Multiple Award Construction Contract (MACC)

Award Notice Posted

Solicitation number
FA8101-09-R-0021
Agency
Awarded
to Ross Group Construction Corporation, LLC
Set-aside
Total Small Business

Opportunity facts

Contract number
FA8101-10-D-0002 Federal IDV award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Tinker AFB Tinker AFB, Oklahoma 73145, United States

Notice details come from SAM.gov. Updated .

Notice text

The MACC program represents a multiple award construction acquisition for design and construction activities at TAFB. Indefinite delivery indefinite quantity (IDIQ) firm fixed price contracts will be awarded to up to six contractors who illustrate their comprehensive understanding of the statement of work (SOW) and adherence to the terms and conditions presented in the solicitation. The MACC contracts will be for one basic year with four, one-year options. Individual project scopes shall be awarded in compliance with Fair Opportunity requirements of the solicitaion as task orders against the basic contract. The MACC program has a cumulative value for all basic contracts awarded not to exceed $100 million.


Work shall consist of multiple disciplines in general construction categories and may involve design services for execution of a broad range of maintenance, repair, alteration, and minor construction projects affecting real property at TAFB. The contractors shall provide diversified design-build or construction only services and activities to support those designs, including Value Engineering (VE) and Leadership in Energy and Environmental Design (LEEDTM) analyses.


The MACC program contractors will perform both conventional and fast-track design-build (construction) activities for TAFB in support of the Base Civil Engineer's real property Sustainment, Restoration, and Maintenance (SRM) and Depot Maintenance Activity Group (DMAG) programs for facilities and infrastructure base-wide. Conventional design-build is the process by which the same contractor provides both the design and construction activities for a project, completing the design before construction activity begins. Fast-track design-build is the process by which the same contractor performs both the design and construction activities for a project, beginning construction at a mutually agreed point prior to completion of the design and construction drawings.


 

Files

File Type Posted
MACC SOW WWYK070088 Revision 5.pdf PDF
RFI Response 168.doc DOC document
FA8101-09-R-0021-0009.pdf PDF
rfi 167 and 163 update.pdf PDF
RFI Response 161-166.doc DOC document
SOW070088 SOW Rev 4.pdf PDF
SOW070244 SOW Rev 3.pdf PDF
FA8101-09-R-0021-0008.doc DOC document
FA8101-09-R-0021-0007.doc DOC document
Question-Answers #5 to FBO.pdf PDF
070244 SOW Rev 2.pdf PDF
FA8101-09-R-0021-0006.pdf PDF
070088 SOW Rev 2.pdf PDF
070094 Dwg M3 00 redline Rev 2.pdf PDF
070094 Dwg M5 01 redline Rev 1.pdf PDF
2009 Base Facility Standard with 2007 ACP Included in Chap 13.pdf PDF
BoilerPlateLanguage.pdf PDF
Electrical Base Stds 2007.pdf PDF
070094 Dwg A6 00 Rev 1.pdf PDF
070094 Spec 15400 - Rev 1.pdf PDF
FA8101-09-R-0021-0005.doc DOC document
MACC Curtain Wall Model-1.pdf PDF
fa8101-09-r-0021-0004.doc DOC document
070244 SOW - Rev 1.pdf PDF
060367 Dwgs - Rev 1.pdf PDF
070094 Spec 01110 - Rev 1.pdf PDF
070094 Dwgs - Rev 1.pdf PDF
070088.zip ZIP file
070295 Spec 01 11 00 - Rev 1.pdf PDF
950028 Asbuilt.pdf PDF
060367 Spec 01 11 00 - Rev 1.pdf PDF
070085 Spec 01 11 00 - Rev 1.pdf PDF
070244.zip ZIP file
070088 SOW - Rev 1.pdf PDF
Question-Answers #2 to FBO.pdf PDF
FA8101-09-R-0021-0003.pdf PDF
Questions-Answers #1 to FBO.pdf PDF
Amendment 0002.pdf PDF
070244 As-Builts 3.zip ZIP file
070244 As-Builts 1.zip ZIP file
070244 As-Builts 2.zip ZIP file
MACC Presolicitation Bus Tour 7-16-09.pdf PDF
Asbuilts 950028 AHU_5-6-7.pdf PDF
Pre-Proposal Conference Minutes.pdf PDF
SEED PROJECT PRICING Revision 1 7AUG.pdf PDF
Pre-Proposal Charts - Final.ppt PPT presentation
3001 UTILITIES.zip ZIP file
Ventilation Bldg 3001 Tinker.doc DOC document
070244 Spec 09612.pdf PDF
03_070088 FP01-Layout1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity