FA8101-09-R-0021-0006.pdf

PDF 44 KB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA8101-09-R-0021
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

Amendment 0006

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
RFI Response 168.doc DOC document
FA8101-09-R-0021-0009.pdf PDF
RFI Response 161-166.doc DOC document
SOW070244 SOW Rev 3.pdf PDF
FA8101-09-R-0021-0008.doc DOC document
Question-Answers #5 to FBO.pdf PDF
2009 Base Facility Standard with 2007 ACP Included in Chap 13.pdf PDF
Electrical Base Stds 2007.pdf PDF
070094 Dwg M3 00 redline Rev 2.pdf PDF
070094 Dwg M5 01 redline Rev 1.pdf PDF
BoilerPlateLanguage.pdf PDF
070094 Dwg A6 00 Rev 1.pdf PDF
070094 Spec 15400 - Rev 1.pdf PDF
MACC Curtain Wall Model-1.pdf PDF
fa8101-09-r-0021-0004.doc DOC document
070094 Spec 01110 - Rev 1.pdf PDF
070295 Spec 01 11 00 - Rev 1.pdf PDF
070085 Spec 01 11 00 - Rev 1.pdf PDF
070088 SOW - Rev 1.pdf PDF
060367 Dwgs - Rev 1.pdf PDF
070088.zip ZIP file
060367 Spec 01 11 00 - Rev 1.pdf PDF
070094 Dwgs - Rev 1.pdf PDF
950028 Asbuilt.pdf PDF
Amendment 0002.pdf PDF
070244 As-Builts 3.zip ZIP file
070244 As-Builts 2.zip ZIP file
MACC Presolicitation Bus Tour 7-16-09.pdf PDF
SEED PROJECT PRICING Revision 1 7AUG.pdf PDF
Ventilation Bldg 3001 Tinker.doc DOC document
Pre-Proposal Conference Minutes.pdf PDF
070244 Spec 09612.pdf PDF
B3001 070094 KTR Route.pdf PDF
060367 AF66 Rev 1.pdf PDF
03_070088 FP01-Layout1.pdf PDF
FA8101-09-R-0021-0001.pdf PDF
Attachment14C.zip ZIP file
Attachment14.zip ZIP file
Attachment14B.zip ZIP file
Attachment 1 - Current Davis Bacon Wage.pdf PDF
Attachment 17.zip ZIP file
Attachment 16.zip ZIP file
Attachment 15.zip ZIP file
Attachment 12.zip ZIP file
SEED PROJECT PRICING.docx DOCX document
Atch 4 - POC listing.doc DOC document
AF 66 SAMPLE.pdf PDF
Atch 8 - subteam consent to release PP info to prime.doc DOC document
Atch 7 - Client auth letter.docx DOCX document
Atch 6 - Consent letter.doc DOC document
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate revised attachments in Section J and correct an inadvertent clerical error in FAR 52.204-8.

***The hour and date specif ied for receipt of Offer is hereby extended FROM 12:00 PM on 14 SEP 09 TO 12:00 PM on 18 SEP 09.***

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Sep-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8101-09-R-0021

X 9B. DATED (SEE ITEM 11)

29-Jun-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Sep-2009

CODE

72 CONS/PKBA

KIMBERLY DELONG/405-739-3930

7858 5TH ST STE 1

TINKER AFB OK 73145-9125

FA8101 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA8101-09-R-0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following changes are hereby incorporated in solicitation FA8101-09-R-0021:

FIRST: The closing date for acceptance of offers is hereby extended:

FROM: 12:00 PM on 14 SEP 09 TO: 12:00 PM on 18 SEP 09

SECOND: Section J-List of Documents, Exhibits and Other Attachments, has been amended to include revised attachments, listed in bold font:

ATTACHMENTS

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Current Davis Bacon Wage

(for Reference Only) 17 per DBWD

Attachment 2 Statement of Work and

Technical Specifications 228 30 Apr 09

Attachment 3 AF Form 66 9

Attachment 4 POC Listing 1

Attachment 5 Seed Project Pricing- Rev 1 1 7 Aug 09

Attachment 6 Consent Authorization Letter 1

Attachment 7 Client Authorization Letter 1

Attachment 8 Subcontractor/Teaming Partner

Consent Form for Release of Past

Performance Information from

Prime Contractor 1

Attachment 9 Past Performance Questionnaire 4

Attachment 10 Performance Questionnaire Letter 1

Attachment 11 Past Performance Information Sheet 2

Attachment 12 Seed Project A: Design/Build

WWYK070088 Repair Break Area Col 2O93 B/3001

Statement of Work- Rev 2 6 11 SEP 09

Drawings 2 17 JUN 09

Drawing (FP01) 1 17JUN 09

As-Builts (070088) 4 AUG 09

AF Form 66- Rev 1 2 7 AUG 09

Wage Determination 5 26 JUN 09

OK080034

Ventilation Building 3001 3

Attachment 13 Seed Project B: Design/Build

WWYK070244 – Repair/Renovate First Floor B/2122

Statement of Work- Rev 2 9 11 SEP 09

Section 09612 20 4 AUG 09

Drawings 7 30 MAR 09

Drawings (FP01 & FP02) 2 14 JUL 08

As-Builts (070244) 20 JUL 09

As-Builts (950028) 4 AUG 09

Back Shop Footprint 1 4 AUG 09

AF Form 66- Rev 1 2 7 AUG 09

Wage Determination 5 26 JUN 09

Attachment 14 Seed Project C: Construction Only

WWYK070295- Replace Emergency Lighting B/3001

Statement of Work 207 31 DEC 08

Section 01 11 00 6 7 AUG 09

Drawings 18 29 DEC 08

AF Form 66- Rev 1 3 7 AUG 09

Wage Determination 5 6 FEB 09

Attachment 15 Seed Project D: Construction Only

WWYK060367- Renovate Madppc Space B/3703

Statement of Work 575 24 MAR 09

Section 01 11 00 4 AUG 09

Drawings 23 19 FEB 09

Rev 1- A501, F101, F102 3 19 AUG 09

AF Form 66- Rev 1 4 7 AUG 09

Attachment 16 Seed Project E: Construction Only

WWYK070085- Replace Lighting in Backshop Metal Halide

Lighting B/3001

Statement of Work 204 31 DEC 08

Section 01 11 00 5 7 AUG 09

Drawings 13 29 DEC 08

AF Form 66- Rev 1 3 7 AUG 09

Attachment 17 Seed Project F: Construction Only

WWYK070094- Repair/Renovate Restrooms PH3 B/3001

Statement of Work 423 14 JAN 08

Section 01 11 00 3 17 AUG 09

Section 15400 36 28 AUG 09

Drawings 25 14 JAN 08

Rev 1- D1.00, A1.00, A6.00 (27 AUG 09), A7.00, M1.01, M1.02, M2.00, M3.00, M4.00, M5.00, M5.01 (27 AUG 09), E1.00, E2.00, E3.00, E4.00 13 19 AUG 09

Rev 2- M3.00 1 27 AUG 09

KTR Route B3001 1

AF Form 66- Rev 1 5 7 AUG 09

Attachment 18 Base Standards for Building/Utility 17 JAN 07

Electrical Distribution Systems/Tele-Data

Communications

Attachment 19 Affirmative Procurement Plan 4 23 SEP

Attachment 20 Tinker Air Force Base Facility Standard 128 2009 THIRD: FAR 52.204-8, paragraph (a)(2) in Section K-Representations, Certifications and Other Statements of

Offerors is hereby amended as follows:

FROM: (2) The small business size standard $13M. TO: (2) The small business size standard $33.5M.

***FOR COMPUTER PURPOSES ONLY***

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 14-Sep-2009 12:00 PM to 18-Sep-2009 12:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .