DRAWINGS.pdf
PDF 2 MB Posted
- Solicitation number
- FA813726R0025
About this file
This document is a set of construction drawings for the WWYK200051 "Replace Switchgear, Building 1" project at Tinker Air Force Base, Oklahoma, prepared by HDR BES and issued on April 17, 2024.
The project involves replacement of electrical switchgear in Building 1, located within the 72 Air Base Wing Civil Engineer Directorate at Tinker AFB. Key structural and electrical work includes demolition of existing equipment and installation of new 480V and 208V switchgear enclosures, a 500 KVA transformer, and associated distribution infrastructure. The project scope encompasses removal of existing posts, screen panels, and concrete equipment pads; construction of new concrete support pads per standard details; installation of new galvanized HSS structural screening and wind screen framing; and complete electrical rerouting with new cable runs, conduits, and grounding systems. The existing 1500 KVA OG&E transformer and 60A elevator disconnect remain in service. New panels include Panel B-9 (600A, 208/120V), Panel B-13 (225A, 208/120V), Panel LPO (600A, 208/120V), and two remotely operated circuit breaker cabinets (208V-ROCP-1 and 480V-ROCP-1 and 480V-ROCP-2). The electrical design follows Tinker AFB electrical standards (March 2023), IBC 2021, ACI 318-19, and AISC 360-16. The project area is limited to approximately 1,010 square feet in the equipment room with life safety compliance verified for the mechanical/electrical storage use group. Construction documents include general notes, structural framing plans, electrical one-line diagrams, panel schedules, and detailed equipment specifications requiring contractor coordination and engineer approval for final installations.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5th Ave
"C " A ve
Arnold St.
"E "A ve
"D " A ve
"C " A ve
3rd Ave.
"D
" D riv e
6th St.
RU
NW
AY
/36
RUNWAY 13/31
TA
XI
W
AY
G
TAXIW
AY H
TAXIWAY B
TAXIWAY C
TAXIWAY M
TA
XI
W
AY
K
TAXIWAY E
TAXIWAY A
TA
XIW
AY EE
TAXIWAY F
TAXIWAY D
TAXIWAY E
TAXIWAY J
TA
XI
W
AY
G
TAXIWAY A
TAXIW
AY H
TAXIWAY C
TAXIWAY D
TAXIWAY EE
TAXIWAY F
Elm Creek
Crutcho Creek
Kuhlman Creek
Kuhlman Creek
Elm Creek
East Crutcho Creek
Elm Creek
El m
Cr ee k
Elm Creek
Elm Creek
Elm Creek
Elm Creek
Ku hlm an Cr ee k
Ea st
Cr utc ho C ree k
Elm Cree k
West Crutcho Creek W es t C ru tch o C re ek
Elm Creek
Soldier Creek
Elm Creek
Soldier CreekSoldier Creek
Ea st
Cr utc ho C re ek
Elm Creek
Ea st
Cr utc ho C re ek
East Crutcho Creek
Soldier Creek
So ldi er Cr ee k
East C rutcho Creek
Soldier Creek
Soldier Creek
So ldi er C re ek
East Crutcho Creek
416506
11401128
59035909
838837
62509
62512
62525
99999
62543
71086
53902
50414
55300
56601
61019
62501
45134
62503
61289
62542
15904
15908
15904
15908
62502
41046
62501
62514
62501
41157
45815
40592
62522
15930
11824
3 10
62540
61089
62528
62523
62501X
43774
62516
3592135916
32101
930G
948-E
911-E
948-W
911-W
33001
35913
65672
930S
43609
42116
62517
62515
62526
62527
62513
62501OK
11289
62501
15930
15908
15904
15908
15904
61018
71089
45134
96022
43120
44045
43610
41163
15930
Ea st
Dr
SE 59th St.
St aff
D r.
5th Ave
W ar eh ou se R d.
7th St.
Mc Na rn ey
A ve
Mitchell Ave
Co ok
A ve
W es t D r.
Extender Dr.
5th Ave.
Globemaster Dr.
Ai r D ep ot
Mercury Rd.
Po nd
R d.
"C " A ve
Hi llto p R d.
"M " A ve
Doolittle Ave
W hit e D r.
Ba ll P ar k R d.
6th St.
Po we rh ou se D r.
Int ru de r D r.
Holden Dr.
Vanaman Rd.
1st St.
Arnold St.
SE 74th St
Ai r D ep ot
Patrol Rd.
Reserve Rd.
"A " A ve
Mu nit ion s R d.
"B " A ve
"H " A ve
Al er t R d.
"E "A ve
Sentry Rd.
34th St.
Twining Dr.
Jo ne s
To we r R d.
Vanaman Rd.
Ind us tria l B lvd
So uth
S t.
1st St.
Do oli ttle A ve
Pi cn ic Rd
Ja me s D r.
Wo lfe
D r.
Ai r D ep ot
"D " A ve
Perimeter Rd.
Rapcon Rd.
Reserve Rd
"L " A ve
"F " A ve
1st St.
Br ow n D r.
Ol d A ir D ep ot
Airey Dr.
General Motors Dr
Bradley Dr.
Entrance Road "C"
Entrance Road "A"
"C " A ve
Vandenberg Dr.
Do rm ito ry
Rd
Dormitory Rd.
Chennault Dr.
Mi tch ell A ve
Spaatz Dr.
En gin e T es t D r.
3rd Ave.
"D " D riv e
Joint STARS Dr.
Ai r D ep ot
Bl vd
Turbine Dr. Turbine Dr.
Central Plant Dr.
6th St.
Falcon Dr.
Blac kbi rd D r.
W ey lan d L oo p
Pegasus Dr.
Thunderbolt D r.
Munitions Rd. Ext.
Codding Rd.
Starlifter Dr.
Chidlaw Ct.
Co rsa ir D r.
Rap tor
Ct.
Ni gh t H aw k C t.
Ph an tom D r.
Fr an kli n
Sk ym as ter
D r.
Spaatz Ct.
La wr en ce
Mu nd ell
Nabors Dr.
Mc Ni ck le
Mi lle r D r.
Ta il F ea the r D r.
Air ey
Ci r.
Smith Ct. Raven Ct.
Air Dep ot Ai r D ep ot
1st St.
TAXIWAY F
Ra w li ng s A ve
Mitc he ll Av e.
Mercury Rd.
Ra ily ar d R d.
He rcu les R d.
TINKER AFB, OK
VICINITY MAP
BASE OPERATIONS B240
CONTRACTING B3
GOTT GATE
TINKER GATE
PASS & ID
B6611
HRUSKOCY GATE
EAKER
GATE
FIRE DEPARTMENT B117
VANCE GATE
LIBERATOR GATE
HOPE
GATE
LEGEND
CONTRACTOR
HAUL ROUTE
LANCER GATE
TRUCK GATE
PIAZZA GATE
BASE CIVIL
ENGINEER
B400
PROJECT
LOCATION
G-001
GE
NE
RA
L N
OT
ES
VI
CI
NI
TY
M
AP
A
ND
SH
EE
T
IN
DE
X
REVIEWED BY:
REVIEWED BY:
USING AGENCY:
ASBESTOS EVALUATION:
SAFETY:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
INDUSTRIAL HYGIENE:
DATE:
PROJECT DRAWING INDEX SIGNATURES
CORROSION ENGINEER: (CECE)
CE OPERATIONS: (CECO)
COMMUNICATIONS: (COMM)
CHIEF ENGINEER DIR: (CECE)
CHIEF DESIGN BRANCH: (CECE)
DESIGN MANAGER: (CECE)
ZONE MANAGER:
CONSTRUCTION MANAGEMENT: (CECE)
ENVIRONMENTAL:
BASE CIVIL ENGINEER: (CE)
FIRE DEPARTMENT: (CEFT)
GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES
OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING
MINIMUM QUALITY STANDARDS, IDENTIFICATION AND
GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF
OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED
THE SPECIFIED ITEMS IN TERMS OF PHYSICAL
PROPERTIES, INCLUDING, COLOR RANGE, FINISH,
DURABILITY, APPEARANCE, PERFORMANCE
CHARACTERISTICS, AND OTHER FACTORS. OTHER
PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE
SUBMITTED FOR EVALUATION AND
APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.
2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE
CONSIDERED AS A WHOLE IN THAT THE GENERAL
CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE
RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL
SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF
THE SPECIFICATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL
CONSTRUCTION FENCING AND BARRICADES AS REQUIRED
TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT
ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE
CONSTRUCTION SITE.
4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES
CAUSED BY CONSTRUCTION TRAFFIC OR ANY
CONSTRUCTION OPERATION SHALL BE REPAIRED OR
REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED
EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE
GOVERNMENT.
5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE
UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW
LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE
"EXISTING" OR "BY OTHERS".
GENERAL NOTES:
G-001 GENERAL NOTES, VICINITY MAP AND SHEET INDEX
SHT. SHEET TITLE
WWYK200051
REPLACE SWITCHGEAR,
BLDG 1
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
H
D R
B
ES
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
YK
RE
PL
AC
E
SW
IT
CH
GE
AR
BL
DG
PROJECT
LOCATION
G-101 LIFE SAFETY PLAN
STRUCTURAL
S-001 STRUCTURAL NOTES
S-002 TYPICAL CONCRETE DETAILS
SD101 EXISTING FIRST FLOOR FRAMING PLAN - DEMOLITION
S-101 EXISTING FIRST FLOOR FRAMING PLAN - NEW WORK
S-201 FRAMING ELEVATIONS AND DETAILS
ELECTRICAL
E-001 LEGEND AND ABBREVIATIONS
E-100 OVERALL PLAN
ED401 ENLARGED PLANS - DEMOLITION
ED601 ONE-LINE - DEMOLITION
E-401 ENLARGED PLANS - NEW WORK
E-501 480V AND 280V SWITCHGEAR RISER
E-601 ONE-LINE - NEW WORK
E-701 SCHEDULES
JW
KH
JW17
A
PR
IL
L
J
J
J
J
J
J
J
J
J
J
J
J
COMM
CORRIDOR
VENDING
OPEN
OFFICE
OPEN
OFFICE
MECH
MEN'S
RAMP
CHILLER ON
MEZZANINE
DOCK
DOCK
T D
-1 T
D -1
TD-1 TD-1TD-1 TD-1
C P
-1 C
P -1
CP-1 CP-1
TD-1 TD-1
CP-1 CP-1
TD-1 TD-1TD-1 TD-1 TD-1
7 8 9 10 11 12 13 14 15 16 17 18
J
K
L
M
EQUIPMENT
ROOM
MECH/ELEC
1010 SF / 500 / 3 PER
55" 0.2
32" 0.2
WIND SCREEN
WIND SCREEN
3'
6'
A CLEAR DOOR WIDTH [FEET - INCHES]
C EXIT CAPACITY [OCCUPANTS]
EXIT DOOR TAG
NEW FIRE EXTINGUISHER
OTHERS
LIFE SAFETY NOTES:
1. FOR EXIT LIGHTS AND EMERGENCY LIGHTING, SEE ELECTRICAL
LIGHTING DRAWINGS (E SERIES).
LINE TYPES FOR MEANS OF EGRESS:
TRAVEL DISTANCE
SYMBOLCOMPONENT
LIFE SAFETY SYMBOLS:
TD
EXIT DISCHARGE ARROW
EXIT DISCHARGE
B CAPACITY FACTOR [INCHES PER OCCUPANT]
COMMON PATH CP
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
R
E P
L A
C E
S W
IT
C
H G
E A
R
B L
D G
KEY PLAN
/1
/2
H D
R B
E S
R M
J M D
E
G-101
L
IF
E S
A F
E T
Y P
L A
N
1/8" = 1'-0"
LIFE SAFETY PLAN1
PROJECT AREA CODE SUMMARY
UFC 1-200-01 (12 JUNE 2023) WITH CHANGE 2
2024 NFPA 101 LIFE SAFETY CODE
UFC 3-600-01 (6 MAY 2021) WITH CHANGE 6
2021 IBC AS AMENDED BY UFC 1-200-01
2021 IEBC AS AMENDED BY UFC 1-200-01
PROJECT AREA BUILDING AREA
FLOOR
1ST FLOOR STORAGE (GROSS)
PROJECT AREA OCCUPANT LOAD
FLOOR
1ST FLOOR
AREA TYPE LOAD FACTOR LOAD REFERENCE
MECH/ELEC 500 SF/ OCC. 3 UFC 3-600-01 TABLE 10-1
EXISTING AREA (GSF)
TOTAL
1,010
1,010
TOTAL 3
G-101
PROJECT EGRESS TRAVEL DISTANCE
STORAGE USE
ALLOWED ACTUAL NFPA 101 REF.
COMMON PATH 53 FT100 FEET (WITH SPRINLKERS) TABLE 42.2.5
TRAVEL DISTANCE 131 FT400 FEET (WITH SPRINLKERS) TABLE 42.2.6
DEAD-END CORRIDOR N/A100 FEET (WITH SPRINLKERS) TABLE 42.2.5
04/17/2024
GENERAL STRUCTURAL NOTES (GSN)
GENERAL
G1. SCOPE
THE NOTES ON THIS SHEET AND THE STANDARD STRUCTURAL DETAILS ARE GENERAL AND
APPLY TO THE ENTIRE PROJECT WHETHER SPECIFICALLY CALLED OUT OR NOT, EXCEPT
WHERE THERE ARE SPECIFIC INDICATIONS TO THE CONTRARY ON STRUCTURAL SHEETS. IF
THERE ARE QUESTIONS, THEY SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER AND
ANSWERED IN WRITING PRIOR TO CONSTRUCTION.
G2. APPLICABLE SPECIFICATIONS AND CODES
A. INTERNATIONAL BUILDING CODE, IBC 2021 WITH APPLICABLE EDITIONS OF THE CODE
REFERENCED STANDARDS.
B. ACI 318-19
C. TAFB FACILITY STANDARDS
D. UFC 1-200-01 (DATED 12 JUNE 2023)
E. UFC 3-301-01 (WITH CHANGE 1, DATED 2 OCTOBER 2023)
F. AISC 360-16
G3. DESIGN CRITERIA
1. APPLIES TO ALL STRUCTURES (UNO)
A. DEAD LOAD:
1. ACTUAL TRIBUTARY STRUCTURE WEIGHT
B. LIVE LOAD:
1. ELECTRICAL YARD: 150 PSF
C. WIND:
1. RISK CATEGORY: III
2. ULTIMATE WIND SPEED; VULT: 116 MPH
3. ALLOWABLE STRESS WIND SPEED; VASD: 90 MPH
4. EXPOSURE: C
D. SEISMIC:
1. RISK CATEGORY: III
2. IMPORTANCE FACTOR: 1.25
3. SPECTRAL RESPONSE ACCELERATION, SS: 0.298g
4. SPECTRAL RESPONSE ACCELERATION, S1: 0.081g
5. SITE CLASS: D
6. SEISMIC DESIGN CATEGORY: B
7. SPECTRAL RESPONSE COEFFICIENT, SDS: 0.31g
8. SPECTRAL RESPONSE COEFFICIENT, SD1: 0.129g
9. BASIC SEISMIC FORCE RESISTING SYSTEM: STEEL SYSTEMS NOT SPECIFICALLY
DETAILED FOR SEISMIC RESISTANCE
10. ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE PROCEDURE
11. DESIGN BASE SHEAR: 3.2 KIPS
12. SEISMIC RESPONSE COEFFICIENT: 0.06
13. RESPONSE MODIFICATION FACTOR: 3.0
G4. SAFETY
SAFETY AND STRUCTURE STABILITY DURING CONSTRUCTION ARE THE SOLE RESPONSIBILITY
OF THE CONTRACTOR. STRUCTURES HAVE BEEN DESIGNED TO RESIST THE DESIGN LIVE
LOADS ONLY AS A COMPLETED STRUCTURE.
G5. OPENINGS
OPENINGS FOR PIPES, DUCTS, CONDUITS, ETC. ARE NOT ALL SHOWN ON THE
STRUCTURAL DRAWINGS. COORDINATE AND PROVIDE OPENINGS AS REQUIRED TO
ACCOMMODATE ALL WORK SHOWN OR SPECIFIED IN THE CONTRACT DOCUMENTS AND
OTHERWISE REQUIRED FOR THE FURNISHING OF A FUNCTIONALLY COMPLETE PROJECT.
REINFORCE AROUND OPENINGS PER STANDARD STRUCTURAL DETAILS UNLESS OTHERWISE
SHOWN.
G6. STANDARD DETAILS
THE STANDARD DETAILS DEPICT TYPICAL DETAILING TO BE USED ON THIS PROJECT. IF
CONDITIONS ARE NOT EXPLICITLY SHOWN ON THE DRAWINGS THEY SHALL BE MADE
SIMILAR TO THE STANDARD DETAILS. OBTAIN APPROVAL OF ENGINEER IN WRITING FOR
SIMILAR CONDITIONS PRIOR TO CONSTRUCTION.
G7. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND ELEVATIONS OF EXISTING
CONSTRUCTION AS REQUIRED TO COORDINATE NEW CONSTRUCTION. SUBMIT REQUIRED
CHANGES FOR APPROVAL.
G8. CONTRACTOR TO SUBMIT FOR REVIEW ALL EQUIPMENT SIZES, OPERATING WEIGHTS,
VIBRATION FORCES, SUPPORT LOCATIONS, ALONG WITH ANY FLOOR OPENINGS, NOTCHES,
AND RECESSES REQUIRED BY SUCH EQUIPMENT. CONCRETE SUPPORT PADS AND/OR
FRAMING REQUIRED TO SUPPORT SAID EQUIPMENT SHALL NOT BE FABRICATED AND
PLACED UNTIL THE CONCRETE SUPPORT PADS AND/OR FRAMING IS APPROVED TO
SUPPORT THE EQUIPMENT.
CONCRETE
C1. DESIGN STRENGTHS:
F'c = 4,000 PSI Fy = 60,000 PSI
C2. CONCRETE COVER
UNLESS OTHERWISE NOTED, PROVIDE CONCRETE COVER FOR REINFORCING AS FOLLOWS:
CONCRETE DEPOSITED AGAINST EARTH: 3"
ALL OTHER: 2"
SEE DRAWINGS FOR EXCEPTIONS
C3. SEE SPECIFICATIONS FOR REINFORCING PLACEMENT REQUIREMENTS.
C4. REFER TO OTHER DISCIPLINE DRAWINGS PRIOR TO CONSTRUCTION FOR EMBEDDED ITEMS
AND PENETRATIONS NOT SHOWN ON STRUCTURAL DRAWINGS. AS REQUIRED TO
ACCOMMODATE ALL WORK SHOWN OR SPECIFIED IN THE CONTRACT DOCUMENTS AND
OTHERWISE REQUIRED FOR THE FURNISHING OF A FUNCTIONALLY COMPLETE PROJECT.
REINFORCE AROUND OPENINGS PER STANDARD STRUCTURAL DETAILS UNLESS OTHERWISE
SHOWN.
C5. PROVIDE 3/4" CHAMFERS AT ALL EXPOSED EDGES. NOT ALL CHAMFERS MAY BE SHOWN ON
DRAWINGS.
C6. FIELD ADJUST REINFORCING AT OPENINGS AND EMBEDDED ITEMS AS INDICATED.
C7. ANCHOR BOLTS NOT SPECIFIED BY ENGINEER SHALL BE DESIGNED AND CERTIFIED BY A
REGISTERED PROFESSIONAL ENGINEER LICENSED IN THE STATE OF OKLAHOMA, RETAINED
BY THE CONTRACTOR, IN ACCORDANCE WITH APPLICABLE PROJECT AND CODE
REQUIREMENTS. SUBMIT AS A SHOP DRAWING FOR REVIEW AND APPROVAL BY THE ENGINEER.
COORDINATE LOCATION, SIZE AND EMBEDMENT PRIOR TO CASTING CONCRETE.
C8. ABSOLUTELY NO WELDING OF REINFORCING BARS OR TORCHING TO BEND REINFORCING
BARS SHALL BE ALLOWED WITHOUT SPECIFIC APPROVAL FROM THE STRUCTURAL
ENGINEER.
C9. ALL CAST IN PLACE AND POST-INSTALLED ANCHORS INDICATED IN THE STRUCTURAL
DOCUMENTS SHALL COMPLY WITH CHAPTER 17 OF ACI 318 AND CHAPTER 19 OF THE
IBC. ALL EXPANSION AND ADHESIVE ANCHORS SHALL HAVE THE ICC REPORT SHOWING
EQUIVALENT LOAD CAPACITY. SUBMIT AND INSTALL PER THE ICC EVALUATION REPORT.
DEFERRED SUBMITTALS
1. DEFINED:
DEFERRED SUBMITTALS ARE THOSE PORTIONS OF THE DESIGN WHICH ARE NOT SUBMITTED AT THE TIME OF PERMIT APPLICATION AND WHICH ARE TO BE SUBMITTED TO THE CONTRACTING OFFICER
FOR ACCEPTANCE PRIOR TO INSTALLATION OF THAT PORTION OF THE WORK.
2. THE FOLLOWING IS A LIST OF DEFERRED SUBMITTALS PER IBC SECTION 107.3.4.1 THAT ARE
EXPECTED TO CONTAIN STRUCTURAL CALCULATIONS OF SAFETY RELATED SYSTEM INFORMATION
FOR REVIEW TO MEET BUILDING PERMITTING REQUIREMENTS FOR DESIGNED SYSTEMS PRIOR TO INSTALLATION OF THE INDICATED STRUCTURAL ELEMENT, EQUIPMENT, DISTRIBUTION SYSTEM, COMPONENT OR ITS ANCHORAGE. THE CONTRACTOR SHALL SUBMIT THE REQUIRED ENGINEER
CERTIFICATION SUPPORTING DATA AND DRAWINGS FOR REVIEW AND ACCEPTANCE BY THE
GOVERNMENT. ADDITIONALLY, ACCEPTANCE INDICATED ON THE ENGINEER'S COMMENT FORM,
ALONG WITH THE COMPLETED FINAL SUBMITTAL SHALL THEN BE FILED BY THE CONTRACTOR AND ACKNOWLEDGED AS ACCEPTED BY THE CONTRACTING OFFICER PRIOR TO INSTALLATION OF THESE
ITEMS.
DEFERRED SUBMITTALS
SPEC SECTIONS/
COMPONENTS
SWITCHGEAR
ANY EQUIPMENT OR COMPONENT IN WHICH A
TECHNICAL SPECIFICATION REQUIRES SUBMITTAL
OF EQUIPMENT OR ANCHORAGE SYSTEM
CALCULATIONS
STEEL
S1. DESIGN STRENGTHS:
HSS SECTIONS (TUBES AND ROUNDS) Fy=46 KSI ALL OTHER PLATES AND SHAPES: Fy=36 KSI
S2. DIMENSIONS:
TO CENTERLINES OF COLUMNS AND BEAMS, TOP SURFACES OF BEAMS AND TUBES AND
BACKS OF CHANNELS AND ANGLES UNO.
S3. ELEVATIONS:
TOP OF STEEL REFERS TO TOP SURFACE OF MEMBER OR FLANGE UNO.
S4. WHEN FILLET WELD SIZE IS NOT INDICATED, PROVIDE MAXIMUM WELD SIZE BASED ON
MATERIAL THICKNESS IN ACCORDANCE WITH AISC SPECIFICATIONS.
S5. ALL BOLTED STRUCTURAL CONNECTIONS ARE BEARING TYPE CONNECTIONS UNLESS
OTHERWISE SPECIFIED TO BE SLIP-CRITICAL. PROVIDE LOAD INDICATING WASHERS AT
SLIP-CRITICAL CONNECTIONS.
S6. CONFORM TO AISC 360, STEEL CONSTRUCTION MANUAL AND AISC 341, SEISMIC DESIGN
MANUAL.
S7. SCREEN PANELS SHALL BE A MINIMUM OF 24 GAUGE THICK CONFORMING TO AISI S100.
CONSTRUCTION AT EXISTING STRUCTURES
E1. SEE DEMOLITION SHEETS.
E2. WHERE DRILL AND EPOXY REINFORCING OR ANCHORS ARE INSTALLED CONTRACTOR SHALL NOT DAMAGE EXISTING REINFORCING. IF REQUIRED, CONTRACTOR SHALL HAVE EXISTING CONCRETE
INVESTIGATED USING GROUND PENETRATING RADAR TO LOCATE EXISTING REINFORCING.
E3. EXISTING CONCRETE SURFACES TO BE JOINED WITH NEW CONCRETE SHALL BE ROUGHENED
TO 1/4" AMPLITUDE, THROUGHLY CLEANED BY SAND BLASTING, AND APPLY BONDING AGENT
JUST PRIOR TO PLACEMENT OF NEW CONCRETE.
E4. WHERE EXISTING REINFORCING IS TO BE PRESERVED, CONTRACTOR SHALL STRAIGHTEN AND
SAND BLAST REINFORCING JUST PRIOR TO PLACEMENT OF NEW CONCRETE.
E5. PRIOR TO DRILL AND EPOXY BOLTS OR REBAR, LOCATE ALL EXISTING REINFORCEMENT. CARE
SHALL BE TAKEN NOT TO DISTURB THE EXISTING REINFORCEMENT.
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
R
E P
L A
C E
S W
IT
C
H G
E A
R
B L
D G
A
P R
IL
H D
R B
E S
C M
R N L M
S-001
G E
N E
R A
L S
T R
U C
T U
R A
L N
O T
E S
1 1/2"
CLR.
4" MIN. CONTRACTOR
COORDINATE PAD
THICKNESS WITH REQUIRED
EQUIP ANCHOR BOLT
EMBEDMENT
4"
MIN.
6"
#4@12" E.W.
MIN.*
#4 CLOSED TIE ADDL
CONT. @ PERIMETER
CONCRETE SURFACE SHALL BE CLEAN,
FREE OF LATENCE, ROUGHENED TO A 1/4"
AMPLITUDE, & COATED W/ BONDING AGENT
3/4" CHAMFER (TYP.)
EXISTING SLAB
EQUIP.
BASE
#4@12"W/ STD HOOKS @
TOP PERIM, 3" EMBEDMENT
AND EPOXY
8" LEG (TYP.)
PAD NOTES:
1. PAD DETAILS APPLY FOR SUPPORT OF ALL EQUIPMENT UNLESS INDICATED
OTHERWISE ON THE DRAWINGS.
2. BEFORE EQUIPMENT SUPPORT PADS ARE CAST, THE PAD SIZES AND
REINFORCING SHALL BE APPROVED BY THE ENGINEER AS BEING CAPABLE
OF SUPPORTING EQUIPMENT TO BE PLACED THEREON. EQUIPMENT BASE
DIMENSIONS SHALL BE THE LARGER OF AS DETERMINED BY THE
EQUIPMENT MANUFACTURER OR AS INDICATED ON THE DRAWINGS.
SUBMIT ALL EQUIPMENT DIMENSIONS AND LOADS TO ENGINEER. THE SIZE,
NUMBER, TYPE, LOCATION AND THREAD PROJECTION OF THE ANCHOR
BOLTS (A.B.) SHALL BE AS DETERMINED BY THE EQUIPMENT
MANUFACTURER AND SHALL BE AS APPROVED BY THE ENGINEER. A.B.
SHALL BE HELD IN POSITION WITH A TEMPLATE WHILE EQUIPMENT PAD IS
CAST.
3. 6" MINIMUM PAD EDGE DIMENSION TO EQUIPMENT A.B. APPLIES FOR ALL
EQUIPMENT SUPPORT PADS.
4. REFERENCE ELECTRICAL DRAWINGS FOR DIMENSIONS & LOCATIONS OF
PADS. FINAL PAD DIMENSIONS ARE TO BE ADJUSTED AS NEEDED TO FIT
FINAL EQUIPMENT SELECTED.
EQUIP. A.B.
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
R
E P
L A
C E
S W
IT
C
H G
E A
R
B L
D G
A
P R
IL
H D
R B
E S
C M
R N L M
S-002
T Y
P
IC
A L C
O N
C R
E T
E D
E T
A
IL
S
12" = 1'-0"1
TYPICAL EQUIPMENT SUPPORT PAD
N
NN
N
N
N
N
N
N
N
N
N
N
L
J
J
J
J
J
J
J
J
J
J
J
J
J
WAITING RM
CORRIDOR
420 SCM
OPEN OFFICE
OPEN OFFICE
OFFICE
OFFICE
BREAK RM
COMM
CORRIDOR
BREAK RM
OPEN OFFICE
OPEN OFFICE
STORAGE
MENS
RESTRM
ICC
CONF RM
VENDING
OPEN
OFFICE
OPEN
OFFICE
MECH
MEN'S
CORRIDOR
ENTRY
ENTRY
MOP SINK
SLIDING HANGAR DOOR
ABANDONED
ABANDONED RU DOOR
414039
MM
NN
LL
KK
JJ
GENERAL NOTES:
1. (*) INDICATES EXISTING DIMENSION TO BE
FIELD VERIFIED BY CONTRACTOR.
2. EXISTING BUILDING INFORMATION IS AS
INDICATED ON THE AS-BUILT DRAWINGS. THE
CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER OF ANY
DISCREPANCIES.
3. CONTRACTOR SHALL REVIEW AS-BUILT
DRAWINGS REPLACE TRANSFORMERS, BLDG 1
PROJECT NUMBER OC-216-1 DATED 17 JULY
1972, AND REPLACE POWER DISTRIBUTION
SYSTEM, LIGHTS AND AIR-CONDITIONING,
BUILDING 1 PROJECT NUMBER OC-9-9, DATED
19 MAY 1986 FOR EXISTING STRUCTURAL
INFORMATION. VERIFY ALL DIMENSIONS
SHOWN WITH EXISTING CONSTRUCTION AND
REPORT ANY DISCREPANCIES TO THE
CONTRACTING OFFICER.
KEYNOTES:
EXISTING POSTS, INCLUDING BASE PLATES AND
SCREENS, SHALL BE REMOVED.
COORDINATE REMOVAL OF EXISTING EQUIPMENT
AND CONCRETE PADS WITH ELECTRICAL SCOPE.
EXISTING EQUIPMENT AND SCREEN POST
ANCHORS SHALL BE GROUND OUT, BACKGOUGED,
AND COVERED WITH GROUT.
TRASH
COMPACTOR
DOCK
25-KW
GENERATOR
NINE
RAMP
CHILLER ON
MEZZANINE
EQUIPMENT
ROOM
CANOPY COLUMNS,
TYP
2' - 2" (*)
10' - 0" (*) 38' - 5" (*) 15' - 0" (*)
2' - 6" (*) 30' - 3" (*) 30' - 11" (*)
6 7 8 9 10 11 12 13 14 15 16 17 18
J
K
M
N
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
R
E P
L A
C E
S W
IT
C
H G
E A
R
B L
D G
KEY PLAN
A
P R
IL
H D
R B
E S
C M
R N L M
SD-101
E X
IS
T
IN
G
F
IR
S T
F L
O O
R F
R A
M
IN
G P
L A
N
D E
M O
L
IT
IO
N
1/8" = 1'-0"
EXISTING FIRST FLOOR FRAMING PLAN - DEMOLITION1
SD-101
N
NN
N
N
N
N
N
N
N
N
N
N
L
J
J
J
J
J
J
J
J
J
J
J
J
J
WAITING RM
CORRIDOR
420 SCM
OPEN OFFICE
OPEN OFFICE
OFFICE
OFFICE
BREAK RM
COMM
CORRIDOR
BREAK RM
OPEN OFFICE
OPEN OFFICE
STORAGE
MENS
RESTRM
ICC
CONF RM
VENDING
OPEN
OFFICE
OPEN
OFFICE
MECH
MEN'S
CORRIDOR
ENTRY
ENTRY
MOP SINK
SLIDING HANGAR DOOR
ABANDONED
ABANDONED RU DOOR
414039
MM
NN
LL
KK
JJ
GENERAL NOTES:
1. (*) INDICATES EXISTING DIMENSION TO BE
FIELD VERIFIED BY CONTRACTOR.
2. EXISTING BUILDING INFORMATION IS AS
INDICATED ON THE AS-BUILT DRAWINGS. THE
CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER OF ANY
DISCREPANCIES.
3. CONTRACTOR SHALL REVIEW AS-BUILT
DRAWINGS REPLACE TRANSFORMERS, BLDG 1
PROJECT NUMBER OC-216-1 DATED 17 JULY
1972, AND REPLACE POWER DISTRIBUTION
SYSTEM, LIGHTS AND AIR-CONDITIONING,
BUILDING 1 PROJECT NUMBER OC-9-9, DATED
19 MAY 1986 FOR EXISTING STRUCTURAL
INFORMATION. VERIFY ALL DIMENSIONS
SHOWN WITH EXISTING CONSTRUCTION AND
REPORT ANY DISCREPANCIES TO THE
CONTRACTING OFFICER.
KEYNOTES:
NEW EQUIPMENT PAD, SEE 1/S-002. COORDINATE
LOCATION WITH ELECTRICAL DRAWINGS.
GALVANIZED HSS5x5x1/4 SCREEN POST.
GALVANIZED 24 GAUGE WALL PANEL.
S-201
S-201 x
TYP
3TYP
TRASH
COMPACTOR
DOCK
25-KW
GENERATOR
NINE
RAMP
CHILLER ON
MEZZANINE
EQUIPMENT
ROOM
2' - 6" (*) 30' - 3" (*) 30' - 11" (*)
CANOPY COLUMNS,
TYP
5' - 0" 5' - 0" 5' - 0"
5' - 0"
5' - 0" 5' - 0" 5' - 0"
/2
1' - 3" +/- C L R
GATE
/2
C/L POST
TOP OF EXISTING
CONCRETE DOCK
EL. 0'-0"
6 7 8 9 10 11 12 13 14 15 16 17 18
J
K
M
N
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
R
E P
L A
C E
S W
IT
C
H G
E A
R
B L
D G
KEY PLAN
A
P R
IL
H D
R B
E S
C M
R N L M
S-101
E X
IS
T
IN
G
F
IR
S T
F L O
O R
F R
A M
IN
G
P L A
N
N E
W W
O R
K
1/8" = 1'-0"
EXISTING FIRST FLOOR FRAMING PLAN - NEW WORK1
S-101
GATE PANEL
TOS EL. 8'-0"
L4x4x1/4 (4)
SIDES, TYP.
1"
EXISTING
EQUIPMENT
ROOM 24 GAUGE WALL PANEL.
FASTEN TO ANGLES W/
#10-16 SELF-DRILLING
SCREWS @ 24" O.C., TYP.
TOC EL. 0'-0"
HSS5x5x1/4
POST, TYP.
EXISTING CONCRETE
SLAB
3' - 7"
(TYP WHERE NOT NOTED)
5' - 0" 4' - 2"
C L R
WELD-ON GATE HINGES PLACED AS
INDICATED. HINGES SHALL HAVE A
NOMINAL CAPACITY OF 500 LBS
EXISTING
PULL HANDLE W/
LOCK AND LATCH
L4x4x1/4 (4)
SIDES, TYP.
24 GAUGE WALL PANEL.
FASTEN TO ANGLES W/
#10-16 SELF-DRILLING
SCREWS @ 24" O.C., TYP.
TOC EL. 0'-0"
HSS5x5x1/4
POST, TYP.
(TYP)
5' - 0"
EXISTING CONCRETE
SLAB
EXISTING
BUILDING
S-201
S-201
TOS EL. 8'-0"
1' - 0"
S-201
EXISTING
TYP
TYP
TYP
1' - 3 1/2"
1 3/4" TYP 1' - 0"
/2
BASE PL 3/4"x15 1/2"x1'-3 1/2"
W/ (4) 3/4"⌀ HILTI KWIK BOLT
TZ2 (3 1/4" EMBED)
HSS, SEE ELEVATIONS
3/16
HSS POST, SEE
ELEVATIONS
SUPPORT ANGLE,
SEE ELEVATIONS
WALL PANEL, SEE
ELEVATIONS
SELF-DRILLING SCREW,
SEE ELEVATIONS
3/16 2-12
3/16 2-12
CONT 12" EA
END, TYP
CONT 12" EA
END, TYP
OUTSIDE FACE
INSIDE FACE
M
POST PER PLAN
SCREEN PER PLAN
SUPPORT ANGLE PER
ELEVATION, TYP
CAP PL 1/4, TYP
TYP
TYP
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
R
E P
L A
C E
S W
IT
C
H G
E A
R
B L
D G
A
P R
IL
H D
R B
E S
C M
R N L M
S-201
F R
A M
IN
G
E L E
V A
T
IO
N S
A N
D D
E T
A
IL
S
1/2" = 1'-0" S-101
ELEVATION - NEW WIND SCREEN FRAMING1
1/2" = 1'-0" S-101
ELEVATION - NEW WIND SCREEN FRAMING2
1 1/2" = 1'-0"
DETAIL - POST BASE PLATE3
1 1/2" = 1'-0"
DETAIL - PANEL SUPPORT ATTACHMENT4
S-201 S-201 1 1/2" = 1'-0" S-201
DETAIL - CORNER CONNECTION OF PANEL SUPPORTS5
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L
A H
O M
A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
R E
P L
A C
E S
W
IT
C H
G E
A R
B
L D
G
/1
/2
H D
R B
E S
K L E
G C
O R
N E
L L
G J A
G L O
W S
K I
E-001
E L
E C
T R
IC
A
L L
E G
E N
D A
N D
A B
B R
E V
IA
T
IO
N
S
B
D
Y
T
C
F
C
J
C
J
S
S2
S3
S4P
SDM
SM
T
S
M
TV
M
VFD
3P
1200A
M
C
SPD
GFP
E
ES
E
E
E
ES
E
ES
E
ES
OS
SOS
IG
P
ELECTRICAL SYMBOLS LEGENDS AND ABBREVIATIONS
A AMPERES OR TRIP
AMPERES
AC ALTERNATING CURRENT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AIC SYMMETRICAL AMPS
INTERRUPTING CAPACITY
AWG AMERICAN WIRE GAUGE
A/R AS REQUIRED
ARR. ARRESTOR
BLDG BUILDING
BRKT BRACKET
C CONDUIT
CB CIRCUIT BREAKER
CKT CIRCUIT
CL CURRENT LIMITING
CO CONDUIT ONLY
CTL CONTROL
DC DIRECT CURRENT
D.T.C. DATA TERMINAL CABINET
EMCS ENERGY MONITORING
AND CONTROL SYSTEM
FACP FIRE ALARM CONTROL
PANEL
FT FOOT, FEET
GFCI GROUND FAULT CIRCUIT
INTERRUPTER, 5MA
PERSONNEL PROTECTION
UNLESS OTHERWISE NOTED.
GRD GROUND
HZ HERTZ
IAW IN ACCORDANCE WITH
IG ISOLATED GROUND
IN INCH, INCHES
IR INFRARED
KV KILOVOLTS
KVA KILOVOLT AMPERES
KVAR KILOVOLT AMPS REACTIVE
KWH KILOWATT HOURS
L-L LINE TO LINE
L-N LINE TO NEUTRAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MTD MOUNTED
MTG MOUNTING
N.C. NORMALLY CLOSED
NEC NATIONAL ELECTRICAL
CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NEUT NEUTRAL
N.O. NORMALLY OPEN
NLT NOT LESS THAN
NMT NOT MORE THAN
OH OVERHEAD
OV OVERRIDE SWITCH
PAS PUBLIC ADDRESS SYSTEM
PE PHOTOELECTRIC
PH PHASE
PLCS PLACES
PNL PANELBOARD
PVC POLYVINYL CHLORIDE
ELECTRICAL RACEWAY
USED ONLY U.G., CARLON
OR EQUIVALENT
RC RIGID STEEL CONDUIT
REF REFERENCE
REQ'D REQUIRED
RGC RIGID GALVANIZED STEEL
CONDUIT
RM ROOM
RMC RIGID METALIC CONDUIT
SHT SHEET
SOB STANDOFF BRACKET
SPACE SPACE(S) ONLY (NO
BREAKER DEVICE)
SPARE SPARE BREAKER OR DEVICE
SPDT SINGLE-POLE, DOUBLE-THROW
SPECS CONTRACT SPECIFICATIONS
SPST SINGLE-POLE, SINGLE-THROW
S/N SOLID NEUTRAL
TB TELEPHONE BACKBOARD
TYP TYPICAL
UG UNDERGROUND
UL LISTED BY UNDERWRITER'S
LABORATORIES
UON UNLESS OTHERWISE NOTED
V VOLTS
VA VOLT AMPERES
W WATT
WAP WIRELESS ACCESS POINT
WH WEATHERHEAD
W/ WITH∅ PHASE
2W+G CIRCUIT TYPE
3W+G CIRCUIT TYPE
4W+G CIRCUIT TYPE
ABBREVIATIONS
POWER SYMBOLS LEGEND
DESCRIPTIONSYMBOL
RECEPTACLE, DUPLEX, 20A, 120V, GROUNDING 2W+G, NEMA
5-20R
RECEPTACLE, DUPLEX, FLOOR MOUNTED, FLUSH, 20A, 120V,
GROUNDING 2W+G NEMA 5-20R.
RECEPTACLE, DUPLEX, CEILING MOUNTED, 20A, 120V,
GROUNDING 2W+G, NEMA 5-20R
RECEPTACLE, QUADRAPLEX
RECEPTACLE/EQUIPMENT CONNECTION, SPECIAL PURPOSE
RECEPTACLE, CLOCK
JUNCTION BOX, ABOVE CEILING
JUNCTION BOX, WALL MOUNTED, SERVING COMPUTER LOAD.
RECEPTACLE, DUPLEX, SERVING COMPUTER LOAD. 20A, 120V,
GROUNDING 2W+G RECEPTACLE, NEMA 5-20R
SWITCH, TOGGLE, WALL MOUNTED, 20A., 120/277V RATED (AC
ONLY), SINGLE-POLE, MOUNT 54" AFF
SWITCH, TOGGLE, WALL MOUNTED, 20A., 120/277V RATED (AC
ONLY), THREE-WAY, SPDT. MOUNT 54" AFF
SWITCH, LOW VOLTAGE, WALL MOUNTED, 4-SCREEN PRESET.
MOUNT 54" AFF
SWITCH, DIMMER, LOW VOLTAGE 0-10V. MOUNT 54" AFF
BRANCH CIRCUIT HOME RUN WITH NEUTRAL, PHASE AND
EQUIPMENT GROUND RESPECTIVELY
RACEWAY, ABOVE FLOOR
COMBINATION STARTER/DISCONNECT WITH HOA
SWITCH-COORDINATE WITH MECH. CONTRACTOR.
SWITCH, DISCONNECT
PANELBOARD, SURFACE MOUNTED
PANELBOARD, RECESSED
DESCRIPTIONSYMBOL
TRANSFORMER, POWER, KVA RATING, WINDING VOLTAGES AND
CONNECTIONS ARE SHOWN NEXT TO SYMBOL
ONE-LINE & CONTROL SCHEMATIC LEGEND
TRANSFORMER, CURRENT, TURNS RATIO, SHOWN NEXT TO
SYMBOL
GROUNDING CONNECTION. WHEN USED WITH TRANSFORMER
WINDING SYMBOL IT INDICATES A NEUTRAL GROUNDING
CONNECTION (ON SECONDARY SIDE ONLY)
GROUNDED WYE WINDING CONNECTION
DELTA CONNECTED
RELAY OR CONTACTOR CONTACTS
SEPARABLE (PLUG-IN) CONNECTOR OR CONNECTION FOR
DRAWOUT ASSEMBLIES
SCHEMATIC, CIRCUIT CONNECTIONS
CIRCUIT BREAKER, MOLDED CASE, TRIP CURRENT [A] AND
QUANTITY OF POLES [P] SHOWN NEXT TO SYMBOL
SWITCH, DISCONNECT, NON-FUSED, LOAD BREAK. CONTINUOUS
CURRENT RATING [A] AND QUANTITY OF POLES [P] SHOWN
NEXT TO SYMBOL
SWITCH, DISCONNECT, FUSED, LOAD BREAK. FUSE AMPERE
RATING [A] AND FUSE TYPE SHOWN NEXT TO SYMBOL
FUSE, AMPERE RATING [A] AND FUSE TYPE SHOWN NEXT TO
SYMBOL
MOTOR THERMAL OVERLOAD PROTECTOR
INTEGRAL PHOTOELECTRIC CELL AND RELAY (PHOTOCONTROL)
WATTHOUR METER
CONTACTOR OR RELAY COIL. LETTER(S) INSIDE OF SYMBOL
MATCH CONTACTS CONTROLLED
SURGE ARRESTER, VALVE TYPE ARRESTER KV RATING SHOWN
NEXT TO SYMBOL
EQUIPMENT ENCLOSURE
SYMBOL MODIFIERS
DESCRIPTIONSYMBOL
AUDIBLE AND VISUALAV
EXISTINGE
FIXED TEMPERATUREF
GROUND FAULT CIRCUIT INTERRUPTERGFI
NEWN
ITEM OR DEVICE RECESSED INTO MOUNTING SURFACER
RADIO FREQUENCYRF
WEATHERPROOFWP
DEVICE MOUNTED ABOVE COUNTER TOPAC
RECEPTACLE SERVING COMPUTER LOAD.C
GROUNDING LEGEND
DESCRIPTIONSYMBOL
CONDUCTOR, BARE, UON
GROUNDING CONNECTION, COUNTERPOISE TO GROUND ROD.
SCHEMATIC CIRCUIT
ELECTRICAL BUSS
CABLE OR WIRE
WYE CONNECTED
LIGHTING SYMBOLS LEGEND
RACEWAY, RISER UP
RACEWAY, RISER DOWN
THERMOSTAT BY MECHANICAL CONTRACTOR
POWER SYMBOLS LEGEND (CONTINUED)
DESCRIPTIONSYMBOL
RECEPTACLE, DUPLEX, SPECIAL PURPOSE
TELEPHONE RECEPTACLE, WALL MOUNTED
BELL
SPEAKER, CEILING MOUNTED
MICROPHONE, CEILING MOUNTED
SPEAKER CONTROL
SOUND CABINET
AUDIO/VISUAL PROJECTOR
CEILING FAN
CABLE TV OUTLET
MOTOR
SWITCH, MOTOR
HORIZONTAL WIREMOLD
240 VOLT 20 AMP RECEPTACLE
SWITCH, TOGGLE, WALL MOUNTED, 20A., 120/277V RATED (AC
ONLY), DOUBLE-POLE, MOUNT 54" AFF
DESCRIPTIONSYMBOL
FLUORESCENT/LED, SURFACE OR PENDANT, RECESSED
CEILING MOUNTED
FLUORESCENT/LED, WALL MOUNTED
NIGHT LIGHT, FLUORESCENT/LED FIXTURE WITH INTERGAL
EMERGENCY BALLAST
CFL/HID/LED FIXTURE, RECESSED CEILING MOUNTED
CFL/HID/LED FIXTURE, WALL MOUNTED
EXIT SIGN, LIGHTED, SURFACE OR PENDANT, CEILING MOUNTED
W/LIGHTED FACE AND DIRECTIONAL ARROW.
EXIT SIGN, LIGHTED, WALL MOUNTED.
EMERGENCY LIGHT, 2 LAMPS, BATTERY POWERED
BRANCH CIRCUIT HOME RUN
CFL/HID/LED FIXTURE, SURFACE OR PENDANT
TRANSFORMER, DRY TYPE
NIGHT LIGHTNL
DATA RECEPTACLE, WALL MOUNTED
TELEPHONE/DATA RECEPTACLE, WALL MOUNTED
SURGE PROTECTION DEVICE
GROUND FAULT PROTECTION
VARIABLE FREQUENCY DRIVER
LIGHTING SWITCHLEG
SITE UTILITIES LEGEND
DESCRIPTIONSYMBOL
DUCT BANK, OVERHEAD PRIMARY
DUCT BANK, OVERHEAD SECONDARY
CFL/HID/LED FIXTURE, AREA LIGHT POLE
MANHOLE, ELECTRIC
HANDHOLE, ELECTRIC
POWER POLE, ELECTRIC
CCTV SECURITY CAMERA
DUCT BANK, UNDERGROUND PRIMARY
DUCT BANK, UNDERGROUND SECONDARY
SWITCH, OCCUPANCY SENSOR, 120V, 1500 WATT.
MOUNT 54" AFF
VERTICAL WIREMOLD
ISOLATED GROUND RECEPTACLE, DUPLEX, ORANGE TYPE. 20A,
120V, GROUNDING 2W+2G RECEPTACLE, NEMA 5-20R
OCCUPANCY SENSOR, CEILING MOUNTED.
MANUAL ON/INTEGRAL MANUAL DIMMING
PHOTOSENSOR, CEILING MOUNTED
GENERAL NOTES:
(APPLICABLE TO ALL ELECTRICAL SHEETS)
1. ALL WORKS SHALL BE PROVIDED AND INSTALLED IN ACCORDANCE WITH
TINKER AFB ELECTRICAL STANDARDS (MARCH 2023)
2. EQUIPMENT INTERRUPTING CAPACITIES SPECIFIED IN THE CONTRACT
DOCUMENTS ARE BASED UPON EQUIPMENT CHARACTERISTICS AND
IMPEDANCES SHOWN ON THE DRAWINGS. IF ACTUAL INSTALLED EQUIPMENT
DEVIATES FROM THESE CHARACTERISTICS OR HAS LOWER IMPEDANCES. THE
CONTRACTOR SHALL INCREASE THE INTERRUPTING CAPACITIES OF ALL ITEMS
ON THE LOAD SIDE OF THE DEVIANT EQUIPMENT IN DIRECT PROPORTION TO
THE CHANGED CHARACTERISTICS. INTERRUPTING CAPACITIES SHALL NOT BE
REDUCED TO VALUES LESS THAN THOSE REQUIRED BY THE CONTRACT
DOCUMENTS.
3. FIRE STOP SHALL BE PROVIDED AT ALL LOCATIONS WHERE ELECTRICAL
EQUIPMENT OR SYSTEMS PENETRATE FIRE RATED WALLS. SEE
ARCHITECTURAL PLANS FOR RATED WALL LOCATIONS.
4. CONTROL WIRING P&ID'S FOR MECHANICAL EQUIPMENT ARE NOT SHOWN ON
THESE SHEETS.
5. RISER AND ONE-LINE DIAGRAMS ARE MEANT TO SHOW ELECTRICAL
RELATIONSHIPS FOR EQUIPMENT, AND THEREFORE MAY NOT INCLUDE ALL
REQUIRED EQUIPMENT DEVICES, AND ACCESSORIES.
SYMBOL NOTES
1. THESE SYMBOLS APPLY TO THE ENTIRE SET OF CONTRACT DRAWINGS.
2. ALL SYMBOLS ARE NOT NECESSARILY USED IN THE DRAWINGS FOR THIS PROJECT. LISTING OF
SYMBOLS DOES NOT IMPLY THAT ALL SYMBOLS ARE USED IN THE CONTRACT DRAWINGS.
3. COLORS FOR ALL OUTLETS AND SWITCHES SHALL BE AS SHOWN ON ARCHITECTURAL PLANS.
4. ALL MOUNTING HEIGHTS SHOWN IN SYMBOL LEGEND SHALL BE AS PER TAS/ADA REQUIREMENTS
UNLESS OTHERWISE NOTED ON THE ARCHITECTURAL DRAWINGS.
5. BRANCH CIRCUIT NUMBERS MAY BE SHOWN NEXT TO SYMBOLS IN MULTIWIRE CIRCUITS.
6. EQUIPMENT IDENTIFIERS, MATCHING EQUIPMENT SCHEDULES, ARE DISPLAYED ATTACHED TO
SYMBOLS BY LEADER ARROWS, UON.
7. SYMBOL ORIENTATION DOES NOT IMPLY DEVICE OR EQUIPMENT ORIENTATION, UNLESS NOTED AS SUCH. SEE REFLECTED CEILING PLANS FOR LIGHT FIXTURE POSITIONS AND ORIENTATIONS.
8. SYMBOL SIZE DOES NOT IMPLY EQUIPMENT SIZE, UON.
9. LOWER CASE LETTER IN POSITION "X" INDICATES FIXTURES CONTROLLED BY SAME LETTER.
10. PLAN SYMBOLS USE THE FOLLOWING LINE TYPE CONVENTION AND ARE REPRESENTED AS
FOLLOWS:
LINETYPE, DENOTES EXISTING TO REMAIN
LINETYPE, DENOTES EXISTING TO BE DEMOLISHED
LINETYPE, DENOTES NEW U.G. OR CONCEALED CONSTRUCTION
LINETYPE, DENOTES NEW CONSTRUCTION
EPM ELECTRIC POWER METER
04/17/24
J
J
J
J
J
J
J
J
J
J
J
J
BREAK RM
COMM
CORRIDOR
BREAK RM
OPEN OFFICE
VENDING
OPEN
OFFICE
OPEN
OFFICE
MECH
ENTRY
--MOP SINK
SLIDING HANGAR DOOR
ABANDONED
ABANDONED RU DOOR
414039
1-PNL-33
F A
C P
RAMP
CHILLER ON
MEZZANINE
DOCK
DOCK
J
J
ELECT
OFFICE
A
ELEVATOR
M E
C H
ELEC
OFFICE
STORAGE
7 8 9 10 11 12 13 14 15 16 17 18
J
K
L
M
EXISTING OG&E XFMR
RE: E-601.
EXISTING 480V UNIT SUBSTATION
(UID-1-SWGSEC-5)
EXISTING 208V UNIT SUBSTATION B
(UID-B-1-SWGSEC-3)
T
M M
M
4 5
I
EXISTING
PANEL B-13
(UID #1-PNL-11)
T
1A
4 5
P
PANEL
HG1
EXISTING PANEL LPO
(UID #1-FA-801)
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L
A H
O M
A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
R E
P L
A C
E S
W
IT
C H
G E
A R
B
L D
G
KEY PLAN
/1
/2
H D
R B
E S
K L E
G C
O R
N E
L L
G J A
G L O
W S
K I
ED401
E L
E C
T R
IC
A
L E
N L
A R
G E
D P
L A
N S
D
E M
O L
IT
IO
N
1/8" = 1'-0" E-100
ELECTRICAL DEMO PLAN - ENLARGED DOCK4
1/8" = 1'-0" E-100
ELECTRICAL DEMO PLAN - ENLARGED ELECTRICAL CLOSET2
1/8" = 1'-0" E-100
ELECTRICAL DEMO PLAN - ENLARGED ELEVATOR ROOM1
GENERAL NOTES:
1. REFER TO ED-601 FOR DEMOLITION ONE-LINE
DIAGRAM FOR ADDITIONAL INFORMATION.
2. ALL DEMO WORK MUST BE PLANNED IN PHASES
TO MINIMIZE IMPACT TO PRODUCTION.
COORDINATE ALL WORK WITH OG&E AND THE
FACILITY USER GROUP. REFER TO E-100 FOR
PHASING PLAN.
3. THIS DRAWING WAS PREPARED FROM EXISTING
AS-BUILTS AND LIMITED ACCESS FOR FIELD
OBSERVATIONS AND VERIFICATIONS. FIELD VERIFY
EXISTING CONDITIONS AND UPDATE AS-BUILT
DRAWINGS FOR RECORD. SUBMIT RFIs TO
GOVERNMENT AND DOR IF THERE ARE ANY
DISCREPANCIES BETWEEN DRAWINGS AND
EXISTING SITE CONDITIONS FOR RESOLUTIONS.
4. UNLESS NOTED OTHERWISE, ALL EXISTING
EQUIPMENT TO REMAIN AND MAINTAIN NORMAL
OPERATION. REFER TO SPECIFICATION 26 20 00
FOR ADDITIONAL INFORMATION ON EXISTING TO
REMAIN EQUIPMENT
KEYED NOTES:
DISCONNECT POWER CONNECTION AND REMOVE
EXISTING 480V UNIT SUBSTATION WITH 480V
SWITCHGEAR ENCLOSURE.
DISCONNECT POWER CONNECTION AND REMOVE
EXISTING 208V UNIT SUBSTATION WITH 208V
SWITCHGEAR ENCLOSURE.
EXISTING 1500KVA OG&E TRANSFORMER TO
REMAIN IN PLACE FOR CONNECTION IN NEW
WORK.
EXISTING PANELBOARD MUST BE REPLACED IN
PLACE. DISCONNECT POWER CONNECTION AS
INDICATED ON DEMOLITION ONE-LINE DIAGRAM.
RETAIN ALL EXISTING BRANCH CIRCUITS BEING
FED FROM PANEL FOR RECONNECTION IN NEW
WORK.
DISCONNECT POWER CONNECTION TO EXISTING
TRANSFORMER AND REMOVE ALL PRIMARY AND
SECONDARY CONDUCTORS/CONDUITS TO
POWER SOURCE.
DISCONNECT POWER CONNECTION FROM
EXISTING 30KVA XFMR (UID #1XFMR-2). SEE
KEYED NOTE #5.
DISCONNECT EXISTING FEEDER. RETAIN FOR
RECONNECTION IN NEW WORK.
1/8" = 1'-0" E-100
ELECTRICAL DEMO PLAN - ELECTRICAL CLOSETS3
EXISTING 30KVA
TO ELEVATOR
D/S
(UID #1XFMR-2)
EXISTING PANEL
B-9
(UID #1-SWGSEC-2)
EXISTING 60A
DISCONNECT
SWITCH TO REMAIN
IN PLACE
EXISTING
30KVA XFMR
TO REMAIN IN
PLACE
7 (TYP)
(TYP)
NORTH BUS
UNDERGROUND PRIMARY FEEDER
SWITCHING STATION "A"
VAULT "A" #4
SOUTH BUS
UNDERGROUND PRIMARY FEEDER
4 POINT LOAD BREAK IN SUBSTATION "A"
200A
3 POINT LOAD BREAK IN SUBSTATION "A"
3 POINT LOAD BREAK
EXISTING 500 KVA XFMR
12.5 KV 208/120 V
LOCATED ON DOCK
AMMETER
WITH SELECTOR
SWITCH
D
Y
VOLTMETER
WITH SELECTOR
SWITCH
V
A
GFI
(EXISTING)
EXISTING 208V
UNIT SUBSTATION
(B-1-SWGSEC-3)
1200 AMP BUS
(EXISTING UNIT
SUBSTATION B)
S P
A R
E
S P
A R
E
PNL. LPO (EXISTING)
(UID #1-FA-801)
600A BUS
S P
A R
E
S P
A R
E
PANEL
"B3 & B3A"
PANEL
"B4 & B5"
T O
A C
U N
IT
S
PANEL
"B16"
PANEL
"B7"
T O
A C
U N
IT
S
T O
A C
U N
IT
S
PANEL
"B14"
PANEL
"B1"
PNL. B-9 (EXISTING)
(UID #1-SWGSEC-2)
600A BUS
EXISTING
30 KVA
XFMR
PANEL
"B4 & B5"
T O
A C
U N
IT
S
PANEL
"B16"
PANEL
"B7"
PANEL
"B8" S P
A R
E
PANEL
"B12"
PANEL
"B-13"
(UID #1-
PNL-11)
EXISTING 1000KVA
XFMR 12.5 KV 208/120 V
LOCATED ON DOCK
D
Y
VOLTMETER
WITH SELECTOR
SWITCH
V
AMMETER
WITH SELECTOR
SWITCH
A
GFI
(EXISTING)
EXISTING 480V
UNIT SUBSTATION
(UID-1-SWGSEC-5)
1600 AMP BUS
S P
A R
E
S P
A R
E
S P
A R
E
S P
A R
E
S P
A R
E
S P
A R
E
S P
A R
E
S P
A R
E
S P
A R
E
S P
A R
E
200 400 200
T-9 T-10 T-8 T-8
225 100
T-8
CHILLER
MOTOR CONTROL
CENTER MCC-1
T-6
225 100
T-8
EXISTING 60A
ELEVATOR D/S
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L
A H
O M
A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
R E
P L
A C
E S
W
IT
C H
G E
A R
B
L D
G
/1
/2
H D
R B
E S
K L E
G C
O R
N E
L L
G J A
G L O
W S
K I
ED601
E L E
C T
R
IC
A L
O N
E -L
IN
E
D
E M
O L
IT
IO
N
NOT TO SCALE
ELECTRICAL ONE-LINE - DEMOLITION1
ED601
GENERAL NOTES:
1. UNLESS NOTED OTHERWISE, RETAIN EXISTING
DOWNSTREAM CONDUCTORS AND CONDUIT
FEEDING EXISTING-TO-REMAIN EQUIPMENT AS
SHOWN IN PLACE.
2. DISCONNECT AND REMOVE EXISTING MEDIUM
VOLTAGE FEEDER INCLUDING CABLES AND
CONDUITS BACK TO VAULT "A" AS SHOWN. CAP
AND ABANDON UNDERGROUND CONDUITS PER
TAFB ELECTRICAL STANDARDS.
3. TRACE AND VERIFY THE EXISTING BRANCH
CIRCUITS FEEDING FROM DEMOLISHED
PANELBOARDS AND EXISTING UNIT-SUBSTATIONS
AS SHOWN. CONFIRM AND PROVIDE CIRCUIT INDEX
DIRECTORIES PER SPECIFICATIONS.
4. ALL DEMO WORK MUST BE PLANNED IN PHASES
TO MINIMIZE IMPACT TO PRODUCTION.
COORDINATE ALL WORK WITH OG&E AND THE
FACILITY USER. REFER TO E-100 FOR PHASING
PLAN.
5. THIS DRAWING WAS PREPARED FROM EXISTING
AS-BUILTS AND LIMITED ACCESS FOR FIELD
OBSERVATIONS AND VERIFICATIONS. FIELD VERIFY
EXISTING CONDITIONS AND UPDATE AS-BUILT
DRAWINGS FOR RECORD.
6. UNLESS NOTED OTHERWISE, ALL EXISTING
EQUIPMENT AS SHOWN TO REMAIN. EXISTING
CIRCUIT BREAKERS AS INDICATED ARE 3-POLE.
KEYED NOTES:
REMOVE EXISTING CONDUCTORS AND CONDUITS.
RETAIN CONDUIT FOR REUSE IN NEW WORK.
P
P
PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
R
R
RR
R
R
R
R
R
R
R
R
2R
1R1
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
3A
R1
S
SS
S
S
S
S
S
S
S
S
1A
S1
S1
S
S
3A
S1
T
T
TT
T
T
T
T
T
T
T
T
1A
T1
T1
T
T
3A
T1
U
U
UU
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
W
W
WW
W
W
W
W
W
W
W
W
1A
U1
U1
W
W
3A
U1
X
X
XX
X
X
X
X
X
X
X
X
1A
W1
W1 20
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
3A
W1
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
1A
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
3A
Y
N
N
NN
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
3B
N
P
P
P
P
I
I
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
H
H
HH
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
G
G
GG
G
G
G
G
G
G
G4G
G1G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
F
F
FF
F
F
F
F
F
F
F
E1
E1
E1
F
F
F
F
3A
E1
E
E
EE
E
E
E
E
E
E
E
E
1A
D1
D1
E
E
E
E
D1
D
D
DD
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
C
C
CC
C
C
C
C
C
C
C
C
C
C
C
C
B
B
BB
B
B
B
B
B
B
B
B1
1A
B1
B1
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B1
A
A
AA
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A 47
A1
A1
A
A
A
N
N
N
3B
R 1R
1AR1
Y
Y
M
M
M
K
K
K
L
I
H
5G
1F1 1F1
F
D1
1A
C1
C1
C1
C1
B
A
A
A
3AF1 4F1
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
SL I D I N G H A N G A R D O O R
BLOCKED
AHU-8
AHU-5
MO
AA
AHU-7
A A
M O
STOCKROOM "E"STOCKROOM "D"
STOCKROOM "C"STOCKROOM "B"
E Q U I P C A G E
E Q U I P C A G E
O F F I C E
O F F I C E
O F F I C E
B R E A K A R E A
PR OD U CTI ON
PRI NTI N G
UT
IL
C H
A S
E
S T O R A G E
S T O R A G E
STOCKROOM "A"
O F F I C E
SHEETMETAL TRAINING AREA
HOT AIR SOLDER TRAINING AREA
STOCKROOM "F"
STOCKROOM "G"
A B A N D O N E D
E L E V A T O R
OFFICE
127 SF
OFFICE
124 SF
OFFICE
125 SF
C O
R R
S
F
VEST.
OFFICE
122 SF
OFFICE
122 SF
OFFICE
122 SFC
O
R R
S F
CONF ERENCE
ROOM
151 SF
PSN
240 SF
OFFICE
100 SF
OFFICE
100 SF
OFFICE
100 SF
OFFICE
100 SF
OFFICE
79 SF
OFFICE
75 SF
OFFICE
107 SF
MEPS OPEN
OFFICE
1426 SF
CAC C ARD OPEN
OFFICE
1702 SF
VEST.
61 SF
OFFICE
116 SF
OFFICE
120 SF
MPS OPEN
OFFICE
DLA ADMIN
OPEN OFF ICE
OFFICE
CORRIDOR
OFFICE
105B
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
OFFICE
STORAGE
100A
CORRIDOR
PRINTING OFFICE
RECEPTION
OFFICE
OPEN
OFFICE
WOMANS
RESTRM
MENS
RESTRM
MENS
RESTRM
STORAGE
ENTRY
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
EM
LAB
WOMANS
RESTRM
MENS
RESTRM
CONF EREN CE/
BREAK RM
CONFERENC E RM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
BREAK RM
C O
R R
ID
O
R
CORRIDOR
MEETIN G RM
IG W ORKSPACE
CONF ERENCE
STORAGE
STORAGE
STORAGE
CORRIDOR
EM
LAB
109A
EM
CONF ERENCE
109B
EM
OPEN OFF ICE
109C
EM
OPEN OFF ICE
OPEN OFF ICE
CLASS RM
EYE EXAM RM
113B
COMM
OFFICE
OFFICE
OFFICE
STORAGE
108X
ADC
WAITING RM
CORRIDOR
C O
R R
ID
O
R
420 SCM
OPEN OFF ICE
OPEN OFF ICE
EM
OPEN OFF ICE
EM
OFFICE
CONF ERENCE
OFFI CE AREA
BREAK AR EA
OFFICE
OFFICE
OFFICE
ELECT
OFFICE
OFFICE
72 ABW/ XP
OPEN OFF ICE
BREAK RM
COMM
CORRIDOR
BREAK RM
OPEN OFF ICE
OPEN OFF ICE
OPEN OFF ICE
CORRIDOR
OFFICE
147A
OFFICE
147B
OPEN OFF ICE
MECH
WOM AN
RESTRM
VACANT
STORAGE
WOM EN
RESTRM
147B
JANITOR
STG
STOR AGE
WOM EN
RESTRM
BREAK
AREA
ELEC
MENS
RESTRM
JANITOR
CORRIDOR
ENTRY
PHONE
JANITOR
RECEPTION
ENTRY
COMM
CLOSET
115A
MEN
RESTRM
WOMENS
RESTRM
CORRIDOR
OFFICE
CONF
RM
CLOSET
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
OPEN
OFFICE
OPEN
OFFICE
OFFICE
OPEN
OFFICE
BREAK
AREA
OPEN
OFFICE
OFFICE
CONF RM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
STORAGE
RECEPTION
CLOSET
ENTRY
MEN
RESTRM
WOMENS
RESTRM
STORAGE
VACANT
VACANT
BREAK RM
STORAGE
ICC
CONF RM
CORRIDOR
OPEN OFF ICE
OFFICE
CORRIDOR
PAR TS
STORAGE
VEND ING
OPEN
OFFICE
OPEN
OFFICE
M E
C H
ELEC
MECH
W O
M E
N 'S
MEN' S
CORRIDOR
ENTRY
ENTRY
MECH
ENTRY
SERVER RM
OFFICE
MICROFICHE
LAB
MECHAN ICAL
VACANT
LAB
SERVER
ROOM
OFFICE
CONF RM
OFFICE
OFFICE
OFFICE
108 OFFICE
STORAGE
CORRIDOR
OFFICE
C O
F F
E E
4 OFFICE
OFFICE
COPY
AREA
ENTRANCE
OFFICE
OFFICE
OFFICE OFFICECOMM
OFFICE
OFFICE OFFICE
MECH
HALLW AY
VAULT
STORAGE
STORAGE
OFFICE
OFFICE
OFFICE
BREAK RM
CLASS RM
CLASS RM
OFFICE
OFFICE
OFFICE
CLASS RM
CLASS RM
CLASS RM
CLASS RM
CLASS RM
CLASS RM
OFFICE
STORAGE
MECH
OFFICE
CLASS RM
CLASS RM
OFFICE
F
IN
N A
N C
E C
U S
T O
M E
R S
V C
A R
E A
FINANCE
WAITING RM
OFFICE
QA
OFFICE
OFFICE
CLASS RM
CLASS RM
VAULT
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OPEN
OFFICE
T.O LI BRARY
AREA
T.O LI BRARY
OFFICE
TRAINING
STORAGE
INSTRU CTORS
OPEN OFF ICE
STORAGE
CLASS RM
D
CURRICULUM DEV
OPEN OFF ICE
CONFERENC E RM
STORAGE
STORAGE
COMM
CLASS RM
E
CLASS RM
F
WOM EN
RESTRM
MEN
RESTRM
SINK
HALLW AY
OPEN
OFFICE
OFFICE
ENTRY
RECEPTION
OFFICE
OFFICE
STORAGE
CORRIDOR
OFFICE
MECH
OPEN
OFFICE
OFFICE
OFFICE
OFFICE
CLASS RM
BREAK AR EA
OPEN
OFFICE
MECH
MOP SINK
VITA
OFFICE
OPEN
OFFICE
MEN
RESTRM
WOM EN
RESTRM
-- MEN
RESTRM
STORAGE
OFFICE
VACANT
STORAGE
ELEC
CLASS RM
G
CLASS RM
H
COMM
OPEN
OFFICE
JANITOR
C O
R R
ID
O
R
OPEN
OFFICE
RECORDS
STORAGE
FI
R
E D
OO
R
A
B A
N
DO
N E
D
FI
R
E D
OO
R
A
B A
N
DO
N E
D
FI
R
E D
O O
R
FI
R
E D
O O
R
FI
R
E D
O O
R
SL I D I N G H A N G A R D O O R
FI
R
E D
O O
R
FI
R
E D
O O
R
FI
R
E D
O O
R
FI
R
E D
O O
R
FI
R E
D
OO
R
A B
A N
DO
N
E D
FI
R
E D
O O
R
76a
R A M P
R A M P
RAISED FLOOR
36 35
RO
LL
IN
G
G A
TE
R O L L I N G G A T E
FI
R
E D
O O
R
FI
R
E D
O O
R
FI
R
E D
O O
R
FI
R
E D
O O
R
FI
R
E D
O O
R
FI
R
E D
O O
R
FI
R
E D
O O
R
FI
R
E D
O O
R
FI
R
E D
O O
R
RAM P
RAM P
SL I D I N G H A N G A R D O O R
A B A N D O N E D
SL I D I N G H A N G A R D O O R
A B A N D O N E D
A B A N D O N E D R U D O O R
FI
R
E D
O O
R
145 A
152 146
1 3
6 7 8
32 31 29 28 25 24 23 22 21 20
10 11 12 13 14 15 16 17 18 19
605958575655545352515049484746444342414039
80 79 78 77 76a 76 75 74 73 72 71 70 69 68 67 66 65 64 63
W W YK140029
1-PNL-33
1-PNL-32
FACP
1-FA-2
F A
C P
-P
N L -3
RAMP
CHILLER ON
MEZZANINE
DOCK
DOCK
1A
3A
6 7
13 14 15
17 18 19 20
B1
22 23 24 25 26 27
28 29 30 31
32 33 34 35
38 39
41 42
43 44 45 46
50 51 52 53
A
A1
B
C
C1
D
D1
E
E1
F
Q
G
H
I
J
K
L
M
N
P
O
R
R1
S
S1
T
T1
U
U1
W
W1
X
Y
ED401
E-401
ED401
E-401
ED401
E-401
E-401
ED401
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L
A H
O M
A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
R E
P L
A C
E S
W
IT
C H
G E
A R
B
L D
G
KEY PLAN
/1
/2
H D
R B
E S
K L E
G C
O R
N E
L L
G J A
G L O
W S
K I
E-100
E L E
C T
R
IC
A L
O V
E R
A L L
P L
A N
1" = 40'-0"
ELECTRICAL OVERALL PLAN1
E-100
PHASING NOTES:
THE FOLLOWING PHASING PLAN IS A GENERAL
SEQUENCING PLAN THAT IS NOT DEEMED TO BE FINAL.
THE CONTRACTOR AND THEIR SUBS MUST PREPARE
THEIR OWN OPERATIONS PLAN AND PHASING PLAN
VALIDATING AND CONFIRMING SEQUENCING AND
TIMELINES THAT WILL ALLOW THE WORK TO BE
COMPLETED IN A LIMITED AMOUNT OF TIME DURING
PLANNING OUTAGES. CONTRACTOR WILL BE
RESPONSIBLE TO PLAN AND COORDINATE WITH THE
CONTRACTING OFFICER, BASE CE, OG&E, AND ANY
OTHER PARTY AS NECESSARY TO ENSURE ALL WORK
IS ACCOMPLISHED IN A TIMELY FASHION AT A TIME
THAT WORKS FOR ALL PARTIES. PHASE NUMBER:
1. DISCONNECTING AND REMOVING EXISTING 480V
UNIT SUBSTATION, INCLUDING MV FEEDERS BACK
TO POWER SOURCE. DISCONNECTING ALL
EXISTING FEEDERS DISTRIBUTING POWER INTO
THE BUILDING AND BEING FED FROM THE EXISTING
UNIT SUBSTATION. RETAIN
CONDUCTORS/CONDUITS FOR RECONNECTION IN
NEW WORK. PROVIDE TEMPORARY POWER DURING
EQUIPMENT REPLACEMENT. PROVIDING,
INSTALLING AND CONNECTING NEW 480V
SWITCHGEAR (UID-1-SWGSEC-5) TO THE
SECONDARY SIDE OF NEWLY INSTALLED 1500KVA
OG&E TRANSFORMER. ALL POWER CONNECTIONS
TO THE SECONDARY SIDE OF THE TRANSFORMER
WILL BE COORDINATED WITH OG&E. CONTRACTOR
MUST ROUTE SECONDARY FEEDERS ABOVE
GROUND AND OVERHEAD TO CANOPY AND ALONG
THE SIDE OF THE BUILDING EXTERIOR WALL.
RECONNECTING ALL EXISTING DISTRIBUTION
FEEDERS TO NEW 480V SWITCHGEAR (UID-1-
SWGSEC-5). TEST AND ENSURE ALL EXISTING
LOADS RETURN TO ORIGINAL OPERATION.
2. DISCONNECTING AND REMOVING EXISTING 208V
UNIT SUBSTATION, INCLUDING MV FEEDERS BACK
TO PANEL SOURCE. DISCONNECTING ALL EXISTING
FEEDERS DISTRIBUTING POWER INTO THE
BUILDING AND BEING FED FROM THE EXISTING UNIT
SUBSTATION. RETAIN CONDUCTORS/CONDUITS
FOR RECONNECTION IN NEW WORK. PROVIDE
TEMPORARY POWER DURING EQUIPMENT
REPLACEMENT. PROVIDING AND INSTALLING
500KVA (480V-208V/120Y) STEP-DOWN
TRANSFORMER AND NEW 208V SWITCHGEAR (UID-
B-1-SWGSEC-3). CONNECTING TRANSFORMER TO
NEW 480V SWITCHGEAR (UID-1-SWGSEC-5) AND TO
NEW 208V SWITCHGEAR (UID-B-1-SWGSEC-3).
RECONNECTING EXISTING DISTRIBUTION FEEDERS
TO NEW 208V SWITCHGEAR. TEST AND ENSURE ALL
LOADS RETURN TO ORIGINAL OPERATION.
3. DISCONNECTING TWO (2) EXISTING 600A
PANELBOARDS , PANEL B-9 (UID #1-SWGSEC-2) AND
PANEL LPO (UID #1-FA-801), INCLUDING OUTDATED
SUB-FED PANELBOARD, PANEL B-13 (UID #1-PNL-11).
REMOVE CONDUCTORS BACK TO PANEL SOURCE.
RETAIN CONDUITS FOR RECONNECTION IN NEW
WORK. PROVIDING AND INSTALLING TWO (2) 600A
PANELBOARDS, PANEL B-9 (UID #1-SWGSEC-2) AND
PANEL LPO (UID #1-FA-801), INCLUDING PANEL B-13
(UID #1-PNL-11) AT THEIR ORIGINAL LOCATIONS.
RECONNECTING ALL EXISTING BRANCH CIRCUITS
TO NEW REPLACEMENT PANELBOARDS. PROVIDING
NEW CONDUCTORS FOR REPLACEMENT
PANELBOARDS AND ROUTED VIA EXISTING
CONDUITS. TEST AND ENSURE ALL NEW AND
EXISTING EQUIPMENT OPERATE PROPERLY.
4. DISCONNECTING AND REMOVING THE EXISTING
30KVA STEP-UP TRANSFORMER (UID #1XFMR-2).
THE STEP-UP TRANSFORMER IS CURRENTLY
FEEDING EXISTING 60A/480V DISCONNECT SWITCH
FOR ELEVATOR. REMOVE CONDUCTORS AND
CONDUITS BACK TO PANEL, PANEL B-9 (UID #1-
SWGSEC-2). RE-FEED EXISTING 60A DISCONNECT
SWITCH (480V) FROM ELEVATOR MACHINE ROOM
AND CONNECT TO NEW 480V SWITCHGEAR (UID-1-
SWGSEC-5). TEST AND ENSURE THE ELEVATOR
MACHINE RETURNS TO ORIGINAL OPERATION.
J
J
J
J
J
J
J
J
J
J
J
J
COMM
MECH
MEN'S
SLIDING HANGAR DOOR
ABANDONED
ABANDONED RU DOOR
414039
1-PNL-33
RAMP
CHILLER ON
MEZZANINE
DOCK
DOCK
4 5
ELECT
OFFICE
A
ELEVATOR
M E
C H
ELEC
OFFICE
STORAGE
7 8 9 10 11 12 13 14 15 16 17 18
J
K
L
M
E-501
E-501
F R
O N
T
B A
C K
F R
O N
T
B A
C K
EXISTING OG&E XFMR
RE: E-601.
3' - 0"
3' - 0"
4' - 6 1/4"
208V-ROCP-1
480V-ROCP-2
480V-ROCP-1
/2
11' - 1 1/4"
4' - 10"
4'
3/
8"
11' - 1 1/4"
8'
1/
4"
3'
4 5
I
1A
EXISTING 60A
ELEVATOR
D/S
4 5
P
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L
A H
O M
A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
R E
P L
A C
E S
W
IT
C H
G E
A R
B
L D
G
KEY PLAN
/1
/2
H D
R B
E S
K L E
G C
O R
N E
L L
G J A
G L O
W S
K I
E-401
E L
E C
T R
IC
A
L E
N L
A R
G E
D P
L A
N S
N
E W
W O
R K
1/8" = 1'-0" E-100
ELECTRICAL PLAN - ENLARGED DOCK4
1/8" = 1'-0" E-100
ELECTRICAL PLAN - ENLARGED ELECTRICAL CLOSET2
1/8" = 1'-0" E-100
ELECTRICAL PLAN - ENLARGED ELEVATOR ROOM1
GENERAL NOTES:
1. REFER TO E-601 FOR NEW WORK ONE-LINE
DIAGRAM FOR ADDITIONAL INFORMATION.
2. ALL NEW WORK MUST BE DONE IN PHASES
COORDINATED WITH THE FACILITY USER GROUP.
REFER TO E-100 FOR PHASING PLAN DETAILS.
3. COORDINATE PLACEMENT OF ELECTRICAL
EQUIPMENT WITH OTHER DISCIPLINES PRIOR TO
ROUGH-IN.
KEYED NOTES:
PROVIDE NEW 480V SWITCHGEAR ENCLOSURE.
RECONNECT EXISTING FEEDER-TO-REMAIN AND
LINE UP WITH THE SWITCHGEAR DISTRIBUTION
SECTION AS REQUIRED FOR RECONNECTION.
PROVIDE 480V-208Y/120V TRANSFORMER AND
MAKE CONNECTION TO 480V SWITCHGEAR AFTER
EQUIPMENT RUNNING.
PROVIDE 208V SWITCHGEAR ENCLOSURE AND
MAKE CONNECTION TO 500KVA TRANSFORMER
AFTER EQUIPMENT IS RUNNING. RECONNECT
EXISTING FEEDER-TO-REMAIN AND LINE UP WITH
THE SWITCHGEAR DISTRIBUTION SECTION AS
REQUIRED FOR RECONNECTION.
PROVIDE REMOTE OPERATIONAL BREAKER
ENCLOSURE FOR 480V AND 208V BREAKERS
HOUSED IN SWITCHGEAR ENCLOSURES.
COORDINATE WITH MANUFACTURER FOR EXACT
SIZE AND DIMENSION AND ADDITIONAL
REQUIREMENTS SUCH AS CLEARANCES AND
INSTALLATIONS. REFER TO SHEET E-501 FOR
REMOTE OPERATIONAL BREAKER ENCLOSURE
ELEVATIONS.
EXISTING 1500KVA OG&E 480V TRANSFORMER TO
FEED NEW 480V SWITCHGEAR ENCLOSURE TO
REMAIN.
CONNECT EXISTING ELEVATOR DISC. SWITCH TO
480V SWITCHGEAR AS SHOWN ON ONE-LINE
DIAGRAM.
PROVIDE PANEL WITH SAME RATING AS EXISTING
PANEL, INCLUDING EXISTING BRANCH CIRCUIT
BREAKERS, AND INSTALL IN PLACE. RECONNECT
ALL EXISTING BRANCH CIRCUITS RETAINED
DURING DEMOLITION TO NEW PANEL EXTEND
CONDUCTORS/CONDUITS AS REQUIRED FOR
FINAL RECONNECTION.
RECONNECT ALL EXISTING FEEDER RETAINED
DURING DEMOLITION TO NEW SWITCHGEAR AS
SHOWN ON ONE-LINE DIAGRAM. EXTEND
CONDUCTORS/CONDUITS AS REQUIRED FOR
FINAL CONNECTION.
PRIOR TO PROCUREMENT AND INSTALLATION,
CONTRACTOR MUST TRACE AND RECORD THE
EXISTING FEEDERS AND ASSOCIATED CIRCUIT
BREAKER SIZE SERVING EACH DEDICATED
FEEDER, SO THAT THE DISTRIBUTION SECTION
OF THE SWITCHGEAR LINE UP IN ORDER OF THE
EXISTING FEEDERS LOCATION. CONTRACTOR
MUST SUBMIT THE SHOP DRAWINGS INDICATING
EACH EXISTING FEEDER ROUTE LINED UP WITH
THE SWITCHGEAR DISTRIBUTION SECTION
RESPECTIVELY, FOR REVIEW AND APPROVAL.
1/8" = 1'-0" E-100
ELECTRICAL PLAN - ENLARGED ELECTRICAL CLOSETS3
PANEL
HG1
PANEL LPO
(UID #1-FA-801)
480V SWITCHGEAR
ENCLOSURE
(UID-1-SWGSEC-5)
208V SWITCHGEAR
ENCLOSURE
(UID-B-1-SWGSEC-3)
500 KVA XFMR
MAIN GROUND
BUS BAR (MGB)
PANEL B-13
(UID #1-PNL-11)
PANEL B-9
(UID #1-SWGSEC-2)
bruh
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L
A H
O M
A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
R E
P L
A C
E S
W
IT
C H
G E
A R
B
L D
G
/1
/2
H D
R B
E S
K L E
G C
O R
N E
L L
G J A
G L O
W S
K I
E-501
E L
E C
T R
IC
A
L
V A
N D
V
S W
IT
C
H G
E A
R E
L E
V A
T
IO
N S
2000AT
3200AF
SPARE SPARE
SPARE
1600AT
SPARE
1600AF
60AT
100AF
600AT
800AF
SPARE
SPARE
GENERAL NOTES:
1. COORDINATE WITH MANUFACTURER ON EXISTING CIRCUIT
BREAKER SIZES BASED ON EXISTING SITE CONDITIONS. PROVIDE
SHOP DRAWINGS AND SUBMIT FOR REVIEW AND APPROVAL.
600AT
800AF
SPARE
600AT
800AF
200AT
400AF
SPARE
800AT
800AF
225AT
400AF
400AT
SPARE
SPARE
SPARE
NOT TO SCALE
480V-ROCP-1 ELEVATION2
OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN CLOSE
OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN CLOSE
SPARE
OPEN CLOSE OPEN CLOSE
480V-ROCP-2
CIRCUIT BREAKER
REMOTE OPERATING
CABINET
OPEN CLOSED
500 KVA XFMR
OPEN CLOSED
T-8
OPEN CLOSED
CHILLER
OPEN CLOSED
MCC-1
OPEN CLOSED
T-6
OPEN CLOSED
SPARE
OPEN CLOSED
T-8
OPEN CLOSED
ELEVATOR D/S
OPEN CLOSED
SPD
OPEN CLOSED
480V-ROCP-1
CIRCUIT BREAKER
REMOTE OPERATING
CABINET
OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN CLOSE
OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN CLOSE
SPARE
OPEN CLOSED
SPARE
OPEN CLOSED
SPARE
OPEN CLOSED
T-9,T-10,T-8
OPEN CLOSED
SPARE
OPEN CLOSED
SPARE
OPEN CLOSED
T-8
OPEN CLOSED
SPARE
OPEN CLOSED
MCB
OPEN CLOSED
OPEN CLOSE
NOT TO SCALE
208V-ROCP-1 ELEVATION1
208V-ROCP-1
CIRCUIT BREAKER
REMOT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .