About this opportunity

The Smithsonian Institution's National Museum of American History (NMAH) is seeking a contractor to perform comprehensive collections relocation services under the PSRP IV Collections Move project. The solicitation requires moving approximately 65,000 artifacts from 32,000 square feet of collections storage and exhibit spaces within the American History Building to the Smithsonian Suitland Collections Center, including specialized handling of diverse collections ranging from vehicles and armaments to costumes and photographs. Key requirements include providing a dedicated project manager with art handling expertise, performing basic collections photography and condition reporting, rehousing artifacts in new Smithsonian-approved housing, tracking all location changes through barcode systems interfaced with the museum's Mimsy XG inventory system, and executing specialized rigging for large or suspended artifacts. The contractor must demonstrate recent experience handling museum collections of comparable scope and complexity, provide climate-controlled transportation with air-ride suspension and constant surveillance, and maintain strict environmental controls during transit. Proposals were originally due March 19, 2025, but have been extended multiple times through seven amendments, with the current deadline set for July 30, 2025 at 3:00 PM EST.

This procurement does not utilize any small business set-aside designations but includes substantial subcontracting goals requiring 40% participation by small business concerns, with specific allocations of 7% each for small disadvantaged businesses and women-owned small businesses, and 4% each for HUBZone, veteran-owned, and service-disabled veteran-owned small businesses. The Smithsonian estimates the total fixed-price contract value will exceed $10 million, with funding spanning multiple fiscal years including $5 million allocated for FY2025. The contract performance period is 1,095 calendar days from the Notice to Proceed, with work to be performed at the National Museum of American History at 1300 Constitution Avenue NW, Washington DC, and the Smithsonian Suitland Collections Center at 4210 Silver Hill Road, Suitland, Maryland. The project involves moving collections to either Museum Support Center Pod 6 or designated buildings at the Paul E. Garber Facility, with specific storage configurations including manually operated mobile pallet rack systems measuring 11' H x 12' W x 4' D across three separate floors accessible by elevator.

Notice text

8 versions

Update #8 · Latest ·

Amendment 0007 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Responses to RFI Questions

---------------------------------------------------------------------------------------------------------------

Amendment 0006 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Revised Scope

---------------------------------------------------------------------------------------------------------------

Amendment 0005 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Responses to RFI Questions

Submission Due Date Extension

---------------------------------------------------------------------------------------------------------------

Amendment 0004 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Revised Responses to RFI Questions

Revised Schedule and Multi-Year Document

---------------------------------------------------------------------------------------------------------------

Amendment 0003 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Responses to RFI Questions

Questions/Clarifications Due Date Extension

---------------------------------------------------------------------------------------------------------------

Amendment 0002 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Responses to RFI Questions 

Submission Due Date Time Extension

---------------------------------------------------------------------------------------------------------------

Amendment 0001 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Response to RFI Questions One

------------------------------------------------------------------------------------------------------------------

This Request for Proposals (RFP) is for Smithsonian Institution's National Museum American History (NMAH) to move collections within the American History Building (AHB), provide new Smithsonian approved collections housing for all identified artifacts, perform basic collections photography, documentation, condition reporting, rehouse artifacts, track all collection location changes, and move the collections to the Smithsonian Suitland Collections Center (SCC), and unpack at either the Museum Support Center (MSC) Pod 6 or a Paul E. Garber Facility (Garber) designated building. The Contractor receiving the award shall provide all supervision, labor, materials, equipment and transportation required to complete the work as described in this RFP and the Contract Documents. 

The Smithsonian currently estimates that the fixed price for the entire project will be more than $10,000,000.

The Period of Performance for the contract is 1095 calendar days from the Notice to Proceed.

STATEMENT OF WORK

The successful offeror shall provide all materials, equipment, labor and supervision necessary to complete the following work at the Smithsonian Institution, National Museum of American History (NMAH), 1300 Constitution Avenue NW, Washington DC, 20560 and Smithsonian Institution's Suitland Collections Center (SSC), 4210 Silver Hill Road, Suitland, Maryland 20746.  

The Work includes, but is not limited to, all work specified in the Scope of Work and consists of drawings, specifications and a preliminary object list.

The objective of the NMAH PSRP IV Collections Move project is to relocate NMAH collections from NMAH to off-site storage at the SCC and includes the following:

A.  Project Management Services: Supply a dedicated Project Manager (PM) with art handling services background to lead a multi-disciplinary team. Work will include:

  • Creating and maintaining a detailed schedule for all move activities;
  • Coordinating with the designated NMAH move coordinator and project COTR on schedules, coordination, cost, and hold weekly progress report meetings;
  • Handling the resolution of any problems that interfere with the progress of the project;
  • Identifying and investigating problems and making recommendations for resolution to COTR;
  • Providing collections and storage space access for move team;
  • Advising on collections housing, packing, documentation, and shipping methods;
  • Providing technical interface between the museum artifact inventory system (CIS XG) and barcoding systems (managing the collections information), and the contractor's housing and packing logs and shipping manifests (contract management tools); 
  • Coordinating with the NMAH Move Coordinator on delivery of supplies (boxes, trays, acid free tissue, etc. containers/crates either in parts or constructed at another site and delivered for packing; housing supplies; tools and equipment for housing/packing/photography); and staging for them until use and shipment to the SCC;
  • Coordinating disposal of old cabinetry and containers as they are emptied and the collections are housed and packed, and shipped to SCC for storage on or in new rack and cabinets;
  • Ensuring condition documentation, photography, location tracking, and object number reconciliation are built into the workflow;  
  • Overseeing contractors/objects transit between facilities (e.g. travel from NMAH to off-site storage at the SCC required);
  • Overseeing contractors to remove boxed collections from shipping containers and store them on pallet racking and in cabinets at the SCC, and updating final location data;

 B. Packing and Storage arrangements for museum collections. Preparing collections for a move from one location to another following all safety and preservation requirements. Work will include:

  • Establishing, and moving artifacts within NMAH to processing area(s) for organizing, documenting, photographing, condition reporting, and housing artifacts for storage in new cabinets at the SCC – using housing methods that demonstrate economies of scale for like collections, and with housing dimensions fit to cabinet/racking configurations at the SCC – then packing the housed artifacts for shipment;
  • After artifact processing is complete and the artifacts are containerized for relocation, moving them to staging while awaiting relocation to Pod 6 at the SCC, and then staging, unpacking, tracking, and storing the artifacts on stationary racking systems, and on manually operated mobile pallet rack systems, and on manually operated mobile cabinetry systems located on (3) separate floors accessible by elevator. The mobile pallet rack system sections are 11' H X 12'W X 4' D, with 3-4 racks to a carriage.  These racks must be balanced as loaded.
  • Tracking collections in storage, staging, and transit using barcode system that is separate but interfaced with contractor's manifest system, including final storage updates;
  • Coordinating shipping and access with Move Coordinator and other tenants moving into Pod 6 concurrently;

 C. Physical transit of art and museum objects from NMAH to SCC. Work includes:

  • Providing the secure and climate-controlled air-ride vehicles with working lift-gate, constant surveillance, and the drivers and any necessary permits or additional escort vehicles;
  • Loading and off-loading collections objects from vehicles; moving crates and objects to or from the gallery or venue (floor and shelf as identified by NMAH staff);
  • Documenting and alerting the museum to collections found in poor condition and requiring special stabilization or conservation treatment prior to housing, packing, and shipment;
  • Designing and fabricating crate interior fittings and outer shells;
  • Providing specialized equipment, tools, and supplies needed to move the works;
  • Condition reporting and data entry of documentation into NMAH’s collection management system (Mimsy XG).  
  • Types of transportation vehicles include: vans, box trucks or other vehicles meeting the NMAH loading dock size limitations (13’3” high, 42’ long).  General standards for museum collections transportation vehicles are:

        1. The truck shall be equipped with air ride suspension, a working lift gate, pallet jacks, dual drivers, Constant Surveillance Service, and climate control.

        2. Climate must be maintained at 70 degrees, +/- 2 degrees over the duration of the trip.

        3. Smithsonian may monitor truck temperature, humidity GPS location and shock readings.

        4. Crates and packages shall be secured to prevent shifting or movement during transport and shall not be stacked.

        5. Pickup and delivery should occur during normal business hours and a schedule of the transit is to be submitted with the estimate.

        6. Stoppage time is not allowed.

D.    Rigging.  Provide all engineering and equipment expertise to install or deinstall large or suspended artifacts ranging from fine art works to vehicles. Specific objects known to require rigging are identified in the Scope of Work. Work includes:  

  • Producing engineering and architecture drawings;
  • Developing a safety plan;
  • Arranging suitable equipment including trucks, gantry, pallet jacks, personnel lifts, forklifts, and other handling equipment, hardware, and tools;
  • Fabricating supports and mounts in suitable size and shape, in compliance with applicable safety regulations and standards, and providing experienced and licensed or certified equipment operators.

Subcontracting Goals

The subcontracting goals for this project are: 40% with small business concerns. At least 7% of total planned subcontracting dollars shall be placed with Small disadvantaged businesses (SDB), including Historically Black Colleges and Universities or Minority Institutions; 7% with Women-owned small businesses (WOSB); 4% shall be placed with Hub-zone Small Businesses (HubSB), 4% with Veteran-owned small businesses (VOSB); and 4% with Service-Disabled Veteran-owned small businesses (SDV).
 

THE PROPOSAL DUE DATE IS WEDNESDAY, MARCH 19, 2025, AT 3:00 PM EASTERN STANDARD TIME.

Update #7 ·

Amendment 0006 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Revised Scope

---------------------------------------------------------------------------------------------------------------

Amendment 0005 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Responses to RFI Questions

Submission Due Date Extension

---------------------------------------------------------------------------------------------------------------

Amendment 0004 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Revised Responses to RFI Questions

Revised Schedule and Multi-Year Document

---------------------------------------------------------------------------------------------------------------

Amendment 0003 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Responses to RFI Questions

Questions/Clarifications Due Date Extension

---------------------------------------------------------------------------------------------------------------

Amendment 0002 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Responses to RFI Questions 

Submission Due Date Time Extension

---------------------------------------------------------------------------------------------------------------

Amendment 0001 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Response to RFI Questions One

------------------------------------------------------------------------------------------------------------------

This Request for Proposals (RFP) is for Smithsonian Institution's National Museum American History (NMAH) to move collections within the American History Building (AHB), provide new Smithsonian approved collections housing for all identified artifacts, perform basic collections photography, documentation, condition reporting, rehouse artifacts, track all collection location changes, and move the collections to the Smithsonian Suitland Collections Center (SCC), and unpack at either the Museum Support Center (MSC) Pod 6 or a Paul E. Garber Facility (Garber) designated building. The Contractor receiving the award shall provide all supervision, labor, materials, equipment and transportation required to complete the work as described in this RFP and the Contract Documents. 

The Smithsonian currently estimates that the fixed price for the entire project will be more than $10,000,000.

The Period of Performance for the contract is 1095 calendar days from the Notice to Proceed.

STATEMENT OF WORK

The successful offeror shall provide all materials, equipment, labor and supervision necessary to complete the following work at the Smithsonian Institution, National Museum of American History (NMAH), 1300 Constitution Avenue NW, Washington DC, 20560 and Smithsonian Institution's Suitland Collections Center (SSC), 4210 Silver Hill Road, Suitland, Maryland 20746.  

The Work includes, but is not limited to, all work specified in the Scope of Work and consists of drawings, specifications and a preliminary object list.

The objective of the NMAH PSRP IV Collections Move project is to relocate NMAH collections from NMAH to off-site storage at the SCC and includes the following:

A.  Project Management Services: Supply a dedicated Project Manager (PM) with art handling services background to lead a multi-disciplinary team. Work will include:

  • Creating and maintaining a detailed schedule for all move activities;
  • Coordinating with the designated NMAH move coordinator and project COTR on schedules, coordination, cost, and hold weekly progress report meetings;
  • Handling the resolution of any problems that interfere with the progress of the project;
  • Identifying and investigating problems and making recommendations for resolution to COTR;
  • Providing collections and storage space access for move team;
  • Advising on collections housing, packing, documentation, and shipping methods;
  • Providing technical interface between the museum artifact inventory system (CIS XG) and barcoding systems (managing the collections information), and the contractor's housing and packing logs and shipping manifests (contract management tools); 
  • Coordinating with the NMAH Move Coordinator on delivery of supplies (boxes, trays, acid free tissue, etc. containers/crates either in parts or constructed at another site and delivered for packing; housing supplies; tools and equipment for housing/packing/photography); and staging for them until use and shipment to the SCC;
  • Coordinating disposal of old cabinetry and containers as they are emptied and the collections are housed and packed, and shipped to SCC for storage on or in new rack and cabinets;
  • Ensuring condition documentation, photography, location tracking, and object number reconciliation are built into the workflow;  
  • Overseeing contractors/objects transit between facilities (e.g. travel from NMAH to off-site storage at the SCC required);
  • Overseeing contractors to remove boxed collections from shipping containers and store them on pallet racking and in cabinets at the SCC, and updating final location data;

 B. Packing and Storage arrangements for museum collections. Preparing collections for a move from one location to another following all safety and preservation requirements. Work will include:

  • Establishing, and moving artifacts within NMAH to processing area(s) for organizing, documenting, photographing, condition reporting, and housing artifacts for storage in new cabinets at the SCC – using housing methods that demonstrate economies of scale for like collections, and with housing dimensions fit to cabinet/racking configurations at the SCC – then packing the housed artifacts for shipment;
  • After artifact processing is complete and the artifacts are containerized for relocation, moving them to staging while awaiting relocation to Pod 6 at the SCC, and then staging, unpacking, tracking, and storing the artifacts on stationary racking systems, and on manually operated mobile pallet rack systems, and on manually operated mobile cabinetry systems located on (3) separate floors accessible by elevator. The mobile pallet rack system sections are 11' H X 12'W X 4' D, with 3-4 racks to a carriage.  These racks must be balanced as loaded.
  • Tracking collections in storage, staging, and transit using barcode system that is separate but interfaced with contractor's manifest system, including final storage updates;
  • Coordinating shipping and access with Move Coordinator and other tenants moving into Pod 6 concurrently;

 C. Physical transit of art and museum objects from NMAH to SCC. Work includes:

  • Providing the secure and climate-controlled air-ride vehicles with working lift-gate, constant surveillance, and the drivers and any necessary permits or additional escort vehicles;
  • Loading and off-loading collections objects from vehicles; moving crates and objects to or from the gallery or venue (floor and shelf as identified by NMAH staff);
  • Documenting and alerting the museum to collections found in poor condition and requiring special stabilization or conservation treatment prior to housing, packing, and shipment;
  • Designing and fabricating crate interior fittings and outer shells;
  • Providing specialized equipment, tools, and supplies needed to move the works;
  • Condition reporting and data entry of documentation into NMAH’s collection management system (Mimsy XG).  
  • Types of transportation vehicles include: vans, box trucks or other vehicles meeting the NMAH loading dock size limitations (13’3” high, 42’ long).  General standards for museum collections transportation vehicles are:

        1. The truck shall be equipped with air ride suspension, a working lift gate, pallet jacks, dual drivers, Constant Surveillance Service, and climate control.

        2. Climate must be maintained at 70 degrees, +/- 2 degrees over the duration of the trip.

        3. Smithsonian may monitor truck temperature, humidity GPS location and shock readings.

        4. Crates and packages shall be secured to prevent shifting or movement during transport and shall not be stacked.

        5. Pickup and delivery should occur during normal business hours and a schedule of the transit is to be submitted with the estimate.

        6. Stoppage time is not allowed.

D.    Rigging.  Provide all engineering and equipment expertise to install or deinstall large or suspended artifacts ranging from fine art works to vehicles. Specific objects known to require rigging are identified in the Scope of Work. Work includes:  

  • Producing engineering and architecture drawings;
  • Developing a safety plan;
  • Arranging suitable equipment including trucks, gantry, pallet jacks, personnel lifts, forklifts, and other handling equipment, hardware, and tools;
  • Fabricating supports and mounts in suitable size and shape, in compliance with applicable safety regulations and standards, and providing experienced and licensed or certified equipment operators.

Subcontracting Goals

The subcontracting goals for this project are: 40% with small business concerns. At least 7% of total planned subcontracting dollars shall be placed with Small disadvantaged businesses (SDB), including Historically Black Colleges and Universities or Minority Institutions; 7% with Women-owned small businesses (WOSB); 4% shall be placed with Hub-zone Small Businesses (HubSB), 4% with Veteran-owned small businesses (VOSB); and 4% with Service-Disabled Veteran-owned small businesses (SDV).
 

THE PROPOSAL DUE DATE IS WEDNESDAY, MARCH 19, 2025, AT 3:00 PM EASTERN STANDARD TIME.

Update #6 ·

Amendment 0005 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Responses to RFI Questions

Submission Due Date Extension

---------------------------------------------------------------------------------------------------------------

Amendment 0004 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Revised Responses to RFI Questions

Revised Schedule and Multi-Year Document

---------------------------------------------------------------------------------------------------------------

Amendment 0003 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Responses to RFI Questions

Questions/Clarifications Due Date Extension

---------------------------------------------------------------------------------------------------------------

Amendment 0002 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Responses to RFI Questions 

Submission Due Date Time Extension

---------------------------------------------------------------------------------------------------------------

Amendment 0001 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Response to RFI Questions One

------------------------------------------------------------------------------------------------------------------

This Request for Proposals (RFP) is for Smithsonian Institution's National Museum American History (NMAH) to move collections within the American History Building (AHB), provide new Smithsonian approved collections housing for all identified artifacts, perform basic collections photography, documentation, condition reporting, rehouse artifacts, track all collection location changes, and move the collections to the Smithsonian Suitland Collections Center (SCC), and unpack at either the Museum Support Center (MSC) Pod 6 or a Paul E. Garber Facility (Garber) designated building. The Contractor receiving the award shall provide all supervision, labor, materials, equipment and transportation required to complete the work as described in this RFP and the Contract Documents. 

The Smithsonian currently estimates that the fixed price for the entire project will be more than $10,000,000.

The Period of Performance for the contract is 1095 calendar days from the Notice to Proceed.

STATEMENT OF WORK

The successful offeror shall provide all materials, equipment, labor and supervision necessary to complete the following work at the Smithsonian Institution, National Museum of American History (NMAH), 1300 Constitution Avenue NW, Washington DC, 20560 and Smithsonian Institution's Suitland Collections Center (SSC), 4210 Silver Hill Road, Suitland, Maryland 20746.  

The Work includes, but is not limited to, all work specified in the Scope of Work and consists of drawings, specifications and a preliminary object list.

The objective of the NMAH PSRP IV Collections Move project is to relocate NMAH collections from NMAH to off-site storage at the SCC and includes the following:

A.  Project Management Services: Supply a dedicated Project Manager (PM) with art handling services background to lead a multi-disciplinary team. Work will include:

  • Creating and maintaining a detailed schedule for all move activities;
  • Coordinating with the designated NMAH move coordinator and project COTR on schedules, coordination, cost, and hold weekly progress report meetings;
  • Handling the resolution of any problems that interfere with the progress of the project;
  • Identifying and investigating problems and making recommendations for resolution to COTR;
  • Providing collections and storage space access for move team;
  • Advising on collections housing, packing, documentation, and shipping methods;
  • Providing technical interface between the museum artifact inventory system (CIS XG) and barcoding systems (managing the collections information), and the contractor's housing and packing logs and shipping manifests (contract management tools); 
  • Coordinating with the NMAH Move Coordinator on delivery of supplies (boxes, trays, acid free tissue, etc. containers/crates either in parts or constructed at another site and delivered for packing; housing supplies; tools and equipment for housing/packing/photography); and staging for them until use and shipment to the SCC;
  • Coordinating disposal of old cabinetry and containers as they are emptied and the collections are housed and packed, and shipped to SCC for storage on or in new rack and cabinets;
  • Ensuring condition documentation, photography, location tracking, and object number reconciliation are built into the workflow;  
  • Overseeing contractors/objects transit between facilities (e.g. travel from NMAH to off-site storage at the SCC required);
  • Overseeing contractors to remove boxed collections from shipping containers and store them on pallet racking and in cabinets at the SCC, and updating final location data;

 B. Packing and Storage arrangements for museum collections. Preparing collections for a move from one location to another following all safety and preservation requirements. Work will include:

  • Establishing, and moving artifacts within NMAH to processing area(s) for organizing, documenting, photographing, condition reporting, and housing artifacts for storage in new cabinets at the SCC – using housing methods that demonstrate economies of scale for like collections, and with housing dimensions fit to cabinet/racking configurations at the SCC – then packing the housed artifacts for shipment;
  • After artifact processing is complete and the artifacts are containerized for relocation, moving them to staging while awaiting relocation to Pod 6 at the SCC, and then staging, unpacking, tracking, and storing the artifacts on stationary racking systems, and on manually operated mobile pallet rack systems, and on manually operated mobile cabinetry systems located on (3) separate floors accessible by elevator. The mobile pallet rack system sections are 11' H X 12'W X 4' D, with 3-4 racks to a carriage.  These racks must be balanced as loaded.
  • Tracking collections in storage, staging, and transit using barcode system that is separate but interfaced with contractor's manifest system, including final storage updates;
  • Coordinating shipping and access with Move Coordinator and other tenants moving into Pod 6 concurrently;

 C. Physical transit of art and museum objects from NMAH to SCC. Work includes:

  • Providing the secure and climate-controlled air-ride vehicles with working lift-gate, constant surveillance, and the drivers and any necessary permits or additional escort vehicles;
  • Loading and off-loading collections objects from vehicles; moving crates and objects to or from the gallery or venue (floor and shelf as identified by NMAH staff);
  • Documenting and alerting the museum to collections found in poor condition and requiring special stabilization or conservation treatment prior to housing, packing, and shipment;
  • Designing and fabricating crate interior fittings and outer shells;
  • Providing specialized equipment, tools, and supplies needed to move the works;
  • Condition reporting and data entry of documentation into NMAH’s collection management system (Mimsy XG).  
  • Types of transportation vehicles include: vans, box trucks or other vehicles meeting the NMAH loading dock size limitations (13’3” high, 42’ long).  General standards for museum collections transportation vehicles are:

        1. The truck shall be equipped with air ride suspension, a working lift gate, pallet jacks, dual drivers, Constant Surveillance Service, and climate control.

        2. Climate must be maintained at 70 degrees, +/- 2 degrees over the duration of the trip.

        3. Smithsonian may monitor truck temperature, humidity GPS location and shock readings.

        4. Crates and packages shall be secured to prevent shifting or movement during transport and shall not be stacked.

        5. Pickup and delivery should occur during normal business hours and a schedule of the transit is to be submitted with the estimate.

        6. Stoppage time is not allowed.

D.    Rigging.  Provide all engineering and equipment expertise to install or deinstall large or suspended artifacts ranging from fine art works to vehicles. Specific objects known to require rigging are identified in the Scope of Work. Work includes:  

  • Producing engineering and architecture drawings;
  • Developing a safety plan;
  • Arranging suitable equipment including trucks, gantry, pallet jacks, personnel lifts, forklifts, and other handling equipment, hardware, and tools;
  • Fabricating supports and mounts in suitable size and shape, in compliance with applicable safety regulations and standards, and providing experienced and licensed or certified equipment operators.

Subcontracting Goals

The subcontracting goals for this project are: 40% with small business concerns. At least 7% of total planned subcontracting dollars shall be placed with Small disadvantaged businesses (SDB), including Historically Black Colleges and Universities or Minority Institutions; 7% with Women-owned small businesses (WOSB); 4% shall be placed with Hub-zone Small Businesses (HubSB), 4% with Veteran-owned small businesses (VOSB); and 4% with Service-Disabled Veteran-owned small businesses (SDV).
 

THE PROPOSAL DUE DATE IS WEDNESDAY, MARCH 19, 2025, AT 3:00 PM EASTERN STANDARD TIME.

Update #5 ·

Amendment 0004 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Revised Responses to RFI Questions

Revised Schedule and Multi-Year Document

---------------------------------------------------------------------------------------------------------------

Amendment 0003 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Responses to RFI Questions

Questions/Clarifications Due Date Extension

---------------------------------------------------------------------------------------------------------------

Amendment 0002 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Responses to RFI Questions 

Submission Due Date Time Extension

---------------------------------------------------------------------------------------------------------------

Amendment 0001 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Response to RFI Questions One

------------------------------------------------------------------------------------------------------------------

This Request for Proposals (RFP) is for Smithsonian Institution's National Museum American History (NMAH) to move collections within the American History Building (AHB), provide new Smithsonian approved collections housing for all identified artifacts, perform basic collections photography, documentation, condition reporting, rehouse artifacts, track all collection location changes, and move the collections to the Smithsonian Suitland Collections Center (SCC), and unpack at either the Museum Support Center (MSC) Pod 6 or a Paul E. Garber Facility (Garber) designated building. The Contractor receiving the award shall provide all supervision, labor, materials, equipment and transportation required to complete the work as described in this RFP and the Contract Documents. 

The Smithsonian currently estimates that the fixed price for the entire project will be more than $10,000,000.

The Period of Performance for the contract is 1095 calendar days from the Notice to Proceed.

STATEMENT OF WORK

The successful offeror shall provide all materials, equipment, labor and supervision necessary to complete the following work at the Smithsonian Institution, National Museum of American History (NMAH), 1300 Constitution Avenue NW, Washington DC, 20560 and Smithsonian Institution's Suitland Collections Center (SSC), 4210 Silver Hill Road, Suitland, Maryland 20746.  

The Work includes, but is not limited to, all work specified in the Scope of Work and consists of drawings, specifications and a preliminary object list.

The objective of the NMAH PSRP IV Collections Move project is to relocate NMAH collections from NMAH to off-site storage at the SCC and includes the following:

A.  Project Management Services: Supply a dedicated Project Manager (PM) with art handling services background to lead a multi-disciplinary team. Work will include:

  • Creating and maintaining a detailed schedule for all move activities;
  • Coordinating with the designated NMAH move coordinator and project COTR on schedules, coordination, cost, and hold weekly progress report meetings;
  • Handling the resolution of any problems that interfere with the progress of the project;
  • Identifying and investigating problems and making recommendations for resolution to COTR;
  • Providing collections and storage space access for move team;
  • Advising on collections housing, packing, documentation, and shipping methods;
  • Providing technical interface between the museum artifact inventory system (CIS XG) and barcoding systems (managing the collections information), and the contractor's housing and packing logs and shipping manifests (contract management tools); 
  • Coordinating with the NMAH Move Coordinator on delivery of supplies (boxes, trays, acid free tissue, etc. containers/crates either in parts or constructed at another site and delivered for packing; housing supplies; tools and equipment for housing/packing/photography); and staging for them until use and shipment to the SCC;
  • Coordinating disposal of old cabinetry and containers as they are emptied and the collections are housed and packed, and shipped to SCC for storage on or in new rack and cabinets;
  • Ensuring condition documentation, photography, location tracking, and object number reconciliation are built into the workflow;  
  • Overseeing contractors/objects transit between facilities (e.g. travel from NMAH to off-site storage at the SCC required);
  • Overseeing contractors to remove boxed collections from shipping containers and store them on pallet racking and in cabinets at the SCC, and updating final location data;

 B. Packing and Storage arrangements for museum collections. Preparing collections for a move from one location to another following all safety and preservation requirements. Work will include:

  • Establishing, and moving artifacts within NMAH to processing area(s) for organizing, documenting, photographing, condition reporting, and housing artifacts for storage in new cabinets at the SCC – using housing methods that demonstrate economies of scale for like collections, and with housing dimensions fit to cabinet/racking configurations at the SCC – then packing the housed artifacts for shipment;
  • After artifact processing is complete and the artifacts are containerized for relocation, moving them to staging while awaiting relocation to Pod 6 at the SCC, and then staging, unpacking, tracking, and storing the artifacts on stationary racking systems, and on manually operated mobile pallet rack systems, and on manually operated mobile cabinetry systems located on (3) separate floors accessible by elevator. The mobile pallet rack system sections are 11' H X 12'W X 4' D, with 3-4 racks to a carriage.  These racks must be balanced as loaded.
  • Tracking collections in storage, staging, and transit using barcode system that is separate but interfaced with contractor's manifest system, including final storage updates;
  • Coordinating shipping and access with Move Coordinator and other tenants moving into Pod 6 concurrently;

 C. Physical transit of art and museum objects from NMAH to SCC. Work includes:

  • Providing the secure and climate-controlled air-ride vehicles with working lift-gate, constant surveillance, and the drivers and any necessary permits or additional escort vehicles;
  • Loading and off-loading collections objects from vehicles; moving crates and objects to or from the gallery or venue (floor and shelf as identified by NMAH staff);
  • Documenting and alerting the museum to collections found in poor condition and requiring special stabilization or conservation treatment prior to housing, packing, and shipment;
  • Designing and fabricating crate interior fittings and outer shells;
  • Providing specialized equipment, tools, and supplies needed to move the works;
  • Condition reporting and data entry of documentation into NMAH’s collection management system (Mimsy XG).  
  • Types of transportation vehicles include: vans, box trucks or other vehicles meeting the NMAH loading dock size limitations (13’3” high, 42’ long).  General standards for museum collections transportation vehicles are:

        1. The truck shall be equipped with air ride suspension, a working lift gate, pallet jacks, dual drivers, Constant Surveillance Service, and climate control.

        2. Climate must be maintained at 70 degrees, +/- 2 degrees over the duration of the trip.

        3. Smithsonian may monitor truck temperature, humidity GPS location and shock readings.

        4. Crates and packages shall be secured to prevent shifting or movement during transport and shall not be stacked.

        5. Pickup and delivery should occur during normal business hours and a schedule of the transit is to be submitted with the estimate.

        6. Stoppage time is not allowed.

D.    Rigging.  Provide all engineering and equipment expertise to install or deinstall large or suspended artifacts ranging from fine art works to vehicles. Specific objects known to require rigging are identified in the Scope of Work. Work includes:  

  • Producing engineering and architecture drawings;
  • Developing a safety plan;
  • Arranging suitable equipment including trucks, gantry, pallet jacks, personnel lifts, forklifts, and other handling equipment, hardware, and tools;
  • Fabricating supports and mounts in suitable size and shape, in compliance with applicable safety regulations and standards, and providing experienced and licensed or certified equipment operators.

Subcontracting Goals

The subcontracting goals for this project are: 40% with small business concerns. At least 7% of total planned subcontracting dollars shall be placed with Small disadvantaged businesses (SDB), including Historically Black Colleges and Universities or Minority Institutions; 7% with Women-owned small businesses (WOSB); 4% shall be placed with Hub-zone Small Businesses (HubSB), 4% with Veteran-owned small businesses (VOSB); and 4% with Service-Disabled Veteran-owned small businesses (SDV).
 

THE PROPOSAL DUE DATE IS WEDNESDAY, MARCH 19, 2025, AT 3:00 PM EASTERN STANDARD TIME.

Update #4 ·

Amendment 0003 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Responses to RFI Questions

Questions/Clarifications Due Date Extension

---------------------------------------------------------------------------------------------------------------

Amendment 0002 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Responses to RFI Questions 

Submission Due Date Time Extension

---------------------------------------------------------------------------------------------------------------

Amendment 0001 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Response to RFI Questions One

------------------------------------------------------------------------------------------------------------------

This Request for Proposals (RFP) is for Smithsonian Institution's National Museum American History (NMAH) to move collections within the American History Building (AHB), provide new Smithsonian approved collections housing for all identified artifacts, perform basic collections photography, documentation, condition reporting, rehouse artifacts, track all collection location changes, and move the collections to the Smithsonian Suitland Collections Center (SCC), and unpack at either the Museum Support Center (MSC) Pod 6 or a Paul E. Garber Facility (Garber) designated building. The Contractor receiving the award shall provide all supervision, labor, materials, equipment and transportation required to complete the work as described in this RFP and the Contract Documents. 

The Smithsonian currently estimates that the fixed price for the entire project will be more than $10,000,000.

The Period of Performance for the contract is 1095 calendar days from the Notice to Proceed.

STATEMENT OF WORK

The successful offeror shall provide all materials, equipment, labor and supervision necessary to complete the following work at the Smithsonian Institution, National Museum of American History (NMAH), 1300 Constitution Avenue NW, Washington DC, 20560 and Smithsonian Institution's Suitland Collections Center (SSC), 4210 Silver Hill Road, Suitland, Maryland 20746.  

The Work includes, but is not limited to, all work specified in the Scope of Work and consists of drawings, specifications and a preliminary object list.

The objective of the NMAH PSRP IV Collections Move project is to relocate NMAH collections from NMAH to off-site storage at the SCC and includes the following:

A.  Project Management Services: Supply a dedicated Project Manager (PM) with art handling services background to lead a multi-disciplinary team. Work will include:

  • Creating and maintaining a detailed schedule for all move activities;
  • Coordinating with the designated NMAH move coordinator and project COTR on schedules, coordination, cost, and hold weekly progress report meetings;
  • Handling the resolution of any problems that interfere with the progress of the project;
  • Identifying and investigating problems and making recommendations for resolution to COTR;
  • Providing collections and storage space access for move team;
  • Advising on collections housing, packing, documentation, and shipping methods;
  • Providing technical interface between the museum artifact inventory system (CIS XG) and barcoding systems (managing the collections information), and the contractor's housing and packing logs and shipping manifests (contract management tools); 
  • Coordinating with the NMAH Move Coordinator on delivery of supplies (boxes, trays, acid free tissue, etc. containers/crates either in parts or constructed at another site and delivered for packing; housing supplies; tools and equipment for housing/packing/photography); and staging for them until use and shipment to the SCC;
  • Coordinating disposal of old cabinetry and containers as they are emptied and the collections are housed and packed, and shipped to SCC for storage on or in new rack and cabinets;
  • Ensuring condition documentation, photography, location tracking, and object number reconciliation are built into the workflow;  
  • Overseeing contractors/objects transit between facilities (e.g. travel from NMAH to off-site storage at the SCC required);
  • Overseeing contractors to remove boxed collections from shipping containers and store them on pallet racking and in cabinets at the SCC, and updating final location data;

 B. Packing and Storage arrangements for museum collections. Preparing collections for a move from one location to another following all safety and preservation requirements. Work will include:

  • Establishing, and moving artifacts within NMAH to processing area(s) for organizing, documenting, photographing, condition reporting, and housing artifacts for storage in new cabinets at the SCC – using housing methods that demonstrate economies of scale for like collections, and with housing dimensions fit to cabinet/racking configurations at the SCC – then packing the housed artifacts for shipment;
  • After artifact processing is complete and the artifacts are containerized for relocation, moving them to staging while awaiting relocation to Pod 6 at the SCC, and then staging, unpacking, tracking, and storing the artifacts on stationary racking systems, and on manually operated mobile pallet rack systems, and on manually operated mobile cabinetry systems located on (3) separate floors accessible by elevator. The mobile pallet rack system sections are 11' H X 12'W X 4' D, with 3-4 racks to a carriage.  These racks must be balanced as loaded.
  • Tracking collections in storage, staging, and transit using barcode system that is separate but interfaced with contractor's manifest system, including final storage updates;
  • Coordinating shipping and access with Move Coordinator and other tenants moving into Pod 6 concurrently;

 C. Physical transit of art and museum objects from NMAH to SCC. Work includes:

  • Providing the secure and climate-controlled air-ride vehicles with working lift-gate, constant surveillance, and the drivers and any necessary permits or additional escort vehicles;
  • Loading and off-loading collections objects from vehicles; moving crates and objects to or from the gallery or venue (floor and shelf as identified by NMAH staff);
  • Documenting and alerting the museum to collections found in poor condition and requiring special stabilization or conservation treatment prior to housing, packing, and shipment;
  • Designing and fabricating crate interior fittings and outer shells;
  • Providing specialized equipment, tools, and supplies needed to move the works;
  • Condition reporting and data entry of documentation into NMAH’s collection management system (Mimsy XG).  
  • Types of transportation vehicles include: vans, box trucks or other vehicles meeting the NMAH loading dock size limitations (13’3” high, 42’ long).  General standards for museum collections transportation vehicles are:

        1. The truck shall be equipped with air ride suspension, a working lift gate, pallet jacks, dual drivers, Constant Surveillance Service, and climate control.

        2. Climate must be maintained at 70 degrees, +/- 2 degrees over the duration of the trip.

        3. Smithsonian may monitor truck temperature, humidity GPS location and shock readings.

        4. Crates and packages shall be secured to prevent shifting or movement during transport and shall not be stacked.

        5. Pickup and delivery should occur during normal business hours and a schedule of the transit is to be submitted with the estimate.

        6. Stoppage time is not allowed.

D.    Rigging.  Provide all engineering and equipment expertise to install or deinstall large or suspended artifacts ranging from fine art works to vehicles. Specific objects known to require rigging are identified in the Scope of Work. Work includes:  

  • Producing engineering and architecture drawings;
  • Developing a safety plan;
  • Arranging suitable equipment including trucks, gantry, pallet jacks, personnel lifts, forklifts, and other handling equipment, hardware, and tools;
  • Fabricating supports and mounts in suitable size and shape, in compliance with applicable safety regulations and standards, and providing experienced and licensed or certified equipment operators.

Subcontracting Goals

The subcontracting goals for this project are: 40% with small business concerns. At least 7% of total planned subcontracting dollars shall be placed with Small disadvantaged businesses (SDB), including Historically Black Colleges and Universities or Minority Institutions; 7% with Women-owned small businesses (WOSB); 4% shall be placed with Hub-zone Small Businesses (HubSB), 4% with Veteran-owned small businesses (VOSB); and 4% with Service-Disabled Veteran-owned small businesses (SDV).
 

THE PROPOSAL DUE DATE IS WEDNESDAY, MARCH 19, 2025, AT 3:00 PM EASTERN STANDARD TIME.

Update #3 ·

Amendment 0002 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Responses to RFI Questions 

Submission Due Date Time Extension

---------------------------------------------------------------------------------------------------------------

Amendment 0001 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Response to RFI Questions One

------------------------------------------------------------------------------------------------------------------

This Request for Proposals (RFP) is for Smithsonian Institution's National Museum American History (NMAH) to move collections within the American History Building (AHB), provide new Smithsonian approved collections housing for all identified artifacts, perform basic collections photography, documentation, condition reporting, rehouse artifacts, track all collection location changes, and move the collections to the Smithsonian Suitland Collections Center (SCC), and unpack at either the Museum Support Center (MSC) Pod 6 or a Paul E. Garber Facility (Garber) designated building. The Contractor receiving the award shall provide all supervision, labor, materials, equipment and transportation required to complete the work as described in this RFP and the Contract Documents. 

The Smithsonian currently estimates that the fixed price for the entire project will be more than $10,000,000.

The Period of Performance for the contract is 1095 calendar days from the Notice to Proceed.

STATEMENT OF WORK

The successful offeror shall provide all materials, equipment, labor and supervision necessary to complete the following work at the Smithsonian Institution, National Museum of American History (NMAH), 1300 Constitution Avenue NW, Washington DC, 20560 and Smithsonian Institution's Suitland Collections Center (SSC), 4210 Silver Hill Road, Suitland, Maryland 20746.  

The Work includes, but is not limited to, all work specified in the Scope of Work and consists of drawings, specifications and a preliminary object list.

The objective of the NMAH PSRP IV Collections Move project is to relocate NMAH collections from NMAH to off-site storage at the SCC and includes the following:

A.  Project Management Services: Supply a dedicated Project Manager (PM) with art handling services background to lead a multi-disciplinary team. Work will include:

  • Creating and maintaining a detailed schedule for all move activities;
  • Coordinating with the designated NMAH move coordinator and project COTR on schedules, coordination, cost, and hold weekly progress report meetings;
  • Handling the resolution of any problems that interfere with the progress of the project;
  • Identifying and investigating problems and making recommendations for resolution to COTR;
  • Providing collections and storage space access for move team;
  • Advising on collections housing, packing, documentation, and shipping methods;
  • Providing technical interface between the museum artifact inventory system (CIS XG) and barcoding systems (managing the collections information), and the contractor's housing and packing logs and shipping manifests (contract management tools); 
  • Coordinating with the NMAH Move Coordinator on delivery of supplies (boxes, trays, acid free tissue, etc. containers/crates either in parts or constructed at another site and delivered for packing; housing supplies; tools and equipment for housing/packing/photography); and staging for them until use and shipment to the SCC;
  • Coordinating disposal of old cabinetry and containers as they are emptied and the collections are housed and packed, and shipped to SCC for storage on or in new rack and cabinets;
  • Ensuring condition documentation, photography, location tracking, and object number reconciliation are built into the workflow;  
  • Overseeing contractors/objects transit between facilities (e.g. travel from NMAH to off-site storage at the SCC required);
  • Overseeing contractors to remove boxed collections from shipping containers and store them on pallet racking and in cabinets at the SCC, and updating final location data;

 B. Packing and Storage arrangements for museum collections. Preparing collections for a move from one location to another following all safety and preservation requirements. Work will include:

  • Establishing, and moving artifacts within NMAH to processing area(s) for organizing, documenting, photographing, condition reporting, and housing artifacts for storage in new cabinets at the SCC – using housing methods that demonstrate economies of scale for like collections, and with housing dimensions fit to cabinet/racking configurations at the SCC – then packing the housed artifacts for shipment;
  • After artifact processing is complete and the artifacts are containerized for relocation, moving them to staging while awaiting relocation to Pod 6 at the SCC, and then staging, unpacking, tracking, and storing the artifacts on stationary racking systems, and on manually operated mobile pallet rack systems, and on manually operated mobile cabinetry systems located on (3) separate floors accessible by elevator. The mobile pallet rack system sections are 11' H X 12'W X 4' D, with 3-4 racks to a carriage.  These racks must be balanced as loaded.
  • Tracking collections in storage, staging, and transit using barcode system that is separate but interfaced with contractor's manifest system, including final storage updates;
  • Coordinating shipping and access with Move Coordinator and other tenants moving into Pod 6 concurrently;

 C. Physical transit of art and museum objects from NMAH to SCC. Work includes:

  • Providing the secure and climate-controlled air-ride vehicles with working lift-gate, constant surveillance, and the drivers and any necessary permits or additional escort vehicles;
  • Loading and off-loading collections objects from vehicles; moving crates and objects to or from the gallery or venue (floor and shelf as identified by NMAH staff);
  • Documenting and alerting the museum to collections found in poor condition and requiring special stabilization or conservation treatment prior to housing, packing, and shipment;
  • Designing and fabricating crate interior fittings and outer shells;
  • Providing specialized equipment, tools, and supplies needed to move the works;
  • Condition reporting and data entry of documentation into NMAH’s collection management system (Mimsy XG).  
  • Types of transportation vehicles include: vans, box trucks or other vehicles meeting the NMAH loading dock size limitations (13’3” high, 42’ long).  General standards for museum collections transportation vehicles are:

        1. The truck shall be equipped with air ride suspension, a working lift gate, pallet jacks, dual drivers, Constant Surveillance Service, and climate control.

        2. Climate must be maintained at 70 degrees, +/- 2 degrees over the duration of the trip.

        3. Smithsonian may monitor truck temperature, humidity GPS location and shock readings.

        4. Crates and packages shall be secured to prevent shifting or movement during transport and shall not be stacked.

        5. Pickup and delivery should occur during normal business hours and a schedule of the transit is to be submitted with the estimate.

        6. Stoppage time is not allowed.

D.    Rigging.  Provide all engineering and equipment expertise to install or deinstall large or suspended artifacts ranging from fine art works to vehicles. Specific objects known to require rigging are identified in the Scope of Work. Work includes:  

  • Producing engineering and architecture drawings;
  • Developing a safety plan;
  • Arranging suitable equipment including trucks, gantry, pallet jacks, personnel lifts, forklifts, and other handling equipment, hardware, and tools;
  • Fabricating supports and mounts in suitable size and shape, in compliance with applicable safety regulations and standards, and providing experienced and licensed or certified equipment operators.

Subcontracting Goals

The subcontracting goals for this project are: 40% with small business concerns. At least 7% of total planned subcontracting dollars shall be placed with Small disadvantaged businesses (SDB), including Historically Black Colleges and Universities or Minority Institutions; 7% with Women-owned small businesses (WOSB); 4% shall be placed with Hub-zone Small Businesses (HubSB), 4% with Veteran-owned small businesses (VOSB); and 4% with Service-Disabled Veteran-owned small businesses (SDV).
 

THE PROPOSAL DUE DATE IS WEDNESDAY, MARCH 19, 2025, AT 3:00 PM EASTERN STANDARD TIME.

Update #2 ·

Amendment 0001 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:

Response to RFI Questions One

------------------------------------------------------------------------------------------------------------------

This Request for Proposals (RFP) is for Smithsonian Institution's National Museum American History (NMAH) to move collections within the American History Building (AHB), provide new Smithsonian approved collections housing for all identified artifacts, perform basic collections photography, documentation, condition reporting, rehouse artifacts, track all collection location changes, and move the collections to the Smithsonian Suitland Collections Center (SCC), and unpack at either the Museum Support Center (MSC) Pod 6 or a Paul E. Garber Facility (Garber) designated building. The Contractor receiving the award shall provide all supervision, labor, materials, equipment and transportation required to complete the work as described in this RFP and the Contract Documents. 

The Smithsonian currently estimates that the fixed price for the entire project will be more than $10,000,000.

The Period of Performance for the contract is 1095 calendar days from the Notice to Proceed.

STATEMENT OF WORK

The successful offeror shall provide all materials, equipment, labor and supervision necessary to complete the following work at the Smithsonian Institution, National Museum of American History (NMAH), 1300 Constitution Avenue NW, Washington DC, 20560 and Smithsonian Institution's Suitland Collections Center (SSC), 4210 Silver Hill Road, Suitland, Maryland 20746.  

The Work includes, but is not limited to, all work specified in the Scope of Work and consists of drawings, specifications and a preliminary object list.

The objective of the NMAH PSRP IV Collections Move project is to relocate NMAH collections from NMAH to off-site storage at the SCC and includes the following:

A.  Project Management Services: Supply a dedicated Project Manager (PM) with art handling services background to lead a multi-disciplinary team. Work will include:

  • Creating and maintaining a detailed schedule for all move activities;
  • Coordinating with the designated NMAH move coordinator and project COTR on schedules, coordination, cost, and hold weekly progress report meetings;
  • Handling the resolution of any problems that interfere with the progress of the project;
  • Identifying and investigating problems and making recommendations for resolution to COTR;
  • Providing collections and storage space access for move team;
  • Advising on collections housing, packing, documentation, and shipping methods;
  • Providing technical interface between the museum artifact inventory system (CIS XG) and barcoding systems (managing the collections information), and the contractor's housing and packing logs and shipping manifests (contract management tools); 
  • Coordinating with the NMAH Move Coordinator on delivery of supplies (boxes, trays, acid free tissue, etc. containers/crates either in parts or constructed at another site and delivered for packing; housing supplies; tools and equipment for housing/packing/photography); and staging for them until use and shipment to the SCC;
  • Coordinating disposal of old cabinetry and containers as they are emptied and the collections are housed and packed, and shipped to SCC for storage on or in new rack and cabinets;
  • Ensuring condition documentation, photography, location tracking, and object number reconciliation are built into the workflow;  
  • Overseeing contractors/objects transit between facilities (e.g. travel from NMAH to off-site storage at the SCC required);
  • Overseeing contractors to remove boxed collections from shipping containers and store them on pallet racking and in cabinets at the SCC, and updating final location data;

 B. Packing and Storage arrangements for museum collections. Preparing collections for a move from one location to another following all safety and preservation requirements. Work will include:

  • Establishing, and moving artifacts within NMAH to processing area(s) for organizing, documenting, photographing, condition reporting, and housing artifacts for storage in new cabinets at the SCC – using housing methods that demonstrate economies of scale for like collections, and with housing dimensions fit to cabinet/racking configurations at the SCC – then packing the housed artifacts for shipment;
  • After artifact processing is complete and the artifacts are containerized for relocation, moving them to staging while awaiting relocation to Pod 6 at the SCC, and then staging, unpacking, tracking, and storing the artifacts on stationary racking systems, and on manually operated mobile pallet rack systems, and on manually operated mobile cabinetry systems located on (3) separate floors accessible by elevator. The mobile pallet rack system sections are 11' H X 12'W X 4' D, with 3-4 racks to a carriage.  These racks must be balanced as loaded.
  • Tracking collections in storage, staging, and transit using barcode system that is separate but interfaced with contractor's manifest system, including final storage updates;
  • Coordinating shipping and access with Move Coordinator and other tenants moving into Pod 6 concurrently;

 C. Physical transit of art and museum objects from NMAH to SCC. Work includes:

  • Providing the secure and climate-controlled air-ride vehicles with working lift-gate, constant surveillance, and the drivers and any necessary permits or additional escort vehicles;
  • Loading and off-loading collections objects from vehicles; moving crates and objects to or from the gallery or venue (floor and shelf as identified by NMAH staff);
  • Documenting and alerting the museum to collections found in poor condition and requiring special stabilization or conservation treatment prior to housing, packing, and shipment;
  • Designing and fabricating crate interior fittings and outer shells;
  • Providing specialized equipment, tools, and supplies needed to move the works;
  • Condition reporting and data entry of documentation into NMAH’s collection management system (Mimsy XG).  
  • Types of transportation vehicles include: vans, box trucks or other vehicles meeting the NMAH loading dock size limitations (13’3” high, 42’ long).  General standards for museum collections transportation vehicles are:

        1. The truck shall be equipped with air ride suspension, a working lift gate, pallet jacks, dual drivers, Constant Surveillance Service, and climate control.

        2. Climate must be maintained at 70 degrees, +/- 2 degrees over the duration of the trip.

        3. Smithsonian may monitor truck temperature, humidity GPS location and shock readings.

        4. Crates and packages shall be secured to prevent shifting or movement during transport and shall not be stacked.

        5. Pickup and delivery should occur during normal business hours and a schedule of the transit is to be submitted with the estimate.

        6. Stoppage time is not allowed.

D.    Rigging.  Provide all engineering and equipment expertise to install or deinstall large or suspended artifacts ranging from fine art works to vehicles. Specific objects known to require rigging are identified in the Scope of Work. Work includes:  

  • Producing engineering and architecture drawings;
  • Developing a safety plan;
  • Arranging suitable equipment including trucks, gantry, pallet jacks, personnel lifts, forklifts, and other handling equipment, hardware, and tools;
  • Fabricating supports and mounts in suitable size and shape, in compliance with applicable safety regulations and standards, and providing experienced and licensed or certified equipment operators.

Subcontracting Goals

The subcontracting goals for this project are: 40% with small business concerns. At least 7% of total planned subcontracting dollars shall be placed with Small disadvantaged businesses (SDB), including Historically Black Colleges and Universities or Minority Institutions; 7% with Women-owned small businesses (WOSB); 4% shall be placed with Hub-zone Small Businesses (HubSB), 4% with Veteran-owned small businesses (VOSB); and 4% with Service-Disabled Veteran-owned small businesses (SDV).
 

THE PROPOSAL DUE DATE IS WEDNESDAY, MARCH 19, 2025, AT 3:00 PM EASTERN STANDARD TIME.

Update #1 ·

This Request for Proposals (RFP) is for Smithsonian Institution's National Museum American History (NMAH) to move collections within the American History Building (AHB), provide new Smithsonian approved collections housing for all identified artifacts, perform basic collections photography, documentation, condition reporting, rehouse artifacts, track all collection location changes, and move the collections to the Smithsonian Suitland Collections Center (SCC), and unpack at either the Museum Support Center (MSC) Pod 6 or a Paul E. Garber Facility (Garber) designated building. The Contractor receiving the award shall provide all supervision, labor, materials, equipment and transportation required to complete the work as described in this RFP and the Contract Documents. 

The Smithsonian currently estimates that the fixed price for the entire project will be more than $10,000,000.

The Period of Performance for the contract is 1095 calendar days from the Notice to Proceed.

STATEMENT OF WORK

The successful offeror shall provide all materials, equipment, labor and supervision necessary to complete the following work at the Smithsonian Institution, National Museum of American History (NMAH), 1300 Constitution Avenue NW, Washington DC, 20560 and Smithsonian Institution's Suitland Collections Center (SSC), 4210 Silver Hill Road, Suitland, Maryland 20746.  

The Work includes, but is not limited to, all work specified in the Scope of Work and consists of drawings, specifications and a preliminary object list.

The objective of the NMAH PSRP IV Collections Move project is to relocate NMAH collections from NMAH to off-site storage at the SCC and includes the following:

A.  Project Management Services: Supply a dedicated Project Manager (PM) with art handling services background to lead a multi-disciplinary team. Work will include:

  • Creating and maintaining a detailed schedule for all move activities;
  • Coordinating with the designated NMAH move coordinator and project COTR on schedules, coordination, cost, and hold weekly progress report meetings;
  • Handling the resolution of any problems that interfere with the progress of the project;
  • Identifying and investigating problems and making recommendations for resolution to COTR;
  • Providing collections and storage space access for move team;
  • Advising on collections housing, packing, documentation, and shipping methods;
  • Providing technical interface between the museum artifact inventory system (CIS XG) and barcoding systems (managing the collections information), and the contractor's housing and packing logs and shipping manifests (contract management tools); 
  • Coordinating with the NMAH Move Coordinator on delivery of supplies (boxes, trays, acid free tissue, etc. containers/crates either in parts or constructed at another site and delivered for packing; housing supplies; tools and equipment for housing/packing/photography); and staging for them until use and shipment to the SCC;
  • Coordinating disposal of old cabinetry and containers as they are emptied and the collections are housed and packed, and shipped to SCC for storage on or in new rack and cabinets;
  • Ensuring condition documentation, photography, location tracking, and object number reconciliation are built into the workflow;  
  • Overseeing contractors/objects transit between facilities (e.g. travel from NMAH to off-site storage at the SCC required);
  • Overseeing contractors to remove boxed collections from shipping containers and store them on pallet racking and in cabinets at the SCC, and updating final location data;

 B. Packing and Storage arrangements for museum collections. Preparing collections for a move from one location to another following all safety and preservation requirements. Work will include:

  • Establishing, and moving artifacts within NMAH to processing area(s) for organizing, documenting, photographing, condition reporting, and housing artifacts for storage in new cabinets at the SCC – using housing methods that demonstrate economies of scale for like collections, and with housing dimensions fit to cabinet/racking configurations at the SCC – then packing the housed artifacts for shipment;
  • After artifact processing is complete and the artifacts are containerized for relocation, moving them to staging while awaiting relocation to Pod 6 at the SCC, and then staging, unpacking, tracking, and storing the artifacts on stationary racking systems, and on manually operated mobile pallet rack systems, and on manually operated mobile cabinetry systems located on (3) separate floors accessible by elevator. The mobile pallet rack system sections are 11' H X 12'W X 4' D, with 3-4 racks to a carriage.  These racks must be balanced as loaded.
  • Tracking collections in storage, staging, and transit using barcode system that is separate but interfaced with contractor's manifest system, including final storage updates;
  • Coordinating shipping and access with Move Coordinator and other tenants moving into Pod 6 concurrently;

 C. Physical transit of art and museum objects from NMAH to SCC. Work includes:

  • Providing the secure and climate-controlled air-ride vehicles with working lift-gate, constant surveillance, and the drivers and any necessary permits or additional escort vehicles;
  • Loading and off-loading collections objects from vehicles; moving crates and objects to or from the gallery or venue (floor and shelf as identified by NMAH staff);
  • Documenting and alerting the museum to collections found in poor condition and requiring special stabilization or conservation treatment prior to housing, packing, and shipment;
  • Designing and fabricating crate interior fittings and outer shells;
  • Providing specialized equipment, tools, and supplies needed to move the works;
  • Condition reporting and data entry of documentation into NMAH’s collection management system (Mimsy XG).  
  • Types of transportation vehicles include: vans, box trucks or other vehicles meeting the NMAH loading dock size limitations (13’3” high, 42’ long).  General standards for museum collections transportation vehicles are:

        1. The truck shall be equipped with air ride suspension, a working lift gate, pallet jacks, dual drivers, Constant Surveillance Service, and climate control.

        2. Climate must be maintained at 70 degrees, +/- 2 degrees over the duration of the trip.

        3. Smithsonian may monitor truck temperature, humidity GPS location and shock readings.

        4. Crates and packages shall be secured to prevent shifting or movement during transport and shall not be stacked.

        5. Pickup and delivery should occur during normal business hours and a schedule of the transit is to be submitted with the estimate.

        6. Stoppage time is not allowed.

D.    Rigging.  Provide all engineering and equipment expertise to install or deinstall large or suspended artifacts ranging from fine art works to vehicles. Specific objects known to require rigging are identified in the Scope of Work. Work includes:  

  • Producing engineering and architecture drawings;
  • Developing a safety plan;
  • Arranging suitable equipment including trucks, gantry, pallet jacks, personnel lifts, forklifts, and other handling equipment, hardware, and tools;
  • Fabricating supports and mounts in suitable size and shape, in compliance with applicable safety regulations and standards, and providing experienced and licensed or certified equipment operators.

Subcontracting Goals

The subcontracting goals for this project are: 40% with small business concerns. At least 7% of total planned subcontracting dollars shall be placed with Small disadvantaged businesses (SDB), including Historically Black Colleges and Universities or Minority Institutions; 7% with Women-owned small businesses (WOSB); 4% shall be placed with Hub-zone Small Businesses (HubSB), 4% with Veteran-owned small businesses (VOSB); and 4% with Service-Disabled Veteran-owned small businesses (SDV).
 

THE PROPOSAL DUE DATE IS WEDNESDAY, MARCH 19, 2025, AT 3:00 PM EASTERN STANDARD TIME.

Files

File Type Posted
33330225RF0010008 Amendment 0007.pdf PDF
33330225RF0010008 Amendment 0006.pdf PDF
143101 PRSP IV Collection Move Bid Schedule - REVISED 2025.07.xlsx XLSX spreadsheet
NMAH_Collections Move Bid RFIs_reponses_all_250320.pdf PDF
NMAH_Collections Move Bid RFIs_reponses_FollowUponly_250320.pdf PDF
AHB 2301_yellowForUncrating.pdf PDF
33330225RF0010008 Amendment 0005.pdf PDF
NMAH_Collections Move Bid RFIs_reponses_FollowUponly_250320.xlsx XLSX spreadsheet
AHB 2301_yellowForUncrating.xlsx XLSX spreadsheet
NMAH_Collections Move Bid RFIs_reponses_all_250320.xlsx XLSX spreadsheet
33330225RF0010008 Amendment 0004.pdf PDF
NMAH_Collections Move Bid RFIs_reponses_250314_all.pdf PDF
NMAH Collections Move Schedule_r1_250314.pdf PDF
2024 12 02 1403102_PSRP IV Collections Move_Multi-Year funding Document - R1 (Final).docx DOCX document
NMAH_Collections Move Bid RFIs_reponses_250314_revisedOnly.xlsx XLSX spreadsheet
NMAH_Collections Move Bid RFIs_reponses_250314_all.xlsx XLSX spreadsheet
25-03_11_PSRP4_CollectionsMove_PreBidRFIs_responses.xlsx XLSX spreadsheet
25-03_13_PSRP4_CollectionsMove_PreBidRFIs_responses.xlsx XLSX spreadsheet
Pod6_StorageEquipment_Conformed_color.pdf PDF
PSRP IV_AHB ROOM MAPS_LEGEND.pdf PDF
33330225RF0010008 Amendment 0003.pdf PDF
1403101_132000_PROTECTION OF EXHIBITS AND COLLECTIONS.pdf PDF
Creating Condition Reports during PSRP4 Move.pdf PDF
huey dimensions and schematic (1).jpg JPG image
NMAHequipment.pdf PDF
33330225RF0010008 Amendment 0002.pdf PDF
Jeep_WTCsteelDetails.pdf PDF
NMAH Plans-WorkAreas_with openingDims.pdf PDF
SI Magazine article_Huey install.pdf PDF
scan3 huey platform.zip ZIP file
PSRP4 Object Damage Incident Reporting.pdf PDF
PSRP IV Inventories_All_Final for RFP.xlsx XLSX spreadsheet
33330225RF0010008 Amendment 0001.pdf PDF
PSRP IV_Inventory Lists_By Room_Excel.zip ZIP file
Performance bonds.pdf PDF
04_Appendices.pdf PDF
2024 12 02 1403102_PSRP IV Collections Move_Multi-Year funding Document.docx DOCX document
Davis Bacon Building.pdf PDF
Davis Bacon Heavy.pdf PDF
Service Contract Act.pdf PDF
Contractor_COVID-19_Safety Protocols_LOW_3.30.22-eg.pdf PDF
Payment Bonds.pdf PDF
02_NMAH Plans-WorkAreas.pdf PDF
03_RoomInventories_Bookmarked.pdf PDF
143101 PRSP IV Collection Move Bid Schedule.xlsx XLSX spreadsheet
01_1403101_PSRP IV Collections Move_Specs.pdf PDF
1403101 NMAH PSRP IV Collections Move Solicitation Document.docx DOCX document
Clauses_33330225RF0010008.pdf PDF
Release of Claim Form.pdf PDF
Show all 49

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
National Museum of American History PSRP IV Collection Move Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Frsp museum collection install chatham NAICS 488991 — Total Small Business
PRESOLICITATION Small Business Construction IDIQ Washington, DC Metropolitan Region Washington, District of Columbia, United States · NAICS 236220 Smithsonian Institution Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors