The document is a procedures manual for Object Damage Incident Reporting for the Smithsonian Institution's National Museum of American History (NMAH) PSRP4 contract. The procedure outlines a five-step process for contractors to report and manage object damage: 1) Immediate notification to the Collections Point of Contact (CPOC) via email with incident details and photos, 2) CPOC review and initial assessment, 3) reporting to project stakeholders, 4) documentation in the museum's system, and 5) follow-up discussion in weekly project meetings. Emergency contacts are provided, including the NMAH Safety Coordinator, Health Unit, Security Control Room, and Building Management.

This incident reporting process is directly related to the PSRP IV Collection Move solicitation (33330225RF0010008), a $10+ million contract to relocate NMAH collections to the Suitland Collections Center. The solicitation includes comprehensive move services such as project management, packing, storage arrangements, physical transit, and rigging of museum artifacts. The contract has specific subcontracting goals: 40% with small businesses, including 7% with small disadvantaged businesses, 7% women-owned small businesses, 4% hub-zone businesses, 4% veteran-owned businesses, and 4% service-disabled veteran-owned businesses. The proposal is due on March 19, 2025, at 3:00 PM EST, with a 1,095-day performance period.

View the file

Other files

File Type Posted
33330225RF0010008 Amendment 0007.pdf PDF
143101 PRSP IV Collection Move Bid Schedule - REVISED 2025.07.xlsx XLSX spreadsheet
33330225RF0010008 Amendment 0006.pdf PDF
NMAH_Collections Move Bid RFIs_reponses_FollowUponly_250320.pdf PDF
AHB 2301_yellowForUncrating.pdf PDF
NMAH_Collections Move Bid RFIs_reponses_all_250320.xlsx XLSX spreadsheet
NMAH_Collections Move Bid RFIs_reponses_all_250320.pdf PDF
NMAH_Collections Move Bid RFIs_reponses_FollowUponly_250320.xlsx XLSX spreadsheet
33330225RF0010008 Amendment 0005.pdf PDF
AHB 2301_yellowForUncrating.xlsx XLSX spreadsheet
2024 12 02 1403102_PSRP IV Collections Move_Multi-Year funding Document - R1 (Final).docx DOCX document
NMAH_Collections Move Bid RFIs_reponses_250314_all.pdf PDF
NMAH Collections Move Schedule_r1_250314.pdf PDF
33330225RF0010008 Amendment 0004.pdf PDF
NMAH_Collections Move Bid RFIs_reponses_250314_all.xlsx XLSX spreadsheet
NMAH_Collections Move Bid RFIs_reponses_250314_revisedOnly.xlsx XLSX spreadsheet
25-03_13_PSRP4_CollectionsMove_PreBidRFIs_responses.xlsx XLSX spreadsheet
33330225RF0010008 Amendment 0003.pdf PDF
1403101_132000_PROTECTION OF EXHIBITS AND COLLECTIONS.pdf PDF
25-03_11_PSRP4_CollectionsMove_PreBidRFIs_responses.xlsx XLSX spreadsheet
Pod6_StorageEquipment_Conformed_color.pdf PDF
PSRP IV_AHB ROOM MAPS_LEGEND.pdf PDF
NMAHequipment.pdf PDF
33330225RF0010008 Amendment 0002.pdf PDF
Jeep_WTCsteelDetails.pdf PDF
SI Magazine article_Huey install.pdf PDF
Creating Condition Reports during PSRP4 Move.pdf PDF
huey dimensions and schematic (1).jpg JPG image
scan3 huey platform.zip ZIP file
NMAH Plans-WorkAreas_with openingDims.pdf PDF
PSRP IV Inventories_All_Final for RFP.xlsx XLSX spreadsheet
PSRP IV_Inventory Lists_By Room_Excel.zip ZIP file
33330225RF0010008 Amendment 0001.pdf PDF
1403101 NMAH PSRP IV Collections Move Solicitation Document.docx DOCX document
01_1403101_PSRP IV Collections Move_Specs.pdf PDF
Payment Bonds.pdf PDF
Contractor_COVID-19_Safety Protocols_LOW_3.30.22-eg.pdf PDF
Service Contract Act.pdf PDF
04_Appendices.pdf PDF
Clauses_33330225RF0010008.pdf PDF
Davis Bacon Building.pdf PDF
Davis Bacon Heavy.pdf PDF
2024 12 02 1403102_PSRP IV Collections Move_Multi-Year funding Document.docx DOCX document
Release of Claim Form.pdf PDF
Performance bonds.pdf PDF
02_NMAH Plans-WorkAreas.pdf PDF
143101 PRSP IV Collection Move Bid Schedule.xlsx XLSX spreadsheet
03_RoomInventories_Bookmarked.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PSRP4 Object Damage Incident Reporting

1 Notify PSRP4 contractors notify NMAH Collections Point of Contact (CPOC) via email immediately. Include the following information:

Incident location, object name and object number NMAH staff on site and witnesses Brief description of incident Photo of the damage

In case of injury or emergency, contact the relevant staff:

Roy Johnson, NMAH Safety Coordinator johnsonrm@si.edu, 202-633-3502

NMAH Health Unit South Wing NMAH Room 1270, 202-633-3670

NMAH Security Control Room 202-633-3970

Emergency Building Management 202-633-9300

2 Review NMAH CPOC follows up with PSRP4 contractors to review incident and determine next steps. NMAH CPOC assesses work area and photographs damage. If feasible, NMAH CPOC cleans up work area (e.g. sweep up broken glass). Depending on the severity and kind of the damage, the CPOC may request a work stoppage for staff safety until other NMAH staff can respond (e.g. Conservation or Office of Safety Health and Environmental Management).

3 Report NMAH CPOC contacts NMAH project COTR, PSRP4 contractors’ supervisor, appropriate curator, and Christina Simms (head of conservation) with summary of incident.

4 Document NMAH CPOC summarizes the incident in XG via the Damage Activity and submits photographs of the damage. See Damage Activity guidance on

. NMAH CPOC prepares and submits a to Registrar's Office via Jira.Confluence Smithsonian Institution Damage/Loss Report

5 Follow Up NMAH and contractors review details of the incident in the weekly project check in meeting. Discussion should include issues leading to the damage and ways to avoid future incidents. If necessary, NMAH CPOC will follow up with Conservation staff to sufficiently stabilize object for safe packing and transport to Pod 6. Conservation staff document any treatment in XG via the Condition and Conservation activities. Conservation staff may attach photographs of treatment to the Conservation activity.

The first four steps of this process ("Notify" through “Document”) should take place as soon as possible after the incident.

mailto:johnsonrm@si.edu https://confluence.si.edu/pages/viewpage.action?pageId=98075354 https://confluence.si.edu/pages/viewpage.action?pageId=98075354 https://confluence.si.edu/download/attachments/300253442/SI%20Damage%20Loss%20Report%20-%20TEMPLATE.pdf?version=1&modificationDate=1736890000000&api=v2