead-End Corridor Length

Table 10-4. Allowable Common Path of Travel Distance

Table 10-5. Allowable Travel Distance

Appendices

Appendix A: Asbestos and Lead Based Paint

Appendix B: Structural

Appendix C: Electrical

Appendix D: As-Built

June 8, 2026 | 3

Acronyms and Abbreviations

A Amperes AABC Associated Air Balance Council ACCA Air Conditioning Contractors Association AFB Air Force Base AHJ Authorities having jurisdiction AHU Air handling unit AISC American Institute of Steel Construction ANSI American National Standards Institute ASCE American Society of Civil Engineers ASHRAE American Society of Heating, Refrigeration and Air-Conditioning Engineers ASTM American Society for Testing and Materials BTU British thermal unit CFM Cubic Feet per Minute CV Constant volume DB Dry Bulb DEG Degrees DoD Department of Defense DX Direct expansion EPDM Ethylene propylene diene monomer FDC Fire Department Connection

FPS Feet per Second FT Feet GFCI Ground-fault circuit interrupter GPM Gallons per minute HPSB High Performance Sustainability Building HVAC Heating, ventilation, and air conditioning IBC International Building Code IEBC International Existing Building Code IN Inches kV Kilovolt kVA Kilovolt-amps LCCA Life Cycle Cost Analysis LED Light emitting diode MAU Make-up air unit MBH 1000 BTUs per Hour MCC Motor Control Center MERV Minimum efficiency reporting value MPH Miles per hour N North NAC Notification Appliance Circuit NEBB National Environmental Balancing Bureau NEC National Electrical Code NFPA National Fire Protection Association SMACNA Sheet Metal and Air Conditioning Contractors' National Association TAFB Tinker Air Force Base TO Technical Order TP Technical Paper TSEWG Tri-Service Executive Working Group UFC Unified Facilities Criteria V Volt VAV Variable air volume

4 | June 8, 2026

W West WB Wet Bulb WG Water Gauge % Percentage § Subsection °F Fahrenheit

June 8, 2026 | 5

1 Overview

The electrical equipment on the dock under the canopied and sprinklered area will be removed and replaced. The new equipment will be phased in so as not impact building operations and such that the existing switchgear will only be shut down once it is replaced. At the project out brief provided on 20 Sept 2023; the design team provided the government with three options for siting and Cameron Twyford approved this siting approach.

Per that same out brief the team described the reasoning the equipment should not be installed outside the canopied and sprinklered area; specifically, it would drive significant fire scope. Cameron Twyford approved that reasoning and concurred with keeping the equipment under the canopy.

The design team FPE asked if the nearby WWYK160073 – Repair Fire Risers, SE

Corner, BLDG1 (FSD1), B1 project would include an FDC, as that is required by code.

Cameron Twyford confirmed the project includes an FDC and a hydrant within 150 ft of the FDC. Given this, fire protection scope for this project will be limited to a code check and existing sprinkler analysis.

A 1500 KVA transformer has already been installed by OG&E and will not be part of this project.

The client also requested the space be contained by floor to top panels to keep debris and dust from the area as the space is at the back of a wind tunnel. The design team will provide a space fully enclosed on four sides but with an open top as this area is covered by canopy. After original completion of this design package in April 2024, the project was never moved forward to Construction.

During design “dust off” activities in March 2026 a significant conflict was found between the originally planned egress path from Building 1, the now completed WWYK160073

Repair Fire Risers, SE Corner, BLDG1 (FSD1), and the originally scoped Switchgear

Wind Screen with this project. The team presented options for resolution and held an

Over-the-Shoulder Review Meeting on March 20th, 2026, to discuss with users and CE personnel. At this meeting, Ray Green, Project Execution Branch Chief for CE confirmed decision to proceed with the option to remove the Wind Screen from Project Scope.

2 Applicable Codes and Standards

Air Force Instructions

• AFI 32-10141 Planning and Programming Fire Safety Deficiency Correction

Projects (15 May 2019)

Tinker AFB Standards

• TAFB Facility Standard (2026)

• TAFB Facility Standard – Mechanical Attachment C

• TAFB ES Tinker Air Force Base Electrical Standards (1 Jan 2026)

6 | June 8, 2026

• TAFB FP Tinker Fire Protection Standards (March 2026)

National Fire Protection Association (NFPA)

• NFPA 1 Fire Code (2021)

• NFPA 13 Standard for the Installation of Sprinkler Systems (2022)

• NFPA 51B Standard for Fire Prevention During Welding, Cutting, and Other

Hot Work (2019)

• NFPA 70 National Electrical Code (2026)

• NFPA 72 National Fire Alarm and Signaling Code (2022)

• NFPA 101 Life Safety Code (2026)

• NFPA 241 Standard for Safeguarding Construction, Alteration, and

Demolition Operations (2022)

Unified Facilities Criteria (UFC)

• UFC 1-200-01 DoD Building Code, (17 December 2024 with Change 4)

• UFC 3-101-01 Architecture (16 Dec 2020, with Change 3, 2 Oct 2023)

• UFC 3-110-03 Roofing (1 May 2012, with Change 5, 12 Jun 2020)

• UFC 3-201-01 Civil Engineering (20 Dec 2022)

• UFC 3-301-01 Structural Engineering (11 Apr 2023, with Change 6, dated 30

Jan 2026)

• UFC 3-400-02 Design: Engineering Weather Data (20 Sep 2018)

• UFC 3-401-01 Mechanical Engineering (1 Jul 2013 with Change 1, 1 Oct 2015)

• UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems (01 Jul 2013, with Change 8, 21 Jul 2021)

• UFC 3-420-01 Plumbing Systems (1 Apr 2021)

• UFC 3-501-01 Electrical Engineering (27 Nov 2024)

• UFC 3-520-01 Interior Electrical Systems (21 January 2026 with Change 1)

• UFC 3-550-01 Exterior Electrical Power Distribution (01 November 2019 with

Change 3)

• UFC 3-600-01 Fire Protection Engineering for Facilities (8 Aug 2016 with

Change 6, 6 May 2021)

• UFC 3-601-02 Operation and Maintenance: Inspection, Testing and

Maintenance of Fire Protection Systems (7 October 2021))

• UFC 4-010-01 DoD Minimum Antiterrorism Standards For Buildings (12 Dec

2018, with Change 2 Jul 30, 2022)

• UFC 4-020-01 Security Engineering Facilities Planning Manual (11 Sep 2008)

June 8, 2026 | 7

• UFC 4-023-07 Design to Resist Direct Fire Weapons Effects, w/ Change 1 (1

Feb 2017)

General

• ABA Architectural Barriers Act (2015)

• ACI 318-19 Building Code Requirements for Structural Concrete (2019)

• ASCE 7-22 Minimum Design Loads and Associated Criteria for Buildings and

Other Structures (2022)

• ASHRAE 62.1 Ventilation for Acceptable Indoor Air Quality (2022)

• ASHRAE 90.1 Energy Standard for Building Except Low-Rise Residential

Buildings (2019)

• IBC International Building Code (2024) as amended by UFC 1-200-01

(17 December 2024 with Change 4)

• IEBC International Existing Building Code (2024) as amended by UFC

1-200-01

• IMC International Mechanical Code (2021) as amended by UFC

3-410-01

• IPC International Plumbing Code (2023) as amended by UFC

3-420-01

3 Existing Non-Conforming Conditions

Currently there are no known Existing Non-Conforming Conditions.

4 Anti-Terrorism / Force Protection (AT/FP) Design

This section provides AT design criteria for this facility and summarizes how the project will comply with the minimum standards.

UFC 4-010-01 Minimum Antiterrorism Standards for Buildings apply to this project.

These standards apply to DoD components, to all DoD Inhabited Buildings and high occupancy family housing, and to all inhabited tenant buildings on DoD installations.

Section 1-5.2.1 Major Investments triggers the minimum standards if the cost for the building renovation, modification, repairs, revitalizations, and restorations exceeds 50% of the replacement cost of the existing building. Per UFC 3-701-01, Replacement cost is a stand-alone cost that represents the total cost to design and construct a new facility based on current codes, UFC and other design criteria that replaces an existing facility.

The replacement cost is distinctly different from the PRV. The replacement cost includes the demolition and disposal of the existing facility, hazmat removal, and special construction features such as special foundations and historic considerations. The

8 | June 8, 2026 replacement cost generally excludes site work and utilities outside the 5-foot line except when current codes, UFC and other design criteria require utilities and site work outside the 5-foot line to be modified, replaced/modernized and/or upgraded.

The escalated estimated replacement cost for this facility is $194,003,634.00. The construction cost estimate is $2,300,847.00. The project does not exceed 50% of the escalated estimated replacement cost; therefore, the entire facility will not need to be brought up to ATFP standards.

5 Architectural

No Scope.

6 Structural

6.1 Design Approach

Design will follow requirements of UFC 3-301-01, Change 6 dated 30 Jan 2026, and

Tinker AFB Standards.

Design concrete reinforced equipment pads to support new electrical switchgears. New housekeeping pads will be anchored to the existing concrete slab.

6.2 General Design Parameters and Assumptions

6.2.1 Structural Loads

Dead Loads

Dead loads will be considered resulting from fixed construction, materials, and equipment. Dead loads will be determined and applied in accordance with ASCE 7-22, and other pertinent standards and vendor-supplied information.

Live Loads

Live loads are those loads produced by the use and occupancy of the building or structure, and do not include loads such as wind/seismic loads, rain loads, flood loads, or dead loads. Minimum uniformly distributed live loads will be as required by UFC 3-301-

01 Table E-1 and ASCE 7-22.

Wind Loads

Wind loads for structural design of main wind force resisting systems and components and cladding shall be determined and applied in accordance with ASCE 7-22.

June 8, 2026 | 9

Wind Speed

The minimum 3-second gust design wind speed shall be determined using the ASCE 7

Hazard Tool website. A basic wind speed of 116 mph (90 mph nominal) will be used for the project location.

Exposure Category

Building exposure classification C, as defined by ASCE 7-22, shall be used for this building.

Risk Category

Building risk category III, as defined by ASCE 7-22, shall be used for this building.

Load Combinations

Load combinations using strength level design for material strength and unity checks, and service level design analysis for foundation bearing and deflection checks as defined in ASCE 7-22.

Seismic

Seismic loads shall be determined in accordance with IBC 2024. The structure will be designed as Seismic Design Category (SDC) of “B” based on the seismic parameters defined in IBC 2024.

UFC 3-301-01 Chapter 4, Seismic Evaluation and Retrofit of Existing Buildings, references RP-10 as the applicable code for seismic evaluation and retrofit requirements.

Per section 1.3 of RP-10, SDC B buildings are exempt from meeting the standards.

6.2.2 Special Inspections

Special inspections will not be required for this project in accordance with Chapter 17 of

IBC 2024 since the work is considered minor in nature.

6.2.3 Structural Observations

In accordance with Section 1704.6 of IBC 2021, structural observations by a registered professional are required for this project since the structure is classified as Risk Category

III.

6.3 Demolition

Remove existing steel framed gate and supports for fencing, and existing housekeeping pads below existing equipment.

6.4 Construction

Provide housekeeping pads for each new electrical switchgear.

10 | June 8, 2026

7 Mechanical

No Scope.

8 Electrical

8.1 Design Approach

The project scope will include the replacement of 480V and 208V unit substations with

480V and 208V switchgears of the prefabricated engineering walk-in enclosure type and remote switches to control the circuit breakers. The 480V switchgear will be fed from the secondary side of the newly installed OG&E 1500 kVA transformer. The 208V switchgear will be fed via a new 500kVA step-down transformer from the new 480V switchgear. All feeders will be routed overhead. Existing feeders fed from existing 480V and 280V unit substations will be retained for reconnection to the new work.

The existing 600A panelboards, Panel B-9 (UID #1-SWGSEC-2) and existing panel

"B13" (UID #1-PNL-11) located in the mechanical room are recently replaced under contract WWYK #090044 and are as part of Revision 1 of this contract. The existing

600A Panel LPO (UID #1-FA-801), located in closet within the building will be replaced with same rating as existing panelboards. The existing step-up transformer and outdated panelboard located within the mechanical room, which are fed from the existing 600A panelboard B-9 (UID #1-SWGSEC-2), will also be replaced, according to user request.

8.2 General Design Parameters and Assumptions

A 12.47kV-480Y/120V, 1500kVA OG&E transformer has been installed in preparation to provide power for these 480V and 208V switchgear replacements. There is a meter socket provided by OG&E located adjacent to the transformer. The transformer is currently not energized and safely protected with construction bollards.

Currently, the existing 480V and 208V unit substations are fed from two separated

Medium Voltage feeders (15kV), which originate from Switching Station ‘A’ or Vault ‘A’.

The existing 480V unit substation is rated 1600A and located within the prefabricated manufactured enclosure. The 480V unit substation has 1000kVA step-down transformer.

The existing 208V unit substation is rated 1200A, which is located adjacent to the 480V unit substation. The 208V unit substation has 500kVA step-down transformer. Both unit substations are outdated and required to be upgraded to continue serving the critical loads located in building. The unit substation 208V has been offline once and was difficult to re-energize once taken offline.

All existing feeders being fed from existing 480V unit substation will remain and be reconnected to new switchgear. The two existing feeders being fed from existing 208V unit substation will have new conductors, but the conduits will remain for reconnection to new switchgear. RFI was sent for clarification of splicing allowance per Tinker Electrical

Standards for these existing feeders. Per the COR, Jim Rowden, via email dated 3 Oct

2023, he approved the exception to the Tinker Electrical Standards of splicing from existing conductors. Splices are allowed to make an extension if new switchgear

June 8, 2026 | 11 replacement’s location is required to line up with all existing feeders to make connection(s) to the new work.

There are existing power meter attached to existing unit substations; however, the readings are outdated. The readings were not recorded correctly. The data cannot be used for peak demand load analysis. There will not be any peak load study to reconfirm the equipment sizes as indicated per paragraph 1.3.3. COR, Jim Rowden, approved not performing the peak load study. All equipment sizes as indicated in PAA will not change and will be used for design.

All equipment indicated to be replaced will be the same ratings including branch circuit breakers as existing equipment and in the same location. All existing feeders will be re-fed to new panelboards. Per COR, Jim Rowden, designing the same rating equipment replacement is approved.

All work will be phased as follows with the 480V unit substation replaced first, then new

500kVA step-down transformer installed and then the last phase will be replacing the

208V unit substation and downstream replaced panelboards as mentioned above. All work shall be confirmed to be fully operable and returning power to connections before moving forward to next phase.

Temporary Power sources will be provided to ensure the building remains fully operational during the switch over.

8.3 Demolition

8.3.1 Lighting

Not in Scope.

8.3.2 Power

Phase I: Disconnecting and removing existing 480V unit substation, including MV feeders back to power source. Disconnecting all existing feeders being fed from the existing unit substation. Retain conductors/conduits for reconnection in new work.

Provide Temporary power during equipment replacement.

Phase II: Disconnecting and removing existing 208V unit substation, including MV feeders back to panel source. Disconnecting all existing feeders being fed from the existing unit substation. Remove existing conductors/, but retain existing conduits for reconnection in new work. Provide Temporary power during equipment replacement.

Phase III: Disconnecting and removing existing 600A panelboards Panel LPO (UID #1-

FA-801). Remove conductors back to panel source. Retain conduits for reconnection in new work.

Phase IV: Disconnecting and removing the existing 30kVA step-up transformer, which is fed from existing 600A panelboard B-9 (UID #1-SWGSEC-2). The step-up transformer

(UID #1XFMR-2) is currently feeding 60A/480V disconnect switch for Elevator. Remove conductors and conduits back to panel B-9 (UID #1-SWGSEC-2).

Tracing all existing circuits/branch circuits/feeders and making notes for reconnection in new works.

12 | June 8, 2026

8.4 Construction

8.4.1 Lighting

Not in Scope.

8.4.2 Power

Phase I: Providing, installing and connecting new 480V switchgear (UID-1-SWGSEC-5) to the secondary side of newly installed 1500kVA OG&E transformer. All power connections to the secondary side of the transformer will be coordinated with OG&E.

There will be new overhead feeders routed to canopy and along the side of the building exterior wall to be routed to OG&E transformer. Reconnecting all existing feeders to new

480V switchgear (UID-1-SWGSEC-5). Test and ensure all existing loads return to original operation.

Phase II: Providing and installing 500kVA (480V-208V/120Y) step-down transformer and new 208V switchgear (UID-B-1-SWGSEC-3). Connecting transformer to new 480V switchgear (UID-1-SWGSEC-5).

Phase III: Providing and installing 600A panelboard, Panel LPO (UID #1-FA-801.

Reconnecting all existing branch circuits to new panelboards. Providing new conductors and routing to original panel sources. Connect feeders of Panel LPO (UID #1-FA-801) to new 208V switchgear (UID-B-1-SWGSEC-3). Test and ensure all loads return to original operation.

Phase IV: Connecting existing 60A disconnect switch (480V) from elevator machine and connect to new 480V switchgear (UID-1-SWGSEC-5). Provide new branch circuit. Test and ensure the elevator machine returns to original operation.

The Contractor must provide and install galvanized steel uni-strut equipment rack for remote operational breaker panels. Contractor must verify quantify of each 208V and

480V switchgear circuit breakers. The location of the rack must be unobstructed and to be installed not higher than 6-ft from finished floor.

8.5 Arc Flash Analysis

The design provides preliminary short circuit calculations for new electrical distribution systems in the EasyPower file which will be submitted for the Contractor to perform a final power study. The final power study will be conducted by the Contractor. Arc Flash detail labeling will be required on all electrical transformers, disconnects, and distribution equipment associated with this project. All new and modified electrical panels and distribution equipment shall have Fault Current Analysis and Arc Flash Calculations performed per NFPA 70, NFPA 70E, and TAFB Base Electrical Standards. Fault Current

Analysis shall be submitted for CE review and approval.

The contractor also will be required to provide field labels indicating the short fault circuit and date of the calculations on the enclosure of the new equipment in accordance with

NEC 2026, Article 110.16 and 408.6(1)

June 8, 2026 | 13

9 Civil

No Scope.

10 Fire Protection and Life Safety

10.1 Fire Protection and Life Safety Analysis Approach

This project consists of relocating the fence around the existing switch gear to accommodate new switch gear and transformer.

In accordance with UFC 3-600-01 Section 2-1.20, this Scope of Work is not considered a

Major Project.

The scope of work is defined as an Alteration - Level 2, per IEBC. An Alteration - Level 2 includes the reconfiguration of space, the addition or elimination of any door or window, the reconfiguration of any system, or the installation of any additional equipment. Per

NFPA 101, this work is also classified as a Modification, defined as the reconfiguration of any space; the addition, relocation or elimination of any door or window; the addition or elimination of load-bearing elements; the reconfiguration or extension of any system; or the installation of any additional equipment.

UFC 3-600-01 §34-1.2.7 states that where the building rehabilitation chapter of NFPA

101 requires newly constructed elements, components, and systems to comply with new construction requirements in this UFC (UFC 3-600-01) and NFPA 101 for New

Construction. Additionally, the work must not make the building areas located outside of the work area less conforming with UFC 3-600-01 and NFPA 101 than before the

Modification project was undertaken.

10.2 Types of Construction

The project includes interior work within the building but will not change the existing construction type, which is Type IV. The new construction materials will be Type IIB, non-combustible, presenting a lower hazard level than the existing construction.

10.3 General Building Heights and Areas

The project area consists of 1,010 SF. The project is under an existing canopy exterior of the building but is included within the overall building’s fire area. The project will not increase the height and fire area of the existing building. Analysis of the existing building is not within the scope of work.

10.4 Occupancy Classification

The project area is currently a Group S-1 Moderate Hazard Storage Use (Storage

Occupancy) use and will remain Group S-1 Moderate Hazard Storage Use (Storage

Occupancy).

14 | June 8, 2026

10.5 Passive Fire Protection

There are no requirements for passive fire protection for this project. Existing penetration protective and sealants through fire and smoke rated barriers and walls will be maintained.

10.6 Interior Finishes

Interior finishes will be provided in accordance with Section 10.2 of NFPA 101 and the requirements of the Occupancy Specific Criteria.

Table 10-1. Interior Finishes Requirements

Occupancy Interior Floor

Finishes Rooms and Enclosed

Spaces Exits Enclosures Exit Access Corridors

Storage (NFPA 101: Section

42.3.3)

Class I Or Class II Class A, Class B, Or Class C

Class A Or Class B

Class A, Class B or Class C

10.7 Means of Egress

10.7.1 Occupant Load

The project occupancy occupant load is required to be assigned to each space of a building related to that space’s intended use. Per NFPA 101, section 7.3.1, the occupant load will be calculated by dividing the floor area of a space by an Occupant Load Factor

(OLF) from Table 7.3.1.2 of NFPA 101, and UFC 3-600-01, Table 10-1, and occupant load should not less than that result. The occupancy load for the scope of work area is 3 people.

Table 10-2. Occupancy Specific Criteria

Use OLF (FT2/person)

Electrical Room 500 gross

10.7.2 Dead-End Limits and Common Path of Travel

Where dead-end corridors exist, an occupant entering the corridor thinking there is an exit at the end, and finding none, is forced to retrace the path to reach an exit. The building is fully sprinklered per NFPA 101, the maximum allowable dead-end corridor length is as follows:

Table 10-3. Maximum Allowable Dead-End Corridor Length

Occupancy Allowable Dead-End Corridor Allowed

Actual Length of Dead-End Corridor

Storage Ordinary- Hazard

100 feet N/A

Source: NFPA 101

June 8, 2026 | 15

A common path of travel exists where occupants are required to travel a single path to reach the point at which the occupants have the choice of two or more paths of travel to remote exits. The building is fully sprinklered per NFPA 101, the allowable common path of travel distance is as follows:

Table 10-4. Allowable Common Path of Travel Distance

Occupancy Allowable Common Path

Allowed Actual Length of Common Path

Storage Ordinary-Hazard 100 feet 52 feet 6 inches

Source: NFPA 101

10.7.3 Travel Distance

Travel distance is the distance an occupant must travel before reaching an exit or an interior fire lane. The building is fully sprinklered per NFPA, 101 the allowable travel distance is as follows:

Table 10-5. Allowable Travel Distance

Occupancy Travel Distance Allowed Travel Distance Path

Storage Ordinary-Hazard 400 feet 131 feet 0 inches

Source: NFPA 101

10.7.4 Arrangement of Means of Egress

Doors must provide a minimum clear width of 32 IN (NFPA 101: Section 7.2.1.2.3.2).

New corridor(s) or aisle(s) have a clear width greater than 44 IN (NFPA 101: Section

38.2.3.2). Common Path, Dead-end, and Egress Travel Distances for the work area are shown on the Life Safety Plan.

10.7.5 Illumination of Means of Egress

Overhead egress lighting currently exists. Existing egress lighting complies with NFPA

101 §7.8.

10.7.6 Emergency Lighting

Emergency lighting currently exists. Existing emergency lighting complies with NFPA 101

§7.9.

10.7.7 Marking of Means of Egress

Exits out of the scope of work area is exterior of the building and will not require an exit sign in accordance with NFPA 101 section 7.10.1.2.1.

10.8 Fire Pumps and Water Supply

Existing fire pumps and water supply will remain unaffected by this project.

16 | June 8, 2026

10.9 Fire Department Connections

Existing Fire Department Connections will remain unaffected by this project.

Automatic Sprinkler and Suppression Systems Analysis

The building is equipped throughout with automatic sprinkler protection. The fire suppression spans overhead within the scope of work area and will not be altered since it is designed to meet an ordinary hazard.

10.11 Standpipe Systems

There are no standpipe systems for this building, and none are required by UFC 3-600-

01.

10.12 Fire Alarm System

Building 1 is currently protected with a Siemens networked fire alarm and mass notification system. Adding additional fire alarm and mass notification appliances is not a part of the scope of work.

10.13 Fire Alarm Reporting System

Building 1 is currently protected with a Siemens networked fire alarm and mass notification system. The fire alarm/mass notification system transmits Alarm, Trouble and

Supervisory signals to the Monaco D-21 Base-Wide Monitoring Center.

10.14 Fire Department (Emergency) Vehicle Access

Exterior fire department vehicle access remains unaffected by this project.

10.15 Portable Fire Extinguishers

Existing Portable Fire Extinguishers do not comply with NFPA 10 (2-A Extinguisher, maximum travel distance to the extinguisher of 75 feet). One Portable Fire Extinguisher will be provided as part of this SOW.

11 Phasing

Installation of the electrical equipment will be such that the facility will not lose power during normal operating hours and the existing switchgear will be shut down only once

(permanently). See electrical for details.

Appendix A Asbestos and Lead Based Paint

Roberts, Robin

From: 72 ABW/CE Asbestos-LBP <72ABW.CE.Asbestos-LBP@us.af.mil>

Sent: Monday, November 20, 2023 2:59 PM

To: Roberts, Robin; DUCK, LAURA M CIV USAF AFMC 72 ABW/CEIE

Cc: Goyette, Carmen; Holliday, Cynthia; GREEN, MICHAEL J CIV USAF AFMC 72 ABW/CEIE

Subject: RE: Important: WWYK200051 - Replace Switchgear in Bldg 1 - Request for LBP &

Asbestos Report

Signed By: laura.duck.1@us.af.mil

Hello, Mr. Green performed this inspec�on and did not iden�fy any suspect asbestos materials and XRF analysis for LBP was nega�ve. I have cc’d him as well. We do have a report but my computer has been updated and I am not able to find or provide new reports at this �me. IT is helping to resolve this.

I apologize for the inconvenience but we will a)empt to provide as soon as possible.

v/r, Laura Duck

72 ABW/CEIE

Physical Scientist

Toxic Substances & Air Quality

Comm: (405) 734-3101; DSN: 884-3101

Cell: 405-200-7377From: Roberts, Robin <Robin.Roberts@hdrinc.com>

Sent: Monday, November 20, 2023 8:55 AM

To: DUCK, LAURA M CIV USAF AFMC 72 ABW/CEIE <laura.duck.1@us.af.mil>

Cc: Goyette, Carmen <Carmen.Goyette@hdrinc.com>; Holliday, Cynthia <Cynthia.Holliday@hdrinc.com>

Subject: [Non-DoD Source] RE: Important: WWYK200051 - Replace Switchgear in Bldg 1 - Request for LBP & Asbestos

Report

Good Morning Laura, I probably missed your email, but have you provided us with WWYK200051 - Replace Switchgear in Bldg. 1, LBP &

Asbestos Report? 35% Deliverables are due today to Tinker, please reply at your earliest convenience.

Thank you.

Kindly, Robin Roberts

D 210.841.2801 M 512.970.2368 hdrinc.com/follow-us

From: Roberts, Robin

Sent: Wednesday, November 8, 2023 9:03 AM

To: DUCK, LAURA M CIV USAF AFMC 72 ABW/CEIE <laura.duck.1@us.af.mil>

Cc: Goyette, Carmen <Carmen.Goyette@hdrinc.com>; Holliday, Cynthia <Cynthia.Holliday@hdrinc.com>

Subject: RE: Important: WWYK200051 - Replace Switchgear in Bldg 1 - Request for LBP & Asbestos Report

Laura, Also, we need lead-based paint report please. Thank you.

D 210.841.2801 M 512.970.2368

From: Roberts, Robin

Sent: Wednesday, November 8, 2023 8:58 AM

To: DUCK, LAURA M CIV USAF AFMC 72 ABW/CEIE <laura.duck.1@us.af.mil>

Cc: Goyette, Carmen <Carmen.Goyette@hdrinc.com>; Holliday, Cynthia <Cynthia.Holliday@hdrinc.com>

Subject: Important: WWYK200051 - Replace Switchgear in Bldg 1 - Request for LPB & Asbestos Report

Importance: High

Good Morning Laura, Can you please provide to us Asbestos Report for this project?

We are in 35% and final will go to Tinker on Nov. 20th, so we would like to have a report by then please.

Thank you.

Administrative Project Coordinator

HDR

613 NW Loop 410, Suite 700 San Antonio, Texas 78216 D 210.841.2801 M 512-970-2368 robin.roberts@hdrinc.com

This electronic transmission (and any documents accompanying it) may contain confiden�al communica�on.

Unauthorized use is prohibited. If you have received this message in error, please return it immediately and delete the original.

Appendix B Structural

Project: Tinker Air Force Base Computed: CJM Date:

Task: Replace Switchgear in Building 1 Reviewed: JFC Date: 8 Apr 2026

08/04/2026

PURPOSE:

Provide a structural design for equipment pads for new electrical equipment at Building 1.

REFERENCES:

1) UFC 3-301-01 - Unified Facilities Criteria: Structural Engineering, with Change 6, Dated 30 January 2026.

2) IBC 2024 - International Building Code, 2024 Edition

3) IEBC 2024 - International Existing Building Code, 2024 Edition

4) ASCE 7-22 - Minimum Design Loads and Associated Criteria for Buildings and Other Structures

5) ACI 318-19 - Building Code Requirements for Structural Concrete

GIVEN:

1) Existing concrete compressive strength (f'c_exist): 3,000 psi

2) Existing reinforcing yield strength (fy_exist): 60 ksi

3) Existing soil bearing capacity (qu_exist): 2,000 psf

4) Existing floor slab thickness: 6"

5) Design Risk Category: III

Calculations Key:

input Input variable or constant output Output variable demand Demand variable capacity Capacity value

OK Utilization or check below unity or standard

NG Utilization or check above unity or standard

Project No.: 10366256 Task No.: 008.03.01 Page 1 of 7

08/04/2026

Design Loads: Dead Loads

≔γconc 150 pcf Density of reinforced concrete

≔γstl 490 pcf Density of structural steel

≔tslab 6 in Thickness of floor slab(s)

≔σDL_slab =⋅γconc tslab 75 psf Unit weight of existing concrete slab

Design Loads: Wind Loads

≔Vult 116 mph Ultimate wind speed per IBC Figure 1609.3(2)

≔VASD =⋅Vult ‾‾‾0.6 89.853 mph Nominal wind speed per IBC Eq. 16-17.

≔Kd 0.85 Wind Directionality Factor per ASCE 7 Table 26.6-1.

≔Kh 0.85 Velocity pressure coefficient per ASCE 7 Table 26.10-1.

≔zg 1246 Sea level height of structure (feet)

≔Ke =e ⋅-0.0000362 zg 0.956 Ground elevation factor per ASCE 7 Table 26.9-1

Footnote 2

≔Kzt 1.00 Topographic factor per ASCE 7 Section 26.8.2.

≔qz =⋅⋅⋅⋅⋅⋅0.00256 Kh Kzt Kd Ke Vult mph psf 23.791 psf Velocity pressure per ASCE 7 Eq. 26.10-1.

≔Gf 0.85 Gust factor per ASCE 7 Section 26.11.1.

≔hwall +8 ft 0 in Height of fence

≔lwall_1 +19 ft 10.5 in Length of fence running North/South

≔lwall_2 +33 ft 6 in Length of fence running East/West

≔Height_Width_Ratio =―― lwall_1 hwall

2.484 Height to width ratio for fence perpendicular to wind

direction

≔Cf 1.40 Force coefficient factor per ASCE 7 Figure 29.3-1

≔qz_screen =⋅⋅qz Gf Cf 28.311 psf Factored design wind pressure on fence per ASCE 7 Eq. 29.4-1

Project No.: 10366256 Task No.: 008.03.01 Page 2 of 7

08/04/2026

Design Loads: Seismic Loads

≔SS 0.298

Spectral response acceleration values

≔S1 0.081

≔SDS 0.31

Spectral response coefficients

≔SD1 0.129

Importance factor for seismic design per ASCE 7 Table 1.5-2.≔Ie 1.25

≔Ip 1.0 Component importance factor per ASCE 7 Section 13.1.3

≔Cs =⋅⋅1.6 SDS Ip 0.496 Seismic response coefficient per ASCE 7 Eq. 13.3-2

Structural Design: Existing Soil Bearing

≔qsoil 2000 psf

≔Psw1 =+6693.68 lbf 2424.56 lbf 9118.24 lbf Total weight of switchgear 1

≔Asw1 =⋅93.60 in 121.25 in 78.813 ft

Footprint area of switchgear 1

≔σsw1 =―― Psw1

Asw1

115.695 psf

Bearing pressure from switchgear 1

≔Psw2 =++7644.68 lbf 9613.68 lbf 2334.56 lbf 19592.92 lbf Total weight of switchgear 2

≔Asw2 =⋅159.60 in 121.25 in 134.385 ft

Footprint area of switchgear 2

≔σsw2 =―― Psw2

Asw2

145.796 psf

Bearing pressure from switchgear 2

≔Ev_sw1 =⋅⋅0.2 SDS Psw1 565.331 lbf Vertical seismic component for switchgear 1

≔Ev_sw2 =⋅⋅0.2 SDS Psw2 1214.761 lbf Vertical seismic component for switchgear 2

≔Eh_sw1 =⋅Psw1 Cs 4522.647 lbf Horizontal seismic component for switchgear 1

≔Eh_sw2 =⋅Psw2 Cs 9718.088 lbf Horizontal seismic component for switchgear 2

Net soil bearing capacity; 6" housekeeping pad below switchgear ≔qsoil_net =--qsoil σDL_slab ⋅6 in γconc 1850 psf

≔IRsoil_bearing =if else max ⎛⎝ ,σsw1 σsw2⎞⎠ qsoil_net 1.0

‖ “Existing Soils are Adequate”

‖ “Ground Improvements Required”

“Existing Soils are Adequate”

Project No.: 10366256 Task No.: 008.03.01 Page 3 of 7

08/04/2026

≔Msw_1 =⋅Eh_sw1

118 in

4 in

23743.897 ⋅ft lbf

Overturning moments of switchgears

≔Msw_2 =⋅Eh_sw2

118 in

4 in

51019.964 ⋅ft lbf

≔tpad_sw 6 in Thickness of equipment pad below switch gear

≔xdis =――― tpad_sw atan

12.941 in Distribution length each side of switchgear

Reaction on one side of switchgear due to overturning≔Rsw1 =―――――

Msw_1

+121.25 in xdis

2123.295 lbf

Project No.: 10366256 Task No.: 008.03.01 Page 4 of 7

08/04/2026

≔wsw1 =――― Rsw1

93.60 in

272.217 plf Linear load from horizontal seismic component

Reaction on one side of switchgear due to overturning≔Rsw2 =―――――

Msw_2

+121.25 in xdis

4562.453 lbf

≔wsw2 =――― Rsw2

159.60 in

343.042 plf Linear load from horizontal seismic component

≔wDL_sw1 =―――――――― Psw1

+⋅2 93.60 in ⋅2 121.25 in

254.64 plf Perimeter loading of switch gear

≔wDL_sw2 =―――――――― Psw2

+⋅2 159.60 in ⋅2 121.25 in

418.578 plf Perimeter loading of switch gear

≔wEv_sw1 =―――――――― Ev_sw1

+⋅2 93.60 in ⋅2 121.25 in

15.788 plf Perimeter loading of vertical seismic component

≔wEv_sw2 =―――――――― Ev_sw2

+⋅2 159.60 in ⋅2 121.25 in

25.952 plf Perimeter loading of vertical seismic component

≔wuf_LC8_sw1 =++wDL_sw1 ⋅0.7 wEv_sw1 ⋅0.7 wsw1 456.244 plf

≔wuf_LC8_sw2 =++wDL_sw2 ⋅0.7 wEv_sw2 ⋅0.7 wsw2 676.873 plf

≔wuf_LC8_sw1_left =+-0.6 wDL_sw1 ⋅0.7 wEv_sw1 ⋅0.7 wsw1 332.285 plf

≔wuf_LC8_sw2_left =+-⋅0.6 wDL_sw2 ⋅0.7 wEv_sw2 ⋅0.7 wsw2 473.109 plf

≔qs_over =――――――――― max ⎛⎝ ,wuf_LC8_sw1 wuf_LC8_sw2⎞⎠

+tpad_sw ⋅2 xdis

254.769 psf Net maximum bearing pressure due to overturning moments from seismic components

Project No.: 10366256 Task No.: 008.03.01 Page 5 of 7

08/04/2026

Switchgear Plan

≔IRsoil_bearing_over =if else qs_over qsoil_net 1.0

‖ “Existing Soils are Adequate”

‖ “Ground Improvements Required”

“Existing Soils are Adequate”

≔wf_LC8_sw1 =++⋅1.2 wDL_sw1 wEv_sw1 wsw1 593.573 plf

≔wf_LC8_sw2 =++⋅1.2 wDL_sw2 wEv_sw2 wsw2 871.287 plf

Factored loading due to overturning

≔wf_LC8_sw1_left =+-0.9 wDL_sw1 wEv_sw1 wsw1 485.606 plf

≔wf_LC8_sw2_left =+-⋅0.9 wDL_sw2 wEv_sw2 wsw2 693.81 plf

≔larm =xdis 12.941 in Length of moment arm into slab

≔Mmax_slab_sw =―――――――――― ⋅max ⎛⎝ ,wf_LC8_sw1 wf_LC8_sw2⎞⎠ larm

126.659 ⋅ft lbf Maximum moment in slab

≔Vmax_slab_sw =⋅max ⎛⎝ ,wf_LC8_sw1 wf_LC8_sw2⎞⎠ larm 939.6 lbf Maximum shear in slab

Project No.: 10366256 Task No.: 008.03.01 Page 6 of 7

08/04/2026

≔Sm_slab =―――――――― ⋅⎛⎝ +93.60 in ⋅2 xdis⎞⎠ tslab

716.89 in

Strength reduction factor for plain concrete per ACI 318 Table 21.2.1.≔ϕunf 0.60

≔f'c_exist 3000 psi Compressive strength of existing concrete

≔ϕMn_slab =min

,⋅⋅⋅⋅ϕunf 5 f'c_exist psi psi Sm_slab ⋅⋅⋅ϕunf 0.85 f'c_exist Sm_slab

9.816 ⋅ft kip

Flexural capacity of slab per ACI 318 Eqs. 14.5.2.1a and 14.5.2.1b.

≔IRf_slab =―――― Mmax_slab_sw ϕMn_slab 0.013

One-way shear capacity in plain concrete sections per ACI 318 Table 14.5.5.1.≔ϕVn_slab =⋅⋅⋅⋅ϕunf ― f'c_exist psi psi ⎛⎝ ⋅⎛⎝ +93.60 in ⋅2 xdis⎞⎠ tslab⎞⎠ 31.413 kip

≔IRv_slab =―――― Vmax_slab_sw ϕVn_slab 0.03

Check housekeeping pad thickness

≔Vanchor =―― Eh_sw2

4859.044 lbf Seismic shear each side of switchgear

≔Vanchor_base =―― Vanchor

1619.681 lbf Base shear per anchor

≔Mside =―― Msw_2

25509.982 ⋅ft lbf Resultant moment of each side

≔Tanchor =――― Mside

121.25 in

2524.699 lbf Uplift in rear anchors

See attached Hilti Profis design for embedment checks

Project No.: 10366256 Task No.: 008.03.01 Page 7 of 7

STRUCTURAL CALCULATION APPENDIX A:

SWITCHGEAR CUTSHEETS

CMULDERICK

Rectangle

CMULDERICK

Callout Design strip due to overturning

CMULDERICK

Dimension 4" + xdis

CMULDERICK

Dimension xdis + 93.60 in (min), 159.60 in (max)

Rectangle

CMULDERICK

Rectangle

CMULDERICK

Dimension 145.25"

CMULDERICK

Callout

4" PAD

CMULDERICK

Callout

(E)6" CONC SLAB

CMULDERICK

Rectangle

CMULDERICK

Rectangle

CMULDERICK

Polygon

CMULDERICK

Polygon

CMULDERICK

Text Box

WDL

CMULDERICK

Text Box WEv

CMULDERICK

Text Box WEh

CMULDERICK

Arrow

CMULDERICK

Text Box Eh

CMULDERICK

Arrow

CMULDERICK

Text Box Ev

CMULDERICK

Text Box

PDL

Rectangle f

Rectangle

Appendix C Electrical

Internal

Melissa Poggi Consulting Application Engineer melissa.poggi@se.com

Proposal Name: Test Quote

Quote Name: transformer

Proposal Number: P-250102-4948414

Quote Number: Q-6498714

Through Addenda Number: 0

Sales Representative: Melissa Poggi

Conditions of Sale

This Quotation is subject to Coordinated Project Terms. See https://www.se.com/us/en/download/document/0100PL0043/

Quoted price in currencies other than U.S. Dollars is per the annual Schneider Electric exchange guidance.

Quote is valid for 30 days. Quoted lead times are approximate and subject to change.

Schneider Electric reserves the right to amend, withdraw or otherwise alter this submission without penalty or charge as a result of any event beyond its control arising from or due to the current Covid-19 epidemic or events subsequent to this epidemic / pandemic including changes in laws, regulations, by laws or direction from a competent authority.

https://www.se.com/us/en/download/document/0100PL0043/

Proposal Name: Test Quote

Quote Name: transformer

Quote Number: Q-6498714

Quote Date:

Seq # Qty Product Description 1 1 Designation :

Product Details:

1 - EX500T68HCUSS-LV Transformer: DOE 2016 EX or EXN

Transformer Type: DOE 2016 EX or EXN Transformer Rating: 500kVA Transformer Phase: Three Phase Primary Voltage: 480V Delta Secondary Voltage: 208Y/120V Transformer Taps: 4 - 2.5% 2+2- Taps Frequency: 60Hz Transformer Winding Material: Copper Sound Level: 54DB Insulation & Temperature: Class 220 (H), 150 Deg C Enclosure Material: 304 Stainless Steel Painted ANSI Grey Enclosure Type: Type 1 UL Labeled

Internal

Melissa Poggi Consulting Application Engineer melissa.poggi@se.com

Proposal Name: Tinker AFB LV Distribution - Oklahoma City, OK - HDR

Quote Name: Tinker AFB LV Distribution

Proposal Number: P-240318-4362772

Quote Number: Q-4848996

Quote Date: 04/15/2024

Through Addenda Number: 0

Sales Representative: Melissa Poggi

Conditions of Sale

This Quotation is subject to Coordinated Project Terms. See https://www.se.com/us/en/download/document/0100PL0043/

Quoted price in currencies other than U.S. Dollars is per the annual Schneider Electric exchange guidance.

Quote is valid for 30 days. Quoted lead times are approximate and subject to change.

Schneider Electric reserves the right to amend, withdraw or otherwise alter this submission without penalty or charge as a result of any event beyond its control arising from or due to the current Covid-19 epidemic or events subsequent to this epidemic / pandemic including changes in laws, regulations, by laws or direction from a competent authority.

Pricing

Total DISTRIBUTOR SELL PRICE $2,374,180.88 https://www.se.com/us/en/download/document/0100PL0043/

Proposal Name: Tinker AFB LV Distribution -

Oklahoma City, OK - HDR

Quote Date: 04/15/2024

PRINTED : 4/15/2024 2:02 PM

Seq # Qty Product Description Price Each Subtotal 1 1 Designation :

Product Details :

$1,583,347.64 $1,583,347.64

1 - POWER-ZONE 4 SWITCHGEAR COMMS-LOW VOLTAGE SWITCHGEAR

Lineup with MTZ Micrologic X Breakers Contact Factory for Delivery on Lineup with NEMA 3R Walkin Enclosure with Smart System Communications Network 2.0 Single Main With Feeders

480/277V,3PH-4W,60HZ

3200A Copper Main Bus Solidly Grounded Neutral 100% Neutral 65kA Maximum Available Fault Current NEMA Type 3R Outdoor Walk-in Construction ANSI 49 Exterior Color Paint Network Communications with Device Web Pages (IFE/Meter) Ethernet Modbus TCP Customer RJ45 Connection Breakers (Masterpact) on Modbus RS485 Serial Network connected to Ethernet Modbus TCP Interface All devices pre-wired and pre-tested to the customer connection Manually Operated Overhead Lifting Device Humidistat 2 Emergency/Exit Lights White Back Pans EcoStruxure Service Ready - Continuous Thermal Monitoring Universal Panel Server Special Records:

TAG SP-0840 - 01 - CPT, 15kVA -

ENCLOSURE OPTIONS

1 - Section(s) with no Vertical Bus 1 - 22", 3200A, Indoor Vertical Auxiliary Section 7 - 72" Deep Enclosure 7 - Bus Isolation Barriers 6 - Bus Compartment Side Barriers 7 - Bottom Plates (including Rodent Protection) 7 - Strip Heaters in Bus Compartment 7 - Strip Heaters in Cable Compartment 7 - Undercoating 5 - Section(s) with 3200A, Thermal Silver Plated Vertical Bus 6 - 22", 3200A, 4W, 100%N, Indoor Vertical Section 6 - 22" NEMA Type 3R section adder 2 - Aisle Exhaust Fan 1 - Section(s) with 1600A, Thermal Silver Plated Vertical Bus

INCOMING ONE: CONNECTIONS & METERING OPTIONS

Freestanding Cable Fed - Top Incoming 3200A UL Service Entrance Label 120kA Medium Exposure SPD SPD Surge Counter SPD Dry Contacts 3200A 4W Compression 2-Hole 600MCM Lugs Special Records:

TAG SP-0842 - 01 - SPD, DISCONNECT -

MAIN ONE: CIRCUIT BREAKER

3200A, MTZ2-32H1, Electrically Operated Main Breaker

DESCRIPTION:

Micrologic X Unit (6.0X), LSIG Communications Module & Wiring - Main/Tie Micrologic X Digital Module - ERMS Sensor Plug Rating - 2500A Trip Setting (Amps) - 2500 Energy Reduction Maintenance Switch - Locally Mounted Power Meter - PM8244RD in line up with communications Three PTs - Incoming Special Wiring to Instrumentation Compartment - Shunt Close Special Wiring to Instrumentation Compartment - Cell Switches Shunt Close - Electrically Operated Main Special Wiring to Instrumentation Compartment - Shunt Trip Shunt Trip - Electrically Operated Main Closing Coil (XF) 120Vac 1C Connected, 1C Test, 1C Disconnected Cell Switch Assembly Open/Close Pushbutton Lock - Main Shunt Trip Coil (MX1) 120Vac Spring Charging Motor (MCH) 120Vac Special Wiring to Instrumentation Compartment - Auxiliary Switches Breaker Padlock Attachment on Circuit Breaker Breaker ID Nameplate - Main 8A Form C Contacts Auxiliary Switch Strip Heaters in Breaker Compartment Status Indicating Lights - Open/Close Metering CTs Cell - 2 BC

INCOMING 1 FEEDER BREAKERS & INSTRUMENTATION

800A, MTZ2-08H1, Electrically Operated Feeder Breaker

DESCRIPTION: MCC-1

Micrologic X Unit (6.0X), LSIG Communications Module & Wiring - Feeder Modbus RS485 Serial Communication to Breaker/Cradle Sensor Plug Rating - 400A Trip Setting (Amps) - 300 Special Wiring to Instrumentation Compartment - Shunt Close Breaker ID Nameplate - Feeder Special Wiring to Instrumentation Compartment - Cell Switches Shunt Close - Electrically Operated Feeder Shunt Trip - Electrically Operated Feeder Special Wiring to Instrumentation Compartment - Shunt Trip Spring Charging Motor (MCH) 120Vac Breaker Padlock Attachment on Circuit Breaker 800A, 4W, Mechanical 1-Hole Lugs Open/Close Pushbutton Lock - Feeder Shunt Trip Coil (MX1) 120Vac 3C Connected, 3C Test, 3C Disconnected Cell Switch Assembly Special Wiring to Instrumentation Compartment - Auxiliary Switches Closing Coil (XF) 120Vac 8A Form C Contacts Auxiliary Switch Status Indicating Lights - Open/Close Strip Heaters in Breaker Compartment Cell - 3 A Load Side Power Direction - Cable (Bottom)

800A, MTZ2-08H1, Electrically Operated Feeder Breaker DESCRIPTION: Elevator Micrologic X Unit (6.0X), LSIG Communications Module & Wiring - Feeder Modbus RS485 Serial Communication to Breaker/Cradle Sensor Plug Rating - 400A Trip Setting (Amps) - 175 Special Wiring to Instrumentation Compartment - Shunt Close Breaker ID Nameplate - Feeder Special Wiring to Instrumentation Compartment - Cell Switches Shunt Close - Electrically Operated Feeder Shunt Trip - Electrically Operated Feeder Special Wiring to Instrumentation Compartment - Shunt Trip Spring Charging Motor (MCH) 120Vac Breaker Padlock Attachment on Circuit Breaker 800A, 4W, Mechanical 1-Hole Lugs Open/Close Pushbutton Lock - Feeder Shunt Trip Coil (MX1) 120Vac 3C Connected, 3C Test, 3C Disconnected Cell Switch Assembly Special Wiring to Instrumentation Compartment - Auxiliary Switches Closing Coil (XF) 120Vac 8A Form C Contacts Auxiliary Switch Status Indicating Lights - Open/Close Strip Heaters in Breaker Compartment Cell - 3 B Load Side Power Direction - Cable (Bottom)

800A, MTZ2-08H1, Electrically Operated Feeder Breaker

DESCRIPTION: T-8

Micrologic X Unit (6.0X), LSIG Communications Module & Wiring - Feeder Modbus RS485 Serial Communication to Breaker/Cradle Sensor Plug Rating - 400A Trip Setting (Amps) - 225 Special Wiring to Instrumentation Compartment - Shunt Close Breaker ID Nameplate - Feeder Special Wiring to Instrumentation Compartment - Cell Switches Shunt Close - Electrically Operated Feeder Shunt Trip - Electrically Operated Feeder Special Wiring to Instrumentation Compartment - Shunt Trip Spring Charging Motor (MCH) 120Vac Breaker Padlock Attachment on Circuit Breaker 800A, 4W, Mechanical 1-Hole Lugs Open/Close Pushbutton Lock - Feeder Shunt Trip Coil (MX1) 120Vac 3C Connected, 3C Test, 3C Disconnected Cell Switch Assembly Special Wiring to Instrumentation Compartment - Auxiliary Switches Closing Coil (XF) 120Vac 8A Form C Contacts Auxiliary Switch Status Indicating Lights - Open/Close Strip Heaters in Breaker Compartment Cell - 3 C Load Side Power Direction - Cable (Bottom)

800A, MTZ2-08H1, Electrically Operated

DESCRIPTION: T-6

Micrologic X Unit (6.0X), LSIG Communications Module & Wiring - Feeder Modbus RS485 Serial Communication to Breaker/Cradle Sensor Plug Rating - 400A Trip Setting (Amps) - 400 Special Wiring to Instrumentation Compartment - Shunt Close Breaker ID Nameplate - Feeder Special Wiring to Instrumentation Compartment - Cell Switches Shunt Close - Electrically Operated Feeder Shunt Trip - Electrically Operated Feeder Special Wiring to Instrumentation Compartment - Shunt Trip Spring Charging Motor (MCH) 120Vac Breaker Padlock Attachment on Circuit Breaker 800A, 4W, Mechanical 1-Hole Lugs Open/Close Pushbutton Lock - Feeder Shunt Trip Coil (MX1) 120Vac 3C Connected, 3C Test, 3C Disconnected Cell Switch Assembly Special Wiring to Instrumentation Compartment - Auxiliary Switches Closing Coil (XF) 120Vac 8A Form C Contacts Auxiliary Switch Status Indicating Lights - Open/Close Strip Heaters in Breaker Compartment Cell - 3 D Load Side Power Direction - Cable (Bottom)

800A, MTZ2-08H1, Electrically Operated Feeder Breaker

DESCRIPTION: T-8

Micrologic X Unit (6.0X), LSIG Communications Module & Wiring - Feeder Modbus RS485 Serial Communication to Breaker/Cradle Sensor Plug Rating - 400A Trip Setting (Amps) - 225 Special Wiring to Instrumentation Compartment - Shunt Close Breaker ID Nameplate - Feeder Special Wiring to Instrumentation Compartment - Cell Switches Shunt Close - Electrically Operated Feeder Shunt Trip - Electrically Operated Feeder Special Wiring to…