This document is a detailed technical specification (Section 132000) for protection of exhibits and collections during a museum renovation project at the National Museum of American History (NMAH). The specification provides comprehensive guidelines for protecting artifacts, objects, furnishings, and equipment during construction, including requirements for dust control, moisture protection, temperature and humidity management, and impact protection. Key protection methods include using fire-retardant materials, polyethylene barriers, silica gel dehumidifiers, rigid and soft impact protection systems, and careful handling procedures to prevent damage to irreplaceable museum items.

The specification is part of a larger $10+ million Smithsonian Institution contract (Solicitation Number 33330225RF0010008) for the NMAH PSRP IV Collection Move project, with a 1,095-calendar day performance period. The project involves moving collections within the American History Building to the Suitland Collections Center, including project management, packing, storage arrangements, physical transit of artifacts, and rigging services. The solicitation includes specific subcontracting goals: 40% with small businesses, with targeted allocations for small disadvantaged businesses (7%), women-owned small businesses (7%), Hub-zone businesses (4%), veteran-owned businesses (4%), and service-disabled veteran-owned businesses (4%). The proposal is due on Wednesday, March 19, 2025, at 3:00 PM Eastern Standard Time.

View the file

Other files

File Type Posted
33330225RF0010008 Amendment 0007.pdf PDF
143101 PRSP IV Collection Move Bid Schedule - REVISED 2025.07.xlsx XLSX spreadsheet
33330225RF0010008 Amendment 0006.pdf PDF
NMAH_Collections Move Bid RFIs_reponses_FollowUponly_250320.pdf PDF
AHB 2301_yellowForUncrating.pdf PDF
NMAH_Collections Move Bid RFIs_reponses_all_250320.xlsx XLSX spreadsheet
NMAH_Collections Move Bid RFIs_reponses_all_250320.pdf PDF
NMAH_Collections Move Bid RFIs_reponses_FollowUponly_250320.xlsx XLSX spreadsheet
33330225RF0010008 Amendment 0005.pdf PDF
AHB 2301_yellowForUncrating.xlsx XLSX spreadsheet
2024 12 02 1403102_PSRP IV Collections Move_Multi-Year funding Document - R1 (Final).docx DOCX document
NMAH_Collections Move Bid RFIs_reponses_250314_all.pdf PDF
NMAH Collections Move Schedule_r1_250314.pdf PDF
33330225RF0010008 Amendment 0004.pdf PDF
NMAH_Collections Move Bid RFIs_reponses_250314_all.xlsx XLSX spreadsheet
NMAH_Collections Move Bid RFIs_reponses_250314_revisedOnly.xlsx XLSX spreadsheet
25-03_13_PSRP4_CollectionsMove_PreBidRFIs_responses.xlsx XLSX spreadsheet
33330225RF0010008 Amendment 0003.pdf PDF
25-03_11_PSRP4_CollectionsMove_PreBidRFIs_responses.xlsx XLSX spreadsheet
Pod6_StorageEquipment_Conformed_color.pdf PDF
PSRP IV_AHB ROOM MAPS_LEGEND.pdf PDF
NMAHequipment.pdf PDF
33330225RF0010008 Amendment 0002.pdf PDF
Jeep_WTCsteelDetails.pdf PDF
PSRP4 Object Damage Incident Reporting.pdf PDF
SI Magazine article_Huey install.pdf PDF
Creating Condition Reports during PSRP4 Move.pdf PDF
huey dimensions and schematic (1).jpg JPG image
scan3 huey platform.zip ZIP file
NMAH Plans-WorkAreas_with openingDims.pdf PDF
PSRP IV Inventories_All_Final for RFP.xlsx XLSX spreadsheet
PSRP IV_Inventory Lists_By Room_Excel.zip ZIP file
33330225RF0010008 Amendment 0001.pdf PDF
1403101 NMAH PSRP IV Collections Move Solicitation Document.docx DOCX document
01_1403101_PSRP IV Collections Move_Specs.pdf PDF
Payment Bonds.pdf PDF
Contractor_COVID-19_Safety Protocols_LOW_3.30.22-eg.pdf PDF
Service Contract Act.pdf PDF
04_Appendices.pdf PDF
Clauses_33330225RF0010008.pdf PDF
Davis Bacon Building.pdf PDF
Davis Bacon Heavy.pdf PDF
2024 12 02 1403102_PSRP IV Collections Move_Multi-Year funding Document.docx DOCX document
Release of Claim Form.pdf PDF
Performance bonds.pdf PDF
02_NMAH Plans-WorkAreas.pdf PDF
143101 PRSP IV Collection Move Bid Schedule.xlsx XLSX spreadsheet
03_RoomInventories_Bookmarked.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

March 11, 2025 OFEO Project No. 1403101 NMAH PSRP IV - Collections Move Page 1 of 8

PROTECTION OF EXHIBITS AND COLLECTIONS 132000

SECTION 132000 – PROTECTION OF EXHIBITS AND COLLECTIONS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Design, install, and maintain protection of artifacts, storage units, furnishings, equipment, and immovable items through protecting-in-place within the areas areas affected by the work of the project.

B. Work Performed by Others:

1. Smithsonian Institution will relocate all furnishings, equipment, artifacts, archival materials, and other items that must be handled by curatorial staff prior to start of Work.

C. Many of the artifacts are original documents, art, or objects that cannot be replaced. Expend all efforts required to protect these items from damage.

1.3 DEFINITIONS

A. In this specification section, the term “Item” refers individually or collectively to the artifacts, objects, furnishings, and equipment housed in the areas to be protected, or removed from the area prior to protection.

1.4 INFORMATIONAL SUBMITTALS

A. Protection Work Plan: Submit a complete, coordinated, and detailed work plan, sequence, and methodology for the protection of each Item indicated on the Drawings. Provide drawing at scale 1:100 minimum.

1. Show locations of Work Area isolation partitions, type of partitions proposed for use, and proposed time frame for their operation. Show access routes to areas.

2. Indicate locations of protective covers and enclosures.

3. Indicate the dust- and HVAC-control measures proposed for use.

4. Show waste handling procedures.

5. Identify further options if proposed measures are later determined to be inadequate.

6. Include details of proposed protection.

B. Sequence and Schedule: Develop a complete and detailed sequence of events and schedule addressing the dates and time for procurement, prefabrication, installation, and removal of protection, as dictated by the Work progress. Include this sequence and schedule as part of the

NMAH PSRP IV - Collections Move Page 2 of 8 overall project schedule addressed in Division One. Update this schedule with the progress schedule and make it available for require at the same time as the progress schedule.

C. Qualification Data: For applicable Sub-Contractors documenting qualifications listed in “Quality Assurance.”

1. Include a list of successfully completed project over the last five years. Include the following:

a. Project name.

b. Project location

c. Project Description and Date Complete.

d. Description of this Contractor’s Role

e. Name of Contractor’s Team Members involved in the Project

f. Name, Title, and Phone Number of the Client.

2. Should separate subcontractors be selected for object protection and lighting work, provide Qualification Data for each subcontractor for the relevant work.

D. Product Data: Submit product data for all materials and systems to be utilized for the execution of the Work. See Part 2 – Products.

E. Samples: Provide samples of material specified and required for the work.

F. Field Documentation: Prior to the start of the protection and with the COTR in attendance, document the conditions of all Items to be protected. Follow requirements of Division One, paragraph 39. Submit to the COTR.

1.5 QUALITY ASSURANCE

A. Installer Qualifications: A firm experienced in design, installation and removal of successful exhibit and collection protection systems similar in purpose and extent to those required for this project.

1.6 PROJECT CONDITIONS

A. The National Museum of American History will remain fully occupied during the Work. While some individual spaces may be closed during work, others will remain partially occupied.

PART 2 - PRODUCTS

2.1 GENERAL PERFORMANCE REQUIRMENTS

A. Adhesives

1. Where adhesives are required for fabrication of protection systems, use only according to manufacturer’s recommendations. Apply in well ventilated space, away from areas accessible by Staff if possible. Thoroughly cure materials prior to location material in close proximity to Items. Insure out-gassing chemicals are harmless to Items.

NMAH PSRP IV - Collections Move Page 3 of 8

B. Condensation

1. Protect Items covered for dust and impact protection from condensation with materials designed and manufactured for that specific purpose. Arrange protection to permit air circulation. Protection material placed against Item surface shall have a breathable buffer. Provide vents to permit air circulation.

C. Dust Protection

1. Protect all Items from dust generated for the Work of Project. Apply dust protection to Items or provide protection by the installation of barriers or curtains.

D. Fire-safety Requirements

1. All materials shall conform to the following:

a. Flame Spread: 0 - 25 (ASTM E84)

b. Smoke Contribution: 0 – 450 (ASTM E84)

2. Fire Retardant Treated Wood

a. Fire retardant treatments impregnated into the materials for fire resistance shall have minimal hygroscopicity according to American Wood-Preservers Association Standards C-20 and C-27.

b. Fire Retardant treatments impregnated into the materials for fire resistance shall not be corrosive.

c. Fire retardant treatments shall be approved by the Smithsonian Institution Office of Environmental Management and Safety for performance the Smithsonian’s Conservation and Analytical Laboratory for Conservation.

d. Manufacturer: Hickson Dricon FRTW or approve equal.

3. Fire Resistant Drape

a. Apply a fire resistant drape over Items to be protected in place. Flame resistant drape materials shall be approved by the COTR.

4. Scaffolding, Ladders and lifts:

a. Where ladders, lifts, or scaffolding is required around or over Items to be protected, follow guidelines set forth in Division One, paragraph 36.

5. Sudden Movements, Jolts, and Impacts:

a. Protect all Items from sudden movements, jolts, and impacts resulting from working on in in close proximity to any Items. Insure there is sufficient clearance separating the work or activity from any Item or from the protective barrier to the protected Item. Adjust clearance as required to avoid sudden movements, jolts, and impacts.

6. Vibration Isolation:

NMAH PSRP IV - Collections Move Page 4 of 8

a. Isolate all Items (both Impacted and Non-Impacted) from vibration caused by protection and Project Work.

2.2 MATERIALS

A. Plywood: 13mm fire-retardant plywood sheets.

B. Lumber: fire-retardant wood blocking and spaces.

C. Polyethylene Sheet: Reinforced, fire-resistive sheet, 0.25-mm minimum thickness, with flame-spread rating of 15 or less per ASTM E 84 and passing NFPA 701 Test Method 2.

D. Dust-Control Adhesive-Surface Walk-off Mats: Provide mats minimum 914 by 1624 mm.

E. Protective Foam: Fire retardant, thickness as required for impact performance, minimum thickness (by ply or total) = 50 mm. Material to be Voltek, Volara Type AFR, Dow Ethafoam, Fire Retardant Foam, or approved equal.

F. Tape – select for appropriate use: Duct Tape, Nylon Reinforced tape, Masking Tape, Painters Tape, etc.

G. Chemical De-humidifiers: Silica Gel in closed containers.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Coordinate installation of protection in advance of the start of the renovation. Provide each component ready for use when needed to avoid delay. Do not remove until protection is no longer needed.

B. Prefabricate protection components and acquire equipment and materials needed well in advance of the time they will be needed. Prefabricate segment, pieces, parts, or modules of the size and weight to permit easy movement into and around the building without requiring special access points or shoring or bracing off of wall, ceilings, or floors. Prefabricated segments, pieces, parts, or modules shall be of the size and weight to permit safe handling and installation in close proximity to the Items, and cannot represent a greater risk to the Items that they are design to protect than the adjacent construction.

C. Move and adjust the protection as the project work progresses.

D. Monitor the condition of the Items protected. Correct conditions adversely affecting the Items.

Notify the COTR on the condition of the Items.

E. Modify, cut, or alter the protection to accommodate the project work or existing conditions.

These modification and alterations shall not compromise the effectiveness of the protection.

F. Remove protection upon completion of the work in the protected areas.

NMAH PSRP IV - Collections Move Page 5 of 8

G. Repair damage caused by the installation and removal of the protection to the Items and the Building. Damaged Items must be restored to the pre-construction conditions. Where determined by the COTR, the Contractor shall reimburse the Smithsonian Institution for restoration of Items damaged by the Contractor’s work.

H. Clean by appropriate means each Item as required prior to installation of protection. Cleaning procedures and materials shall be approved by the COTR.

I. Where repair or restoration of a damage item or component of the building is not possible, the Contractor shall replace the Item or component. Acceptance of the replacement shall be at the sole discretion of the COTR.

3.2 SPECIFIC PERFORMANCE REQUIREMENTS

A. Dust Protection for Items: Where required for the proper protection of Items, follow the guidelines set forth below. Protect each Item against dust and the resultant deterioration and damage.

1. Draw polyethylene dust barriers tight and anchor on all sides. Where required, protect barrier to prevent contact with Item. Stretch polyethylene tautly, fold under itself at the edges, and anchor properly using duct tape plus ½’ staples or wood slate and drywall screws. Use tape to seal the enclosure, not to create it.

2. Submit the shop drawings and manufacturer’s technical information for to use. Drawings are to depict the Contractor’ proposed methods of protecting The Items from dust, dirt, and impact.

3. Venting: where venting is required in barriers to maintain temperature and humidity, provide filtered vents of the size and location to permit the circulation of ambient building air.

4. Adhesive Tapes: Seal dust barrier and drape seams against dust and moisture with appropriate plastic adhesive tapes that are moisture resistant and dust tight. Under no circumstance shall the Contractor apply tape directly to the item.

5. Buffer: Where dust protection is applied directly to an Item and the dust membrane comes in contact with metal, wood, painted, or cloth surfaces or any surface affected by moisture, apply a buffer between the surface and the dust barrier. This buffer shall be lightweight, breathable, non-abrasive, and chemically inert covering – DuPont’s Nomex or approved equal.

B. Moisture Protection for Items: Where required for proper protection of Items, provide polyethylene barrier similar to Dust barrier specified above.

1. Examine spaces for drip pans or other areas that exhibit leaking, and take precautions against spilling water in Items.

2. While piping will be drained prior to capping and removal, residual water may remain in pipes or other devices. Take care that water does not drip on Items.

3. Remove any water that spills during system or ceiling demolition, and dry surfaces.

C. Temperature and Humidity Protection for Items: Protect each Item against changes in humidity and against condensation, and the resultant deterioration and damage.

1. Maintain normal museum temperature and humidity levels during construction.

NMAH PSRP IV - Collections Move Page 6 of 8

2. Provide monitoring equipment where required by DOTR. Monitor for maintenance of recommended temperature and humidity levels. Submit the equipment and chemical de-humidifier manufacturer’s technical information prior to use.

3. Contain silica gel in porous containers to permit the free passage of air over the chemical.

4. Do not allow silica gel or the container to come into direct contact with the Item.

5. Periodically inspect containment and dehumidification chemical. Replace as needed.

D. Impact Protection for Items: Where required for the proper protection of Items, protect each Item against impact and the resultant damage.

1. See Prototypical Details on Drawings for recommended approach to protection of Items.

2. Rigid Protection: Provide rigid protection on horizontal surfaces where items are impacted by work directly above, on vertical surfaces of glass-front cabinets, and any other circumstances that require enhanced protection.

a. Performance: Design rigid protection to protect the specific Item against impact or contact. The horizontal protection shall stop for penetration a 100 kilogram object with a contact area of .5 square meters dropped from 8 meters. The vertical protection must stop a lateral force of 100 kilogram without movement, racking, or shifting.

b. Prefabrication: Prefabricate rigid protection system off site to the greatest extent possible. Brace prefabricated section to permit movement and installation without racking. Assemble in space using handtools only.

c. Mobility: Design rigid protection to be easily placed around and over the Item.

Provide units that can be lifted and moved by hand, or with the use of rolling carts or platforms

d. Venting: Provide venting high and low for natural convection. Size and place vents to allow air flow through case. Provide filters at vents for dust.

e. Buffer: Separate Item from Rigid Protection with rosin paper, polyethylene, neoprene, or other archival sheeting material.

3. Soft Impact Protection: Provide soft protection where rigid performance is not required, or for irregularly-shaped objects not requiring rigid protection.

a. Performance: Design soft protection to protect the specific Item against impact or contact. The horizontal protection must stop a .5 kilogram with a 25 mm diameter contact surface dropped from 3 meters.

b. Prefabrication: Prefabricate soft protection off site to the greatest extent possible.

c. Mobility: Protection shall be easily placed around and over the Item.

d. Buffer:

e. Tapes and Adhesives: Do not apply tapes or adhesives to Items requiring protection.

4. Protection for Floors and Floor Coverings

a. Apply protection to floors were indicated. Apply protection prior to the start of the work, and remove upon completion. See Drawings.

E. Installation

NMAH PSRP IV - Collections Move Page 7 of 8

1. Install protective systems carefully. Stage and phase work as not to interfere with museum operations, the progress of other work , or emergency egress. The protection for the Items shall be in place, complete, and effective prior to the start of the construction work.

F. Barricades, Warning Signs, and Lights: Comply with requirements of authorities having jurisdiction for erecting structurally adequate barricades, including warning signs and lighting.

G. Temporary Egress: Maintain temporary egress from existing occupied facilities as indicated and as required by authorities having jurisdiction.

H. Cleaning: Periodically clean the protection system of accumulated dust and debris. Do not allow dust or debris to accumulate on surface of protection systems..

I. Removal: After permanent construction operations have been complete, and as approved by the COTR, carefully remove the protection. Call all protection of dust and debris prior to removal.

Take extreme care to avoid dust migration and damage to the Items during removal of the protection.

J. Repair: repair any damage to the Item caused by its protection and/or the renovations. The survey conducted prior to the install shall be used as the base line for the condition of the Item prior to the protection. Restoration work of the damage shall be at the cost of the Contractor.

END OF SECTION 13 2000