Question-Answers #5 to FBO.pdf

PDF 57 KB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA8101-09-R-0021
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

Responses to Questions #5, RFI's #158-160

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
MACC SOW WWYK070088 Revision 5.pdf PDF
RFI Response 168.doc DOC document
FA8101-09-R-0021-0009.pdf PDF
RFI Response 161-166.doc DOC document
SOW070244 SOW Rev 3.pdf PDF
FA8101-09-R-0021-0008.doc DOC document
SOW070088 SOW Rev 4.pdf PDF
2009 Base Facility Standard with 2007 ACP Included in Chap 13.pdf PDF
Electrical Base Stds 2007.pdf PDF
070094 Dwg M3 00 redline Rev 2.pdf PDF
MACC Curtain Wall Model-1.pdf PDF
fa8101-09-r-0021-0004.doc DOC document
070094 Spec 01110 - Rev 1.pdf PDF
070295 Spec 01 11 00 - Rev 1.pdf PDF
070085 Spec 01 11 00 - Rev 1.pdf PDF
070088 SOW - Rev 1.pdf PDF
060367 Dwgs - Rev 1.pdf PDF
070088.zip ZIP file
060367 Spec 01 11 00 - Rev 1.pdf PDF
070244 SOW - Rev 1.pdf PDF
Amendment 0002.pdf PDF
070244 As-Builts 1.zip ZIP file
MACC Presolicitation Bus Tour 7-16-09.pdf PDF
SEED PROJECT PRICING Revision 1 7AUG.pdf PDF
Ventilation Bldg 3001 Tinker.doc DOC document
Asbuilts 950028 AHU_5-6-7.pdf PDF
Pre-Proposal Charts - Final.ppt PPT presentation
070244 Spec 09612.pdf PDF
B3001 070094 KTR Route.pdf PDF
060367 AF66 Rev 1.pdf PDF
070295 AF66 Rev 1.pdf PDF
070094 AF66 Rev 1.pdf PDF
070244 AF66 Rev 1.pdf PDF
back shop foot print.xlsx XLSX spreadsheet
070088 AF66 Rev 1.pdf PDF
Attachment14C.zip ZIP file
Attachment14.zip ZIP file
Attachment14B.zip ZIP file
Attachment 1 - Current Davis Bacon Wage.pdf PDF
Attachment 17.zip ZIP file
Attachment 16.zip ZIP file
Attachment 15.zip ZIP file
Attachment 12.zip ZIP file
Attachment 13.zip ZIP file
SEED PROJECT PRICING.docx DOCX document
Atch 4 - POC listing.doc DOC document
AF 66 SAMPLE.pdf PDF
Atch 8 - subteam consent to release PP info to prime.doc DOC document
Atch 9 - PP Questionnaire.doc DOC document
Atch 11 - past perf inform.doc DOC document
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question/Answers #5

14 September 2009

The questions and answers below comprise all questions submitted by contractors from 2 SEP

09- 11 SEP 09. If there is a question that isn’t included in this document and was submitted, please contact A1C Kimberly DeLong at kimberly.delong@tinker.af.mil.

RFI

# Subject Question/Answer

158 Design/Build

Reference responses to “Questions/Answers #1” dated 13 August

2009, RFI no. 1, and “Questions/Answers #2” dated 20 August 2009, RFIs no. 108, 117, and 135 seem to conflict. For practical purposes, most A/E’s will be reluctant to sign and seal 100% drawings and specifications without having first having performed a thorough site inspection/evaluation (which could not be provided for the MACC proposal participants owing to logistical and time constraints). It would appear that the successful Offerors for seed projects A and B would then be afforded an opportunity to conduct a thorough site inspection/evaluation subsequent to notice of intent to award, and then sign and seal the drawings and specifications. The response to

“Questions/Answers #2” RFI no. 108 seems to concur with this approach. The responses to “Questions/Answers #1” RFI no. 1 and

“Questions/Answers #2” RFI no. 117 disagree with this approach, while “Questions/Answers #2” RFI no. 135 is less clear. Please confirm the requirement for the seed project submission.

***This answer supercedes all answers previously provided by the government in regards to this subject.***

Offerors will be required to provide completed (100%) design drawings, specifications, design analysis and supporting documentation as specified in the contract documents. These documents are not required to be signed and sealed. After award of the contract the contractor will be allowed to visit the site and perform a thorough site investigation. A conference with Government personnel shall be held to discuss any changes that need to be made as a result of the site visit and the design philosophy in general. A reasonable time will be given to the contractor to finalize the changes.

The Government will review and agree with the changes before the contractor seals the final design. Once design has been sealed contractor may move forward to construction.

All subsequent full design-build task orders (as defined in Section A paragraph 1.1.1 of MACC SOW) awarded under the basic contract will require 100% design documents to be signed and sealed.

mailto:kimberly.delong@tinker.af.mil

Minimal design-build task orders (as defined in paragraph 1.1.2 of the

MACC SOW) will generally not require signed/sealed drawings unless indicated in the statement of work for the individual task order.

The 42 division Unified Facility Guide Specifications along with the

Tinker Specifications provided in Section F of the MACC Contract

Statement of Work will be used as the basis for all specifications generated in support of task orders awarded under this contract (seed projects and task orders subsequent to award). These specifications are to be edited to meet the requirements of each individual task order.

The offerors may obtain editable versions of the UFGS by downloading either the UFGS Master (which contains all sections of the UFGS) or the individual sections. UFGS specifications are edited using the program SpecsIntact, available at:

http://www.wbdg.org/ccb/browse_org.php?o=70 or http://specsintact.ksc.nasa.gov.

159 Contracting

Section L- G. Volume 3 Cost/Price Proposal paragraph 3 states

“NOTE: All sections, (Sections A through K), of the SF 1442 must be returned to be considered responsive to the solicitation requirements”.

Please confirm that this is required.

Yes, follow all instructions in Section L of the solicitation.

160 Contracting What are the procedures for dropping off proposals?

If a contractor needs access to Tinker AFB to drop off their proposal, they shall contact either Sharla Flowers or A1C Kimberly DeLong at

405-739-4189 or kimberly.delong@tinker.af.mil and sharla.flowers@tinker.af.mil .

mailto:kimberly.delong@tinker.af.mil mailto:sharla.flowers@tinker.af.mil

File details come from the government source that posted it. Updated .