This is Amendment 0004 to solicitation FA813726R0025, issued by the U.S. Air Force at Tinker Air Force Base (FA8137 AFSC PZIOC), effective May 27, 2026. The amendment extends the proposal submission deadline from June 22, 2026 to July 2, 2026 and corrects the line item descriptions for two Contract Line Item Numbers (CLINs). The solicitation pertains to Project WWYK200051 for Switchgear B1 work (FSC: Z2AA).

The specific modifications to the line items are as follows: CLIN 0001 description is changed from "Replace Switchgear B1" (EEIC: 52400) to "Repair Switchgear B1" (EEIC: 52400), and CLIN 0002 description is changed from "Replace Switchgear B1" (EEIC: 53600) to "Design for Switchgear B1" (EEIC: 53600). The solicitation number is updated to FA813726R00250004. All other terms and conditions of the original solicitation remain unchanged. Contracting officers for this procurement are Dedrian Parmer and Stephen Palmer at Tinker AFB, Oklahoma.

View the file

Other files

File Type Posted
Solicitation Amendment FA813726R00250005 SF 30.pdf PDF
WWYK160073 REPAIR FIRE RISER AS-RECORDED 3.18.24.pdf PDF
Att1_200051_SWITCHGEAR_IFC_REV_1_6-17-26_DRAWINGS.pdf PDF
Att2_200051_IFC Rev1_Design_Analysis.pdf PDF
PreBid Govt Revised Response for WWYK200051 Replace Switchgear Bldg 1 ( 06.22.2026).pdf PDF
WWYK200051_SWITCHGEAR_IFC_DRAWINGS.pdf PDF
Solicitation Amendment FA813726R00250003 SF 30.pdf PDF
Pre-Bid RFI Govt Response Att2_Pictures for Electrical Closet.pdf PDF
Solicitation Amendment FA813726R00250002 SF 30.pdf PDF
Pre-Bid RFIs Govt Response for WWYK200051 Replace Switchgear Bldg 1 (06.08.2026).pdf PDF
Pre-Bid RFI Govt Response Att1_Inspection Report - WWYK090044F.pdf PDF
WWYK200051_TAFB IFC_FINAL_SPECIFICATIONS.pdf PDF
841018.pdf PDF
830009.pdf PDF
Solicitation Amendment FA813726R00250001 SF 30.pdf PDF
Bldg 1 - Electrical.pdf PDF
770142.pdf PDF
730072.pdf PDF
870148.pdf PDF
WWYK200051_SWITCHGEAR_IFC_CAD (2).zip ZIP file
B-1MEP.pdf PDF
950213.pdf PDF
710216.pdf PDF
00 80 00.pdf PDF
01 45 00.00 10.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
00 71 00.pdf PDF
00 80 05.pdf PDF
01 32 16.00 20.pdf PDF
01 78 00.pdf PDF
00 70 00.pdf PDF
00 72 00.pdf PDF
01 78 23.pdf PDF
01 33 00.pdf PDF
01 33 16.00 10.pdf PDF
01 42 00.pdf PDF
01 50 00.pdf PDF
WWYK200051 Initial Site Visit Sign In Sheet.pdf PDF
Section M - Evaluation Factors for Award.pdf PDF
Solicitation FA813726R0025_WWYK200051_Replace_Switchgear .pdf PDF
Section L - Instructions to Offerors.pdf PDF
WWYK200051 WAGE Determinations.pdf PDF
WWYK200051 Initial Site Visit Location.pdf PDF
EAL List.xlsx XLSX spreadsheet
STATEMENT OF WORK (SOW).pdf PDF
DRAWINGS.pdf PDF
Submittal Register.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

J

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

27 May 2026

4. REQUISITION/PURCHASE

REQUISITION NUMBER

5. PROJECT NUMBER (if applicable)

WWYK200051

6. ISSUED BY CODE FA8137

FA8137 AFSC PZIOC

CP 405 739 4040, 7858 5TH ST STE 1

TINKER AFB, OK 73145-9125

UNITED STATES

DEDRIAN PARMER, Email: dedrian.parmer@us.af.mil Telephone: 4057340860 Stephen Palmer, Email: stephen.palmer@us.af.mil Telephone: 4057394182

7. ADMINISTERED BY (if other than Item 6)

CODE

SCD: PAS:

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)

CODE: FACILITY CODE:

9A. AMENDMENT OF SOLICITATION NUMBER

FA813726R0025

9B. DATED (SEE ITEM 11)

14 May 2026

10A. MODIFICATION OF CONTRACT/ORDER

NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; 1 or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required) See Section G - Contract Administration Data

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK

ONE

A.THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.)

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to extend the proposal submission deadline to July 02, 2026, and to correct the titles for CLIN 0001 and CLIN 0002.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Stephen N Palmer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

22 Jun 2026

Computer generated. Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA-FAR (48 CFR) 53.243

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section A - Solicitation/Contract Form

The following modifications were made:

Information From To Response Due Date 22 Jun 2026 02 Jul 2026 Solicitation Number FA813726R00250003 FA813726R00250004

Section B - Supplies or Services & Prices or Costs

Line Item 0001

The following Line Item modifications were made:

Information From To

Description PROJECT WWYK200051 Replace Switchgear B1

FSC: Z2AA , EEIC: 52400

PROJECT WWYK200051 Repair Switchgear B1

FSC: Z2AA , EEIC: 52400

Line Item 0002

The following Line Item modifications were made:

Information From To

Description WWYK200051 Replace Switchgear B1.

FSC: Z2AA, EEIC: 53600.

WWYK200051 Design for Switchgear B1.

FSC: Z2AA, EEIC: 53600.

FA813726R00250004

SUMMARY OF CHANGES
Solicitation/Contract Form
Supplies or Services & Prices or Costs

File details come from the government source that posted it. Updated .